This document is a set of electrical construction drawings for a federal facility renovation project covering multiple buildings. The drawings include detailed electrical schematics, one-line diagrams, switchboard footprints, and motor control center configurations across numerous building sections, with both existing and revised (proposed) conditions shown. The project involves demolition and replacement of electrical infrastructure including transformers, switchboards (01-MSB, 11-MSB), panelboards, and motor control centers, with coordination required across multiple medium voltage and low voltage systems operating at 12,470V primary and 480/277V or 208/120V secondary voltages.
Key work requirements include: demolishing existing transformer PMT-10, PMT-11, and associated equipment while preserving raceways for reuse; replacing pilot devices on motor control center 11-MCC-2 with LED push-to-test indicator lights (31 units), hand-off-auto selector switches (16 units), and reset buttons (16 units); establishing housekeeping pads with 5,000-PSI concrete; providing all conduit supports per NEC with stainless steel fastening hardware; field-verifying equipment fit within allocated electrical clearances with submittal confirmation; and preserving all existing circuits for retermination. The contractor must provide detailed shutdown plans, temporary power plans, and phasing plans for review 30 days prior to implementation. Drawings reference associated one-line diagrams and panelboard schedules for complete circuiting information across at least 25 buildings and numerous distribution panels and substations throughout the facility.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONDUIT (TYPICAL) 2
SWITCHBOARD "01-MSB"
ID PLACARD
91.50"
24"
36" 36"
4"
4"
01-MSB
DETAIL NOTES:
1. MEASUREMENTS INSIDE OF EQUIPMENT FOOTPRINT
ARE APPROXIMATE.
2. NUMBER INSIDE CONDUIT INDICATES APPROXIMATE
DIAMETER OF CONDUIT.
3. CONTRACTOR SHALL COORDINATE WITH
EQUIPMENT MANUFACTURER TO ENSURE
REPLACEMENT SWITCHBOARD ENCAPSULATES ALL
EXISTING CONDUIT PENETRATIONS. CONTRACTOR
SHALL INDICATE ABOVE REQUIREMENTS DURING
SUBMITTAL PROCESS FOR VA AND ENGINEER
REVIEW.
24.00"
72.00"
36.00"
3" 3" 3" 3"
3" 2-1/2"
2-1/2" 1-1/2"
25.00"
75.00"
35.00"
3" 3" 3" 3"
3" 2-1/2"
2-1/2" 1-1/2"
4.00"
8.00"
7.00"
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 8:36:57 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
EP506
ELECTRICAL DETAILS
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
GENERAL NOTES (FOR THIS SHEET)
KEY NOTES (FOR THIS SHEET)
NTS
BUILDING 1 SWITCHBOARD "01-MSB" ELEVATION DETAIL
001EP401a
1 HOUSEKEEPING PAD, 5000-PSI CONCRETE, 3-1/2"H, #4 REBAR
EVERY 12" ON-CENTER. COORDINATE WITH CAST-IN-PLACE
CONCRETE SPECIFICATION FOR ADDITIONAL INFORMATION.
HOUSEKEEPING PAD SHALL EXTEND 4" BEYOND EQUIPMENT
FOOTPRINT.
CONDUIT IS SHOWN FOR DIAGRAMMATICAL PURPOSES ONLY.
CONTRACTORS SHALL ROUTE CONDUIT AS REQUIRED TO
COORDINATE WITH EXISTING CONDITIONS. PROVIDE ALL
CONDUIT SUPPORTS REQUIRED PER NEC; ALL FASTENING
HARDWARE SHALL BE STAINLESS STEEL.
EXISTING TRANSFORMER "PMT-10", CAPACITOR, AND
DISCONNECT SHALL BE DEMOLISHED. DEMOLISH ALL
CONDUCTORS ASSOCIATED BACK TO SOURCE. RACEWAYS
SHALL BE PRESERVED AND REUSED.
EXISTING SWITCHBOARD SHALL BE DEMOLISHED AND
REPLACED. PRESERVE ALL CIRCUITS FOR RETERMINATION.
