6933A224Q000010 Amd 0001.pdf

PDF 1 MB Posted

Attached to
TRAINING VESSEL KINGS POINTER (TVKP) FY 25 REGULATORY DRY DOCK
Solicitation number
6933A224Q000010
Issued by

About this file

This document is an amendment to Solicitation Number 6933A224Q000010 for TRAINING VESSEL KINGS POINTER (TVKP) FY 25 REGULATORY DRY DOCK. The amendment updates the Statement of Work and provides answers to questions from potential offerors. The estimated period of performance is from 01/14/2025 to 02/20/2025. The solicitation is for industrial support to perform dry dock repairs on the TVKP, with a firm fixed price purchase order anticipated. Quoters are to submit pricing for all materials, dry dock, services, equipment and labor required on the vendor price sheet. The bid area is limited to shipyards on the United States East Coast, and a site visit was held on 07/09/2024. The solicitation is issued by the Department of Transportation Maritime Administration.

View the file

Other files

File Type Posted
6933A224Q000010 Amd 0002.pdf PDF
Attmt I TVKP 2025 DD SOW V14.pdf PDF
msd base.pdf PDF
Fly Bridge Receiver 1 .pdf PDF
Attmt II TSKP FY25 DD Vendor Price Sheet (SECTION B).xlsx XLSX spreadsheet
Fly Bridge Receiver Name Plate.pdf PDF
Tow Winch 1.pdf PDF
Q and A TVKP Drydock 2025 Rev2.pdf PDF
tow winch 2.pdf PDF
Air Receiver 302469 .pdf PDF
1547-5280 Compressed Air Diag. Mod Rev. 5 .pdf PDF
tow winch 3.pdf PDF
Attmt I TVKP 2025 DD SOW V13.pdf PDF
Air Receiver 302469.pdf PDF
1547-4705_Rudder Details.pdf PDF
ABS Rules Part 7 Chapter 6.pdf PDF
Anchor Windlass Pic1.jpg JPG image
2020 NFSY Megger Readings.doc DOC document
Sherwin Williams Coating Spec 04122024.pdf PDF
GMD Kings Pointer Zinc Anodes 2022.pdf PDF
Kickpipe Pic 1.jpg JPG image
TVKP Critical Gauges 12-2022.xls XLS spreadsheet
2022 GMD SHIPYARD Anchor Chain Gauging.pdf PDF
1547-4411 Rev 5 Machinery Arrgmt.pdf PDF
ABS Rules Part 7 Chapter 5 Sections 1 and 2.pdf PDF
1547-5235_1 Piping Sewage and Deck Drains.pdf PDF
2022 RUDDER CLEARANCE MEASUREMENTS from GMD.xlsx XLSX spreadsheet
TSKP FY25 CSS 6933A224Q000010 REV 2.pdf PDF
Fly Bridge Receiver 1.pdf PDF
2020 Tailshaft Readings.pdf PDF
1547-2510 Rev 7 Longitudinal Struct Sections.pdf PDF
Tank Plan ST Locations.pdf PDF
T.S. Kings Pointer - Asbestos Survey Report - Sept. 2020 (Rev. 1).pdf PDF
Kickpipe Pic 2.jpg JPG image
Sullair ES6.pdf PDF
1547-4701 Rev 3 Rudder Arr.pdf PDF
1547-5235_2 Piping Sewage and Deck Drains (1).pdf PDF
1547-5250 Vents Rev 7 Vents Piping diagram.pdf PDF
TV KINGS POINTER Docking Calculations.pdf PDF
Anchor Windlass Pic2.jpg JPG image
KINGS POINTER Tank Tables 15 Oct 13.pdf PDF
KINGS POINTER MEGGER READINGS blank.docx DOCX document
Attmt II TSKP FY25 DD Vendor Price Sheet.xlsx XLSX spreadsheet
MA-57 Drydock Report.pdf PDF
1547-5280 Compressed Air Diag. Mod (Rev. 5).pdf PDF
W O Knife Gate.pdf PDF
BNA TVKP Bow Thruster Report 2022.pdf PDF
1547-3620_1 Rev 1 Insulation Plan.pdf PDF
TVKP Stack Drain Pic.jpg JPG image
Section 2.6 of TE1 through TE6.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

6933A224Q000010 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

6933A2

NORFOLK VA 23505

7737 HAMPTON BLVD BLDG 19 STE 300

DIVISION OF ATLANTIC OPERATIONS

MARITIME ADMINISTRATION

07/11/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/03/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment updates Statement of Work and provides answers to questions from potentials offerors.

Estimated Period of Performance: 01/14/2025 to 02/20/2025.

15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

WILLIAM A. WILE FOR KAREN TEMPEST

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

william.wile Typewritten Text 7/11/2024 william.wile Alans Stamp

File details come from the government source that posted it. Updated .