1547-2510 Rev 7 Longitudinal Struct Sections.pdf

PDF 4 MB Posted

Attached to
TRAINING VESSEL KINGS POINTER (TVKP) FY 25 REGULATORY DRY DOCK
Solicitation number
6933A224Q000010
Issued by

About this file

This document appears to be a revised set of typical drawings for a dry dock repair project on the training vessel Kings Pointer. The key details include:

The drawings show modifications to the vessel, including the addition of new sewage tanks outboard of an 8-foot longitudinal bulkhead and creation of lightening holes when a void was converted to a center flume tank. Revisions were made to existing drawings as noted.

The related federal contract opportunity is for a firm fixed price purchase order to perform dry dock repairs on the Kings Pointer vessel in accordance with the Statement of Work (SOW) - ATTACHMENT I. The work is to be performed at a shipyard on the United States East Coast. A site visit will be held on July 9, 2024 at the Merchant Marine Academy in Kings Point, NY. The solicitation is being issued by the Department of Transportation Maritime Administration.

View the file

Other files

File Type Posted
6933A224Q000010 Amd 0002.pdf PDF
Attmt I TVKP 2025 DD SOW V14.pdf PDF
msd base.pdf PDF
Fly Bridge Receiver 1 .pdf PDF
Attmt II TSKP FY25 DD Vendor Price Sheet (SECTION B).xlsx XLSX spreadsheet
Fly Bridge Receiver Name Plate.pdf PDF
6933A224Q000010 Amd 0001.pdf PDF
Tow Winch 1.pdf PDF
Q and A TVKP Drydock 2025 Rev2.pdf PDF
tow winch 2.pdf PDF
Air Receiver 302469 .pdf PDF
1547-5280 Compressed Air Diag. Mod Rev. 5 .pdf PDF
tow winch 3.pdf PDF
Attmt I TVKP 2025 DD SOW V13.pdf PDF
Air Receiver 302469.pdf PDF
1547-4705_Rudder Details.pdf PDF
ABS Rules Part 7 Chapter 6.pdf PDF
Anchor Windlass Pic1.jpg JPG image
2020 NFSY Megger Readings.doc DOC document
Sherwin Williams Coating Spec 04122024.pdf PDF
GMD Kings Pointer Zinc Anodes 2022.pdf PDF
Kickpipe Pic 1.jpg JPG image
TVKP Critical Gauges 12-2022.xls XLS spreadsheet
2022 GMD SHIPYARD Anchor Chain Gauging.pdf PDF
1547-4411 Rev 5 Machinery Arrgmt.pdf PDF
ABS Rules Part 7 Chapter 5 Sections 1 and 2.pdf PDF
1547-5235_1 Piping Sewage and Deck Drains.pdf PDF
2022 RUDDER CLEARANCE MEASUREMENTS from GMD.xlsx XLSX spreadsheet
TSKP FY25 CSS 6933A224Q000010 REV 2.pdf PDF
Fly Bridge Receiver 1.pdf PDF
2020 Tailshaft Readings.pdf PDF
Tank Plan ST Locations.pdf PDF
T.S. Kings Pointer - Asbestos Survey Report - Sept. 2020 (Rev. 1).pdf PDF
Kickpipe Pic 2.jpg JPG image
Sullair ES6.pdf PDF
1547-4701 Rev 3 Rudder Arr.pdf PDF
1547-5235_2 Piping Sewage and Deck Drains (1).pdf PDF
1547-5250 Vents Rev 7 Vents Piping diagram.pdf PDF
TV KINGS POINTER Docking Calculations.pdf PDF
Anchor Windlass Pic2.jpg JPG image
KINGS POINTER Tank Tables 15 Oct 13.pdf PDF
KINGS POINTER MEGGER READINGS blank.docx DOCX document
Attmt II TSKP FY25 DD Vendor Price Sheet.xlsx XLSX spreadsheet
MA-57 Drydock Report.pdf PDF
1547-5280 Compressed Air Diag. Mod (Rev. 5).pdf PDF
W O Knife Gate.pdf PDF
BNA TVKP Bow Thruster Report 2022.pdf PDF
1547-3620_1 Rev 1 Insulation Plan.pdf PDF
TVKP Stack Drain Pic.jpg JPG image
Section 2.6 of TE1 through TE6.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYPICAL LIGHTENING

HOLES CREATED WHEN VOID

CONVERTED TO A CL FLUME TANK

NEW SEWAGE TK

OUTBOARD P&S

1. ADDED "AS-FOUND" LIGHTENING HOLES IN

8ft BHD, FR 41-35 P&S

2. ADDED NOTE OF NEW SEWAGE TANKS

OUTBD OF 8 ft LONG'L BHD, P&S

3. MODIFIED EXISTING WHERE NOTED

4-B

BECI

JULY

'13

DOOR REMOVED

NEW FACE PLATE FB4x3/8" ADDED

CUT OUT FOR

NEW DOOR

2-A

2-B

TYPICAL LIGHTENING

HOLES CREATED WHEN VOID

CONVERTED TO A CL FLUME TANK

NEW SEWAGE TK

OUTBOARD P&S

File details come from the government source that posted it. Updated .