This document contains a set of construction drawings for the renovation and seismic retrofit of Building 3 at the Roseburg VA Medical Center (VAMC). The drawings depict the fire protection, fire alarm, and fire sprinkler systems that will be demolished and reinstalled as part of the renovation project. Key details include:
The project will renovate Building 3 of the Roseburg VAMC under Solicitation 36C26024R0060. The work involves modifying the existing fire protection, fire alarm, and fire sprinkler systems to accommodate the new space configuration. The project will include disconnecting and retaining existing devices, demolishing conduit, and reinstalling devices. Drawings are provided for the basement, first, second, and attic floor plans, as well as a fire alarm riser diagram. The scope also includes a new vertical double detector check valve assembly, fire department connection, and related piping work.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
75 cd
75 cd 75 cd
75 cd
15 cd
75 cd
15 cd
75 cd 75 cd
75 cd
75 cd
75 cd
75 cd
75 cd 75 cd
75 cd
75 cd
75 cd
15 cd
75 cd
15 cd
75 cd
15 cd
75 cd
75 cd
75 cd c d c d c d
R/F
P S
P S
P S
P S
P S
P S P
S
P S
P S
P
SP
S P
S
F
F
F
AIM
AIM
B P
S
6 7 8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
542.92 5.24.3
D.1
B.9
1 103 12
(E) FIRE ALARM
PANELS TO REMAIN
INCOMING 4" FIRE WATER
UNDERGROUND SERVICE LINE -
REFER TO SHEET FXD101 AND
FX101 FOR MORE INFORMATION.
4"TEE RISER
RISER UP
4" FIRE WATER
SERVICE MAIN
Z
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:3
A
M
FD101
FIRE PROTECTION DEMOLITION -
BASEMENT FLOOR PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 GF AH
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE ALARM DEMOLITION - BASEMENT FLOOR
PLAN
SHEET NOTES
A. REFER TO DEMOLITION NOTES ON SHEET FA001 FOR MORE INFORMATION.
B. DISCONNECT AND RETAIN ALL FIRE ALARM, MASS NOTIFICATION DEVICES
AND WIRING FOR REINSTALLATION. CONTRACTOR TO EVALUATE
MANUFACTURER'S RECOMMENDED REPLACEMENT DATE FOR SUCH DEVICES
AS SMOKE DETECTORS AND SHALL NOTIFY COR IF ANY DEVICES/EQUIPMENT
ARE NOT SUITABLE FOR REUSE.
C. DEMOLISH FIRE ALARM CONDUIT.
0' 4' 8' 16'2'
NOTE: DEVICE LAYOUT AND TOTALS BASED ON AVAILABLE RECORD DRAWINGS
DATED 10/15/19.
FIRE ALARM - SPEAKER STROBE - 12
FIRE ALARM - STROBE ONLY (CEILING) - 14
FIRE ALARM - STROBE ONLY (WALL) - 3
SMOKE DETECTOR - PHOTOELECTRIC - 13
HEAT DETECTOR - R/F - 1
MANUAL FIRE ALARM PULL STATION - 3
ADDRESSABLE INPUT MODULE - 2
ADDRESSABLE OUTPUT MODULE - N/A
EXISTING BASEMENT FLOOR FA DEVICE TOTALS
Revisions: Date:
Expires: 06/30/24Expires: 12/31/2024
15 cd 15 cd
30 cd
15 cd 15 cd 15 cd
30 cd 30 cd
75 cd
15 cd15 cd
15 cd
15 cd
15 cd
15 cd
15 cd
75 cd
30 cd
15 cd 15 cd
15 cd
15 cd
15 cd
75 cd
15 cd
75 cd
15 cd
15 cd 15 cd
15 cd
75 cd
15 cd c d c d 15 c d c d
P S
P S
P S
P S
P S
P S
P S
P S
P S
P S
P S
P S
P S
F
F
F
AIM
AIM
AOM
B P
S F
A C
P
B P
S
6 7 8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
542.92 5.24.3
D.1
B.9
EOL MNS NAC3B-3, 15KΩ
EOL AUD NAC3A-2, 47KΩ
CC
CC
1S
1S
DH
DH
1 103 12
FIRE SPRINKLER RISER
Z
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:3
A
M
FD102
FIRE PROTECTION DEMOLITION -
FIRST FLOOR PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 GF AH
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE ALARM DEMOLITION - FIRST FLOOR PLAN
0' 4' 8' 16'2'
NOTE: DEVICE LAYOUT AND TOTALS BASED ON AVAILABLE RECORD DRAWINGS
DATED 10/15/19.
FIRE ALARM - SPEAKER STROBE - 11
FIRE ALARM - STROBE ONLY (CEILING) - 21
FIRE ALARM - STROBE ONLY (WALL) - 4
SMOKE DETECTOR - PHOTOELECTRIC - 13
HEAT DETECTOR - R/F - N/A
MANUAL FIRE ALARM PULL STATION - 3
ADDRESSABLE INPUT MODULE - 2
ADDRESSABLE OUTPUT MODULE - 1
EXISTING 1ST FLOOR FA DEVICE TOTALS SHEET NOTES
A. REFER TO DEMOLITION NOTES ON SHEET FA001 FOR MORE INFORMATION.
B. DISCONNECT AND RETAIN ALL FIRE ALARM, MASS NOTIFICATION DEVICES
AND WIRING FOR REINSTALLATION. CONTRACTOR TO EVALUATE
MANUFACTURER'S RECOMMENDED REPLACEMENT DATE FOR SUCH DEVICES
AS SMOKE DETECTORS AND SHALL NOTIFY COR IF ANY DEVICES/EQUIPMENT
ARE NOT SUITABLE FOR REUSE.
C. DEMOLISH FIRE ALARM CONDUIT.
1. DISCONNECT AND RETAIN FIRE ALARM CONTROL PANEL FOR FUTURE
REINSTALLATION.
FLAG NOTES #
75 cd 75 cd 15 cd 15 cd
15 cd 15 cd
15 cd
75 cd
75 cd
15 cd
15 cd 15 cd
30 cd 30 cd
15 cd
15 cd 15 cd
15 cd
30 cd
15 cd
30 cd
15 cd
75 cd
75 cd 15 cd c d c d c d c d
P S
P S
P S
P S
P S
P S
P S
P S
P S
P S
AIM
AIM
F
6 7 8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
542.92 5.24.3
D.1
B.9
1 103 12
FIRE SPRINKLER RISER
Z
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:3
A
M
FD103
FIRE PROTECTION DEMOLITION -
SECOND FLOOR PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 GF AH
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE ALARM DEMOLITION - SECOND FLOOR
PLAN
0' 4' 8' 16'2'
NOTE: DEVICE LAYOUT AND TOTALS BASED ON AVAILABLE RECORD DRAWINGS
DATED 10/15/19.
FIRE ALARM - SPEAKER STROBE - 9
FIRE ALARM - STROBE ONLY (CEILING) - 17
FIRE ALARM - STROBE ONLY (WALL) - 4
SMOKE DETECTOR - PHOTOELECTRIC - 10
HEAT DETECTOR - R/F - N/A
MANUAL FIRE ALARM PULL STATION - N/A
ADDRESSABLE INPUT MODULE - 2
ADDRESSABLE OUTPUT MODULE - N/A
EXISTING 2ND FLOOR FA DEVICE TOTALS SHEET NOTES
A. REFER TO DEMOLITION NOTES ON SHEET FA001 FOR MORE INFORMATION.
B. DISCONNECT AND RETAIN ALL FIRE ALARM, MASS NOTIFICATION DEVICES
AND WIRING FOR REINSTALLATION. CONTRACTOR TO EVALUATE
MANUFACTURER'S RECOMMENDED REPLACEMENT DATE FOR SUCH DEVICES
AS SMOKE DETECTORS AND SHALL NOTIFY COR IF ANY DEVICES/EQUIPMENT
ARE NOT SUITABLE FOR REUSE.
C. DEMOLISH FIRE ALARM CONDUIT.
95 cd
R/F
R/FR/F R/F
6 7 8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
542.92 5.24.3
D.1
B.9
1 103 12
Z
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:3
A
M
FD104
FIRE PROTECTION DEMOLITION -
ATTIC PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 GF AH
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
0' 4' 8' 16'2' 1/4" = 1'-0"1
FIRE ALARM DEMOLITION - ROOF PLAN
NOTE: DEVICE LAYOUT AND TOTALS BASED ON AVAILABLE RECORD DRAWINGS
DATED 10/15/19.
FIRE ALARM - SPEAKER STROBE - 1
FIRE ALARM - STROBE ONLY (CEILING) - N/A
FIRE ALARM - STROBE ONLY (WALL) - N/A
SMOKE DETECTOR - PHOTOELECTRIC - N/A
HEAT DETECTOR - R/F - 4
MANUAL FIRE ALARM PULL STATION - N/A
ADDRESSABLE INPUT MODULE - N/A
ADDRESSABLE OUTPUT MODULE - N/A
EXISTING ATTIC LEVEL FA DEVICE TOTALS SHEET NOTES
A. REFER TO DEMOLITION NOTES ON SHEET FA001 FOR MORE INFORMATION.
B. DISCONNECT AND RETAIN ALL FIRE ALARM, MASS NOTIFICATION DEVICES
AND WIRING FOR REINSTALLATION. CONTRACTOR TO EVALUATE
MANUFACTURER'S RECOMMENDED REPLACEMENT DATE FOR SUCH DEVICES
AS SMOKE DETECTORS AND SHALL NOTIFY COR IF ANY DEVICES/EQUIPMENT
ARE NOT SUITABLE FOR REUSE.
C. DEMOLISH FIRE ALARM CONDUIT.
6 7 8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
542.92 5.24.3
D.1
B.9
1 103 12
Z
E 2 1/2" F TO GROUND
FLOOR SYSTEM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:3
A
M
FXD101
FIRE SPRINKLER - BASEMENT
FLOOR DEMO PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 CK PR
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE SPRINKLER - BASEMENT FLOOR DEMO
PLAN
SHEET NOTES
A. MODIFY EXISTING SPRINKLER SYSTEM AS REQUIRED TO ACCOMMODATE NEW
SPACE CONFIGURATION.
B. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL
CONSTRUCTION AND ARCHITRAVE DRAWINGS FOR CEILING TYPES AND ROOM
ELEVATIONS.
C. SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE, RECESSED PENDENT
STYLE IN AREAS WITH DROPPED CEILING, UPRIGHT IN AREAS WITH CEILINGS
EXPOSED TO STRUCTURE.
D. SPRINKLERS INSTALLED IN ACOUSTIC TILE CEILING SHALL BE LOCATED
SYMMETRICALLY IN TILES UNLESS OTHERWISE INDICATED ON THE
ARCHITECTURAL DRAWINGS. SUBMIT PROPOSED LAYOUT FOR APPROVAL BY
THE ARCHITECT.
E. SLOPE PIPING TO DRAIN BACK TO FLOOR CONTROL VALVE. COORDINATE
LOCATION OF ANY ADDITIONAL LOW POINT DRAINS WITH THE CONTRACTING
OFFICER'S DESIGNATED REPRESENTATIVE
F. PROVIDE NFPA REQUIRED AIR RELIEF VALVES AT SYSTEM HIGH POINTS.
0' 4' 8' 16'2'
1. NEW VERTICAL DOUBLE DETECTOR CHECK VALVE ASSEMBLY(DCDA), NEW
FDC CHECK VALVE AND PIPING.
2. RE-ROUTE SPRINKLER PIPING. ALL SPRINKLER PIPING SHALL ROUTE
OVERHEAD TO POINT OF CONNECTION AT DCDA.
FLAG NOTES #
WH
FD
FD
FD
FD
FD
FD
FD
75 cd
75 cd
F
75 cd
75 cd
75 cd
75 cd
75 cd
75 cd
75 cd
75 cd
75 cd
15 cd
75 cd
75 cd
15 cd
P S
F
F F
75 cd
AIM
AIM
15 cd
15 cd
15 cd
15 cd
15 cd
15 cd
75 cd
75 cd
75 cd
75 cd
75 cd
75 cd
75 cd
75 cd
B P
S
P S
AIM
AIM
AIM
AIM
F
6 7
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
42.92
5.2
4.3
D.1
B.9
1 103 12
VEST M
BA109
44 SF
LOCKER M
BA111
86 SF
TOILET M
BA110
125 SF
SHOWER M1
BA110a
32 SF
VEST W
BA103
48 SF
LOCKER W
BA104
118 SF
TOILET W
BA105
139 SF
SHOWER W
BA106
77 SF
UNIFORMS
BA107
157 SF
EMS CHIEF
BA113
104 SF
EMS AO
BA101
106 SF
BREAK ROOM
BA115
241 SF
EMS INT
DESIGNER
BA119
79 SF
LG EQPT
STORAGE
BA117
907 SF
EMS STORAGE
BA108
320 SF
ELECT
BA122
320 SF
UTIL
BA112
44 SF
EMS ASST
CHIEF
BA114
105 SF
EMS SUPER
BA118
119 SF
EMS TRAINING
SUPER
BA120
101 SF
MACH ROOM
BA121
39 SF
ELEV.
E100
91 SFSTAIR 1
E102
122 SF
ELEV LOBBY
E100
135 SF
CORR
E101
409 SF
EMS SUPPORT
BA102
91 SF
SHWR M2
BA110b
17 SF
HAC
BA116
25 SF
4.9 7.2
X
Y
Z
MNS
MNS
MNS
MNS
MNS MNS
MNS
MNS
MNS
MNS
MNS
MNS
MNS
MNS
MNS
SDSD
SEISMIC JOINT - SEE SHEET NOTE D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:4
A
M
FA101
FIRE ALARM - BASEMENT FLOOR
PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 GF AH
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE ALARM - BASEMENT FLOOR PLAN
0' 4' 8' 16'2'
SHEET NOTES
A. REINSTALL EXISTING FIRE ALARM DEVICES AND REUSE EXISTING WIRING
WHERE PRACTICABLE. TEST TO VERIFY EXISTING CABLE INTEGRITY PRIOR TO
REUSE. RECORD ALL WIRING BETWEEN DEVICES AND SUBMIT TO EOR FOR
AS-BUILT PURPOSES. EXISTING SLC AND MASS NOTIFICATION CABLES MAY
BE REUSED IF TESTED AND VERIFIED. SLC CABLING MAY BE T-TAPPED.
EXISTING NAC CIRCUIT CABLE MAY BE REUSED IF TESTED AND VERIFIED. IF
REUSED CONNECT TO FIRE ALARM (CLEAR LENS) STROBE APPLIANCES.
B. FIRE ALARM DEVICES INSTALLED IN THE ELEVATOR HOISTWAY SHALL BE
ACCESSIBLE FOR SERVICING, TESTING, AND MAINTENANCE FROM OUTSIDE
THE ELEVATOR HOISTWAY AS REQUIRED BY NFPA 72 21.3.7.
C. REFER TO MECHANICAL CONSULTANT DRAWINGS TO COORDINATE EXACT
FIRE DAMPER LOCATIONS.
D. FOR CIRCUITS CROSSING SEISMIC JOINT, PROVIDE EXPANSION DEFLECTION
FITTING WITH A MINIMUM OF 1-1/2" DEFLECTION CAPABILITY IN ALL
DIRECTIONS.
E. FOR DEVICES INSTALLED ALONG EXISTING EXTERIOR WALL WHERE
SHOTCRETE WILL BE APPLIED, ROUGH-IN 3/4" DIAMETER CONDUIT WITH
4SX1-1/2"D BACKBOXES . CONTRACTOR TO NOTIFY STRUCTURAL EOR IF
LARGER DIAMETER CONDUIT OR BACKBOX IS REQUIRED.
1. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER WATER FLOW
SWITCH. REFER TO FIRE SPRINKLER DRAWINGS.
2. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER FIRE SPRINKLER
OUTSIDE SCREW AND YOKE VALVE. REFER TO FIRE SPRINKLER DRAWINGS.
3. PROVIDE FIRE ALARM CONNECTION TO ELEVATOR CONTROL PANEL FOR
PRIMARY RECALL FUNCTION. REFER TO SITE SPECIFIC ELEVATOR DRAWINGS.
4. PROVIDE FIRE ALARM CONNECTION TO ELEVATOR CONTROL PANEL FOR
SECONDARY RECALL FUNCTION. REFER TO SITE SPECIFIC ELEVATOR
DRAWINGS.
5. PROVIDE FIRE ALARM CONNECTION TO ELEVATOR CONTROL PANEL FOR
FIREMANS HAT FUNCTION. REFER TO SITE SPECIFIC ELEVATOR DRAWINGS.
6. PROVIDE FIRE ALARM CONNECTION TO ELEVATOR CONTROL PANEL FOR
SHUNT TRIP FUNCTION. REFER TO SITE SPECIFIC ELEVATOR DRAWINGS.
FLAG NOTES #
F
C P
FD FD
75 cd 75 cd
75 cd
75 cd
75 cd
15 cd
P S
75 cd
F
F
F F
A C
P
AIM
AIM
75 cd
75 cd
75 cd
75 cd
75 cd 75 cd
15 cd
15 cd
15 cd
75 cd
F
75 cd
15 cd
15 cd
15 cd
15 cd
FAA
F A
A
75 cd
75 cd
S
B P
S B
P S
6 7
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
42.92
5.2
4.3
D.1
B.9
1 103 12
TOILET W
1A201
110 SF
TOILET M
1A202
97 SF
FLEET
1A204
103 SF UNION
1A203
87 SF
BILLING
1A206
250 SF
FS SUPPORT
1A207
124 SF
FISCAL SERV.
AUDITOR
1A207B
103 SF
IT
1A212
94 SF
FISCAL SERV
AUDITOR
1A207A
100 SF
FS CHIEF
1A210
100 SF
FS ASST CHIEF
1A211
100 SF
HBPC
DIRECTOR
1A209B
105 SF
HBPC CHIEF
1A209A
105 SF
ELEV LOBBY
E200
138 SF
CORR
E201
552 SF
FS STOR
1A207C
21 SF
HBPC
SUPPORT
1A209
392 SF
UN OFFC
1A203A
101 SF
UN OFFC
1A203B
94 SF
VISN 1
1A205
309 SF
REVENUE MGR
1A206A
102 SF
STOR
1A203C
9 SF
HBPC CLEAN
STOR
1A209C
61 SF
HAC
1A208
26 SF
4.9 7.2
X
Y
Z
STAIR
E202
226 SF
MNS MNS
MNSMNS
MNS MNS
MNS
MNS
MNS
MNS
MNS
MNS
SD
SD
SEISMIC JOINT - SEE SHEET NOTE D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:4
A
M
FA102
FIRE ALARM - FIRST FLOOR PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 GF AH
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE ALARM - FIRST FLOOR PLAN
0' 4' 8' 16'2'
SHEET NOTES
A. REINSTALL EXISTING FIRE ALARM DEVICES AND REUSE EXISTING WIRING
WHERE PRACTICABLE. TEST TO VERIFY EXISTING CABLE INTEGRITY PRIOR TO
REUSE. RECORD ALL WIRING BETWEEN DEVICES AND SUBMIT TO EOR FOR
AS-BUILT PURPOSES. EXISTING SLC AND MASS NOTIFICATION CABLES MAY
BE REUSED IF TESTED AND VERIFIED. SLC CABLING MAY BE T-TAPPED.
EXISTING NAC CIRCUIT CABLE MAY BE REUSED IF TESTED AND VERIFIED. IF
REUSED CONNECT TO FIRE ALARM (CLEAR LENS) STROBE APPLIANCES.
B. FIRE ALARM DEVICES INSTALLED IN THE ELEVATOR HOISTWAY SHALL BE
ACCESSIBLE FOR SERVICING, TESTING, AND MAINTENANCE FROM OUTSIDE
THE ELEVATOR HOISTWAY AS REQUIRED BY NFPA 72 21.3.7.
C. REFER TO MECHANICAL CONSULTANT DRAWINGS TO COORDINATE EXACT
FIRE DAMPER LOCATIONS.
D. FOR CIRCUITS CROSSING SEISMIC JOINT, PROVIDE EXPANSION DEFLECTION
FITTING WITH A MINIMUM OF 1-1/2" DEFLECTION CAPABILITY IN ALL
DIRECTIONS.
E. FOR DEVICES INSTALLED ALONG EXISTING EXTERIOR WALL WHERE
SHOTCRETE WILL BE APPLIED, ROUGH-IN 3/4" DIAMETER CONDUIT WITH
4SX1-1/2"D BACKBOXES . CONTRACTOR TO NOTIFY STRUCTURAL EOR IF
LARGER DIAMETER CONDUIT OR BACKBOX IS REQUIRED.
1. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER WATER FLOW
SWITCH. REFER TO FIRE SPRINKLER DRAWINGS.
2. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER FIRE SPRINKLER
OUTSIDE SCREW AND YOKE VALVE. REFER TO FIRE SPRINKLER DRAWINGS.
3. PROVIDE TWO DEDICATED TELEPHONE LINES FOR DIGITAL ALARM
COMMUNICATOR TRANSMITTER.
FLAG NOTES #
AIM
75 cd
75 cd
75 cd
75 cd
P S
F
F
75 cd
75 cd
75 cd
75 cd
15 cd
15 cd 15 cd
15 cd
75 cd
75 cd
75 cd
75 cd
75 cd
75 cd
75 cd
75 cd
75 cd
AIM
6 7
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
42.92
5.2
4.3
D.1
B.9
1 103 12
TOILET M
2A302
97 SF
TOILET W
2A301
110 SF
CALL CENTER
2A309
226 SF
HR SUPPORT
2A308
381 SF
SHARED
CONF/TRAIN
2A303
335 SF
LOG CHIEF
2A304B
103 SF
LOG ASST
CHIEF
2A304A
102 SF
LOGISTICS
SUPPORT
2A304
257 SF
HR DIRECTOR
2A308C
105 SF
HR CHIEF
2A308E
105 SF
FLEX SPACE
2A307
109 SF
LOG
SUPERVISOR
2A306
112 SF
ELEV LOBBY
E300
138 SF
CORR
E301
414 SF
HR
SUPERVISOR
2A308B
108 SF
HR COPY/
SUPPLY
2A308G
56 SF
HR WORK
STATIONS
2A308D
188 SF
HR RECORDS
2A308F
65 SF
LOG SUPPLY
2A304C
48 SF
LOG
SUPERVISOR
2A305
109 SF
P.I.V.
2A308A
155 SF
4.9 7.2
X
Y
Z
STAIR
E302
226 SF
MNS
MNS
MNS
MNS
MNS
MNS
MNS
MNS
MNS
MNS
SEISMIC JOINT - SEE SHEET NOTE D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:4
A
M
FA103
FIRE ALARM - SECOND FLOOR
PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 GF AH
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE ALARM - SECOND FLOOR PLAN
0' 4' 8' 16'2'
SHEET NOTES
A. REINSTALL EXISTING FIRE ALARM DEVICES AND REUSE EXISTING WIRING
WHERE PRACTICABLE. TEST TO VERIFY EXISTING CABLE INTEGRITY PRIOR TO
REUSE. RECORD ALL WIRING BETWEEN DEVICES AND SUBMIT TO EOR FOR
AS-BUILT PURPOSES. EXISTING SLC AND MASS NOTIFICATION CABLES MAY
BE REUSED IF TESTED AND VERIFIED. SLC CABLING MAY BE T-TAPPED.
EXISTING NAC CIRCUIT CABLE MAY BE REUSED IF TESTED AND VERIFIED. IF
REUSED CONNECT TO FIRE ALARM (CLEAR LENS) STROBE APPLIANCES.
B. FIRE ALARM DEVICES INSTALLED IN THE ELEVATOR HOISTWAY SHALL BE
ACCESSIBLE FOR SERVICING, TESTING, AND MAINTENANCE FROM OUTSIDE
THE ELEVATOR HOISTWAY AS REQUIRED BY NFPA 72 21.3.7.
C. REFER TO MECHANICAL CONSULTANT DRAWINGS TO COORDINATE EXACT
FIRE DAMPER LOCATIONS.
D. FOR CIRCUITS CROSSING SEISMIC JOINT, PROVIDE EXPANSION DEFLECTION
FITTING WITH A MINIMUM OF 1-1/2" DEFLECTION CAPABILITY IN ALL
DIRECTIONS.
E. FOR DEVICES INSTALLED ALONG EXISTING EXTERIOR WALL WHERE
SHOTCRETE WILL BE APPLIED, ROUGH-IN 3/4" DIAMETER CONDUIT WITH
4SX1-1/2"D BACKBOXES . CONTRACTOR TO NOTIFY STRUCTURAL EOR IF
LARGER DIAMETER CONDUIT OR BACKBOX IS REQUIRED.
1. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER DRY SYSTEM VALUE.
REFER TO FIRE SPRINKLER DRAWINGS.
2. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER DRY SYSTEM AIR
COMPRESSOR FOR LOW PRESSURE SENSOR. REFER TO FIRE SPRINKLER
DRAWINGS.
FLAG NOTES #
95 cd
6 7
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
42.92
5.2
4.3
D.1
B.9
1 103 12
4.9 7.2
X
Y
Z
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:4
A
M
FA104
FIRE ALARM - ATTIC FLOOR PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 GF AH
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE ALARM - ATTIC PLAN
0' 4' 8' 16'2'
SHEET NOTES
A. REINSTALL EXISTING FIRE ALARM DEVICES AND REUSE EXISTING WIRING
WHERE PRACTICABLE. TEST TO VERIFY EXISTING CABLE INTEGRITY PRIOR TO
REUSE. RECORD ALL WIRING BETWEEN DEVICES AND SUBMIT TO EOR FOR
AS-BUILT PURPOSES. EXISTING SLC AND MASS NOTIFICATION CABLES MAY
BE REUSED IF TESTED AND VERIFIED. SLC CABLING MAY BE T-TAPPED.
EXISTING NAC CIRCUIT CABLE MAY BE REUSED IF TESTED AND VERIFIED. IF
REUSED CONNECT TO FIRE ALARM (CLEAR LENS) STROBE APPLIANCES.
FACP
BPS
Primary: Dedicated 120V 20A Circuit
Secondary: 12V Batteries
75 cd75 cd
75 cd 75 cd
TO BUILDING 4
TO BUILDING 5
GROUND FLOOR
1ST FLOOR
GROUND FLOOR
1ST FLOOR
Primary: Dedicated 120V 20A Circuit
Secondary: 12V Batteries
FAA
2ND FLOOR
ATTIC
AIM AIM F
BPS
Primary: Dedicated 120V 20A Circuit
Secondary: 12V Batteries
MNS
75 cd
MNS
75 cd75 cd75 cd75 cd75 cd
MNS
75 cd75 cd75 cd15 cd15 cd15 cd15 cd75 cd
75 cd75 cd
MNS
75 cd
MNS MNS
75 cd
MNS
BPS
Primary: Dedicated 120V 20A Circuit
Secondary: 12V Batteries
ATTIC
2ND FLOOR
75 cd75 cd75 cd75 cd75 cd75 cd75 cd75 cd15 cd15 cd75 cd
75 cd
MNS
75 cd
MNS
75 cd
MNS
75 cd
MNS
75 cd
MNS
75 cd75 cd75 cd
MNS
15 cd
MNS
15 cd
MNS
15 cd
MNS
75 cd 75 cd75 cd75 cd75 cd75 cd75 cd75 cd75 cd15 cd15 cd75 cd75 cd
75 cd75 cd
MNS
75 cd
MNS MNS
75 cd
MNS
75 cd
MNS
95 cd
75 cd
MNS
15 cd
MNS
15 cd15 cd
MNS
15 cd75 cd
MNS
75 cd
MNS
75 cd
MNS
15 cd
MNS
75 cd
MNS
75 cd
MNS
15 cd
MNS
15 cd
MNS
75 cd
MNS
75 cd
MNS
75 cd
MNS
75 cd
MNS
F R/F
S P
F
F F AIM AIM S
P
F F
F F AIM AIM
R/F
S P
FAA
ELE
VATOR L
OBBY
ELE
VATOR H
OIS
TW
AY
DRY F
IR
E S
PRIN
KLE
R S
YSTEM
V
ALU
E
DRY F
IR
E S
PRIN
KLE
R S
YSTEM
AIM AIM AIM AIM
ELE
VATOR P
RIM
ARY R
ECALL
ELE
VATOR S
ECONDARY R
ECALL
ELE
VATOR F
IR
EM
ANS H
AT
ELE
VATOR S
HUNT T
RIP
S P
ELE
VATOR R
OOM
W
ATERFLO
W V
ALU
E
OUTSID
E S
CREW
A
ND Y
OKE V
ALV
E
ELE
VATOR H
OIS
TW
AY
ELE
VATOR L
OBBY
W
ATERFLO
W V
ALU
E
OUTSID
E S
CREW
A
ND Y
OKE V
ALV
E
ELE
VATOR L
OBBY
S P
FACP P
ANEL
PROTECTIO
N
F F
EGRESS D
OOR
EGRESS D
OOR
EGRESS D
OOR
EGRESS D
OOR
RIS
ER R
OOM
EGRESS D
OOR
EGRESS D
OOR
EGRESS D
OOR
EGRESS D
OOR
EGRESS D
OOR
EGRESS D
OOR
S D
S D
FIR
E D
AM
PER
FIR
E D
AM
PER
S D
S D
FIR
E D
AM
PER
FIR
E D
AM
PER
SD
SD
FIR
E D
AM
PER
FIR
E D
AM
PER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:4
A
M
FA601
FIRE ALARM DIAGRAM
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 GF AH
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
FIRE ALARM RISER DIAGRAM
1. Waterflow bell supplied, installed, powered, and controlled by others. Not an FACP function
General Notes:
General System Trouble X X
AC Power Failure X X
FACP3 / FAAP# Mass Notification Switch - Building 6 X X X X
FACP3 / FAAP# Mass Notification Switch - Building 5 X X X X
FACP3 / FAAP# Mass Notification Switch - Building 4 X X X X
FACP3 / FAAP# Mass Notification Switch - Building 3 X X X X
Sprinkler PIV Tamper Switch X X
Sprinkler Valve Tamper Switch X X
Sprinkler Water Flow Switch X X X X X X
Manual Pull Station X X X X X
Heat Detector - Area X X X X X
Smoke Detector - Area X X X X X
Activate Fire Alarm Visual Notification
Appliances Through-out Building
Activate Automatic Fire Alarm Voice
Message Through-out Building
Activate Building 3 Waterflow Bell.
NOTE 1
Activate Mass Notification Visual
Notification Appliances
Through-out Building
Activate Automatic Mass Notification Voice Message
Through-out Building
Release Building 3 Magnetically Held
Doors
Activate Fire Alarm Visual Notification
Appliances Through-out Building
Activate Automatic Fire Alarm Voice
Message Through-out Building
Activate Mass Notification Visual
Notification Appliances
Through-out Building
Activate Automatic Mass Notification Voice Message
Through-out Building
Activate Fire Alarm Visual Notification
Appliances Through-out Building
Activate Automatic Fire Alarm Voice
Message Through-out Building
Activate Mass Notification Visual
Notification Appliances
Through-out Building
Activate Automatic Mass Notification Voice Message
Through-out Building
Activate Fire Alarm Visual Notification
Appliances Through-out Building
Activate Automatic Fire Alarm Voice
Message Through-out Building
Activate Mass Notification Visual
Notification Appliances
Through-out Building
Activate Automatic Mass Notification Voice Message
Through-out Building
Display Alarm at
FACP3 & FAAP3
Display Supv. at
FACP3 & FAAP3
Display Trouble at
FACP3 & FAAP3
Transmit Alarm to Central Station
Transmit Supv. to Central Station
Transmit Trouble to Central Station
Device Type / Description Action
FIRE ALARM FUNCTIONAL MATRIX - BUILDING 3
SHEET NOTES
A. REFER TO GENERAL NOTES ON SHEET FA001 FOR MORE INFORMATION.
B. REINSTALL EXISTING FIRE ALARM DEVICES AND REUSE EXISTING WIRING
WHERE PRACTICABLE. TEST TO VERIFY EXISTING CABLE INTEGRITY PRIOR TO
REUSE. RECORD ALL WIRING BETWEEN DEVICES AND SUBMIT TO EOR FOR AS-
BUILT PURPOSES. EXISTING SLC AND MASS NOTIFICATION CABLES MAY BE
REUSED IF TESTED AND VERIFIED. SLC CABLING MAY BE T-TAPPED. EXISTING
NAC CIRCUIT CABLE MAY BE REUSED IF TESTED AND VERIFIED. IF REUSED
CONNECT TO FIRE ALARM (CLEAR LENS) STROBE APPLIANCES.
C. BUILDING 3 MASS NOTIFICATION INTERCONNECTION PROVIDED BY BUILDING 5.
D. VERIFY THE LOCATION AND TYPE OF ALL ELEVATOR CONNECTION POINTS.
E. CABLE SHOWN BETWEEN DEVICES IS DIAGRAMMATIC. INSTALL ANY NEW CABLE
UTILIZING THE SHORTEST PATH POSSIBLE. COORDINATE DEVIATIONS FROM
SHOP DRAWINGS WITH COR.
WH
FD
FD
FD
FD
FD
FD
FD
6 7
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
42.92
5.2
4.3
D.1
B.9
1 103 12
VEST M
BA109
44 SF
LOCKER M
BA111
86 SF
TOILET M
BA110
125 SF
SHOWER M1
BA110a
32 SF
VEST W
BA103
48 SF
LOCKER W
BA104
118 SF
TOILET W
BA105
139 SFSHOWER W
BA106
77 SF
UNIFORMS
BA107
157 SF
EMS CHIEF
BA113
104 SF
EMS AO
BA101
106 SF
BREAK ROOM
BA115
241 SF
EMS INT
DESIGNER
BA119
79 SF
LG EQPT
STORAGE
BA117
907 SF
EMS STORAGE
BA108
320 SF
ELECT
BA122
320 SF
UTIL
BA112
44 SF
EMS ASST
CHIEF
BA114
105 SF
EMS SUPER
BA118
119 SF
EMS TRAINING
SUPER
BA120
101 SF
MACH ROOM
BA121
39 SF
ELEV.
E100
91 SFSTAIR 1
E102
122 SF
ELEV LOBBY
E100
135 SF
CORR
E101
409 SF
EMS SUPPORT
BA102
91 SF
SHWR M2
BA110b
17 SF
HAC
BA116
25 SF
4.9 7.2
X
Y
Z
4" F 4
E 2 1/2" F TO GROUND
FLOOR SYSTEM
4" F
E
4" F (E)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:4
A
M
FX101
FIRE SPRINKLER - BASEMENT
FLOOR PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 CK PR
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE SPRINKLER - BASEMENT FLOOR PLAN
SHEET NOTES
A. MODIFY EXISTING SPRINKLER SYSTEM AS REQUIRED TO ACCOMMODATE NEW
SPACE CONFIGURATION.
B. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL
CONSTRUCTION AND ARCHITRAVE DRAWINGS FOR CEILING TYPES AND ROOM
ELEVATIONS.
C. SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE, RECESSED PENDENT
STYLE IN AREAS WITH DROPPED CEILING, UPRIGHT IN AREAS WITH CEILINGS
EXPOSED TO STRUCTURE.
D. SPRINKLERS INSTALLED IN ACOUSTIC TILE CEILING SHALL BE LOCATED
SYMMETRICALLY IN TILES UNLESS OTHERWISE INDICATED ON THE
ARCHITECTURAL DRAWINGS. SUBMIT PROPOSED LAYOUT FOR APPROVAL BY
THE ARCHITECT.
E. SLOPE PIPING TO DRAIN BACK TO FLOOR CONTROL VALVE. COORDINATE
LOCATION OF ANY ADDITIONAL LOW POINT DRAINS WITH THE CONTRACTING
OFFICER'S DESIGNATED REPRESENTATIVE
F. PROVIDE NFPA REQUIRED AIR RELIEF VALVES AT SYSTEM HIGH POINTS.
0' 4' 8' 16'2'
1. POINT OF CONNECTION TO EXISTING 4" F
2. DEMOLISH EXISTING 4" BRANCH AND RISER
3. NEW FIRE SPRINKLER RISER
4. VERIFY SIZE BY MEANS OF HYDRAULIC CALCULATIONS PRIOR TO INSTALLING.
SEE 'AS BUILT' FIRE SPRINKLER DRAWING, DATED 4 FEB 87, ATTACHED FOR
INFORMATION.
5. EXISTING 6" FIRE LATERAL.
6. 3" DRAIN TO EXTERIOR.
7. PROVIDE SEISMIC JOINT WITH MINIMUM 1 1/2" DEFLECTION CAPABILITY IN ALL
DIRECTIONS.
FLAG NOTES #
F
C P
FD FD
6 7
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
42.92
5.2
4.3
D.1
B.9
1 103 12
TOILET W
1A201
110 SFTOILET M
1A202
97 SF
FLEET
1A204
103 SF
UNION
1A203
87 SF
BILLING
1A206
250 SF
FS SUPPORT
1A207
124 SF
FISCAL SERV.
AUDITOR
1A207B
103 SF
IT
1A212
94 SF
FISCAL SERV
AUDITOR
1A207A
100 SF
FS CHIEF
1A210
100 SF
FS ASST CHIEF
1A211
100 SF
HBPC
DIRECTOR
1A209B
105 SF
HBPC CHIEF
1A209A
105 SF
ELEV LOBBY
E200
138 SF
CORR
E201
552 SF
FS STOR
1A207C
21 SF
HBPC
SUPPORT
1A209
392 SF
UN OFFC
1A203A
101 SF
UN OFFC
1A203B
94 SF
VISN 1
1A205
309 SF
REVENUE MGR
1A206A
102 SF
STOR
1A203C
9 SF
HBPC CLEAN
STOR
1A209C
61 SF
HAC
1A208
26 SF
4.9 7.2
X
Y
Z
STAIR
E202
226 SF
4" F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:4
A
M
FX102
FIRE SPRINKLER - FIRST FLOOR
PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 CK PR
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE SPRINKLER - FIRST FLOOR PLAN
0' 4' 8' 16'2'
SHEET NOTES
A. MODIFY EXISTING SPRINKLER SYSTEM AS REQUIRED TO ACCOMMODATE NEW
SPACE CONFIGURATION.
B. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL
CONSTRUCTION AND ARCHITRAVE DRAWINGS FOR CEILING TYPES AND ROOM
ELEVATIONS.
C. SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE, RECESSED PENDENT
STYLE IN AREAS WITH DROPPED CEILING, UPRIGHT IN AREAS WITH CEILINGS
EXPOSED TO STRUCTURE.
D. SPRINKLERS INSTALLED IN ACOUSTIC TILE CEILING SHALL BE LOCATED
SYMMETRICALLY IN TILES UNLESS OTHERWISE INDICATED ON THE
ARCHITECTURAL DRAWINGS. SUBMIT PROPOSED LAYOUT FOR APPROVAL BY
THE ARCHITECT.
E. SLOPE PIPING TO DRAIN BACK TO FLOOR CONTROL VALVE. COORDINATE
LOCATION OF ANY ADDITIONAL LOW POINT DRAINS WITH THE CONTRACTING
OFFICER'S DESIGNATED REPRESENTATIVE
1. DEMOLISH EXISTING FIRE SPRINKLER RISER AND BRANCH. CAP BRANCH LINE
CONNECTION TO 2 1/2" PIPING.
2. NEW FIRE SPRINKLER RISER AND FLOOR CONTROL STATION.
3. VERIFY SIZE BY MEANS OF HYDRAULIC CALCULATIONS PRIOR TO INSTALLING.
4. POINT OF CONNECTION TO EXISTING 2 1/2" F PIPING.
5. 3" DRAIN
6. PROVIDE SEISMIC JOINT WITH MINIMUM 1 1/2" DEFLECTION CAPABILITY IN ALL
DIRECTIONS.
FLAG NOTES #
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
42.92
5.2
4.3
D.1
B.9
1 103 12
TOILET M
2A302
97 SF
TOILET W
2A301
110 SF
CALL CENTER
2A309
226 SF
HR SUPPORT
2A308
381 SF
SHARED
CONF/TRAIN
2A303
335 SF
LOG CHIEF
2A304B
103 SF
LOG ASST
CHIEF
2A304A
102 SF
LOGISTICS
SUPPORT
2A304
257 SF
HR DIRECTOR
2A308C
105 SF
HR CHIEF
2A308E
105 SF
FLEX SPACE
2A307
109 SF
LOG
SUPERVISOR
2A306
112 SF
ELEV LOBBY
E300
138 SF
CORR
E301
414 SF
HR
SUPERVISOR
2A308B
108 SF
HR COPY/
SUPPLY
2A308G
56 SF
HR WORK
STATIONS
2A308D
188 SF
HR RECORDS
2A308F
65 SF
LOG SUPPLY
2A304C
48 SF
LOG
SUPERVISOR
2A305
109 SF
P.I.V.
2A308A
155 SF
4.9 7.2
X
Y
Z
STAIR
E302
226 SF
2 1/2" F (E)
2 1/2" F
4" F 3
1/
2" F
1" D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:4
A
M
FX103
FIRE SPRINKLER - SECOND FLOOR
PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 CK PR
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE SPRINKLER - SECOND FLOOR PLAN
0' 4' 8' 16'2'
SHEET NOTES
A. MODIFY EXISTING SPRINKLER SYSTEM AS REQUIRED TO ACCOMMODATE NEW
SPACE CONFIGURATION.
B. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL
CONSTRUCTION AND ARCHITRAVE DRAWINGS FOR CEILING TYPES AND ROOM
ELEVATIONS.
C. SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE, RECESSED PENDENT
STYLE IN AREAS WITH DROPPED CEILING, UPRIGHT IN AREAS WITH CEILINGS
EXPOSED TO STRUCTURE.
D. SPRINKLERS INSTALLED IN ACOUSTIC TILE CEILING SHALL BE LOCATED
SYMMETRICALLY IN TILES UNLESS OTHERWISE INDICATED ON THE
ARCHITECTURAL DRAWINGS. SUBMIT PROPOSED LAYOUT FOR APPROVAL BY
THE ARCHITECT.
E. SLOPE PIPING TO DRAIN BACK TO FLOOR CONTROL VALVE. COORDINATE
LOCATION OF ANY ADDITIONAL LOW POINT DRAINS WITH THE CONTRACTING
OFFICER'S DESIGNATED REPRESENTATIVE
F. PROVIDE NFPA REQUIRED AIR RELIEF VALVES AT SYSTEM HIGH POINTS.
1. DEMOLISH EXISTING FIRE SPRINKLER RISER AND BRANCH. CAP BRANCH LINE
CONNECTION TO 2 1/2" PIPING.
2. NEW FIRE SPRINKLER RISER AND FLOOR CONTROL STATION.
3. VERIFY SIZE BY MEANS OF HYDRAULIC CALCULATIONS PRIOR TO INSTALLING.
4. POINT OF CONNECTION TO EXISTING 2 1/2" F PIPING.
5. NEW DRY PIPE VALVE AND APPURTENANCES TO SERVE ATTIC. EXISTING
RISER TO ATTIC IS 2 1/2".
6. CONNECT TO EXISTING RISER TO ATTIC.
7. CONNECT TO EXISTING ATTIC DRAIN, PIPE TO NEW RISER DRAIN LOCATION.
8. 3" DRAIN.
9. PROVIDE SEISMIC JOINT WITH MINIMUM 1 1/2" DEFLECTION CAPABILITY IN ALL
DIRECTIONS.
FLAG NOTES #
8 9 10.1 11
A
B.1
C
D
D.9
F
7.8 8.7
E
B
42.92
5.2
4.3
D.1
B.9
1 103 12
4.9 7.2
X
Y
Z
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204
Tel 503.416.2400
SAZAN# 735-22015
A u to d e s k D o c s /P
D X
-2
R o s e b u rg B u ild in g
S e is m ic
R
R /7
-2
R o s e b u rg
B u ild in g
S e is m ic
E le c V
.r v t
/6 /2
:3
:4
A
M
FX104
FIRE SPRINKLER - ATTIC FLOOR
PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
206-972-0645
EMMANUEL (MANNY) BAUTISTA, PE, F.SAME
Seismic Retrofit and Renovation
Bldg. 3
VA Roseburg Healthcare System
653-21-102 director
11/7/2023 CK PR
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
1/4" = 1'-0"1
FIRE SPRINKLER - ATTIC PLAN
0' 4' 8' 16'2'
SHEET NOTES
A. MODIFY EXISTING SPRINKLER SYSTEM AS REQUIRED TO ACCOMMODATE NEW
SPACE CONFIGURATION. SEE ARCHITECTURAL DRAWINGS.
B. SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE, RECESSED PENDENT
STYLE IN AREAS WITH DROPPED CEILING, UPRIGHT IN AREAS WITH CEILINGS
EXPOSED TO STRUCTURE.
C. SLOPE PIPING TO DRAIN BACK TO FLOOR CONTROL VALVE. UTILIZE EXISTING
DRAIN RISER. COORDINATE LOCATION OF ANY ADDITIONAL LOW POINT
DRAINS WITH THE CONTRACTING OFFICER'S DESIGNATED REPRESENTATIVE
| 231107 Roseburg BLDG 3 Construction - FA |
| Sheets |
| FA101 - FIRE ALARM - BASEMENT FLOOR PLAN |
| FA102 - FIRE ALARM - FIRST FLOOR PLAN |
| FA103 - FIRE ALARM - SECOND FLOOR PLAN |
| FA104 - FIRE ALARM - ATTIC FLOOR PLAN |
| FA601 - FIRE ALARM DIAGRAM |
| FD101 - FIRE PROTECTION DEMOLITION - BASEMENT FLOOR PLAN |
| FD102 - FIRE PROTECTION DEMOLITION - FIRST FLOOR PLAN |
| FD103 - FIRE PROTECTION DEMOLITION - SECOND FLOOR PLAN |
| FD104 - FIRE PROTECTION DEMOLITION - ATTIC PLAN |
| FX101 - FIRE SPRINKLER - BASEMENT FLOOR PLAN |
| FX102 - FIRE SPRINKLER - FIRST FLOOR PLAN |
| FX103 - FIRE SPRINKLER - SECOND FLOOR PLAN |
| FXD101 - FIRE SPRINKLER - BASEMENT FLOOR DEMO PLAN |
File details come from the government source that posted it. Updated .