This document appears to be a set of architectural drawings related to the renovation and seismic retrofit of Building 3 at the Roseburg VA Medical Center. The drawings include detailed plans for the basement, first, and second floors, as well as the attic and roof. Key details include the demolition of existing windows, doors, stairs, and canopies, as well as the installation of new concrete slabs, window openings, and wrought iron railings. The project aims to seismically mitigate the existing building. This document is part of a larger federal contract opportunity, Solicitation #36C26024R0060, issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 20, to renovate Building 3 at the Roseburg VA facility.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAWCUT AND REMOVE
PORTION OF BRICK
AND CONCRETE WALL
BELOW WINDOW SILL
CAREFULLY REMOVE
EXISTING WINDOW AND ALL
RELATED WOOD FRAMING -
PACKAGE TOGETHER,
DOCUMENT PER SPECS, AND
TURN OVER TO OWNER
REMOVE
LANDING AND
STAIRS
REFERENCE DRAWINGS
FOR NEW CONCRETE
FILL ON METAL PAN
FLOOR
SAWCUT AND REMOVE
PORTION OF BRICK
AND CONCRETE WALL
BELOW WINDOW SILL
CAREFULLY REMOVE
EXISTING WINDOW AND
ALL RELATED WOOD
FRAMING - PACKAGE
TOGETHER, DOCUMENT
PER SPECS, AND TURN
OVER TO OWNER
REMOVE
LANDING AND
STAIRS
CAREFULLY REMOVE EXISTING
DOOR AND ALL RELATED
HARDWARE - SALVAGE FOR
REINSTALLATION - SEE DOOR
SCHEDULE
REFERENCE DRAWINGS
FOR NEW CONCRETE FILL
ON METAL PAN FLOOR
REMOVE EXISTING CANOPY
OVER DOOR AND RELATED
SUPPORTS, DOWNSPOUTS
AND GUTTERS
DO NOT SAWCUT HEADER
BRICKS - CAREFULLY REMOVE A
MINUMUM NUMBER OF BRICKS
REQ'D TO INSTALL NEW FLOOR,
NUMBER AND LABEL AND TURN
OVER TO OWNER - INFILL WITH
CONCRETE BELOW FLOOR
LEVEL AS NECESSARY
CAREFULLY REMOVE
EXISTING WINDOW AND ALL
RELATED WOOD FRAMING -
PACKAGE TOGETHER,
DOCUMENT PER SPECS,
AND TURN OVER TO OWNER
SAWCUT AND REMOVE
PORTION OF BRICK
AND CONCRETE WALL
BELOW WINDOW SILL
SAWCUT AND
REMOVE PORTION OF
BRICK AND
CONCRETE WALL
BELOW WINDOW SILL
CAREFULLY REMOVE
EXISTING DOOR AND ALL
RELATED HARDWARE CLEAN,
SAN AND REPAINT AND
REINSTALL AT DOOR E209d
DO NOT CUT BRICK
SOLDIER COURSE
ABOVE 1ST AND 2ND
FLOOR WINDOWS
EXISTING HISTORIC
WOOD CORNICE, DOOR
FRAME, AND COLUMNS
TO REMAIN. EXAMINE
FOR DAMAGE AND
NOTIFY ARCHITECT OF
ANY DAMAGED PIECES
REMOVE CONCRETE
STOOP AND SIDEWALK
OUTSIDE OF DOOR AND
PREP AREA FOR NEW
CONCRETE FLOOR SLAB
1/2"
REMOVE EXISTING FLASHING
AND CANOPY INCLUDING
ROOFING - CLEAN ADHESIVE
AND DIRT OFF EXG BRICK
UPPER PORTION OF PEDIMENT
TO BE REMOVED
CAREFULLY REMOVE EXG
LIGHT FIXTURES AND SALVAGE
FOR REINSTALLATION INSIDE
ELEVATOR LOBBY
SECURITY CAMERA TO BE
RELOCATED - REF
SECURITY DRAWINGS
EXISTING WOOD TRIM TO BE
REMOVED, SANDED AND
REFINISHED, REPAINT AND
REINSTALL
EXISTING WOOD TRIM TO
BE REMOVED, SANDED
AND REFINISHED, REPAINT
AND REINSTALL
SAWCUT AND REMOVE
PORTION OF BRICK
AND CONCRETE WALL
BELOW WINDOW SILL
CAREFULLY REMOVE
EXISTING WINDOW AND
ALL RELATED WOOD
FRAMING AND TRIM -
PACKAGE TOGETHER,
DOCUMENT PER SPECS,
AND TURN OVER TO
OWNER
REFERENCE DRAWINGS
FOR NEW DOOR IN
EXISTING OPENING
CAREFULLY REMOVE EXISTING
WINDOW AND ALL RELATED
WOOD FRAMING - PACKAGE
TOGETHER, DOCUMENT PER
SPECS, AND TURN OVER TO
OWNER
SAWCUT AND REMOVE
PORTION OF BRICK AND
CONCRETE WALL BELOW
WINDOW SILL
DO NOT CUT BRICK
SOLDIER COURSE
ABOVE 2ND FLOOR
WINDOWS
CAREFULLY REMOVE
CONCRETE SILL BELOW
WINDOW - PACKAGE AND LABEL
AS SPECIFIED AND TURN OVER
TO OWNER
SECTION INTERIOR
ELEV.
