This document outlines a two-phase federal design-build contract solicitation for concrete diffuser replacements at the Eisenhower Lock located in Massena, New York. The Saint Lawrence Seaway Development Corporation is seeking qualification proposals from firms to replace up to six concrete diffusers below the downstream sill over two winter seasons. In Phase I, interested firms must submit capability proposals by October 22, 2020 demonstrating their ability to successfully execute the design-build contract. Approximately five firms will be shortlisted to compete in Phase II, where they will submit detailed proposals. The estimated construction costs range between $5-10 million, and the contract type will be firm-fixed price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 6923G521R0002A00006.pdf | ||
| 6923G521R0002A00005.pdf | ||
| 326-CSG-36-1 Dewatering and Drainage Pumps.pdf | ||
| 326-C-20-25 Filling and Emptying Culverts Details.pdf | ||
| 6923G521R0002A00004.pdf | ||
| Site Map Indicating Concrete Spoil Area.pdf | ||
| SLS-326-300 vicinity_locality (1).pdf | ||
| DiffusersRFP-6923G521R0002.pdf | ||
| Wage Determination.pdf | ||
| 326-C-20-130 Frames Covers Location Plan.pdf | ||
| 6923G521R0002A00003.pdf | ||
| 6923G521R0002A00002.pdf | ||
| 6923G521R0002A00001.pdf | ||
| 326-C-20-21 Lower Sill Plan-Elevation-Section.pdf | ||
| 326-C-20-1 Lock General Plan Elevations-Sections.pdf | ||
| 6923G521R0002 Phase I Request for Qualifications.pdf | ||
| 326-C-20-22 Lower Sill Reinforcement.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLSDC Concrete Diffusers Replacement Reference Photos
**Photos are from recent winters and do not indicate present day condition**
Winter 2017
| SLSDC Concrete Diffusers Replacement |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
File details come from the government source that posted it. Updated .