REFERENCE ONE-LINE DIAGRAM ON SHEET 001ED601 AND
001EP601 FOR ADDITIONAL INFORMATION.
1. NOT ALL RACEWAYS, BOXES, OR CONNECTIONS MAY BE SHOWN
FOR CLARITY. REFERENCE ONE-LINE DIAGRAMS AND FLOOR
PLANS FOR ADDITIONAL INFORMATION.
Revisions: Date:
NTS
BUILDING 1 EXISTING TRANSFORMER "PMT-10" PHOTO DETAIL
001EP401a
1" = 1'-0"
BUILDING 01 SWITCHBOARD "01-MSB" FOOTPRINT
001EP401a
NTS
BUILDING 1 EXISTING SWITCHBOARD "01-MSB" PHOTO DETAIL
001EP401a
- 1" = 1'-0"
2B BUILDING 01 REVISED SWITCHBOARD "01-MSB" FOOTPRINT
- 1" = 1'-0"
2A BUILDING 01 EXISTING SWITCHBOARD "01-MSB" FOOTPRINT
GENERAL NOTES
KEY NOTES
CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL
THAT THEIR PROPOSED EQUIPMENT SELECTION (I.E.
PANELBOARD, GENERATOR, ETC.) WILL FIT WITH ALL
REQUIRED ELECTRICAL CLEARANCES. CONTRACTOR SHALL
PROVIDE STATEMENT CONFIRMING THAT EQUIPMENT WILL FIT
IN ALLOCATED SPACE ON SUBMITTAL.
2.
SPDSPD
Division 25-27
DETAIL NOTES:
1. MEASUREMENTS INSIDE OF EQUIPMENT FOOTPRINT
ARE APPROXIMATE.
2. NUMBER INSIDE CONDUIT INDICATES APPROXIMATE
DIAMETER OF CONDUIT.
3. CONTRACTOR SHALL COORDINATE WITH
EQUIPMENT MANUFACTURER TO ENSURE
REPLACEMENT SWITCHBOARD ENCAPSULATES ALL
EXISTING CONDUIT PENETRATIONS. CONTRACTOR
SHALL INDICATE THE ABOVE REQUIREMENTS
DURING SUBMITTAL PROCESS FOR VA AND
ENGINEER REVIEW.
11-MSB
CONDUIT (TYPICAL) 3
SWITCHBOARD "11-MSB"
4"
48"
91.50"
36"
4"
ID PLACARD
36"
24.00" 24.00" 24.00"
114.00"
22.00"
48.00"
4.00" 6.00"
4" 4"
3" 3"
2"
2-1/2" 2.00"
3.00"
4"
4"
4"
4"
4"
2" 2"
4.00"
6.00"
4.00"
4.00"
84.00"
36.00"
43.00"
4"
3"
4"
4" 4"2-1/2"
3"
4"
4"
4"
4"
4"
2" 2" 2"
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 8:37:01 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
EP507
ELECTRICAL DETAILS
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
GENERAL NOTES (FOR THIS SHEET)
KEY NOTES (FOR THIS SHEET)
1 EXISTING TRANSFORMER "PMT-11" AND ASSOCIATED
CONDUCTORS TO BE DEMOLISHED. CONDUIT SHALL BE CUT
AND CAPPED.
HOUSEKEEPING PAD, 5000-PSI CONCRETE, 3-1/2"H, #4 REBAR
EVERY 12" ON-CENTER. COORDINATE WITH CAST-IN-PLACE
CONCRETE SPECIFICATION FOR ADDITIONAL INFORMATION.
HOUSEKEEPING PAD SHALL EXTEND 4" BEYOND EQUIPMENT
FOOTPRINT.
CONDUIT IS SHOWN FOR DIAGRAMMATICAL PURPOSES ONLY.
CONTRACTORS SHALL ROUTE CONDUIT AS REQUIRED TO
COORDINATE WITH EXISTING CONDITIONS. PROVIDE ALL
CONDUIT SUPPORTS REQUIRED PER NEC; ALL FASTENING
HARDWARE SHALL BE STAINLESS STEEL.
