This is a complete set of 100% Construction Documents (final design phase) for the Replace 2nd Floor Roof project at Audie L. Murphy Memorial Veterans Hospital in San Antonio, Texas. The project is identified as Project No. 671-21-143 and is overseen by the Department of Veterans Affairs' Central Texas Veterans Health Care System, with design by WestEast Design Group JV, LLC (Elk Consortium + Texas Registered Architectural Firm).

The construction documents include architectural plans with detailed roof replacement specifications organized by work areas (A, B, C, and D), demolition plans identifying existing systems to be removed, phasing plans for two construction phases, and comprehensive roof details addressing flashings, penetrations, and transitions. Architectural scope includes removal of the existing solar collector steam piping system, demolition of the current 2nd floor roof assembly, and installation of a new TPO (thermoplastic polyolefin) roof system with associated structural supports and waterproofing details. The documents incorporate mechanical, electrical, and plumbing (MEP) coordination requirements, including temporary relocation and support of existing conduits, equipment, and piping to accommodate roof replacement. General notes specify infection control procedures, dust containment using negative air machines, coordination with hospital facilities, and compliance with federal and state construction codes. Alternate bid items include penthouse roof system replacement, document curbs, treating existing nailer and blocking, and existing metal fascia replacement. The project emphasizes sequencing coordination across multiple building areas to maintain hospital operations during construction, with detailed specifications for material standards, safety protocols, and equipment support methodologies throughout the design package.

View the file

Other files

File Type Posted
Asbestos Survey.pdf PDF
36C25726B0004 0004.docx DOCX document
VA AUDIE MURPHY ROOF REPORT Signed.pdf PDF
23040-VA-Replace_2nd_Flr_Roof_Uncovering-Field Observation Report-001.pdf PDF
36C25726B0004 0003.docx DOCX document
RFI final 26B0004.docx DOCX document
36C25726B0004 0002.docx DOCX document
36C25726B0004 0001.docx DOCX document
S06 Pre-bid sign in sheet.pdf PDF
ICRA 671-24-004.pdf PDF
36C25726B0004_1.docx DOCX document
PCRA 671-24-004.pdf PDF
671-21-143-VA-SA-Replace_2nd_Floor_Roof-Specifications.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PQ

COVER SHEET AND

DRAWING INDEX

GI0.1

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC Elk Consortium +

Texas Registered Architectural Firm

DRAWING INDEX

ARCHITECTURAL ADD ALTERNATES

PROJECT: REPLACE 2ND FLOOR ROOF

PROJECT NO. : 671-21-143

100% CONSTRUCTION DOCUMENTS FINAL

CENTRAL TEXAS VETERANS HEALTH CARE

Department

Veterans Affairs of

SAN ANTONIO, TEXAS

AUDIE L. MURPHY MEMORIAL VETERANS HOSPITAL

7400 MERTON MINTER BLVD.

COORDINATION:

EXISTING CONDITIONS:

1. SPECIFICATIONS

2. DRAWINGS

SITE VICINITY MAPC6

PL

AN

N

OR

TH

TR

UE

N

OR

TH

ABBREVIATIONS

ARCHITECTURAL SYMBOLS LEGEND

CONSTRUCTION SAFETY NOTES

DOCUMENT ORGANIZATION

INFECTION PREVENTION NOTESGENERAL PROJECT NOTES

N.I.C.

SAFETY/SECURITY:

CONSTRUCTION SETS:

CORRESPONDENCE / INSTRUCTIONS:

MISCELLANEOUS:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC Elk Consortium +

Texas Registered Architectural Firm

ALTERNATE No.1

PENTHOUSE

VON SCHEELE RD.

W

URZB

ACH R

OAD

M

ER

TO

N

M

IN

TE

R

B

LV

D

MELROSE HOLMGREEN ROAD

LOADING

DOCK

7TH FLOOR ROOF

N.I.C.

N.I.C.

N.I.C.

N.I.C. N.I.C.

N.I.C.

N.I.C.

N.I.C.

