This document is a set of Questions and Answers related to Solicitation 36C26024R0060 for the Z2DA--653-21-102 Bldg. 3 Seismic Retrofit and Renovation project at the Roseburg VA Medical Center. The key details are:
The project is an extension of the existing VA Schneider Electric Andover FIPS201 Continuum physical access control system (PACS) and Pelco Continuum video surveillance system. The existing fire alarm and security systems are to be reused, with no new security panels or workstations required. The contractor will be responsible for providing a working system per the existing conditions, and for warranty on any new work performed, but not for the existing equipment. There are no requirements for new interfaces to other building systems. The project will involve removing and reinstalling the existing video cameras and public address system. The solicitation has a proposal due date of September 16, 2024 at 12:00 PM PT.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26024R0060 Questions and Answers
| Question |
| Answer |
| What fixture type are the (2) clouded fixtures on the attached sheet EL101? They are called out as an R2 which is a 4” downlight per the luminaire schedule, but the fixtures are shown as a linear fixture. |
| The fixture type for the men’s and women’s toilet (BA105 and BA110) should be type R4. |
| Is the existing Security system Edwards, Notifier or Other? If ‘Other’ can you please specify which brand it is? |
| The existing fire alarm panel is an Edwards system. The existing security system is notifier. |
| The solicitation document has conflicting information regarding the due date of our proposal for this project. In section 10 of the Form 1442 the proposal due date is given as 1200pm September 16, 2024. In section 13 the proposal due date is given as 09-09-24 by 1200PDT |
| Amendment 001 clarified this question as proposals are due September 16, 2024 at 12:00PM PT. |
Spec section 28 13 00 Physical Access Control PACs Is this project an extension of the existing VA Schneider Electric Andover FIPS201 Continuum PACS system?
Yes, this is an extension of the existing Schneider Electric Andover FIPS201 Continuum PACS system.
| Will new Security panels communicate to the existing VA Continuum server via a VA provided network connection? |
| The existing system is to be reused, there are no new security panels being installed. |
| Will the project require any SMS Continuum security software Licenses? If yes how many. |
| No new software licenses required. |
| Will this project require a new PACs server? If yes please clarify. |
| No, this project will not require a new PAC’s server. |
Spec section 28 13 00 Physical Access Control PACs Door hardware group specification 08 71 00 does not provide electrified hardware for all the card reader doors; will electrified door hardware and required power supplies be provided and installed by Division 8 for all card reader doors?
Yes, electrified door hardware and power supplies will be required.
Spec section 28 13 00 Physical Access Control PACs Does the PACS system need to interface with the fire alarm system?
No, the PACS does not have to interact with the fire alarm system.
Spec section 28 13 00 Physical Access Control PACs Will a dedicated 120-volt power circuit be provided at any new security panel?
A new security panel is not required for this project therefore a new electrical circuit will not be required.
Spec section 28 13 00 Physical Access Control PACs The specification calls for double pole door status switches, are these required in this project?
The switch needs to detect door status only.
Spec section 28 13 00 Physical Access Control PACs IDS system interface, does the SMS need to interface with the IDS system? If yes please provide the make and model of the system at each location.
No, the SMS does not need to interface with the IDS system.
Spec section 28 13 00 Physical Access Control PACs Security Access Detection interface, does the SMS need to interface with the SAD system? If yes please provide the make and model of the system at each location.
No the SMS does not need to interface with the SAD system.
Spec section 28 13 00 Physical Access Control PACs EPPS interface, does the SMS need to interface with the EPPS system? If yes please provide the make and model of the system at each location.
No, the SMS does not need to interface with the EPPS system.
Spec section 28 13 00 Physical Access Control PACs Visitor management system does the SMS need to interface with a VMS system? If yes please provide the make and model of the system at each location.
No, a visitor management system is not a part of this project so it will not need to interact with the SMS system.
Spec section 28 13 00 Physical Access Control PACs Time and attendance system does the SMS need to interface with a TaA system? If yes please provide the make and model of the system at each location.
No, a time and attendance system is not a part of this project so it will not need to interact with the SMS system.
Spec section 28 13 00 Physical Access Control PACs Real Time Guard Tour does the SMS need to interface with a RTGT system? If yes please provide the make and model of the system and each location.
No, RTGT system is not a part of this project so it will not need to interact with the SMS system.
Spec section 28 13 00 Physical Access Control PACs Elevator interface does the SMS need to interface with an elevator or system? If yes please provide the make and model of the system and each location.
No, an elevator interface system is not a part of this project so it will not need to interact with the SMS system.
Spec section 28 13 00 Physical Access Control PACs Intercom interface does the SMS need to interface with an Intercom system? If yes please provide the make and model of the system and number of location.
No, intercom interface is not a part of this project so it will not need to interact with the SMS system.