EXISTING SWITCHBOARD "11-MSB" SHALL BE DEMOLISHED
AND REPLACED. REFERENCE ASSOCIATED BUILDING
ONE-LINE DIAGRAMS FOR ADDITIONAL INFORMATION.
NTS
BUILDING 11 EXISTING SWITCHBOARD "11-MSB" PHOTO DETAIL
011EP401a
NTS
BUILDING 11 EXISTING TRANSFORMER "PMT-11" PHOTO DETAIL
011EP401a
1. NOT ALL RACEWAYS, BOXES, OR CONNECTIONS MAY BE
SHOWN FOR CLARITY. REFERENCE ONE-LINE DIAGRAMS AND
FLOOR PLANS FOR ADDITIONAL INFORMATION.
Revisions: Date:
NTS
BUILDING 11 SWITCHBOARD "11-MSB" FOOTPRINT
011EP401a
NTS
BUILDING 11 SWITCHBOARD "11-MSB" ELEVATION DETAIL
011EP401a
- NTS
1A BUILDING 11 EXISTING SWITCHBOARD "11-MSB" FOOTPRINT
- NTS
1B BUILDING 11 REVISED SWITCHBOARD "11-MSB" FOOTPRINT
GENERAL NOTES
KEY NOTES
CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL
THAT THEIR PROPOSED EQUIPMENT SELECTION (I.E.
PANELBOARD, GENERATOR, ETC.) WILL FIT WITH ALL
REQUIRED ELECTRICAL CLEARANCES. CONTRACTOR SHALL
PROVIDE STATEMENT CONFIRMING THAT EQUIPMENT WILL FIT
IN ALLOCATED SPACE ON SUBMITTAL.
2.
SPDSPD
DETAIL NOTES:
1. UNITS ARE DIRECT REPLACEMENTS FOR EXISTING CAPACITOR BANKS. WHERE APPROPRIATE, UTILIZE EXISTING SERVICES FOR MOUNTING; MOUNT CAPACITOR BANK TO EXISTING
EQUIPMENT IN EXISTING LOCATION WHERE APPROPRIATE. PROVIDE GALVANIZED UNISTRUT
AND STAINLESS STEEL MOUNTING HARDWARE AS REQUIRED.
EQUIPMENT
EQUIPMENT EQUIPMENT
EQUIPMENT
FRONT VIEW SIDE VIEW
12.00"
27.00"
EQUIPMENT PILOT
LIGHTS
EQUIPMENT RATING
PLACARD
10.60"
27.00"
DETAIL NOTES:
ALL PILOT DEVICES ON MOTOR CONTROL CENTER SHALL BE REPLACED.
REFERENCE KEY NOTES 1, 2, AND 3 FOR ADDITIONAL INFORMATION AND DEVICE
QUANTITITES.
1. DURING REPLACEMENT OF MOTOR CONTROL CENTER PILOT DEVICES, ALL
EQUIPMENT SHALL REMAIN OPERATIONAL. REPLACEMENT OF PILOT DEVICES
SHALL NOT CONSTITUTE A SHUTDOWN.
2. COORDINATE EXACT REPLACEMENT PARTS AS REQUIRED.
TYP.
TYP.
TYP.
PHOTOCELL
JUNCTION BOX
CONDUIT
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 8:37:04 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
EP508
ELECTRICAL DETAILS
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
Revisions: Date:
GENERAL NOTES (FOR THIS SHEET)
KEY NOTES (FOR THIS SHEET)
1 DEMOLISH AND REPLACE EXISTING INDICATOR LIGHT PILOT
DEVICES. REPLACEMENT DEVICES SHALL BE LED,
PUSH-TO-TEST, 30MM, HEAVY DUTY OIL-TIGHT. TOTAL
QUANTITY OF INDICATOR LIGHTS TO BE REPLACED IS 31.
