This document is an Electrical Schedules drawing set for federal construction projects involving Buildings 2 and 3. The drawings provide detailed electrical specifications, circuit directories, panelboard schedules, and conduit/wire routing information for multiple facilities.
The schedules include circuit directories for various panelboards (02-LLB, 02-WHA, 02-WHA replacement, and 03-DP9/1) with identification of circuit breaker ratings, load descriptions, and demand calculations. Key electrical infrastructure specified includes motor control centers (MCC-01 through MCC-03), transformers (PMT-09), active harmonic filters (09-AHF-09), and surge protection devices. Building 2 work encompasses conduit and wire routing specifications with conductor sizes ranging from 12 AWG to 600 kcmil, installation locations, and grounding requirements. Building 3 specifications address a 480/277V, 3-phase, 4-wire switchboard with 600-amp bus rated for 65kAIC service located in Room 103, supplied from an automatic transfer switch (03-ATS). General notes require circuit tracing to identify circuit breaker loads and provision of updated typewritten circuit directories with identified circuit descriptions. Page 5 and subsequent pages indicate "NO WORK TO BE PERFORMED" for certain building sections, limiting scope to identified areas only.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/30/2025 9:30:51 AM
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
001EP706
BLDG 001 - ELECTRICAL SCHEDULES
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
Revisions: Date:
GENERAL NOTES
KEY NOTES
1. REFERENCE FLOOR PLANS AND ONE-LINE DIAGRAMS
FOR ADDITIONAL INFORMATION.
PERFORM CIRCUIT TRACING TO IDENTIFY CIRCUIT BREAKER
LOAD. PROVIDE NEW TYPEWRITTEN CIRCUIT DIRECTORY
WITH UPDATED / IDENTIFIED CIRCUIT DESCRIPTIONS.
Division 25-27
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/30/2025 9:30:54 AM
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
002EP701
BLDG 002 - ELECTRICAL SCHEDULES
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
Revisions: Date:
GENERAL NOTES
1. REFERENCE FLOOR PLANS AND ONE-LINE DIAGRAMS
FOR ADDITIONAL INFORMATION.
FROM TO QTY SIZE (QTY) & SIZE
GROUND
SIZE
002-P-01 ACTIVE HARMONIC FILTER "09-AHF-09" TRANSFORMER "PMT-09" ACTIVE HARMONIC FILTER "09-AHF-09" 1 3-1/2" (3) 600 kcmil 3/0 AWG - 002-P-02 ACTIVE HARMONIC FILTER "09-AHF-09" CT INSTRUMENTATION ACTIVE HARMONIC FILTER "09-AHF-09" TRANSFORMER "PMT-09" 1 1-1/2" SEE NOTES 12 AWG 2 002-P-03 PANELBOARD "DP9A/1" TRANSFORMER "PMT-09" PANELBOARD "DP9A/1" 3 3-1/2" (4) 500 kcmil 3/0 AWG -
002-G-01 WATER PIPE BOND PANEL "LHB" SECTION 1 MAIN WATER SERVICE PIPE 1 - - 2 AWG -
002-G-02 SERVICE EQUIPMENT BOND PANEL "02-P1" GROUND ROD 1 - - 1/0 AWG 1
002-G-03 AIR TERMINAL BOND ESE AIR TERMINAL GROUND ROD 1 - - 2 AWG -
002-G-04 GROUNDING ARRAY GROUND ROD GROUND ROD 1 - - 1/0 AWG 1
002-G-05 WATER PIPE BOND PANEL "02-P1" MAIN WATER SERVICE PIPE 1 1" - 1/0 AWG -
002-G-06 WATER PIPE BOND MAIN FIRE RISER WATER PIPE GROUND ROD 1 - - 1/0 AWG 1
NOTE(S):
1. GROUNDING ELECTRODE SYSTEM BONDING CONDUCTORS SHALL BE ROUTED IN CONDUIT WHERE EXPOSED AND SHALL BE BARE WHEN UNDERGROUND.
