2020 NFSY Megger Readings.doc

DOC document 62 KB Posted

Attached to
TRAINING VESSEL KINGS POINTER (TVKP) FY 25 REGULATORY DRY DOCK
Solicitation number
6933A224Q000010
Issued by

About this file

The document provided is a megger insulation test report for various electrical cables onboard the ship Kingspointer at the North Florida Shipyards, Inc. (NFSY) shipyard. It lists the cable type, circuit ID, conductor ID, lead color, terminal points, and megger readings for satisfactory or unsatisfactory insulation and continuity for components such as air conditioning circulation pumps, toilet pump, deck hydraulic pump, sewage pumps, and emergency diesel generator.

The related federal contract opportunity is for TRAINING VESSEL KINGS POINTER (TVKP) FY 25 REGULATORY DRY DOCK, solicited by the Department of Transportation Maritime Administration. The solicitation requires industrial support for dry dock repairs on the Kings Pointer training vessel, with service to be performed at the contractor's shipyard on the United States East Coast. Quoters are to provide pricing for all materials, dry dock, services, equipment, and labor on the provided vendor price sheet.

View the file

Other files

File Type Posted
6933A224Q000010 Amd 0002.pdf PDF
Attmt I TVKP 2025 DD SOW V14.pdf PDF
msd base.pdf PDF
Fly Bridge Receiver 1 .pdf PDF
Attmt II TSKP FY25 DD Vendor Price Sheet (SECTION B).xlsx XLSX spreadsheet
Fly Bridge Receiver Name Plate.pdf PDF
6933A224Q000010 Amd 0001.pdf PDF
Tow Winch 1.pdf PDF
Q and A TVKP Drydock 2025 Rev2.pdf PDF
tow winch 2.pdf PDF
Air Receiver 302469 .pdf PDF
1547-5280 Compressed Air Diag. Mod Rev. 5 .pdf PDF
tow winch 3.pdf PDF
Attmt I TVKP 2025 DD SOW V13.pdf PDF
Air Receiver 302469.pdf PDF
1547-4705_Rudder Details.pdf PDF
ABS Rules Part 7 Chapter 6.pdf PDF
Anchor Windlass Pic1.jpg JPG image
Sherwin Williams Coating Spec 04122024.pdf PDF
GMD Kings Pointer Zinc Anodes 2022.pdf PDF
Kickpipe Pic 1.jpg JPG image
TVKP Critical Gauges 12-2022.xls XLS spreadsheet
2022 GMD SHIPYARD Anchor Chain Gauging.pdf PDF
1547-4411 Rev 5 Machinery Arrgmt.pdf PDF
ABS Rules Part 7 Chapter 5 Sections 1 and 2.pdf PDF
1547-5235_1 Piping Sewage and Deck Drains.pdf PDF
2022 RUDDER CLEARANCE MEASUREMENTS from GMD.xlsx XLSX spreadsheet
TSKP FY25 CSS 6933A224Q000010 REV 2.pdf PDF
Fly Bridge Receiver 1.pdf PDF
2020 Tailshaft Readings.pdf PDF
1547-2510 Rev 7 Longitudinal Struct Sections.pdf PDF
Tank Plan ST Locations.pdf PDF
T.S. Kings Pointer - Asbestos Survey Report - Sept. 2020 (Rev. 1).pdf PDF
Kickpipe Pic 2.jpg JPG image
Sullair ES6.pdf PDF
1547-4701 Rev 3 Rudder Arr.pdf PDF
1547-5235_2 Piping Sewage and Deck Drains (1).pdf PDF
1547-5250 Vents Rev 7 Vents Piping diagram.pdf PDF
TV KINGS POINTER Docking Calculations.pdf PDF
Anchor Windlass Pic2.jpg JPG image
KINGS POINTER Tank Tables 15 Oct 13.pdf PDF
KINGS POINTER MEGGER READINGS blank.docx DOCX document
Attmt II TSKP FY25 DD Vendor Price Sheet.xlsx XLSX spreadsheet
MA-57 Drydock Report.pdf PDF
1547-5280 Compressed Air Diag. Mod (Rev. 5).pdf PDF
W O Knife Gate.pdf PDF
BNA TVKP Bow Thruster Report 2022.pdf PDF
1547-3620_1 Rev 1 Insulation Plan.pdf PDF
TVKP Stack Drain Pic.jpg JPG image
Section 2.6 of TE1 through TE6.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTH FLORIDA SHIPYARDS, INC.

SHIPBOARD ELECTRIC CABLE

MEGGER INSULATION TEST

Ship/Hull: Kingspointer
NFSY Number 1320-028
Work Item Number: 90304

Item Title : Arriving Megger Readings

Cable Type
Circuit

ID

Cond

ID

Lead Color Term Pt Megger Reading

Continuity Term Lug Insulation Sleeving Sat Unsat Sat Unsat Sat Unsat Sat Unsat

A/C circ pump #1

200m
200m
200m

A/c circ pump #2

200m
200m
200m

Toilet pump

500m
500m
500m

Deck hyd pump

500m
500m
500m

PCCP pump #1

200m
200m
200m

SCPP pump#1

200m
200m
200m

PCPP pump #2

200m
200m
200m

SCPP pump #2

200m
200m
200m

MSD macerator

500m
500m
500m

MSD dischrg pump

200m
200m

Sewage pump

100m
100m
200m

Wash water pump

500m
500m

EDG

58m
69m
69m

Main deck A/c

500m
500m
500m

Lower deck a/C

500m
500m
500m

Anchor HPU

500m
500m
500m

Date:02/18/2020 Performed By: Bailey/Para Remarks: _________________________ NFSY Form E001

File details come from the government source that posted it. Updated .