DEMOLISH AND REPLACE EXISTING HAND-OFF-AUTO
SELECTOR SWITCH PILOT DEVICES. REPLACEMENT DEVICES
SHALL BE 30MM, HEAVY DUTY OIL-TIGHT. TOTAL QUANTITY
OF HAND-OFF-AUTO SELECTOR SWITCHES TO BE REPLACED
IS 16.
DEMOLISH AND REPLACE EXISTING RESET BUTTON PILOT
DEVICES. REPLACEMENT DEVICES SHALL BE 30MM, HEAVY
DUTY OIL-TIGHT. TOTAL QUANTITY OF RESET BUTTONS TO BE
REPLACED IS 16.
1. NOT ALL RACEWAYS, BOXES, OR CONNECTIONS MAY BE
SHOWN FOR CLARITY. REFERENCE ONE-LINE DIAGRAMS AND
FLOOR PLANS FOR ADDITIONAL INFORMATION.
NTS
POWER FACTOR CORRECTION CAPACITOR ELEVATION
(CAPACITORS "PMP-07", "11-CAPS-ACRU1" AND "11-CAPS-ACRU2")
EP401,
011EP402b
NTS
BLDG 11 MOTOR CONTROL CENTER "11-MCC-2" PHOTO DETAIL
011EP104
- NTS
3 PHOTOCELL INSTALLATION PHOTO DETAIL
- NTS
4 NOT USED
PROVIDE ALL MOUNTING AND FASTENING HARWARE
REQUIRED. HARDWARE SHALL BE STAINLESS STEEL.
GENERAL NOTES
KEY NOTES
S
P
3P 4688.69 A
SLG 3261.11 A
750.0 kVA
5.71 %Z Pri: 12470 V Sec: 480 V
PD-RISER POLE CUTOUTS
COOPER
N-Tin Fuse Link, 27kV S/T 100.0 A
CLARK PUBLIC UTILITIES
CBL-UTILITY UG
Size 1/0 1 Set(s)
0.7 ft Non-Magnetic
ATS-MV
UTIL-GRAND#1
3P 5094.66 A
SLG 3444.32 A
12470.0 V
PD-HVS-3
S&C SMU-20, 14.4kV E-Rated S/T 65.0 A
PMT-08
BAY 1A
BAY 2-4
BAY 5-6
S
P
PMS-11
3P 4696.35 A
SLG 3202.39 A
12470.0 V
PMS-11-C
PMT-11-A
BAY 1C
PMT-11-B
Open
PDS-PMS-11
PDS-PMS-11
CBL-PMT-11
Size 2 1 Set(s)
110.0 ft Non-Magnetic
PD-PMT-11 PRI
COOPER
ELX, 8.3-23kV S/T 100.0 A
3P 4653.93 A
SLG 3176.44 A
12470.0 V
PMT-11 PRI
PMT-11
1500.0 kVA
6.0000 %Z Pri 12470 V Sec 480 V
PMT-11 SEC
3P 30323.27 A
SLG 25336.01 A
480.0 V
FB-PMT-11 SEC
SQUARE D
PEF & PEC, Micrologic (Obs.)