REPLACE 2ND FLOOR

ROOF PROJECT

PENTHOUSE ROOF

7TH FLOOR ROOF

2ND FLOOR ROOF

1ST FLOOR

GROUND FLOOR

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC Elk Consortium +

Texas Registered Architectural Firm

2ND FLOOR ROOF PHASING PLANF5VA HOSPITAL CAMPUS MAPF1

PL

AN

N

OR

TH

TR

UE

N

OR

TH

LEGEND

GENERAL NOTES

PHASING LEGEND

N.I.C.

PHASE 1 PHASE 2

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.N.I.C.N.I.C.

N.I.C.

N.I.C.

EXISTING ROOF

ACCESS PENTHOUSE

BUILDING ELEVATIONA5

ALTERNATE

No.1

PENTHOUSE

EXISTING ROOF

ACCESS PENTHOUSE

PALLETS WILL BE DISBURSED

THROUGHOUT ROOF TO

MINIMIZE WEIGHT IN ONE AREA

DEMOLITION ROOF PLAN - KEY PLANE1

GENERAL DEMOLITION NOTESLEGEND

GENERAL NOTES FOR THE REMOVAL OF THE

SOLAR COLLECTOR STEAM PIPING SYSTEM

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC Elk Consortium +

DEMOLITION ENLARGED ROOF PLAN - AREA AF1

DEMOLITION LEGEND DEMOLITION KEY NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC

DEMOLITION ENLARGED ROOF PLAN - AREA BF1 DEMOLITION ENLARGED ROOF PLAN - AREA CF5

DEMOLITION KEY NOTESDEMOLITION LEGEND

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC

LEGEND

DEMOLITION KEY NOTES

DEMOLITION ENLARGED ROOF PLAN - AREA DF1

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC

GENERAL NOTES

ROOF PLAN - NEW WORK - KEY PLANE1

LEGEND

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC

ENLARGED ROOF PLAN - NEW WORK - AREA AF1

LEGEND KEY NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC

ENLARGED ROOF PLAN - NEW WORK - AREA BF1 ENLARGED ROOF PLAN - NEW WORK - AREA CF5

LEGEND KEY NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC

ENLARGED ROOF PLAN - NEW WORK - AREA DF1

LEGEND

KEY NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC

METAL WALL PANEL FLASHINGB7

FLASHING AT EXISTING EXPANSION JOINT CURBD4

FASCIA FLASHING SYSTEM AT EXISTING ROOF EDGEB1 FLASHING AT EXISTING SURFACE-MOUNTED FLASHING CONDITIONB4

FLASHING AT EXISTING EQUIPMENT CURBD1

DOOR THRESHOLD FLASHING DETAILF7

FLASHING AT EXISTING LOADING DOCK EXPANSION JOINTD7

FLASHING AT EXISTING ROOF TRANSITIONF4PIPE SUPPORT CURB F1

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC

FLASHING AND COMPONENTS AT NEW ROOF DRAINB1 TPO SQUARE TUBE WRAP DETAILB7PLUMBING VENT OR PIPE PENETRATION ROOF DETAIL - TYPICALB4

MEMBRANE - COATED METAL PENETRATION POCKET DETAILD1 JUNCTION BOX FOR SATELLITE WIRING HOOK-UPSD4 INVERTER PAD COLUMN FLASHINGD7

30" (762 mm)

6" (1 52 mm)

TPO HEAT WELDED WALKWAY INSTALLATIONF1

6" (1 52 mm)

5" (1 27 mm) M

AX

TPO ADHERED LOOPED LIGHTNING SUPPRESSION MOUNTINGF4 HIGH TEMPURATURE FLASHING AT STEAM PIPE VENTF7

± 2"

± 2"

±2"

± 2"

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC

TPO SPLIT PIPE BOOT DETAILB1 TPO POURABLE SEALER POCKET DETAIL- TYPICALB7TPO PREFORMED VENT BOOT DETAIL - TYPICALB4

MEMBRANE - COATED METAL MULTIPLE PENETRATION POCKET DETAILD1 TPO PREMOLDED VENT BOOT FLASHING DETAILD4

± 2"

± 2"

± 2"

± 2"

ROOF EDGE DETAILF1 ROOF-TO-WALL DETAILF3 FLASHING AND EXPANSION JOINT DETAILF4 FLASHING AND EXPANSION JOINT DETAILF7

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-143

Management

SEPT. 03, 2024 18

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

100% CD FINALCONSULTANTS:

Office of Facilities

JQ

09/03/2024

Replace 2nd Floor Roof

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC

MEP GENERAL NOTES

& DETAILS

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC Elk Consortium +

Texas Registered Architectural Firm

N O

RT

H

F

LO

RE

S

SA

N

A N

TO

N

IO

, T

EX

A

S

0.