Spec section 28 13 00 Physical Access Control PACs Will the project require a new Continuum security workstation? If yes how many.
No, this project will not require a new continuum security workstation.
Spec section 28 23 00 Video Surveillance Is this project an extension of the existing VA integrated Pelco Control Point CCTV & Andover PACS systems?
Yes, this is an extension of the existing VA Roseburg CCTV and PACS system.
Spec section 28 23 00 Video Surveillance The building currently has 10 Pelco cameras connected to a fiber switch connected to recorders located in Bldg.1. Are the existing cameras to be removed / relocated and re-installed?
The existing camera are to be removed and reinstalled in the final locations.
Spec section 28 23 00 Video Surveillance If a new camera system is to be installed what manufacture will be required?
No, a new video camera system will not be installed.
Spec section 28 23 00 Video Surveillance Will the cameras connect and be recorded by the existing Pelco recorders?
Yes, the existing system is connected to the Pelco recorders and will be reconnected before close of construction.
Spec section 28 23 00 Video Surveillance Will a new network recorder (NVR), be required in this project? If yes please provide the manufacturer and location.
No, a new NVR will not be required.
Spec section 28 23 00 Video Surveillance The drawings or specifications do not identify a new patch panel or network switch requirement. Will patch panels or network switches be required in this project or are we to use the existing? If new, please provide the manufacturer and location.
No, new patch panels or network switches are not required.
Spec section 28 23 00 Video Surveillance Will new IP cameras connect to the existing network and switch? If no please describe the connection architecture.
If new cameras are required, they will connect to the existing camera network and switch.
Spec section 28 23 00 Video Surveillance Remote client PC. Will any computers need to be provided in this project? If yes how many?
No
Spec section 28 23 00 Video Surveillance Video display equipment. Are any monitors required as part of this project? If yes please provide the number and size.
No
Spec section 28 23 00 Video Surveillance PDA server. Are servers required as part of this project? If yes please provide how many.
No
Spec section 28 23 00 Video Surveillance Video workstation server. Are servers required as part of this project? If yes please provide the number.
No
Spec section 28 23 00 Video Surveillance Intercom interface does the VMS need to interface with an Intercom system. If yes, please provide the make and model of the system and number of location.
No
See clarification below. We have some potential concerns about meeting the outside air CFM that we wanted to bring to the attention of the A/E.
Regarding OSA CFMs: we can only hope to get about 20% of the unit’s CFM as OSA. There is no guarantee of this nor catalog/tested data to prove it. There is just people’s “experience”. You’ll get less CFM if the unit is creating the airflow itself vs if there is a positively pressurized OSA fan for instance, delivering/pushing the airflow to the indoor units. So, with that said, a 750CFM unit can possibly achieve 150 CFM of OSA when using an OSA kit.
No question was provided and no comment returned.
When VRF first came on to the market, what was said about how long the systems would last? What is said today about VRF longevity?
I think of boilers, chillers & 4-pipe AHUs as having a 20-25 year lifespan. Do you agree with that? VRF is obviously less than that, right? What, maybe 15-years? First-off, a compressor that runs 24/7 isn’t going to last forever… Most compressors only have a 5-year warranty… I believe there is a valid reason for that.
With that in mind, I must ask the question: The Building 3 system has been running for 9 years already and they want to un-install, then re-use it? Who is on the hook when the system dies and/or is obsolete in a few years? Who is on the hook for warranty? With R32 coming in 2026, I see these old VRF projects suffering big time. The backwards compatibility that we have enjoyed for years will restart at zero come January 1, 2026.
The VA might want to consider installing a new 410a system, so they can expect a good 10-15 years out of it.
The Contractor will be responsible for providing a working system as it was working prior to construction. The contractor will be responsible to warranty the work that they performed and material that they provided, i.e in this case the new coolant line sets and connections, the installation of the units, but not the actual units. After construction if a leak develops in the new line sets the contractor installs it will be covered under warranty. If the unit itself fails (not due to contractor workmanship), that will not be a contractor warranty issue.
We don’t see anything on the demo of the PA (Speaker) system or the Intrusion detection system.
We are assuming that the VA would want these devices removed, saved, and then reinstalled.
The new floor plans show speakers being installed. Nothing on the intrusion detection that I saw.
It is the intent of this project to remove the PA system and reinstall in the new locations as shown on the plans.
| Are we allowed to cap and demo the fire sprinkler system for the whole duration of the project? If so, we are assuming no fire watch needed? |
| Yes. |
| Will the contractor be required to install temporary smoke detectors for this project? |
| No. |
| RFP Page 8 of 84 states that projects submitted under Technical Experience shall be completed within the past five (5) years of the date of issuance of this Will the Government please accept projects completed within the last six years from the date of issuance of this RFP? |
| The RFP instructions remain the same. |