2. PROVIDE MANUFACTURERS CT / INSTRUMENTATION CABLING; COORDINATE WITH ALL MANUFACTURERS REQUIREMENTS.
BLDG 002 - CONDUIT AND WIRE SCHEDULE
CONDUIT
TAG
SERVICE
ROUTING CONDUIT CONDUCTORS
NOTES
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/30/2025 9:31:00 AM
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
002EP702
BLDG 002 - ELECTRICAL SCHEDULES
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
Revisions: Date:
GENERAL NOTES
KEY NOTES
1. REFERENCE FLOOR PLANS AND ONE-LINE DIAGRAMS
FOR ADDITIONAL INFORMATION.
PERFORM CIRCUIT TRACING TO IDENTIFY CIRCUIT BREAKER
LOAD. PROVIDE NEW TYPEWRITTEN CIRCUIT DIRECTORY
WITH UPDATED / IDENTIFIED CIRCUIT DESCRIPTIONS.
Location: BLDG 2, RM B-104 Volts: 208/120 Wye A.I.C Rating: 22k
Supply From: "02-LHA" Phases: 3 Bus Rating: 100 A
Mounting: Surface Wires 4 Main Circuit Breaker: 60 A
Enclosure: Type 1
CKT Trip Poles Poles Trip CKT
1 20 A 1 0 0 1 20 A 2
3 20 A 1 0 0 1 20 A 4
5 20 A 1 0 0 1 20 A 6
7 20 A 1 0 0 1 20 A 8
9 20 A 1 0 0 1 20 A 10
11 20 A 1 0 0 1 20 A 12
13 20 A 1 0 0 1 20 A 14
15 20 A 1 0 0 1 20 A 16
17 20 A 1 0 0 1 20 A 18
19 20 A 1 0 0 1 20 A 20
21 20 A 1 0 0 1 20 A 22
23 20 A 1 0 0 1 20 A 24
25 20 A 1 0 0 1 20 A 26
27 20 A 1 0 0 1 20 A 28
29 20 A 1 0 0 1 20 A 30
31 20 A 1 0 0 1 20 A 32
33 20 A 1 0 0 1 20 A 34
35 20 A 1 0 0 1 20 A 36
37 20 A 1 0 0 1 20 A 38
39 20 A 1 0 0 1 20 A 40
41 20 A 1 0 0 1 20 A 42
43 20 A 1 0 0 1 20 A 44
45 20 A 1 0 0 1 20 A 46
47 20 A 1 0 0 1 20 A 48
49 20 A 1 0 0 1 20 A 50
51 20 A 1 0 0 1 20 A 52
53 20 A 1 0 0 1 20 A 54
Total Load:
Total Amps:
LOAD TYPE
Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%
0 100.00%
Notes:
Telecom Rack 0
0 Total Est. Power Demand:
0 Total Conn. Amperage:
0 Total Est. Amperage Demand:
Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:
0 0 0
0 0 0
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
COMPUTER OFFICE DEDICATED LIGHT FRAMES (RED)
CIRCUIT DESCRIPTION
LIGHTS SHOWER, WATER COOLER NORTH RECEPT FINISH AREA
RECEPT MECH, STERILE PKG RECEPT CKT SORT, WASH, MAINT, BAY LIFT
RECEPT MENDING RM RECEPT CKTS, WATER SOFT SYS, MAINT/ LUNCH
PANELBOARD: 02-LLA (REPLACEMENT)
VA PER PHASE
CIRCUIT DESCRIPTION A B C
RECEPT CKT OFFICE LIGHTS CKT CANOPY SOUTH & EAST
CEILING HEATERS MENDING STORAGE PROOF OF FLOW DRYER, SPRINKLER
Location: BLDG 2, RM B-104 Volts: 208/120 Wye A.I.C Rating: 22k
Supply From: "02-LHB" Phases: 3 Bus Rating: 100 A
Mounting: Surface Wires 4 Main Circuit Breaker: 60 A
Enclosure: Type 1
CKT Trip Poles Poles Trip CKT
1 20 A 1 0 0 1 15 A 2
3 20 A 1 0 0 2 20 A 4
5 20 A 2 0 0 " " 6
7 " " 0 0 1 15 A 8
9 20 A 1 0 0 1 15 A 10
11 15 A 1 0 0 1 15 A 12