3.

SA

N

A N

TO

N

IO

R G

V

P H

O N

E

TB

PE

F

IR

M R

EG

IS

TR

A

TI

O

N N

O

CONSULTANTS

MEP001

100% CD FINAL

8/22/24

A. PROJECT SCOPE SHALL INCLUDE TEMPORARY SUPPORT AND RAISING OF EXISTING CONDUITS ON ALL ROOFS SHOWN HEREIN AS REQUIRED TO ACCOMMODATE ROOF REPLACEMENT AND RAISING OF EXISTING ROOF INSULATION. CONTRACTOR SHALL MAINTAIN

AND EXTEND EXISTING CONDUCTORS AND CONDUIT AS REQUIRED.

B. GENERAL: EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE REUSED, SALVAGED, REINSTALLED, OR OTHERWISE INDICATED TO REMAIN OWNER'S PROPERTY, REMOVE DEMOLISHED MATERIALS FROM PROJECT SITE AND LEGALLY DISPOSE OF THEM IN AN EPA-APPROVED LANDFILL. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE REMOVE FROM OWNER OCCUPIED AREAS DAILY. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND

AREAS.

C. TRACE CIRCUITS FEEDING EXISTING TO-REMAIN PORTIONS OF THE BUILDING. DO NOT DEMOLISH CIRCUITS IN THESE AREAS. IF CIRCUITS ARE IN BOTH "TO REMAIN" AND "TO BE REMOVED" AREAS, DEMOLISH BACK TO NEAREST TO-REMAIN J-BOX.

D. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT REQUIRED BY NEW CONSTRUCTION AND AS INDICATED.

COMPLETE SELECTIVE DEMOLITION OPERATIONS ABOVE EACH FLOOR OR TIER BEFORE DISTURBING SUPPORTING MEMBERS ON

THE NEXT LOWER LEVEL.

E. REMOVED AND SALVAGED ITEMS: CLEAN SALVAGED ITEMS, PACK OR CRATE ITEMS AFTER CLEANING. IDENTIFY CONTENTS OF CONTAINERS. STORE ITEMS IN A SECURE AREA UNTIL DELIVERY TO OWNER. TRANSPORT ITEMS TO OWNER'S STORAGE AREA

DESIGNATED BY OWNER. PROTECT ITEMS FROM DAMAGE DURING TRANSPORT AND STORAGE.

F. REMOVED AND REINSTALLED ITEMS: CLEAN AND REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED REUSE.

PAINT EQUIPMENT TO MATCH NEW EQUIPMENT. PACK OR CRATE ITEMS AFTER CLEANING AND REPAIRING. IDENTIFY CONTENTS OF CONTAINERS. PROTECT ITEMS FROM DAMAGE DURING TRANSPORT AND STORAGE. REINSTALL ITEMS IN LOCATIONS INDICATED. COMPLY WITH INSTALLATION REQUIREMENTS FOR NEW MATERIALS AND EQUIPMENT. PROVIDE CONNECTIONS, SUPPORTS, AND MISCELLANEOUS MATERIALS NECESSARY TO MAKE ITEM FUNCTIONAL FOR USE INDICATED.

G. EXISTING ITEMS TO REMAIN: PROTECT CONSTRUCTION INDICATED TO REMAIN AGAINST DAMAGE AND SOILING DURING SELECTIVE DEMOLITION. WHEN PERMITTED BY ARCHITECT, ITEMS MAY BE REMOVED TO A SUITABLE, PROTECTED STORAGE LOCATION DURING SELECTIVE DEMOLITION AND REINSTALLED IN THEIR ORIGINAL LOCATIONS AFTER SELECTIVE DEMOLITION OPERATIONS

ARE COMPLETE.

