Asbestos Survey.pdf

PDF 218 KB Posted

Attached to
Z2DA--671-24-004 NRM Replace 2nd Floor Roof
Solicitation number
36C25726B0004
Issued by

About this file

This document is a floor plan diagram for the Fifth Floor of a facility, dated January 25, 2013. The plan uses color coding to indicate asbestos-containing material (ACM) abatement status across different areas of the floor. Blue-shaded areas indicate regions that have been abated from floor to ceiling, including ceiling tile replacement, but excluding interstitial spaces. Yellow-shaded areas are presumed to not have been abated and require further assessment or remediation. Gray-shaded areas are confirmed to have no ACM present. The diagram includes room labels and designations throughout the floor layout, with a directional compass and location indicator at the bottom right. This type of plan is typically used for environmental compliance documentation, facility management, renovation planning, or federal contract requirements related to asbestos assessment and remediation work in commercial or government buildings.

View the file

Other files

File Type Posted
36C25726B0004 0004.docx DOCX document
VA AUDIE MURPHY ROOF REPORT Signed.pdf PDF
23040-VA-Replace_2nd_Flr_Roof_Uncovering-Field Observation Report-001.pdf PDF
36C25726B0004 0003.docx DOCX document
RFI final 26B0004.docx DOCX document
36C25726B0004 0002.docx DOCX document
36C25726B0004 0001.docx DOCX document
S06 Pre-bid sign in sheet.pdf PDF
36C25726B0004_1.docx DOCX document
ICRA 671-24-004.pdf PDF
PCRA 671-24-004.pdf PDF
671-21-143-VA-SA-Replace_2nd_Floor_Roof-Drawings.pdf PDF
671-21-143-VA-SA-Replace_2nd_Floor_Roof-Specifications.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .