This document contains a set of construction drawings for the renovation and seismic retrofit of Building 3 at the Roseburg VA Medical Center (VAMC). The drawings depict the fire protection, fire alarm, and fire sprinkler systems that will be demolished and reinstalled as part of the renovation project. Key details include:

The project will renovate Building 3 of the Roseburg VAMC under Solicitation 36C26024R0060. The work involves modifying the existing fire protection, fire alarm, and fire sprinkler systems to accommodate the new space configuration. The project will include disconnecting and retaining existing devices, demolishing conduit, and reinstalling devices. Drawings are provided for the basement, first, second, and attic floor plans, as well as a fire alarm riser diagram. The scope also includes a new vertical double detector check valve assembly, fire department connection, and related piping work.

View the file

Other files

File Type Posted
Attachment 1 Site Visit Sign-In 653-21-102 Bldg 3 Seismic 08.23.2024.pdf PDF
36C26024R0060 0004.pdf PDF
Attachment 1 - 653-21-102 Additional Q_A 9.9.24.pdf PDF
Attachment 2 - 653-21-102_Seismic Retrofit Specs Vol2a R9.9.24.pdf PDF
36C26024R0060 0003.docx DOCX document
36C26024R0060 0001.docx DOCX document
36C26024R0060 0002.docx DOCX document
Attachment 1 - Question and Answer 36C26024R0060.docx DOCX document
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part1.pdf PDF
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part2.pdf PDF
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part11.pdf PDF
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part6.pdf PDF
Roseburg Campus Map.png PNG image
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part3.pdf PDF
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part12.pdf PDF
653-21-102_Roseburg Bldg 3-Seismic Retrofit Soils Report FInal.pdf PDF
Offeror Past Performance References R4.30.24.pdf PDF
653-21-102_Roseburg Bldg 3-Seismic Retrofit IFC Submittal-Specs Vol2a.pdf PDF
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part8.pdf PDF
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part4.pdf PDF
36C26024R0060_2.docx DOCX document
653-21-102_Roseburg Bldg 3-Seismic Retrofit IFC Submittal-Specs Vol2b.pdf PDF
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part7.pdf PDF
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part9.pdf PDF
Offeror Technical Experience R4.30.24.pdf PDF
653-21-102 Price Breakout.xlsx XLSX spreadsheet
WD OR20240085 6.7.24.pdf PDF
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part5.pdf PDF
653-21-102_Roseburg Renovate Bldg 3 IFC Drawings Part13.pdf PDF
SOW - 653-21-102 Seismic Retrofit B3 R4.4.24.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

75 cd

75 cd 75 cd

75 cd

15 cd

75 cd

15 cd

75 cd 75 cd

75 cd

75 cd

75 cd

75 cd

75 cd 75 cd

75 cd

75 cd

75 cd

15 cd

75 cd

15 cd

75 cd

15 cd

75 cd

75 cd

75 cd c d c d c d

R/F

P S

P S

P S

P S

P S

P S P

S

P S

P S

P

SP

S P

S

F

F

F

AIM

AIM

B P

S

6 7 8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

542.92 5.24.3

D.1

B.9

1 103 12

(E) FIRE ALARM

PANELS TO REMAIN

INCOMING 4" FIRE WATER

UNDERGROUND SERVICE LINE -

REFER TO SHEET FXD101 AND

FX101 FOR MORE INFORMATION.

4"TEE RISER

RISER UP

4" FIRE WATER

SERVICE MAIN

Z

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:3

A

M

FD101

FIRE PROTECTION DEMOLITION -

BASEMENT FLOOR PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 GF AH

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE ALARM DEMOLITION - BASEMENT FLOOR

PLAN

SHEET NOTES

A. REFER TO DEMOLITION NOTES ON SHEET FA001 FOR MORE INFORMATION.

B. DISCONNECT AND RETAIN ALL FIRE ALARM, MASS NOTIFICATION DEVICES

AND WIRING FOR REINSTALLATION. CONTRACTOR TO EVALUATE

MANUFACTURER'S RECOMMENDED REPLACEMENT DATE FOR SUCH DEVICES

AS SMOKE DETECTORS AND SHALL NOTIFY COR IF ANY DEVICES/EQUIPMENT

ARE NOT SUITABLE FOR REUSE.

C. DEMOLISH FIRE ALARM CONDUIT.

0' 4' 8' 16'2'

NOTE: DEVICE LAYOUT AND TOTALS BASED ON AVAILABLE RECORD DRAWINGS

DATED 10/15/19.

FIRE ALARM - SPEAKER STROBE - 12

FIRE ALARM - STROBE ONLY (CEILING) - 14

FIRE ALARM - STROBE ONLY (WALL) - 3

SMOKE DETECTOR - PHOTOELECTRIC - 13

HEAT DETECTOR - R/F - 1

MANUAL FIRE ALARM PULL STATION - 3

ADDRESSABLE INPUT MODULE - 2

ADDRESSABLE OUTPUT MODULE - N/A

EXISTING BASEMENT FLOOR FA DEVICE TOTALS

Revisions: Date:

Expires: 06/30/24Expires: 12/31/2024

15 cd 15 cd

30 cd

15 cd 15 cd 15 cd

30 cd 30 cd

75 cd

15 cd15 cd

15 cd

15 cd

15 cd

15 cd

15 cd

75 cd

30 cd

15 cd 15 cd

15 cd

15 cd

15 cd

75 cd

15 cd

75 cd

15 cd

15 cd 15 cd

15 cd

75 cd

15 cd c d c d 15 c d c d

P S

P S

P S

P S

P S

P S

P S

P S

P S

P S

P S

P S

P S

F

F

F

AIM

AIM

AOM

B P

S F

A C

P

B P

S

6 7 8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

542.92 5.24.3

D.1

B.9

EOL MNS NAC3B-3, 15KΩ

EOL AUD NAC3A-2, 47KΩ

CC

CC

1S

1S

DH

DH

1 103 12

FIRE SPRINKLER RISER

Z

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:3

A

M

FD102

FIRE PROTECTION DEMOLITION -

FIRST FLOOR PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 GF AH

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE ALARM DEMOLITION - FIRST FLOOR PLAN

0' 4' 8' 16'2'

NOTE: DEVICE LAYOUT AND TOTALS BASED ON AVAILABLE RECORD DRAWINGS

DATED 10/15/19.

FIRE ALARM - SPEAKER STROBE - 11

FIRE ALARM - STROBE ONLY (CEILING) - 21

FIRE ALARM - STROBE ONLY (WALL) - 4

SMOKE DETECTOR - PHOTOELECTRIC - 13

HEAT DETECTOR - R/F - N/A

MANUAL FIRE ALARM PULL STATION - 3

ADDRESSABLE INPUT MODULE - 2

ADDRESSABLE OUTPUT MODULE - 1

EXISTING 1ST FLOOR FA DEVICE TOTALS SHEET NOTES

A. REFER TO DEMOLITION NOTES ON SHEET FA001 FOR MORE INFORMATION.

B. DISCONNECT AND RETAIN ALL FIRE ALARM, MASS NOTIFICATION DEVICES

AND WIRING FOR REINSTALLATION. CONTRACTOR TO EVALUATE

MANUFACTURER'S RECOMMENDED REPLACEMENT DATE FOR SUCH DEVICES

AS SMOKE DETECTORS AND SHALL NOTIFY COR IF ANY DEVICES/EQUIPMENT

ARE NOT SUITABLE FOR REUSE.

C. DEMOLISH FIRE ALARM CONDUIT.

1. DISCONNECT AND RETAIN FIRE ALARM CONTROL PANEL FOR FUTURE

REINSTALLATION.

FLAG NOTES #

75 cd 75 cd 15 cd 15 cd

15 cd 15 cd

15 cd

75 cd

75 cd

15 cd

15 cd 15 cd

30 cd 30 cd

15 cd

15 cd 15 cd

15 cd

30 cd

15 cd

30 cd

15 cd

75 cd

75 cd 15 cd c d c d c d c d

P S

P S

P S

P S

P S

P S

P S

P S

P S

P S

AIM

AIM

F

6 7 8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

542.92 5.24.3

D.1

B.9

1 103 12

FIRE SPRINKLER RISER

Z

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:3

A

M

FD103

FIRE PROTECTION DEMOLITION -

SECOND FLOOR PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 GF AH

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE ALARM DEMOLITION - SECOND FLOOR

PLAN

0' 4' 8' 16'2'

NOTE: DEVICE LAYOUT AND TOTALS BASED ON AVAILABLE RECORD DRAWINGS

DATED 10/15/19.

FIRE ALARM - SPEAKER STROBE - 9

FIRE ALARM - STROBE ONLY (CEILING) - 17

FIRE ALARM - STROBE ONLY (WALL) - 4

SMOKE DETECTOR - PHOTOELECTRIC - 10

HEAT DETECTOR - R/F - N/A

MANUAL FIRE ALARM PULL STATION - N/A

ADDRESSABLE INPUT MODULE - 2

ADDRESSABLE OUTPUT MODULE - N/A

EXISTING 2ND FLOOR FA DEVICE TOTALS SHEET NOTES

A. REFER TO DEMOLITION NOTES ON SHEET FA001 FOR MORE INFORMATION.

B. DISCONNECT AND RETAIN ALL FIRE ALARM, MASS NOTIFICATION DEVICES

AND WIRING FOR REINSTALLATION. CONTRACTOR TO EVALUATE

MANUFACTURER'S RECOMMENDED REPLACEMENT DATE FOR SUCH DEVICES

AS SMOKE DETECTORS AND SHALL NOTIFY COR IF ANY DEVICES/EQUIPMENT

ARE NOT SUITABLE FOR REUSE.

C. DEMOLISH FIRE ALARM CONDUIT.

95 cd

R/F

R/FR/F R/F

6 7 8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

542.92 5.24.3

D.1

B.9

1 103 12

Z

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:3

A

M

FD104

FIRE PROTECTION DEMOLITION -

ATTIC PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 GF AH

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

0' 4' 8' 16'2' 1/4" = 1'-0"1

FIRE ALARM DEMOLITION - ROOF PLAN

NOTE: DEVICE LAYOUT AND TOTALS BASED ON AVAILABLE RECORD DRAWINGS

DATED 10/15/19.

FIRE ALARM - SPEAKER STROBE - 1

FIRE ALARM - STROBE ONLY (CEILING) - N/A

FIRE ALARM - STROBE ONLY (WALL) - N/A

SMOKE DETECTOR - PHOTOELECTRIC - N/A

HEAT DETECTOR - R/F - 4

MANUAL FIRE ALARM PULL STATION - N/A

ADDRESSABLE INPUT MODULE - N/A

ADDRESSABLE OUTPUT MODULE - N/A

EXISTING ATTIC LEVEL FA DEVICE TOTALS SHEET NOTES

A. REFER TO DEMOLITION NOTES ON SHEET FA001 FOR MORE INFORMATION.

B. DISCONNECT AND RETAIN ALL FIRE ALARM, MASS NOTIFICATION DEVICES

AND WIRING FOR REINSTALLATION. CONTRACTOR TO EVALUATE

MANUFACTURER'S RECOMMENDED REPLACEMENT DATE FOR SUCH DEVICES

AS SMOKE DETECTORS AND SHALL NOTIFY COR IF ANY DEVICES/EQUIPMENT

ARE NOT SUITABLE FOR REUSE.

C. DEMOLISH FIRE ALARM CONDUIT.

6 7 8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

542.92 5.24.3

D.1

B.9

1 103 12

Z

E 2 1/2" F TO GROUND

FLOOR SYSTEM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:3

A

M

FXD101

FIRE SPRINKLER - BASEMENT

FLOOR DEMO PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 CK PR

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE SPRINKLER - BASEMENT FLOOR DEMO

PLAN

SHEET NOTES

A. MODIFY EXISTING SPRINKLER SYSTEM AS REQUIRED TO ACCOMMODATE NEW

SPACE CONFIGURATION.

B. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL

CONSTRUCTION AND ARCHITRAVE DRAWINGS FOR CEILING TYPES AND ROOM

ELEVATIONS.

C. SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE, RECESSED PENDENT

STYLE IN AREAS WITH DROPPED CEILING, UPRIGHT IN AREAS WITH CEILINGS

EXPOSED TO STRUCTURE.

D. SPRINKLERS INSTALLED IN ACOUSTIC TILE CEILING SHALL BE LOCATED

SYMMETRICALLY IN TILES UNLESS OTHERWISE INDICATED ON THE

ARCHITECTURAL DRAWINGS. SUBMIT PROPOSED LAYOUT FOR APPROVAL BY

THE ARCHITECT.

E. SLOPE PIPING TO DRAIN BACK TO FLOOR CONTROL VALVE. COORDINATE

LOCATION OF ANY ADDITIONAL LOW POINT DRAINS WITH THE CONTRACTING

OFFICER'S DESIGNATED REPRESENTATIVE

F. PROVIDE NFPA REQUIRED AIR RELIEF VALVES AT SYSTEM HIGH POINTS.

0' 4' 8' 16'2'

1. NEW VERTICAL DOUBLE DETECTOR CHECK VALVE ASSEMBLY(DCDA), NEW

FDC CHECK VALVE AND PIPING.

2. RE-ROUTE SPRINKLER PIPING. ALL SPRINKLER PIPING SHALL ROUTE

OVERHEAD TO POINT OF CONNECTION AT DCDA.

FLAG NOTES #

WH

FD

FD

FD

FD

FD

FD

FD

75 cd

75 cd

F

75 cd

75 cd

75 cd

75 cd

75 cd

75 cd

75 cd

75 cd

75 cd

15 cd

75 cd

75 cd

15 cd

P S

F

F F

75 cd

AIM

AIM

15 cd

15 cd

15 cd

15 cd

15 cd

15 cd

75 cd

75 cd

75 cd

75 cd

75 cd

75 cd

75 cd

75 cd

B P

S

P S

AIM

AIM

AIM

AIM

F

6 7

8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

42.92

5.2

4.3

D.1

B.9

1 103 12

VEST M

BA109

44 SF

LOCKER M

BA111

86 SF

TOILET M

BA110

125 SF

SHOWER M1

BA110a

32 SF

VEST W

BA103

48 SF

LOCKER W

BA104

118 SF

TOILET W

BA105

139 SF

SHOWER W

BA106

77 SF

UNIFORMS

BA107

157 SF

EMS CHIEF

BA113

104 SF

EMS AO

BA101

106 SF

BREAK ROOM

BA115

241 SF

EMS INT

DESIGNER

BA119

79 SF

LG EQPT

STORAGE

BA117

907 SF

EMS STORAGE

BA108

320 SF

ELECT

BA122

320 SF

UTIL

BA112

44 SF

EMS ASST

CHIEF

BA114

105 SF

EMS SUPER

BA118

119 SF

EMS TRAINING

SUPER

BA120

101 SF

MACH ROOM

BA121

39 SF

ELEV.

E100

91 SFSTAIR 1

E102

122 SF

ELEV LOBBY

E100

135 SF

CORR

E101

409 SF

EMS SUPPORT

BA102

91 SF

SHWR M2

BA110b

17 SF

HAC

BA116

25 SF

4.9 7.2

X

Y

Z

MNS

MNS

MNS

MNS

MNS MNS

MNS

MNS

MNS

MNS

MNS

MNS

MNS

MNS

MNS

SDSD

SEISMIC JOINT - SEE SHEET NOTE D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:4

A

M

FA101

FIRE ALARM - BASEMENT FLOOR

PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 GF AH

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE ALARM - BASEMENT FLOOR PLAN

0' 4' 8' 16'2'

SHEET NOTES

A. REINSTALL EXISTING FIRE ALARM DEVICES AND REUSE EXISTING WIRING

WHERE PRACTICABLE. TEST TO VERIFY EXISTING CABLE INTEGRITY PRIOR TO

REUSE. RECORD ALL WIRING BETWEEN DEVICES AND SUBMIT TO EOR FOR

AS-BUILT PURPOSES. EXISTING SLC AND MASS NOTIFICATION CABLES MAY

BE REUSED IF TESTED AND VERIFIED. SLC CABLING MAY BE T-TAPPED.

EXISTING NAC CIRCUIT CABLE MAY BE REUSED IF TESTED AND VERIFIED. IF

REUSED CONNECT TO FIRE ALARM (CLEAR LENS) STROBE APPLIANCES.

B. FIRE ALARM DEVICES INSTALLED IN THE ELEVATOR HOISTWAY SHALL BE

ACCESSIBLE FOR SERVICING, TESTING, AND MAINTENANCE FROM OUTSIDE

THE ELEVATOR HOISTWAY AS REQUIRED BY NFPA 72 21.3.7.

C. REFER TO MECHANICAL CONSULTANT DRAWINGS TO COORDINATE EXACT

FIRE DAMPER LOCATIONS.

D. FOR CIRCUITS CROSSING SEISMIC JOINT, PROVIDE EXPANSION DEFLECTION

FITTING WITH A MINIMUM OF 1-1/2" DEFLECTION CAPABILITY IN ALL

DIRECTIONS.

E. FOR DEVICES INSTALLED ALONG EXISTING EXTERIOR WALL WHERE

SHOTCRETE WILL BE APPLIED, ROUGH-IN 3/4" DIAMETER CONDUIT WITH

4SX1-1/2"D BACKBOXES . CONTRACTOR TO NOTIFY STRUCTURAL EOR IF

LARGER DIAMETER CONDUIT OR BACKBOX IS REQUIRED.

1. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER WATER FLOW

SWITCH. REFER TO FIRE SPRINKLER DRAWINGS.

2. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER FIRE SPRINKLER

OUTSIDE SCREW AND YOKE VALVE. REFER TO FIRE SPRINKLER DRAWINGS.

3. PROVIDE FIRE ALARM CONNECTION TO ELEVATOR CONTROL PANEL FOR

PRIMARY RECALL FUNCTION. REFER TO SITE SPECIFIC ELEVATOR DRAWINGS.

4. PROVIDE FIRE ALARM CONNECTION TO ELEVATOR CONTROL PANEL FOR

SECONDARY RECALL FUNCTION. REFER TO SITE SPECIFIC ELEVATOR

DRAWINGS.

5. PROVIDE FIRE ALARM CONNECTION TO ELEVATOR CONTROL PANEL FOR

FIREMANS HAT FUNCTION. REFER TO SITE SPECIFIC ELEVATOR DRAWINGS.

6. PROVIDE FIRE ALARM CONNECTION TO ELEVATOR CONTROL PANEL FOR

SHUNT TRIP FUNCTION. REFER TO SITE SPECIFIC ELEVATOR DRAWINGS.

FLAG NOTES #

F

C P

FD FD

75 cd 75 cd

75 cd

75 cd

75 cd

15 cd

P S

75 cd

F

F

F F

A C

P

AIM

AIM

75 cd

75 cd

75 cd

75 cd

75 cd 75 cd

15 cd

15 cd

15 cd

75 cd

F

75 cd

15 cd

15 cd

15 cd

15 cd

FAA

F A

A

75 cd

75 cd

S

B P

S B

P S

6 7

8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

42.92

5.2

4.3

D.1

B.9

1 103 12

TOILET W

1A201

110 SF

TOILET M

1A202

97 SF

FLEET

1A204

103 SF UNION

1A203

87 SF

BILLING

1A206

250 SF

FS SUPPORT

1A207

124 SF

FISCAL SERV.

AUDITOR

1A207B

103 SF

IT

1A212

94 SF

FISCAL SERV

AUDITOR

1A207A

100 SF

FS CHIEF

1A210

100 SF

FS ASST CHIEF

1A211

100 SF

HBPC

DIRECTOR

1A209B

105 SF

HBPC CHIEF

1A209A

105 SF

ELEV LOBBY

E200

138 SF

CORR

E201

552 SF

FS STOR

1A207C

21 SF

HBPC

SUPPORT

1A209

392 SF

UN OFFC

1A203A

101 SF

UN OFFC

1A203B

94 SF

VISN 1

1A205

309 SF

REVENUE MGR

1A206A

102 SF

STOR

1A203C

9 SF

HBPC CLEAN

STOR

1A209C

61 SF

HAC

1A208

26 SF

4.9 7.2

X

Y

Z

STAIR

E202

226 SF

MNS MNS

MNSMNS

MNS MNS

MNS

MNS

MNS

MNS

MNS

MNS

SD

SD

SEISMIC JOINT - SEE SHEET NOTE D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:4

A

M

FA102

FIRE ALARM - FIRST FLOOR PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 GF AH

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE ALARM - FIRST FLOOR PLAN

0' 4' 8' 16'2'

SHEET NOTES

A. REINSTALL EXISTING FIRE ALARM DEVICES AND REUSE EXISTING WIRING

WHERE PRACTICABLE. TEST TO VERIFY EXISTING CABLE INTEGRITY PRIOR TO

REUSE. RECORD ALL WIRING BETWEEN DEVICES AND SUBMIT TO EOR FOR

AS-BUILT PURPOSES. EXISTING SLC AND MASS NOTIFICATION CABLES MAY

BE REUSED IF TESTED AND VERIFIED. SLC CABLING MAY BE T-TAPPED.

EXISTING NAC CIRCUIT CABLE MAY BE REUSED IF TESTED AND VERIFIED. IF

REUSED CONNECT TO FIRE ALARM (CLEAR LENS) STROBE APPLIANCES.

B. FIRE ALARM DEVICES INSTALLED IN THE ELEVATOR HOISTWAY SHALL BE

ACCESSIBLE FOR SERVICING, TESTING, AND MAINTENANCE FROM OUTSIDE

THE ELEVATOR HOISTWAY AS REQUIRED BY NFPA 72 21.3.7.

C. REFER TO MECHANICAL CONSULTANT DRAWINGS TO COORDINATE EXACT

FIRE DAMPER LOCATIONS.

D. FOR CIRCUITS CROSSING SEISMIC JOINT, PROVIDE EXPANSION DEFLECTION

FITTING WITH A MINIMUM OF 1-1/2" DEFLECTION CAPABILITY IN ALL

DIRECTIONS.

E. FOR DEVICES INSTALLED ALONG EXISTING EXTERIOR WALL WHERE

SHOTCRETE WILL BE APPLIED, ROUGH-IN 3/4" DIAMETER CONDUIT WITH

4SX1-1/2"D BACKBOXES . CONTRACTOR TO NOTIFY STRUCTURAL EOR IF

LARGER DIAMETER CONDUIT OR BACKBOX IS REQUIRED.

1. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER WATER FLOW

SWITCH. REFER TO FIRE SPRINKLER DRAWINGS.

2. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER FIRE SPRINKLER

OUTSIDE SCREW AND YOKE VALVE. REFER TO FIRE SPRINKLER DRAWINGS.

3. PROVIDE TWO DEDICATED TELEPHONE LINES FOR DIGITAL ALARM

COMMUNICATOR TRANSMITTER.

FLAG NOTES #

AIM

75 cd

75 cd

75 cd

75 cd

P S

F

F

75 cd

75 cd

75 cd

75 cd

15 cd

15 cd 15 cd

15 cd

75 cd

75 cd

75 cd

75 cd

75 cd

75 cd

75 cd

75 cd

75 cd

AIM

6 7

8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

42.92

5.2

4.3

D.1

B.9

1 103 12

TOILET M

2A302

97 SF

TOILET W

2A301

110 SF

CALL CENTER

2A309

226 SF

HR SUPPORT

2A308

381 SF

SHARED

CONF/TRAIN

2A303

335 SF

LOG CHIEF

2A304B

103 SF

LOG ASST

CHIEF

2A304A

102 SF

LOGISTICS

SUPPORT

2A304

257 SF

HR DIRECTOR

2A308C

105 SF

HR CHIEF

2A308E

105 SF

FLEX SPACE

2A307

109 SF

LOG

SUPERVISOR

2A306

112 SF

ELEV LOBBY

E300

138 SF

CORR

E301

414 SF

HR

SUPERVISOR

2A308B

108 SF

HR COPY/

SUPPLY

2A308G

56 SF

HR WORK

STATIONS

2A308D

188 SF

HR RECORDS

2A308F

65 SF

LOG SUPPLY

2A304C

48 SF

LOG

SUPERVISOR

2A305

109 SF

P.I.V.

2A308A

155 SF

4.9 7.2

X

Y

Z

STAIR

E302

226 SF

MNS

MNS

MNS

MNS

MNS

MNS

MNS

MNS

MNS

MNS

SEISMIC JOINT - SEE SHEET NOTE D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:4

A

M

FA103

FIRE ALARM - SECOND FLOOR

PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 GF AH

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE ALARM - SECOND FLOOR PLAN

0' 4' 8' 16'2'

SHEET NOTES

A. REINSTALL EXISTING FIRE ALARM DEVICES AND REUSE EXISTING WIRING

WHERE PRACTICABLE. TEST TO VERIFY EXISTING CABLE INTEGRITY PRIOR TO

REUSE. RECORD ALL WIRING BETWEEN DEVICES AND SUBMIT TO EOR FOR

AS-BUILT PURPOSES. EXISTING SLC AND MASS NOTIFICATION CABLES MAY

BE REUSED IF TESTED AND VERIFIED. SLC CABLING MAY BE T-TAPPED.

EXISTING NAC CIRCUIT CABLE MAY BE REUSED IF TESTED AND VERIFIED. IF

REUSED CONNECT TO FIRE ALARM (CLEAR LENS) STROBE APPLIANCES.

B. FIRE ALARM DEVICES INSTALLED IN THE ELEVATOR HOISTWAY SHALL BE

ACCESSIBLE FOR SERVICING, TESTING, AND MAINTENANCE FROM OUTSIDE

THE ELEVATOR HOISTWAY AS REQUIRED BY NFPA 72 21.3.7.

C. REFER TO MECHANICAL CONSULTANT DRAWINGS TO COORDINATE EXACT

FIRE DAMPER LOCATIONS.

D. FOR CIRCUITS CROSSING SEISMIC JOINT, PROVIDE EXPANSION DEFLECTION

FITTING WITH A MINIMUM OF 1-1/2" DEFLECTION CAPABILITY IN ALL

DIRECTIONS.

E. FOR DEVICES INSTALLED ALONG EXISTING EXTERIOR WALL WHERE

SHOTCRETE WILL BE APPLIED, ROUGH-IN 3/4" DIAMETER CONDUIT WITH

4SX1-1/2"D BACKBOXES . CONTRACTOR TO NOTIFY STRUCTURAL EOR IF

LARGER DIAMETER CONDUIT OR BACKBOX IS REQUIRED.

1. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER DRY SYSTEM VALUE.

REFER TO FIRE SPRINKLER DRAWINGS.

2. PROVIDE FIRE ALARM CONNECTION TO FIRE SPRINKLER DRY SYSTEM AIR

COMPRESSOR FOR LOW PRESSURE SENSOR. REFER TO FIRE SPRINKLER

DRAWINGS.

FLAG NOTES #

95 cd

6 7

8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

42.92

5.2

4.3

D.1

B.9

1 103 12

4.9 7.2

X

Y

Z

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:4

A

M

FA104

FIRE ALARM - ATTIC FLOOR PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 GF AH

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE ALARM - ATTIC PLAN

0' 4' 8' 16'2'

SHEET NOTES

A. REINSTALL EXISTING FIRE ALARM DEVICES AND REUSE EXISTING WIRING

WHERE PRACTICABLE. TEST TO VERIFY EXISTING CABLE INTEGRITY PRIOR TO

REUSE. RECORD ALL WIRING BETWEEN DEVICES AND SUBMIT TO EOR FOR

AS-BUILT PURPOSES. EXISTING SLC AND MASS NOTIFICATION CABLES MAY

BE REUSED IF TESTED AND VERIFIED. SLC CABLING MAY BE T-TAPPED.

EXISTING NAC CIRCUIT CABLE MAY BE REUSED IF TESTED AND VERIFIED. IF

REUSED CONNECT TO FIRE ALARM (CLEAR LENS) STROBE APPLIANCES.

FACP

BPS

Primary: Dedicated 120V 20A Circuit

Secondary: 12V Batteries

75 cd75 cd

75 cd 75 cd

TO BUILDING 4

TO BUILDING 5

GROUND FLOOR

1ST FLOOR

GROUND FLOOR

1ST FLOOR

Primary: Dedicated 120V 20A Circuit

Secondary: 12V Batteries

FAA

2ND FLOOR

ATTIC

AIM AIM F

BPS

Primary: Dedicated 120V 20A Circuit

Secondary: 12V Batteries

MNS

75 cd

MNS

75 cd75 cd75 cd75 cd75 cd

MNS

75 cd75 cd75 cd15 cd15 cd15 cd15 cd75 cd

75 cd75 cd

MNS

75 cd

MNS MNS

75 cd

MNS

BPS

Primary: Dedicated 120V 20A Circuit

Secondary: 12V Batteries

ATTIC

2ND FLOOR

75 cd75 cd75 cd75 cd75 cd75 cd75 cd75 cd15 cd15 cd75 cd

75 cd

MNS

75 cd

MNS

75 cd

MNS

75 cd

MNS

75 cd

MNS

75 cd75 cd75 cd

MNS

15 cd

MNS

15 cd

MNS

15 cd

MNS

75 cd 75 cd75 cd75 cd75 cd75 cd75 cd75 cd75 cd15 cd15 cd75 cd75 cd

75 cd75 cd

MNS

75 cd

MNS MNS

75 cd

MNS

75 cd

MNS

95 cd

75 cd

MNS

15 cd

MNS

15 cd15 cd

MNS

15 cd75 cd

MNS

75 cd

MNS

75 cd

MNS

15 cd

MNS

75 cd

MNS

75 cd

MNS

15 cd

MNS

15 cd

MNS

75 cd

MNS

75 cd

MNS

75 cd

MNS

75 cd

MNS

F R/F

S P

F

F F AIM AIM S

P

F F

F F AIM AIM

R/F

S P

FAA

ELE

VATOR L

OBBY

ELE

VATOR H

OIS

TW

AY

DRY F

IR

E S

PRIN

KLE

R S

YSTEM

V

ALU

E

DRY F

IR

E S

PRIN

KLE

R S

YSTEM

AIM AIM AIM AIM

ELE

VATOR P

RIM

ARY R

ECALL

ELE

VATOR S

ECONDARY R

ECALL

ELE

VATOR F

IR

EM

ANS H

AT

ELE

VATOR S

HUNT T

RIP

S P

ELE

VATOR R

OOM

W

ATERFLO

W V

ALU

E

OUTSID

E S

CREW

A

ND Y

OKE V

ALV

E

ELE

VATOR H

OIS

TW

AY

ELE

VATOR L

OBBY

W

ATERFLO

W V

ALU

E

OUTSID

E S

CREW

A

ND Y

OKE V

ALV

E

ELE

VATOR L

OBBY

S P

FACP P

ANEL

PROTECTIO

N

F F

EGRESS D

OOR

EGRESS D

OOR

EGRESS D

OOR

EGRESS D

OOR

RIS

ER R

OOM

EGRESS D

OOR

EGRESS D

OOR

EGRESS D

OOR

EGRESS D

OOR

EGRESS D

OOR

EGRESS D

OOR

S D

S D

FIR

E D

AM

PER

FIR

E D

AM

PER

S D

S D

FIR

E D

AM

PER

FIR

E D

AM

PER

SD

SD

FIR

E D

AM

PER

FIR

E D

AM

PER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:4

A

M

FA601

FIRE ALARM DIAGRAM

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 GF AH

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

FIRE ALARM RISER DIAGRAM

1. Waterflow bell supplied, installed, powered, and controlled by others. Not an FACP function

General Notes:

General System Trouble X X

AC Power Failure X X

FACP3 / FAAP# Mass Notification Switch - Building 6 X X X X

FACP3 / FAAP# Mass Notification Switch - Building 5 X X X X

FACP3 / FAAP# Mass Notification Switch - Building 4 X X X X

FACP3 / FAAP# Mass Notification Switch - Building 3 X X X X

Sprinkler PIV Tamper Switch X X

Sprinkler Valve Tamper Switch X X

Sprinkler Water Flow Switch X X X X X X

Manual Pull Station X X X X X

Heat Detector - Area X X X X X

Smoke Detector - Area X X X X X

Activate Fire Alarm Visual Notification

Appliances Through-out Building

Activate Automatic Fire Alarm Voice

Message Through-out Building

Activate Building 3 Waterflow Bell.

NOTE 1

Activate Mass Notification Visual

Notification Appliances

Through-out Building

Activate Automatic Mass Notification Voice Message

Through-out Building

Release Building 3 Magnetically Held

Doors

Activate Fire Alarm Visual Notification

Appliances Through-out Building

Activate Automatic Fire Alarm Voice

Message Through-out Building

Activate Mass Notification Visual

Notification Appliances

Through-out Building

Activate Automatic Mass Notification Voice Message

Through-out Building

Activate Fire Alarm Visual Notification

Appliances Through-out Building

Activate Automatic Fire Alarm Voice

Message Through-out Building

Activate Mass Notification Visual

Notification Appliances

Through-out Building

Activate Automatic Mass Notification Voice Message

Through-out Building

Activate Fire Alarm Visual Notification

Appliances Through-out Building

Activate Automatic Fire Alarm Voice

Message Through-out Building

Activate Mass Notification Visual

Notification Appliances

Through-out Building

Activate Automatic Mass Notification Voice Message

Through-out Building

Display Alarm at

FACP3 & FAAP3

Display Supv. at

FACP3 & FAAP3

Display Trouble at

FACP3 & FAAP3

Transmit Alarm to Central Station

Transmit Supv. to Central Station

Transmit Trouble to Central Station

Device Type / Description Action

FIRE ALARM FUNCTIONAL MATRIX - BUILDING 3

SHEET NOTES

A. REFER TO GENERAL NOTES ON SHEET FA001 FOR MORE INFORMATION.

B. REINSTALL EXISTING FIRE ALARM DEVICES AND REUSE EXISTING WIRING

WHERE PRACTICABLE. TEST TO VERIFY EXISTING CABLE INTEGRITY PRIOR TO

REUSE. RECORD ALL WIRING BETWEEN DEVICES AND SUBMIT TO EOR FOR AS-

BUILT PURPOSES. EXISTING SLC AND MASS NOTIFICATION CABLES MAY BE

REUSED IF TESTED AND VERIFIED. SLC CABLING MAY BE T-TAPPED. EXISTING

NAC CIRCUIT CABLE MAY BE REUSED IF TESTED AND VERIFIED. IF REUSED

CONNECT TO FIRE ALARM (CLEAR LENS) STROBE APPLIANCES.

C. BUILDING 3 MASS NOTIFICATION INTERCONNECTION PROVIDED BY BUILDING 5.

D. VERIFY THE LOCATION AND TYPE OF ALL ELEVATOR CONNECTION POINTS.

E. CABLE SHOWN BETWEEN DEVICES IS DIAGRAMMATIC. INSTALL ANY NEW CABLE

UTILIZING THE SHORTEST PATH POSSIBLE. COORDINATE DEVIATIONS FROM

SHOP DRAWINGS WITH COR.

WH

FD

FD

FD

FD

FD

FD

FD

6 7

8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

42.92

5.2

4.3

D.1

B.9

1 103 12

VEST M

BA109

44 SF

LOCKER M

BA111

86 SF

TOILET M

BA110

125 SF

SHOWER M1

BA110a

32 SF

VEST W

BA103

48 SF

LOCKER W

BA104

118 SF

TOILET W

BA105

139 SFSHOWER W

BA106

77 SF

UNIFORMS

BA107

157 SF

EMS CHIEF

BA113

104 SF

EMS AO

BA101

106 SF

BREAK ROOM

BA115

241 SF

EMS INT

DESIGNER

BA119

79 SF

LG EQPT

STORAGE

BA117

907 SF

EMS STORAGE

BA108

320 SF

ELECT

BA122

320 SF

UTIL

BA112

44 SF

EMS ASST

CHIEF

BA114

105 SF

EMS SUPER

BA118

119 SF

EMS TRAINING

SUPER

BA120

101 SF

MACH ROOM

BA121

39 SF

ELEV.

E100

91 SFSTAIR 1

E102

122 SF

ELEV LOBBY

E100

135 SF

CORR

E101

409 SF

EMS SUPPORT

BA102

91 SF

SHWR M2

BA110b

17 SF

HAC

BA116

25 SF

4.9 7.2

X

Y

Z

4" F 4

E 2 1/2" F TO GROUND

FLOOR SYSTEM

4" F

E

4" F (E)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:4

A

M

FX101

FIRE SPRINKLER - BASEMENT

FLOOR PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 CK PR

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE SPRINKLER - BASEMENT FLOOR PLAN

SHEET NOTES

A. MODIFY EXISTING SPRINKLER SYSTEM AS REQUIRED TO ACCOMMODATE NEW

SPACE CONFIGURATION.

B. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL

CONSTRUCTION AND ARCHITRAVE DRAWINGS FOR CEILING TYPES AND ROOM

ELEVATIONS.

C. SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE, RECESSED PENDENT

STYLE IN AREAS WITH DROPPED CEILING, UPRIGHT IN AREAS WITH CEILINGS

EXPOSED TO STRUCTURE.

D. SPRINKLERS INSTALLED IN ACOUSTIC TILE CEILING SHALL BE LOCATED

SYMMETRICALLY IN TILES UNLESS OTHERWISE INDICATED ON THE

ARCHITECTURAL DRAWINGS. SUBMIT PROPOSED LAYOUT FOR APPROVAL BY

THE ARCHITECT.

E. SLOPE PIPING TO DRAIN BACK TO FLOOR CONTROL VALVE. COORDINATE

LOCATION OF ANY ADDITIONAL LOW POINT DRAINS WITH THE CONTRACTING

OFFICER'S DESIGNATED REPRESENTATIVE

F. PROVIDE NFPA REQUIRED AIR RELIEF VALVES AT SYSTEM HIGH POINTS.

0' 4' 8' 16'2'

1. POINT OF CONNECTION TO EXISTING 4" F

2. DEMOLISH EXISTING 4" BRANCH AND RISER

3. NEW FIRE SPRINKLER RISER

4. VERIFY SIZE BY MEANS OF HYDRAULIC CALCULATIONS PRIOR TO INSTALLING.

SEE 'AS BUILT' FIRE SPRINKLER DRAWING, DATED 4 FEB 87, ATTACHED FOR

INFORMATION.

5. EXISTING 6" FIRE LATERAL.

6. 3" DRAIN TO EXTERIOR.

7. PROVIDE SEISMIC JOINT WITH MINIMUM 1 1/2" DEFLECTION CAPABILITY IN ALL

DIRECTIONS.

FLAG NOTES #

F

C P

FD FD

6 7

8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

42.92

5.2

4.3

D.1

B.9

1 103 12

TOILET W

1A201

110 SFTOILET M

1A202

97 SF

FLEET

1A204

103 SF

UNION

1A203

87 SF

BILLING

1A206

250 SF

FS SUPPORT

1A207

124 SF

FISCAL SERV.

AUDITOR

1A207B

103 SF

IT

1A212

94 SF

FISCAL SERV

AUDITOR

1A207A

100 SF

FS CHIEF

1A210

100 SF

FS ASST CHIEF

1A211

100 SF

HBPC

DIRECTOR

1A209B

105 SF

HBPC CHIEF

1A209A

105 SF

ELEV LOBBY

E200

138 SF

CORR

E201

552 SF

FS STOR

1A207C

21 SF

HBPC

SUPPORT

1A209

392 SF

UN OFFC

1A203A

101 SF

UN OFFC

1A203B

94 SF

VISN 1

1A205

309 SF

REVENUE MGR

1A206A

102 SF

STOR

1A203C

9 SF

HBPC CLEAN

STOR

1A209C

61 SF

HAC

1A208

26 SF

4.9 7.2

X

Y

Z

STAIR

E202

226 SF

4" F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:4

A

M

FX102

FIRE SPRINKLER - FIRST FLOOR

PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 CK PR

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE SPRINKLER - FIRST FLOOR PLAN

0' 4' 8' 16'2'

SHEET NOTES

A. MODIFY EXISTING SPRINKLER SYSTEM AS REQUIRED TO ACCOMMODATE NEW

SPACE CONFIGURATION.

B. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL

CONSTRUCTION AND ARCHITRAVE DRAWINGS FOR CEILING TYPES AND ROOM

ELEVATIONS.

C. SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE, RECESSED PENDENT

STYLE IN AREAS WITH DROPPED CEILING, UPRIGHT IN AREAS WITH CEILINGS

EXPOSED TO STRUCTURE.

D. SPRINKLERS INSTALLED IN ACOUSTIC TILE CEILING SHALL BE LOCATED

SYMMETRICALLY IN TILES UNLESS OTHERWISE INDICATED ON THE

ARCHITECTURAL DRAWINGS. SUBMIT PROPOSED LAYOUT FOR APPROVAL BY

THE ARCHITECT.

E. SLOPE PIPING TO DRAIN BACK TO FLOOR CONTROL VALVE. COORDINATE

LOCATION OF ANY ADDITIONAL LOW POINT DRAINS WITH THE CONTRACTING

OFFICER'S DESIGNATED REPRESENTATIVE

1. DEMOLISH EXISTING FIRE SPRINKLER RISER AND BRANCH. CAP BRANCH LINE

CONNECTION TO 2 1/2" PIPING.

2. NEW FIRE SPRINKLER RISER AND FLOOR CONTROL STATION.

3. VERIFY SIZE BY MEANS OF HYDRAULIC CALCULATIONS PRIOR TO INSTALLING.

4. POINT OF CONNECTION TO EXISTING 2 1/2" F PIPING.

5. 3" DRAIN

6. PROVIDE SEISMIC JOINT WITH MINIMUM 1 1/2" DEFLECTION CAPABILITY IN ALL

DIRECTIONS.