H. COORDINATE ALL DEMO ACTIVITIES WITH OWNER AND ARCHITECT AND PROVIDE 10 DAYS NOTICE FOR ANY POWER OUTAGES.

I. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HAVE VERIFIED EXISTING JOB-SITE CONDITIONS DURING THE BIDDING PERIOD TO OBTAIN THE SCOPE OF ELECTRICAL WORK INVOLVED AS A RESULT OF ARCHITECTURAL MODIFICATIONS TO THE EXISTING STRUCTURE. THE SCOPE OF THE WORK SHALL INCLUDE MATERIALS AND OUTLETS, CONSISTING OF FIXTURES, DEVICES, EQUIPMENT OR APPARATUS, WHICH MUST BE REROUTED, RELOCATED OR REMOVED EITHER TEMPORARILY OR PERMANENTLY, OR WHICH MUST BE PROVIDED, SO THAT THE INDICATED REMODELING MAY BE ACCOMPLISHED. NOT ALL EXISTING OUTLETS ARE

NECESSARILY INDICATED ON THE DRAWINGS.

J. CONTRACTOR SHALL MAKE SAFE ALL AREAS OF THE EXISTING STRUCTURE WHICH ARE TO BE DEMOLISHED BY DISCONNECTING

FEEDERS AND SERVICES TO DEMO'D AREAS.

I. PROVIDE EMT UNDER ROOF. SECURE TO STRUCTURE WITH BEAM CLAMPS (SINGLE) OR UNISTRUT (MULTIPLE).

J. PROVIDE IMC ON ROOF FROM ROOF HOODS TO DISCONNECTS.

K. PROVIDE RIGID STEEL CONDUIT ON ROOF FROM ROOF HOODS TO DISCONNECTS.

L. PENETRATE ROOFS AS PER ROOFING GUIDELINES AND GANG CONDUIT TOGETHER. SUPPORT ROOFTOP CONDUIT WITH NEOPRENE

BLOCKS WITH INTEGRAL UNISTRUT. SECURE CONDUIT TO BLOCKS ON ROOF.

M. PROVIDE SEALTITE WITH WP FITTINGS TO MECHANICAL EQUIPMENT, MAX DISTANCE 48”. DO NOT USE CONDUITS.

N. PROVIDE INDIVIDUAL DISCONNECTS FOR ALL SMOKE FIRE DAMPERS AND VAV'S. NO EXCEPTIONS.

O. FIRESTOP ALL CONDUIT PENETRATIONS IN RATED WALLS. SEE ARCHITECTURAL FOR WALL RATINGS. CONTRACTOR SHALL BE

RESPONSIBLE FOR DAMAGE TO SHEET ROCK AND REPAIR.

P. PROVIDE NEMA 3R DISCONNECTS FOR ALL EXTERIOR LOCATIONS AND NEMA 1 DISCONNECTS FOR ALL INTERIOR, DRY LOCATIONS.

Q. POWER AND DATA REQUIREMENTS FOR HVAC CONTROLLERS ARE SHOWN ON POWER SHEETS.

R. ALL EQUIPMENT CONNECTION POINTS ARE DIAGRAMATIC IN NATURE. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH EQUIPMENT INSTALLER FOR EXACT POINT OF CONNECTION. EXTEND FEEDERS IN CONDUIT AS REQUIRED.

ELECTRICAL GENERAL NOTES:

A. CONTRACTOR SHALL CONFORM TO HOSPITAL'S INFECTION CONTROL PROCEDURES WHILE PERFORMING THIS WORK.

CARE SHOULD BE TAKEN TO CONTAIN ALL CONSTRUCTION DUST WITHIN THE REMODELED AREA SO THAT IT DOES NOT TRAVEL TO OTHER AREAS AND INTO THE BUILDING HVAC SYSTEM. PROVIDE NEGATIVE AIR MACHINE AS REQUIRED TO ACCOMPLISH THIS. ALL WORK SHALL BE AS PER THE GUIDELINES ESTABLISHED BY THE

ENVIRONMENTAL SAFETY AND HEALTH DEPARTMENT.