S/T 2000.0 A Plug 2000.0 A
CBL-PMS-11
Size 2 1 Set(s)
1015.0 ft Non-Magnetic
TO BUILDING 24
S
P
PMS-10
3P 4728.52 A
SLG 3225.77 A
12470.0 V
PMS-10-C
PMT-10-BPMS-10-A
Open
PDS-PMS-10
S/T 0.0 A
CBL-PMT-10
Size 2 1 Set(s)
40.0 ft Non-Magnetic
PD-PMT-10 PRI
COOPER
ELX, 8.3-23kV S/T 50.0 A
PMT-10 PRI
3P 4712.44 A
SLG 3216.12 A
12470.0 V
PMT-10
750.0 kVA
5.7000 %Z Pri 12470 V Sec 480 V
PMT-10 SEC
3P 16102.39 A
SLG 14529.57 A
480.0 V
CBL-01-MAIN
Size 400 3 Set(s)
21.0 ft Non-Magnetic
PMT-13
225 kVA
5.4 %Z Pri 12470 V Sec 480V
S
P
CONTINUE TO PMP-13
SHEET 025ED601
350A 3P
CBL-PMS-10-11 TIE
Size 2 1 Set(s)
400.0 ft Non-Magnetic
PD-HVS-4
S&C SMU-20, 14.4kV E-Rated S/T 65.0 A
CBL-PMS-10
Size 2 1 Set(s)
900.0 ft Non-Magnetic
BF-PMT10 PFCC
GOULD SHAWMUT
TRS, 600V Class RK5 S/T 125.0 A
PFCC-PMT10
Capacitor kVAR 100.0
S
P
1750.000 kW 480 V
3P 17519.14 A
SLG 17519.14 A
CBL-06-GEN
Size 600 6 Set(s)
12.0 ft Non-Magnetic
06-GEN-MB
3P 17718.18 A
SLG 17579.58 A
480.0 V
Size 2 1 Set(s)
5.0 ft Non-Magnetic
PMT-01 SEC-CL
COOPER
ELSP, 8.3kV S/T 200.0 A
06-ENG-GEN
CBL-06-PMT-1 PRI
Size 600 7 Set(s)
15.0 ft Magnetic
PMT-01
2000.0 kVA
5.9000 %Z Pri 480 V Sec 12470 V
CBL-PMT-01 SEC
MB-06-GEN
GE
TP & THP,
MVT Plus/PM S/T 3000.0 A Plug 3000.0 A
PMT-01 SEC EXP
COOPER
Bay-O-Net Current Sensing Fuse Link, 23kV S/T 140.0 A
MVSWGR
3P 5094.34 A
SLG 3444.06 A
12470.0 V
CONTINUE TO MB-01-MSB
SHEET 001ED601
CONTINUE TO MB-11-MSB
SHEET 011ED601
TO SHEET ED602
CBL-11-MAIN
Size 600 6 Set(s)
21.0 ft Non-Magnetic
MANHOLE "MH-4"
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 9:57:19 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
ED601
MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART
1 OF 3 - EXISTING
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
- NTS
1 MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART 1 OF 3 - EXISTING
GENERAL NOTES
KEY NOTES
1 EXISTING MEDIUM VOLTAGE SWITCH SHALL BE DEMOLISHED
AND REPLACED. PRESERVE MEDIUM VOLTAGE LOOP FEEDS
FOR RETERMINATION.
EXISTING OVERCURRENT PROTECTIVE DEVICE SHALL BE
DEMOLISHED AND REPLACED. REFERENCE
CORRESPONDING BUILDING REVISED ONE-LINE DIAGRAM
AND PROTECTIVE DEVICE CHANGES SCHEDULE FOR
ADDITIONAL INFORMATION.
EXISTING OVERCURRENT PROTECTIVE DEVICE SETTINGS TO
BE ADJUSTED. REFERENCE CORRESPONDING BUILDING
REVISED ONE-LINE DIGRAM AND PROTECTIVE DEVICE
CHANGES SCHEDULE FOR ADDITIONAL INFORMATION.
UTILITY COORDINATION REQUIRED FOR FUSE ADJUSMENT.
REFERENCE REVISED ONE-LINE DIAGRAM ON SHEET EP601
FOR ADDITIONAL INFORMATION.
EXISTING TRANSFORMER SHALL BE MODIFIED. REFERENCE
ONE-LINE DIAGRAM ON SHEET EP601 FOR ADDITIONAL
INFORMATION.
Revisions: Date:
1.
2.
3.
4.
5.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE ENGINEER.
CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30 DAYS PRIOR TO IMPLEMENTATION.
SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED
AS-BUILTS.
NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY
HAVE WORK SHOWN; ALL ONE- LINE DRAWINGS HAVE
BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE
PURPOSES.
FOR ALL JUNCTION BOXES, EXISTING AND NEW,
CONTRACTOR SHALL VERIFY CIRCUIT NUMBERS AND
PHASE, LABEL CIRCUIT NUMBERS ON WIRES WITHIN
JUNCTION BOX, AND UTILIZE CORRECT PHASE COLORED
WIRE FOR EXTENSION OF CIRCUITS TO POWER SOURCE.