FLAG NOTES #

8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

42.92

5.2

4.3

D.1

B.9

1 103 12

TOILET M

2A302

97 SF

TOILET W

2A301

110 SF

CALL CENTER

2A309

226 SF

HR SUPPORT

2A308

381 SF

SHARED

CONF/TRAIN

2A303

335 SF

LOG CHIEF

2A304B

103 SF

LOG ASST

CHIEF

2A304A

102 SF

LOGISTICS

SUPPORT

2A304

257 SF

HR DIRECTOR

2A308C

105 SF

HR CHIEF

2A308E

105 SF

FLEX SPACE

2A307

109 SF

LOG

SUPERVISOR

2A306

112 SF

ELEV LOBBY

E300

138 SF

CORR

E301

414 SF

HR

SUPERVISOR

2A308B

108 SF

HR COPY/

SUPPLY

2A308G

56 SF

HR WORK

STATIONS

2A308D

188 SF

HR RECORDS

2A308F

65 SF

LOG SUPPLY

2A304C

48 SF

LOG

SUPERVISOR

2A305

109 SF

P.I.V.

2A308A

155 SF

4.9 7.2

X

Y

Z

STAIR

E302

226 SF

2 1/2" F (E)

2 1/2" F

4" F 3

1/

2" F

1" D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:4

A

M

FX103

FIRE SPRINKLER - SECOND FLOOR

PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 CK PR

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE SPRINKLER - SECOND FLOOR PLAN

0' 4' 8' 16'2'

SHEET NOTES

A. MODIFY EXISTING SPRINKLER SYSTEM AS REQUIRED TO ACCOMMODATE NEW

SPACE CONFIGURATION.

B. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL

CONSTRUCTION AND ARCHITRAVE DRAWINGS FOR CEILING TYPES AND ROOM

ELEVATIONS.

C. SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE, RECESSED PENDENT

STYLE IN AREAS WITH DROPPED CEILING, UPRIGHT IN AREAS WITH CEILINGS

EXPOSED TO STRUCTURE.

D. SPRINKLERS INSTALLED IN ACOUSTIC TILE CEILING SHALL BE LOCATED

SYMMETRICALLY IN TILES UNLESS OTHERWISE INDICATED ON THE

ARCHITECTURAL DRAWINGS. SUBMIT PROPOSED LAYOUT FOR APPROVAL BY

THE ARCHITECT.

E. SLOPE PIPING TO DRAIN BACK TO FLOOR CONTROL VALVE. COORDINATE

LOCATION OF ANY ADDITIONAL LOW POINT DRAINS WITH THE CONTRACTING

OFFICER'S DESIGNATED REPRESENTATIVE

F. PROVIDE NFPA REQUIRED AIR RELIEF VALVES AT SYSTEM HIGH POINTS.

1. DEMOLISH EXISTING FIRE SPRINKLER RISER AND BRANCH. CAP BRANCH LINE

CONNECTION TO 2 1/2" PIPING.

2. NEW FIRE SPRINKLER RISER AND FLOOR CONTROL STATION.

3. VERIFY SIZE BY MEANS OF HYDRAULIC CALCULATIONS PRIOR TO INSTALLING.

4. POINT OF CONNECTION TO EXISTING 2 1/2" F PIPING.

5. NEW DRY PIPE VALVE AND APPURTENANCES TO SERVE ATTIC. EXISTING

RISER TO ATTIC IS 2 1/2".

6. CONNECT TO EXISTING RISER TO ATTIC.

7. CONNECT TO EXISTING ATTIC DRAIN, PIPE TO NEW RISER DRAIN LOCATION.

8. 3" DRAIN.

9. PROVIDE SEISMIC JOINT WITH MINIMUM 1 1/2" DEFLECTION CAPABILITY IN ALL

DIRECTIONS.

FLAG NOTES #

8 9 10.1 11

A

B.1

C

D

D.9

F

7.8 8.7

E

B

42.92

5.2

4.3

D.1

B.9

1 103 12

4.9 7.2

X

Y

Z

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

111 SW Fifth Ave, Ste 3210 Portland, Oregon 97204

Tel 503.416.2400

SAZAN# 735-22015

A u to d e s k D o c s /P

D X

-2

R o s e b u rg B u ild in g

S e is m ic

R

R /7

-2

R o s e b u rg

B u ild in g

S e is m ic

E le c V

.r v t

/6 /2

:3

:4

A

M

FX104

FIRE SPRINKLER - ATTIC FLOOR

PLAN

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

Seismic Retrofit and Renovation

Bldg. 3

VA Roseburg Healthcare System

653-21-102 director

11/7/2023 CK PR

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

1/4" = 1'-0"1

FIRE SPRINKLER - ATTIC PLAN

0' 4' 8' 16'2'

SHEET NOTES

A. MODIFY EXISTING SPRINKLER SYSTEM AS REQUIRED TO ACCOMMODATE NEW

SPACE CONFIGURATION. SEE ARCHITECTURAL DRAWINGS.

B. SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE, RECESSED PENDENT

STYLE IN AREAS WITH DROPPED CEILING, UPRIGHT IN AREAS WITH CEILINGS

EXPOSED TO STRUCTURE.

C. SLOPE PIPING TO DRAIN BACK TO FLOOR CONTROL VALVE. UTILIZE EXISTING

DRAIN RISER. COORDINATE LOCATION OF ANY ADDITIONAL LOW POINT

DRAINS WITH THE CONTRACTING OFFICER'S DESIGNATED REPRESENTATIVE

231107 Roseburg BLDG 3 Construction - FA
Sheets
FA101 - FIRE ALARM - BASEMENT FLOOR PLAN
FA102 - FIRE ALARM - FIRST FLOOR PLAN
FA103 - FIRE ALARM - SECOND FLOOR PLAN
FA104 - FIRE ALARM - ATTIC FLOOR PLAN
FA601 - FIRE ALARM DIAGRAM
FD101 - FIRE PROTECTION DEMOLITION - BASEMENT FLOOR PLAN
FD102 - FIRE PROTECTION DEMOLITION - FIRST FLOOR PLAN
FD103 - FIRE PROTECTION DEMOLITION - SECOND FLOOR PLAN
FD104 - FIRE PROTECTION DEMOLITION - ATTIC PLAN
FX101 - FIRE SPRINKLER - BASEMENT FLOOR PLAN
FX102 - FIRE SPRINKLER - FIRST FLOOR PLAN