EXTERIOR
ELEV.
6"
REMOVE EXISTING CONCRETE SLAB RAMP
AND INFILL OVER RIGINAL STAIRS.
EXISTING ORIGINAL CONCRETE STEPS AND BRICK
FOUNDATION WALL TO REMAIN - PROTECT DURING
CONCRETE SLAB DEMOLITION OPERATIONS
SAWCUT AROUND ORIGINAL CONCRET BASE TO EXPOSE AND
SALVAGE - SAND AND FINISH BASE AT NEW CONSTRUCTION -
TYPICAL AT ALL FOUR COLUMNS
SAWCUT AROUND ORIGINAL GRANITE STOOP TO LEAVE IN
PLACE WITH NEW CONSTRUCTION
EXISTING ORIGINAL WROUGHT IRON
RAILINGS TO BE REMOVED WITH
CONCRETE. IF POSSIBLE, SALVAGE
RAILING, CLEAN CONCRETE FROM
BOTTOM RAIL, REFINISH AND REINSTALL.
IF RAILINGS ARE DAMAGED DURING
REMOVAL, REPLACE WITH NEW WROUGHT
IRON RAILS TO MATCH EXG.
STEEL PIPE RAILING AT RAMP TO BE REMOVED
SAWCUT AROUND ORIGINAL CONCRETE
BASE TO EXPOSE AND SALVAGE - SAND
AND FINISH BASE AT NEW CONSTRUCTION -
TYPICAL AT ALL FOUR COLUMNS
1/ 2' 0'
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8' 0'
1/ 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
3/ 0'
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
R os eb ur g B3
\0 4-
D
ES
IG
N
\R
EV
IT
\R
O
SE
BU
R
G
A R
C H
3.
rv t
/6 /2
6:
:3
PM
AD500
DEMOLITION DETAILS
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
SEISMICALLY MITIGATE BLDG. 3
VA Roseburg Healthcare System
653-21-102 director
11-7-2023 kh LMS
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/2" = 1'-0"F2 DEMO AT REAR CANOPY
1/2" = 1'-0"B8 DEMO AT 2ND FLOOR WINDOW
12" = 1'-0"C1 DEMO AT FRONT PORCH STEPS
Revisions: Date:
UP
WH
T
T
T
T
WP
WP
WP
2 2
2 2
CR
CR CR
CR
ES
ES
ES ES
LV
B
LV
A
LV
A
LVB LVB
LV
B
LV
B
LVB
LVB
LV
B
LV
B
LV
B
LV
LVA
M
AIM
AIM
AIM
AIM
AC
P
AC
P
FD
FD
FD
FD
FD
FD
FD
F1 A-302
6 7
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
1'
- 5
E
B
542.92 5.24.3
D.1
B.9
21' - 9" 11' - 4 1/2"12' - 2 1/2"
1'
- 5
129' - 3"
11' - 4 1/2" 21' - 9" 12' - 2 1/2" 38' - 7" 12' - 2 1/2" 21' - 9" 11' - 4 1/2"
4"
2'
- 7
1/ 2"
6 1 /2"
6'
- 0
6 1
/2" 2'
- 7 1/
2"
1'
- 3
6'
- 0
1'
- 3
1'
- 2 1/
2"
3 1
/2" 1'
- 2 1/
2"
3 1
/2"
6'
- 0
12' - 2 1/2"
13' - 5 1/2" 8' - 0" 8' - 0" 8' - 11"
7' - 3" 6' - 2 1/2"
A-202
F1
A-201 C2 A-201C7
A-201
F1
VEST M
BA109
LOCKER M
BA111
TOILET M
BA110
SHOWER M1
BA110a
VEST W
BA103
LOCKER W
BA104
TOILET W
BA105
SHOWER W
BA106
UNIFORMS
BA107
F6 A-304
F6 A-302
F6 A-302
EMS CHIEF
BA113
EMS AO
BA101
BREAK ROOM
BA115
LG EQPT
STORAGE
BA117
EMS INT
DESIGNER
BA119
EMS STORAGE
BA108
ELECT
BA122
A-401 F1
EMS ASST
CHIEF
BA114
EMS SUPER
BA118
EMS TRAINING
SUPER
BA120
A-401 E6
31' - 7 7/8" 7' - 0 1/8"
30' - 1 1/2"
UTIL
BA112
A-802D2 A-802
A-802F6 F2
D9
D4
F9
B4 B6
A-801D4 A-801 F8
A-801B8
D6
D9
F1
F5
D2
D1
B9
A-202
C5
A-202C8A-202 C2
MACH ROOM
BA121
ELEV.