B. COORDINATE DEMOLITION WORK WITH ELECTRICAL AND OTHER DISCIPLINES AS REQUIRED.

C. EQUIPMENT LOCATIONS ARE SHOWN APPROXIMATELY. VERIFY ALL DIMENSIONS AND LOCATIONS AT JOB SITE.

D. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HAVE VERIFIED EXISTING JOBSITE CONDITIONS DURING THE BIDDING PERIOD, SO THEY WILL HAVE DISCOVERED THE FULL SCOPE OF WORK INVOLVED WITH THE MODIFICATION OF THIS EXISTING SPACE. THE SCOPE OF THE WORK SHALL INCLUDE ALL MATERIALS FOR A COMPLETE INSTALLATION INCLUDING DEVICES, EQUIPMENT, OR APPARATUS WHICH MUST BE REROUTED, RELOCATED, OR REMOVED EITHER TEMPORARILY OR PERMANENTLY, OR WHICH MUST BE PROVIDED TO ACCOMMODATE THE INDICATED REMODELING.

NOT ALL EXISTING CONDITIONS ARE NECESSARILY INDICATED ON THE DRAWINGS.

E. WHEN AN EQUIPMENT IS IDENTIFIED TO BE REMOVED, THE OWNER HAS FIRST RIGHT OF REFUSAL BEFORE DISPOSING

OF THAT EQUIPMENT. PROVIDE A MINIMUM OF ONE WEEKS NOTICE PRIOR TO DEMOLITION.

F. PROVIDE ALL NECESSARY CLEAR PATH TO MOVE DEMOLISHED EQUIPMENT OUT OF THE FACILITY AS WELL TO BRING NEW EQUIPMENT INTO THE BUILDING. MODIFY EXISTING PIPING, DUCTWORK CONDUITS, AS REQUIRED TO COMPLETE

THE DEMOLITION.

G. THE "EXISTING" MECHANICAL SYSTEMS INDICATED ON THIS SHEET ARE BASED ON THE INFORMATION AVAILABLE AND MAY BE INCOMPLETE AND INACCURATE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ACTUAL CONDITIONS AND MAKE SUITABLE ADJUSTMENTS AS NECESSARY TO ACCOMMODATE NEW WORK, AT NO EXTRA COST TO THE OWNER. CONDITIONS DIFFERENT TO THOSE INDICATED SHALL BE INCORPORATED INTO THE CONSTRUCTION DOCUMENTS. NOTE THAT ANY UNCOVERED SYSTEMS MUST BE CAREFULLY IDENTIFIED PRIOR TO

MODIFICATIONS.

H. CONTRACTOR SHALL COORDINATE WORK WITH ALL TRADES AND INCLUDE ANY MODIFICATIONS NEEDED TO

ACCOMMODATE THEIR WORK.

MECHANICAL GENERAL DEMOLITION NOTES:

A. COORDINATE DEMOLITION WORK WITH ELECTRICAL AND OTHER DISCIPLINES AS REQUIRED.

B. FIXTURE LOCATIONS ARE SHOWN APPROXIMATELY. VERIFY ALL DIMENSIONS AND LOCATIONS AT JOB SITE.

C. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HAVE VERIFIED EXISTING JOBSITE CONDITIONS DURING THE BIDDING PERIOD, SO THEY WILL HAVE DISCOVERED THE FULL SCOPE OF WORK INVOLVED WITH THE MODIFICATION OF THIS EXISTING SPACE. THE SCOPE OF THE WORK SHALL INCLUDE ALL MATERIALS FOR A COMPLETE INSTALLATION INCLUDING DEVICES, EQUIPMENT, OR APPARATUS WHICH MUST BE REROUTED, RELOCATED, OR REMOVED EITHER TEMPORARILY OR PERMANENTLY, OR WHICH MUST BE PROVIDED TO ACCOMMODATE THE INDICATED REMODELING.

NOT ALL EXISTING CONDITIONS ARE NECESSARILY INDICATED ON THE DRAWINGS.

D. WHEN AN FIXTURE IS IDENTIFIED TO BE REMOVED, THE OWNER HAS FIRST RIGHT OF REFUSAL BEFORE DISPOSING

OF THAT FIXTURE. PROVIDE A MINIMUM OF ONE WEEKS NOTICE PRIOR TO DEMOLITION.