13 15 A 1 0 0 1 20 A 14
15 15 A 1 0 0 1 15 A 16
17 15 A 1 0 0 1 20 A 18
19 15 A 1 0 0 1 15 A 20
21 15 A 1 0 0 1 30 A 22
23 15 A 1 0 0 1 30 A 24
25 15 A 1 0 0 1 15 A 26
27 20 A 1 0 0 2 30 A 28
29 20 A 1 0 0 " " 30
31 30 A 1 0 0 3 20 A 32
33 20 A 1 0 0 " " 34
35 20 A 1 0 0 " " 36
37 20 A 1 0 0 1 20 A 38
39 20 A 1 0 0 1 20 A 40
41 20 A 1 0 0 1 20 A 42
43 20 A 1 0 0 1 20 A 44
45 20 A 1 0 0 1 20 A 46
47 20 A 1 0 0 1 20 A 48
49 20 A 1 0 0 1 20 A 50
51 20 A 1 0 0 1 20 A 52
53 20 A 1 0 0 1 20 A 54
Total Load:
Total Amps:
LOAD TYPE
Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%
0 100.00%
Notes:
PANELBOARD: 02-LLB (REPLACEMENT)
VA PER PHASE
CIRCUIT DESCRIPTION A B C
" SPARE (LINT COLLECTOR)
SCALE SOUTH SPARE (#37 CONTROL CKT LINT COLLECTOR)
SCALE NORTH SPARE (#37 CONTROL CKT LINT COLLECTOR)
CIRCUIT DESCRIPTION
CBW COMP MONDRAIL CONTROL
RECEPT WEST BUILD OUT UN LINT SCRUBBER
SPARE "
2 UH-29 HEATER 2 EF 2 EXHAUST FAN NORTH
2-EF 3 EXHAUST FAN SOUTH SPARE (2-EF 4 EXHAUST FAN 2 SPEED)
2 UH 28 UNIT HEATER POLE DRYER
WATER SOFTNERS 2 UH-24, 25, 26 UNIT HEATERS
GARMET CONVEYOR 2-UH-26 UNIT HEATER
RECEPT ABOVE PANEL 2 UH-20, 21, 22, 27 UNIT HEATER REC OFFICE
RECEPT BREAK RM SPARE (RECEPT VACUUM)
REFRIGERATOR (BREAK ROOM) "
CHILLER CONTROL "
UNKNOWN LOAD FIBER OPTICS EQUIPMENT
HONEYWELL RECEPT B107 WATER HEATER
MICROWAVE (BREAK ROOM) "
SPARE SPARE
SPARE SPARE
SPARE SPARE
NEW ADDITION RECEPT E85 FUEL TANK
HOOD VACUUM SPARE
PAGE SYSTEM, PUMP RECEPT SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:
0 0 0
0 0 0
Telecom Rack 0
0 Total Est. Power Demand:
0 Total Conn. Amperage:
0 Total Est. Amperage Demand:
Location: BLDG 2-3, OUTSIDE Volts: 480/277 Wye A.I.C Rating: 22k
Supply From: "PMT-09 SEC" Phases: 3 Bus Rating: 1200 A
Mounting: Surface Wires 4 Main Circuit Breaker: 1200AF / 1000AT / 3P
Enclosure: Type 3R
CKT Trip Poles Poles Trip CKT 1 450 A 3 0 0 3 600 A 2
3 " " 0 0 " " 4
5 " " 0 0 " " 6
7 125 A 3 0 0 3 200 A 8
9 " " 0 0 " " 10
11 " " 0 0 " " 12
13 100A 3 0 0 3 100 A 14
15 " " 0 0 " " 16
17 " " 0 0 " " 18
19 100A 3 0 100 3 90 A 20
21 " " 0 100 " " 22
23 " " 0 100 " " 24
25 100A 3 0 100 3 30 A 26
27 " " 0 100 " " 28
29 " " 0 100 " " 30
Total Load:
Total Amps:
LOAD TYPE
Largest Motor 0 125.00% 600 VA Other 600 100.00% 600 VA Receptacle 0 100.00% 2 A Lighting 0 125.00% 2 A All other Motor 0 100.00%
0 100.00%
Notes:
PANELBOARD: 02-PMP-09 (REPLACEMENT)
VA PER PHASE
CIRCUIT DESCRIPTION A B C
PANELBOARD "02-LHA" PANELBOARD "02-WH"
CIRCUIT DESCRIPTION
PANELBOARD "03-MAIN" PANELBOARD "02-LHB"
SPARE SPD
SPARE SPARE
SPARE DPM
Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:
200 200 200
2 2 2
Telecom Rack 0
600 Total Est. Power Demand:
0 Total Conn. Amperage:
0 Total Est. Amperage Demand:
Location: BLDG 2, RM A-100A Volts: 208/120 Wye A.I.C Rating: 22k
Supply From: "02-WH" Phases: 3 Bus Rating: 225 A
Mounting: Surface Wires 4 Main Circuit Breaker: 225 A
Enclosure: Type 1
CKT Trip Poles Poles Trip CKT
1 20 A 1 0 0 1 20 A 2
3 20 A 1 0 0 1 20 A 4
5 20 A 1 0 0 1 20 A 6
7 20 A 1 0 0 3 60 A 8
9 20 A 1 0 0 " " 10
11 20 A 1 0 0 " " 12
13 20 A 2 0 0 1 20 A 14
15 " " 0 0 - - 16
17 - - 0 0 1 20 A 18
19 20 A 2 0 0 2 30 A 20
21 " " 0 0 " " 22
23 20 A 1 0 0 - - 24
25 20 A 1 0 0 3 30 A 26
27 20 A 1 0 0 " " 28
29 20 A 1 0 0 " " 30
31 30 A 2 0 0 2 20 A 32
33 " " 0 0 " " 34
35 20 A 1 0 0 -- -- 36
37 20 A 1 0 0 3 15 A 38
39 20 A 1 0 0 " " 40
41 20 A 1 0 0 " " 42
43 20 A 1 0 0 1 20 A 44
45 20 A 1 0 0 1 20 A 46
47 20 A 1 0 0 1 20 A 48
49 20 A 1 0 0 1 20 A 50
51 20 A 1 0 0 1 20 A 52
53 20 A 1 0 0 1 20 A 54
Total Load:
Total Amps:
LOAD TYPE
Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%
0 100.00%
Notes:
PANELBOARD: 02-WHA (REPLACEMENT)
VA PER PHASE
CIRCUIT DESCRIPTION A B C
RECEPT COUNTER A/C
RECEPT OFFICE "
PAPER CUTTER "
CIRCUIT DESCRIPTION
UNKNOWN LOAD SPARE (COLLATOR CENTER POST)
SPARE COLLATOR NORTH POST
RECEPT COUNTER COLLATOR SOUTH POST
POWER POLE, BIZHUB PRINTER RECEPT E WALL
RECEPT FAST WALL SPACE
POWER POLE RECEPT A/C ROOF
" SPACE
SPACE POWER POLE RECEPT
NORTH POWER POLE RECEPT E WALL
RECEPT E WALL SPACE
COLOR COPIER RECEPT T/L
RECEPT N WALL "
RECEPT N WALL "
SPARE SPARE
SPARE SPARE
SPARE SPARE
RECEPT E WALL HIGH SPEED DOOR
RECEPT E WALL "
RECEPT E WALL "
SPARE SPARE
SPARE SPARE
SPARE SPARE
Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:
0 0 0
0 0 0
Telecom Rack 0
0 Total Est. Power Demand:
0 Total Conn. Amperage:
0 Total Est. Amperage Demand:
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/30/2025 9:31:07 AM
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
002EP703
BLDG 002 - ELECTRICAL SCHEDULES
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
Revisions: Date:
GENERAL NOTES
KEY NOTES
1. REFERENCE FLOOR PLANS AND ONE-LINE DIAGRAMS
FOR ADDITIONAL INFORMATION.
PERFORM CIRCUIT TRACING TO IDENTIFY CIRCUIT BREAKER
LOAD. PROVIDE NEW TYPEWRITTEN CIRCUIT DIRECTORY
WITH UPDATED / IDENTIFIED CIRCUIT DESCRIPTIONS.
1 1
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/30/2025 9:31:11 AM
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
002EP704
BLDG 002 - ELECTRICAL SCHEDULES
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
Revisions: Date:
GENERAL NOTES
1. REFERENCE FLOOR PLANS AND ONE-LINE DIAGRAMS
FOR ADDITIONAL INFORMATION.
NO WORK TO BE PERFORMED
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/30/2025 9:31:13 AM
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
003EP701
BLDG 003 - ELECTRICAL SCHEDULES
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
Revisions: Date:
GENERAL NOTES
1. REFERENCE FLOOR PLANS AND ONE-LINE DIAGRAMS
FOR ADDITIONAL INFORMATION.
FROM TO QTY SIZE (QTY) & SIZE
GROUND
SIZE
003-P-01 SURGE PROTECTION DEVICE SWITCHBOARD "03-DP9/1" SURGE PROTECTION DEVICE 1 1" (4) 6 AWG (1) 10 AWG -
003-G-01 WATER PIPE BOND DISC. "03-MAIN" BLDG 3 MAIN WATER PIPE 1 - - 2 AWG 1
NOTE(S):
1. GROUNDING ELECTRODE SYSTEM BONDING CONDUCTORS SHALL BE ROUTED IN CONDUIT WHERE EXPOSED AND SHALL BE BARE WHEN UNDERGROUND.
BLDG 003 - CONDUIT AND WIRE SCHEDULE
CONDUIT
TAG
SERVICE
ROUTING CONDUIT CONDUCTORS
NOTES
VOLTAGE: 480/277V, 3P, 4W LOCATION BLDG 3, RM 103
BUS AMPS: 600A SUPPLY FROM: 03-ATS
AIC: 65KAIC MOUNTING: SURFACE
MAIN: MCB (600A/LSI) ENCLOSURE: TYPE 1
A B C
1 150 / 3 SPARE
2 20 / 1 LIGHTING
3 20 / 1 LIGHTING
4 20 / 1 LIGHTING
5 125 / 3 TRANSFORMER TO BL-B
6 125 / 3 TRANSFORMER TO BL
7 90 / 3 TRANSFORMER TO BL-C
8 70 / 3 SURGE PROTECTION DEVICE 100 100 100
9 - / 2 SPACE
10 600 / 3 MCC
100 100 100 1 1 1
CONNECTED LOAD (VA) DEMAND FACTOR
ESTIMATED
DEMAND (VA)
TOTALS
125.00% 0
CONN. POWER
LOAD (VA)
100.00% 0 CONN. AMP (A) 0
100.00% 0
EST. POWER
DEMAND (VA)
125.00% 0
EST. AMP DEMAND
(A)
OTHER
SWITCHBOARD "03-DP9/1" (REVISED)
CKT # CB / POLE CIRCUIT DESCRIPTION
VA LOAD
NOTES
TOTAL CONNECTED VA BY PHASE
TOTAL CONNECTED AMPS BY PHASE
LOAD TYPE
LARGEST MOTOR
RECEPTACLE
LIGHTING
TR RACK DATA
LOADING
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/30/2025 9:31:17 AM
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
003EP702
BLDG 003 - ELECTRICAL SCHEDULES
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
Revisions: Date:
GENERAL NOTES
1. REFERENCE FLOOR PLANS AND ONE-LINE DIAGRAMS
FOR ADDITIONAL INFORMATION.
NO WORK TO BE PERFORMED
| 001EP706 - BLDG 001 - ELECTRICAL SCHEDULES |
| 002EP701 - BLDG 002 - ELECTRICAL SCHEDULES |
| 002EP702 - BLDG 002 - ELECTRICAL SCHEDULES |
| 002EP703 - BLDG 002 - ELECTRICAL SCHEDULES |
| 002EP704 - BLDG 002 - ELECTRICAL SCHEDULES |
| 003EP701 - BLDG 003 - ELECTRICAL SCHEDULES |
| 003EP702 - BLDG 003 - ELECTRICAL SCHEDULES |
| 004EP701 - BLDG 004 - ELECTRICAL SCHEDULES |
| 004EP702 - BLDG 004 - ELECTRICAL SCHEDULES |
| 005EP701 - BLDG 005 - ELECTRICAL SCHEDULES |
| 006EP701 - BLDG 006 - ELECTRICAL SCHEDULES |
| 007EP701 - BLDG 007 - ELECTRICAL SCHEDULES |
| 011EP701 - BLDG 011 - ELECTRICAL SCHEDULES |
File details come from the government source that posted it. Updated .