E100
STAIR 1
E102
ELEV LOBBY
E100
4'
- 4
8' - 9" 16' - 0"
DRESSINGDRSNG
DRSNG
1"
8' - 0" 10' - 1" 9' - 9"
CORR
E101
EMS SUPPORT
BA102
8' - 9"
C1 A-302
C5 A-301
F1 A-301
F1 A-301
C7 A-303
F3 A-304
F9 A-304
1 123 10
4' - 10 1/2" 2' - 7" 2' - 7"8"
6' - 6"
8"4' - 10 1/2"
6' - 6"
5'
- 1
1" 5'
- 1 1"
1"
4.9 7.2
2' - 8"
6 1 /2"
HAC
BA116
SHWR M2
BA110b
CHASE
7 3 /4"
2'
- 5
"4' - 4" 4' - 10"
118120
E101a
114a
A-801
B2
B4B1
B6
A-803
F8
A-803 D8
F3
F1 F6
D7
D6
D9
A-804D4
C2 A-301
C7 A-302
4' - 4 1/2" 4' - 4 1/2"
7' - 7"
7' - 9"
3' - 10 1/2" 3' - 10 1/2"
22' - 6"
7' - 0"
5"
2' - 6"
1'
- 7
1/ 2"
F8 A-310
E102b
E102a
E100
F3
B3
D8
A-803
B9
D2
D3
B7
X
Y
Z
F2 A-303
F6 A-303
SHPO-2
F1
SHPO-2C7
F3 A-503
F6 A-503
B9
F1 A-503
A-500 D4
A-500 D6
A-500 D8
A-500 F6
A-500 F8
A-500 F4
8' - 8" F8
A-503
121b
B6
A-500
A5
2A6
A3
A3 A6
E2A3
A1
C4
C4A1 A1
A1t
A1t
A1t
C3
C3C6 C3
INFILL EXG PIT WITH CONC.
INFILL EXG PIT
WITH CONC.
RELOCATED HOSE BIBB
6' - 7"
3'
- 1
1"
MECHANICAL EQUIPMENT YARD
SEE CIVIL/MECH FOR PIPE REPAIR AND
REPLACEMENT - CLEAN FACE OF CONCRETE -
REMOVE THRU WALL PIPES AND GROUT HOLES
SOLID. PROVIDE LIQUID APPLIED WATERPROOFING
MEMBRANE ON FOUNDATION WALL AND
PROTECTION BOARD PRIOR TO BACKFILLING HOLESEE CIVIL/MECH FOR PIPE REPAIR AND
REPLACEMENT - CLEAN FACE OF CONCRETE -
PROVIDE LIQUID APPLIED WATERPROOFING
MEMBRANE ON FOUNDATION WALL AND
PROTECTION BOARD PRIOR TO BACKFILLING HOLE
SEE CIVIL/MECH FOR RAIN LEADER PIPE REPAIR
AND REPLACEMENT - CLEAN FACE OF CONCRETE -
PROVIDE LIQUID APPLIED WATERPROOFING
MEMBRANE ON FOUNDATION WALL AND
PROTECTION BOARD PRIOR TO BACKFILLING HOLE
SEE CIVIL/MECH FOR RAIN LEADER PIPE REPAIR AND
REPLACEMENT - CLEAN FACE OF CONCRETE - PROVIDE LIQUID
APPLIED WATERPROOFING MEMBRANE ON FOUNDATION WALL
AND PROTECTION BOARD PRIOR TO BACKFILLING HOLE
SEE CIVIL AND LANDSCAPE SHEETS FOR
SIDEWALK AND LANDSCAPING
HATCHING INDICATES LOCATION
OF NEW/EXG CONCRETE SLAB
JOINT - SEE STRUCTURAL
REMOVE EXG PLYWOOD IN
WINDOW OPENING - INFILL
OPENING WITH CONCRETE AND
BRICK TO MATCH EXISTING
NEW WINDOW IN
EXISTING OPENING
1/
2" 5'
- 9 1/
2"
5' - 8"
A-603
E5
A-603E9 A-603 E7
5 3/8" 6"
1'
- 2
R7
E101
E1E1
E2
C6
C6
C6
C4
C1 C4
C4
A6 A6
A3 A3A3
W3
L1
REPLACE EXG
LOUVER WITH
NEW TO FIT IN
EXG OPENING
SN-R SN-R
SN-RSN-R
SN-R
SN-R
SN-R
SN-R
SN-RSN-R
SN-Lw
SN-Lm
SN-W
SN-R
SN-M
SN-S
SN-S
SN-S
SN-S
SN-R
SN-E
SN-Es
SN-E
SN-X
SN-E
SN-R
A3 A5
A5 1' - 0 1/2"
BOTTLE
FILLER
A-802 B1
C7
A-301
1'
- 0
1/ 2"
REMOVE EXG PLYWOOD
IN WINDOW OPENING
INFILL OPENING WITH
BRICK ON CONCRETE
BACKER - SET NEW
BRICK BACK 1/2" FROM
FACE OF EXISTING
BRICK
1/ 2' 0'
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8' 0'
1/ 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
3/ 0'
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
R os eb ur g B3
\0 4-
D
ES
IG
N
\R
EV
IT
\R
O
SE
BU
R
G
A R
C H
3.
rv t
/6 /2
6:
:4
PM
A-101
BASEMENT FLOOR PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
SEISMICALLY MITIGATE BLDG. 3
VA Roseburg Healthcare System
653-21-102 director
11-7-2023 kh LMS
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"F1 BASEMENT
0 8' 12' 16'4'
Graphic Scale: 1 inch = 4 feet
3/4" = 1'-0"B1 UTILITY ROOM INFILL
UP
UP UP
W P
W P
WP
2 2
2 2
2 2
2 2 4
2 2
2 2
2 2
ES
ES
ES
CR
CR
CR
CR
ES
OS
OS
OS OS
OS
OS
OS
OS
OS
OS OS
OS OS
OS
OS OS
OS
OSOSOS
OS
OSOS
OS
OS
OS
OS
LVB
LVB
LVB
LVA LVA
LV
LVB
LVB
LV
A
LV
B
LV
B
LV
B
LV
B
LVB
LV
B
LV
B
LVBLVB
BP
S
S
FD FD
FA
C
P
F1 A-302
6 7
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
542.92 5.24.3
D.1
B.9
A-202
F1
A-201 C2 A-201C7
A-201
F1
CHILLER YARD
TOILET W
1A201
TOILET M
1A202
F6 A-304
F6 A-302
F6 A-302
7' - 8"
FLEET
1A204
UNION
1A203
BILLING
1A206 FS SUPPORT
1A207
FISCAL SERV.
AUDITOR
1A207B
IT
1A212
FISCAL SERV
AUDITOR
1A207A
FS CHIEF
1A210
FS ASST CHIEF
1A211
HBPC
DIRECTOR
1A209B
HBPC CHIEF
1A209A
A-411 D6
A-411 F2
A-202
C5
A-202C8A-202 C2
2"
2"
7' - 9"
CORR
E201
ELEV LOBBY
E200
8' - 0" 9' - 8" 8' - 0" 6' - 11 1/2" 4' - 10 1/2"
FS STOR
1A207C
C1 A-302
C5 A-301
F1 A-301
F1 A-301
C7 A-303
HBPC
SUPPORT
1A209
F3 A-304
F9 A-304
1 12 6' - 6" 12' - 0 1/2" 16' - 2 1/2" 14' - 6" 17' - 6" 8' - 9" 17' - 6" 14' - 6" 16' - 2 1/2" 12' - 0 1/2" 6' - 6"
3 10
8"4' - 10 1/2"2' - 7"2' - 7"4' - 10 1/2" 8"
2'
- 8
2'
- 8
7'
- 5
1/ 2"
GRADE AREA UP TO BOTTOM
RISER TO ENSURE ALL RISERS
ARE UNIFORM DOWN TO GRADE
AND SIDEWALK
NEW WROUGHT IRON RAILS
3"
UN OFFC
1A203A
UN OFFC
1A203B
1'
- 8
14' - 0" 8' - 2 1/2"
21' - 0"
VISN 1
1A205
4.9 7.2
5 1
/2" REVENUE MGR
1A206A
STOR
1A203C
5 1 /2"
11' - 0"
HBPC CLEAN
STOR
1A209C
5 1 /2"
1/
2"
HAC
1A208
9'
- 6
8' - 2" 5' - 2" 7' - 0" 11' - 0"
CHASE
E201b
E201c
E201
201202
E202
204 203
206 207
207b
207a
209a
E209a
E209d
203a
203b
206a
203c
209c
E201a
207c
209b
C2 A-301
22' - 3"
C7 A-302
2'
- 8
53' - 6" 53' - 6"
7' - 1 1/2" 8' - 0" 7' - 1 1/2"
6' - 4" 8' - 0" 8' - 0" 8' - 11" 8' - 11" 8' - 0" 8' - 0" 6' - 4" 7' - 1 1/2" 8' - 0" 7' - 1 1/2"
9'
- 6
7' - 9"
19' - 4"
10' - 0" 4'
- 5
1/ 2"
9'
- 4
1"
1" 9'
- 4
9'
- 4
9'
- 4
6'
- 1
0 1 /2"
8'
- 0
3' - 10"
4'
- 1
1/ 2"
1' - 8"
F8 A-310
0"
STAIR
E202
X
Y
Z
A-807 B6
D1
B1
F1
A-806
F3
F9
F4D6
A-808
F8
F6
F4
F2 F2
A-303
F6 A-303
8'
- 2
3/ 4"
3'
- 8
1/ 2"
10' - 11 1/2"10' - 11 1/2"
2'
- 8
2' - 8"1' - 10"
7'
- 5
1/ 2"
2'
- 8
7'
- 4
2'
- 8
7'
- 5 1/
2" 1'
- 4
2' - 8"1' - 10" 6' - 5 1/2"
1'
- 4
2' - 8" 6' - 5 1/2" 1' - 10"
7'
- 5
1/ 2"
2'
- 8
7'
- 4
SHPO-2C7
SHPO-2
D8
1/
2"
CONCRETE DECK PAVERS SET ON
VARIABLE HT PEDESTALS ON
CONCRETE STOOP
A-411 F7
A-501 D9
A-501 F8
A-501 D8
A-501 D5
A-501 D3
A-501 F5
A-501 D2
A-501 F2
A-501 F1
3' - 3 3/4"
B6
A-500
A-501 F5
SIM OPP
3'
- 0
3'
- 0
NEW CONCRETE
FLOOR SLAB
WHERE STAIRS
ARE REMOVED
FEC FEC
E1 A3 A3 A3
A6
A3
A3
E2
A6
A3
A3
A3
A3A3 A6
A6
A6
A3 A3
A6
A6
A3 A3
A3
A3
A1
C1 E2
E1
A3
C1
A3
A6 A3
A-603
E5
A-603E9 A-603 E7
A1
3"
1'
- 1
STAIR 2
A-500 C2
A-500 B2
A-500 C4 A-500
C8 A-500
C6
A-500 B8
C5
A3
A-501 F9
E2 E2
A5
6' - 0"
6'
- 0
3'
- 0
6' - 0"
CONCRETE DECK
PAVERS SET ON
VARIABLE HT PEDESTALS
ON CONCRETE SLAB
SN-WSN-M
SN-R
SN-R
SN-R SN-R SN-R
SN-R
SN-R
SN-R
SN-R
SN-RSN-R
SN-R
SN-R
SN-R
SN-R
4'
- 1
1 1 /2"
SN-X
8"
SN-R
SN-E
SN-Es
SN-E
SN-R
SN-R
SN-R
2' - 4 1/2" 4' - 0" 2' - 4 1/2"
NEW PIPE RAILINGS EACH SIDE OF
STAIR RUN - MOUNT IN SLEEVES
TO EXG/NEW CONCRETE
NEW PIPE RAILINGS
EACH SIDE OF STAIR
RUN - MOUNT IN
SLEEVES TO EXG/NEW
CONCRETE
NEW PIPE RAILINGS
EACH SIDE OF STAIR
RUN - MOUNT IN
SLEEVES TO EXG/NEW
CONCRETE
BRICK
COLUMNS SIM
OPP HAND
NEW WROUGHT IRON
RAILINGS TO MATCH EXG.
BRICK
COLUMNS
SIM OPP
HAND
C7
A-301
C9
A-304
2' - 0 3/4"
C1
A-303
A-807
F3
D3
A-806
B6
B8B4
B9
1/ 2' 0'
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8' 0'
1/ 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
3/ 0'
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
R os eb ur g B3
\0 4-
D
ES
IG
N
\R
EV
IT
\R
O
SE
BU
R
G
A R
C H
3.
rv t
/6 /2
6:
:4
PM
A-111
FIRST FLOOR PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
SEISMICALLY MITIGATE BLDG. 3
VA Roseburg Healthcare System
653-21-102 director
11-7-2023 KH LMS
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"F1 FIRST FLOOR
0 8' 12' 16'4'
Graphic Scale: 1 inch = 4 feet
4 4 4
2 2
2 2
2 2
2 2
2 2
CR
ES
LV
LVB LVB
LV
B
LV
B
LV
B
LV
B
LV
B
LV
B
LVB
LVA
LV
B
LVB
LV
B
LVB LVB LVB LVB LVB
LVB
LV
B
LV
B
LVALVA
LVB
LV
B
F1 A-302
6 7
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
542.92 5.24.3
D.1
B.9
A-202
F1
A-201 C2 A-201C7
TOILET M
2A302
TOILET W
2A301
F6 A-304
F6 A-302
F6 A-302
CALL CENTER
2A309
SHARED
CONF/TRAIN
2A303
4'
- 4
LOG ASST
CHIEF
2A304A
LOG CHIEF
2A304B
LOGISTICS
SUPPORT
2A304
11' - 0" 9'
- 6
HR DIRECTOR
2A308C
HR CHIEF
2A308E
HR SUPPORT
2A308
LOG
SUPERVISOR
2A306
FLEX SPACE
2A307
A-421 F6
A-421 F2
A-202
C5
A-202C8A-202 C2
ELEV LOBBY
E300
11' - 0"
9'
- 6
24' - 0"
7' - 9"
CORR
E301
HR
SUPERVISOR
2A308B
HR COPY/
SUPPLY
2A308G
HR WORK
STATIONS
2A308D
HR RECORDS
2A308F
LOG SUPPLY
2A304C
C1 A-302 C5
A-301
F1 A-301
F1 A-301
C7 A-303
F3 A-304
F9 A-3041 123 10
4.9 7.2
10' - 10" 18' - 8" 8' - 0" 8' - 6" 8' - 6"
LOG
SUPERVISOR
2A305
12' - 0"
P.I.V.
2A308A
8' - 6"
CHASE
E302
306305
E301b
E301a
303b
304a
308e
308c
308a
301302
E303a
304 308b
308g
308f
304b
304c
C2 A-301
C7 A-302
8' - 8"
17' - 4" 9' - 8"
5 1 /2"
5 1 /2"
7'
- 0
3'
- 6
11' - 8"
8' - 8"
3' - 8"
4'
- 1
1/ 2"
1 1 /2"
5'
- 1
1/ 2"
3"
1' - 8"
F8 A-310
STAIR
E302
X
Y
Z
A-809
D3
B6
B8B2
A-808
B5
D5
B2 D2
A-809
D7
F7
F4F1
F2 A-303
F6 A-303
SHPO-2C7
SHPO-2
D8
1-HR RATED
CHASE
AROUND
DUCT - SEE
MECH
A-501 B9
A-501 B3
A-501 B8
A-501 B5
LADDER
TO ATTIC
ACCESS
A-501
F2SIM
A-501 F2
A-501
D5SIMA-501
D3
SIM
SIM
A-501
F2SIM
A-501 B2
NEW CONCRETE FLOOR SLAB
WHERE STAIRS ARE REMOVED
F5
A-502
2'
- 1
1/ 4"
A-603
E5
A-603E9 A-603 E7
C5
A-502
E8
A-502
STAIR 2
R7
R7
R7
R7R7R7R7R7R7R7
E301
SN-R
SN-R
SN-R
SN-R
SN-R
SN-R
8"
SN-R SN-R
SN-R SN-R
SN-R
SN-R
SN-R
SN-R
SN-RSN-R
SN-W
SN-RSN-M
SN-Es
SN-R
SN-E
SN-Es
SN-E
3'
- 6
3/ 8"
C7
A-301
FEC
FEC
A6
A3 A3
A3
A3 A3
A6
A3 A3 A3
A3
A3
A3
A3
A6
B3B3
A3
A3
A6
A3
A3
E2
E1
A6
A3
A3
E2
E2
E2
E1
E2 E2
E1
E2
C1
C1
E2
E2
E1
E2C1E2C1
C6 C6
A5
1/ 2' 0'
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8' 0'
1/ 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
3/ 0'
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
R os eb ur g B3
\0 4-
D
ES
IG
N
\R
EV
IT
\R
O
SE
BU
R
G
A R
C H
3.
rv t
/6 /2
6:
:5
PM
A-121
SECOND FLOOR PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
SEISMICALLY MITIGATE BLDG. 3
VA Roseburg Healthcare System
653-21-102 director
11-7-2023 KH LMS
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"F1 SECOND FLOOR
0 8' 12' 16'4'
OS
F1 A-302
6 7
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
542.9 5.24.3
D.1
B.9
A-202
F1
F6 A-304
F6 A-302
A-202
C5
A-202C8A-202 C2
C1 A-302
C5 A-301
F1 A-301
F1 A-301
F3 A-304
F9 A-3043 10
4.9 7.2
C2 A-301
C7 A-302
F8 A-310
X
Y
Z
SHPO-2
D8
ROOF ABOVE
CONNECTOR LOBBY
EXISTING ATTIC ACCESS PROVIDE
NEW LADDER AND FLOOR HATCH
ATTIC SHEAR WALLS
ATTIC SHEAR WALLS
WOOD ATTIC
STRUCTURE TO REMAIN
PROVIDE 3/16" STEEL
PLATE CENTERED OVER
14" X 12" HOLE WITH 4"
MIN. BEARING ALL
SIDES WHERE DUCT IS
REMOVED - EPOXY
BOLT TO CONCRETE
DECK AT 8" O.C.
AROUND PERIMETER
PROVIDE 3/16" STEEL
PLATE CENTERED OVER
14" X 10" HOLE WITH 4"
MIN. BEARING ALL
SIDES WHERE DUCT IS
REMOVED - EPOXY
BOLT TO CONCRETE
DECK AT 8" O.C.
AROUND PERIMETER
BLOCK LOUVER
WITH PLYWOOD
F5
A-502
A-603E9
C5
A-502
E8
A-502
C1
A-502
NEW MECHANICAL DUCT
CHASE DOWN TO FIRST
FLOOR - SAWCUT CONC
FLOOR DECKS BETWEEN
CONCRETE JOISTS/BEAMS
REFERENCE MECHANICAL
SHEETS FOR DUCTS GOING
DOWN THRU CHASE
C7
A-301
2'- 6"
2'-0"
1/ 2' 0'
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8' 0'
1/ 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
3/ 0'
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
R os eb ur g B3
\0 4-
D
ES
IG
N
\R
EV
IT
\R
O
SE
BU
R
G
A R
C H
3.
rv t
/6 /2
6:
:5
PM
A-131
ATTIC PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
SEISMICALLY MITIGATE BLDG. 3
VA Roseburg Healthcare System
653-21-102 director
11-7-2023 kh LMS
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"F1 ATTIC FLOOR
0 8' 12' 16'4'
| ROSEBURG 3 ARCH 2023.pdf |
| Sheets |
| A-101 - BASEMENT FLOOR PLAN |
| A-111 - FIRST FLOOR PLAN |
| A-121 - SECOND FLOOR PLAN |
| A-131 - ATTIC PLAN |
| A-141 - ROOF PLAN |
| A-201 - EXTERIOR ELEVATIONS |
| A-202 - EXTERIOR ELEVATIONS |
| A-301 - N-S BUILDING SECTIONS |
| A-302 - E-W BUILDING SECTIONS |
| A-303 - STAIR SECTIONS |
| A-304 - STAIR SECTIONS |
| A-310 - WALL SECTIONS |
| AD500 - DEMOLITION DETAILS |
File details come from the government source that posted it. Updated .