E. THE "EXISTING" PLUMBING SYSTEMS INDICATED ON THIS SHEET ARE BASED ON THE INFORMATION AVAILABLE AND MAY BE INCOMPLETE AND INACCURATE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ACTUAL CONDITIONS AND MAKE SUITABLE ADJUSTMENTS AS NECESSARY TO ACCOMMODATE NEW WORK, AT NO EXTRA COST TO THE OWNER. CONDITIONS DIFFERENT TO THOSE INDICATED SHALL BE INCORPORATED INTO THE CONSTRUCTION DOCUMENTS. NOTE THAT ANY UNCOVERED SYSTEMS MUST BE CAREFULLY IDENTIFIED PRIOR TO

MODIFICATIONS.

F. CONTRACTOR SHALL COORDINATE WORK WITH ALL TRADES AND INCLUDE ANY MODIFICATIONS NEEDED TO

ACCOMMODATE THEIR WORK.

G. CONTRACTOR TO COORDINATE THE SHUT-DOWN ON ANY EXISTING SYSTEM(S) WITH THE FACILITIES DIRECTOR OF

MAINTENANCE.

H. THE EXISTING WET-PIPE FIRE SPRINKLER SYSTEM WITHIN THIS PROJECT SHALL BE MODIFIED AS NECESSARY TO

ACCOMMODATE ARCHITECTURAL CHANGES.

I. ALL WORK SHALL CONFORM TO ALL STATE AND LOCAL CODES, RULES AND REGULATIONS, AND ORDINANCES.

J. PLUMBING PLANS ARE DIAGRAMMATIC ONLY. THEY ARE INTENDED TO INDICATE CAPACITY, SIZE, LOCATION, DIRECTION AND GENERAL ARRANGEMENT. WHERE NOT SPECIFICALLY SHOWN ON PLANS, CONTRACTOR SHALL APPLY PROFESSIONAL STANDARDS SUCH AS THAT OF THE AMERICAN SOCIETY OF PLUMBING ENGINEERS.

K. WORK SHALL INCLUDE ALL LABOR, MATERIALS, PERMITS AND OTHER COSTS AS ARE NECESSARY FOR THE INSTALLATION OF A COMPLETE AND SATISFACTORY OPERATIONAL PLUMBING AND SANITARY SYSTEM. EQUIPMENT SHALL BE INSTALLED IN SUCH A MANNER AS TO MAINTAIN ITS LISTING AND THE MANUFACTURER'S GUARANTEES

AND WARRANTIES.

L. THIS CONTRACTOR SHALL COORDINATE WITH THE OTHER TRADES TO INSURE THAT EACH TRADE SHALL HAVE SUFFICIENT SPACE TO INSTALL THEIR EQUIPMENT (DUCTWORK, PIPING, ELECTRICAL, ETC.), ALONG WITH THE

PLUMBING WORK.

M. WHERE THE TERM "PROVIDE" IS USED, IT SHALL MEAN "FURNISH AND INSTALL". THE CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL THE OTHER TRADES PRIOR TO THE FABRICATION, PURCHASE AND/OR

INSTALLATION OF THE WORK.

N. UNLESS NOTED, ALL MATERIALS SHALL BE NEW, COMPLETE, INCLUDE MANUFACTURER'S WARRANTY, AND BE U.L.

APPROVED IF APPLICABLE. ALL WORK SHALL PRESENT A NEAT MECHANICAL APPEARANCE WHEN COMPLETED.

O. FIELD VERIFY ALL DIMENSIONS. CONTRACTOR SHALL VERIFY ELEVATION OF UTILITY CONNECTIONS ON SITE PRIOR TO COMMENCING WORK. FINAL CONNECTION TO SITE UTILITIES SHALL BE BY THE PLUMBING CONTRACTOR.

P. PLUMBING SYSTEM INSTALLER SHALL PROVIDE ALL STRUCTURAL MEMBERS, SUPPORT BRACKETS, FLASHING, HARDWARE, ETC., REQUIRED TO INSTALL A COMPLETE SYSTEM.

Q. DRAIN WASTE AND VENT PIPING SHALL BE PVC SCH. 40 WHEN INSTALLED BELOW GRADE OR UNDER CONCRETE

SLABS. DRAIN WASTE AND VENT PIPING INSTALLED ABOVE GRADE SHALL BE PVC SCH. 40.

R. ALL SANITARY PIPING CHANGES OF DIRECTION 45 DEGREES OR MORE SHALL BE ACCOMPLISHED BY USING 45

DEGREE 1/8 BEND ELBOWS UNLESS OTHERWISE NOTED.

S. ALL MODEL NUMBERS INDICATED ARE PROVIDED TO ESTABLISH THE QUALITY LEVEL AND FEATURES REQUIRED.

LISTED MANUFACTURERS AND OTHER PRIOR APPROVED EQUALS MAY BE SUBSTITUTED WHEN PROVIDED WITH EQUAL FEATURES, EITHER STANDARD OR AS ACCESSORIES. SUBSTITUTED AIR DEVICES AND PLUMBING FIXTURES

MUST BE SIMILAR IN APPEARANCE TO THE ITEMS SPECIFICALLY INDICATED.

T. ALL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER. CLEAN THE SITE DAILY AND REMOVE FROM THE

PREMISES ANY DIRT AND DEBRIS CAUSED BY THE WORK INCLUDED IN THIS CONTRACT.

U. INSTALL CAST IRON PIPE IN ALL PLENUM RATED SPACES.

PLUMBING GENERAL NOTES:

MEP OVERALL PLAN

1 MEP OVERALL PLAN

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC Elk Consortium +

Texas Registered Architectural Firm

N O

RT

H

F

LO

RE

S

SA

N

A N

TO

N

IO

, T

EX

A

S

0.

3.

SA

N

A N

TO

N

IO

R G

V

P H

O N

E

TB

PE

F

IR

M R

EG

IS

TR

A

TI

O

N N

O

CONSULTANTS

MEP100

100% CD FINAL

8/22/24

PLUMBING KEYED NOTES:

1 MEP ENLARGED DEMOLITION ROOF PLAN - AREAS B&C

MEP ROOF REPLACEMENT

PLAN - AREAS B&C

Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter BLVD., San Antonio, Texas

200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com

WestEast Design Group JV, LLC Elk Consortium +

Texas Registered Architectural Firm

N O

RT

H

F

LO

RE

S

SA

N

A N

TO

N

IO

, T

EX

A

S

0.

3.

SA

N

A N

TO

N

IO

R G

V

P H

O N

E

TB

PE

F

IR

M R

EG

IS

TR

A

TI

O

N N

O

CONSULTANTS

MEP102

100% CD FINAL

8/22/24

ELECTRICAL KEYED NOTES:

PLUMBING KEYED NOTES:

Sheets and Views
671-21-143-GI0.1 Cover Sheet and Drawing Index-GI0.1
671-21-143-GI0.2 Document Organization and General Notes-GI0.2
671-21-143-GI0.3 Campus Map and Demolition Phasing Plan-GI0.3
671-21-143-GI0.4 Tapered Roof Layout-GI0.4
671-21-143-AD1.0 Demo Roof Plan-Key Plan-AD1.0
671-21-143-AD1.1 Demo Roof Plan-Area A-AD1.1
671-21-143-AD1.2 Demo Roof Plan-Areas B and C-AD1.2
671-21-143-AD1.3 Demo Roof Plan-Area D-AD1.3
671-21-143-A1.0 Roof Plan-New Work-Key Plan-A1.0
671-21-143-A1.1 Roof Plan-New Work-Area A-A1.1
671-21-143-A1.2 Roof Plan-New Work-Areas B and C-A1.2
671-21-143-A1.3 Roof Plan-New Work-Area D-A1.3
671-21-143-A2.0 Roof Details-A2.0
671-21-143-A2.1 Roof Details-A2.1
671-21-143-A2.2 Roof Details-A2.2
671-21-143-A2.3 Roof Details-A2.3
2024-08-22 VA CT Roof Replacement MEP Sealed.pdf
MEP-MEP001
MEP-MEP001
MEP-MEP100
MEP-MEP100
MEP-MEP101
MEP-MEP101
MEP-MEP102
MEP-MEP102

File details come from the government source that posted it. Updated .