S
P
S
P
Open
Open
Open
S/T 0.0 A
CBL-PMT-09
Size 2 1 Set(s)
5.0 ft Non-Magnetic
PD-HVS-2
S&C SMU-20, 14.4kV E-Rated S/T 65.0 A
CBL-PMT-07-06
PMT-06
500.0 kVA
4.5200 %Z Pri 12470 V Sec 480 V
PMT-06 PRI
3P 4308.66 A
SLG 2972.98 A
12470.0 V
PMT-06 SEC
3P 12598.72 A
SLG 12826.96 A
480.0 V
FB-PMT-06 SEC
SQUARE D
MG w/ ET1.0, 2-8x Inst.
S/T 600.0 A
PD-PMT-06 PRI
PMT-06 PRI-B
PMT-06 PRI-A
PMT-02
750.0 kVA
5.9200 %Z Pri 12470 V Sec 480 V
PMT-02 PRI
3P 4946.91 A
SLG 3357.12 A
12470.0 V
PMT-02 SEC
CBL-PMP-02
Size 350 4 Set(s)
2.0 ft Non-Magnetic
FB-PMT-02 SEC
SQUARE D
Powerpact P-Frame, 5.0 &
6.0 A/P/H
S/T 1200.0 A
PD-PMT-02 PRI
COOPER
ELX, 8.3-23kV S/T 50.0 A
PMT-02 PRI-A
PMT-02 PRI-B
CBL-PMT-02-06
PMT-02 SITE LTG DISC
CBL-PMT-09-02
Size 2 1 Set(s)
350.0 ft Non-Magnetic
PMT-09
750.0 kVA
5.3000 %Z Pri 12470 V Sec 480 V
PMT-09 PRI
3P 5092.31 A
SLG 3442.85 A
12470.0 V
PMT-09 SEC
PD-PMT-09 PRI
COOPER
ELX, 8.3-23kV S/T 50.0 A
PMT-09 PRI-A
PMT-09 PRI-B
FB-PMT-09 SEC
SQUARE D
S/T 1000.0 A
PFCC-PMT09
Capacitor kVAR 275.0
SW-PFCC09
ARRESTOR-PMT-09
NO ARRESSTORS
ON XFMR PRIMARY
BAY 1B
S
P PMT-05
500.0 kVA
5.2600 %Z Pri 12470 V Sec 480V
TO BUILDING 02,
PANELBOARD P1
SHEET 002ED602
PMT-05
CBL-PMP-09
Size 350 4 Set(s)
5.0 ft Non-Magnetic
MVSWGR
3P 5094.34 A
SLG 3444.06 A
12470.0 V
CONTINUE TO
TRANSFORMER
PMT-07
CONTINUE TO 02-PMP-09 (DP9A/1)
SHEET 002ED601
CONTINUE TO PMP-02
SHEET 012ED601
CONTINUE TO 20-4MDS
SHEET 020ED601
TO SHEET ED601 TO SHEET ED603
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 9:57:22 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
ED602
MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART
2 OF 3 - EXISTING
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
GENERAL NOTES
KEY NOTES
EXISTING MEDIUM VOLTAGE TRANSFORMER SHALL BE
DEMOLISHED AND REPLACED. PRESERVE MEDIUM
VOLTAGE LOOP FEEDS FOR RETERMINATION.
EXISTING OVERCURRENT PROTECTIVE DEVICE SHALL BE
DEMOLISHED AND REPLACED. REFERENCE
CORRESPONDING BUILDING REVISED ONE-LINE DIAGRAM
AND PROTECTIVE DEVICE CHANGES SCHEDULE FOR
ADDITIONAL INFORMATION.
- NTS
1 MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART 2 OF 3 - EXISTING
Revisions: Date:
1.
2.
3.
4.
5.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE ENGINEER.
CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30 DAYS PRIOR TO IMPLEMENTATION.
SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED
AS-BUILTS.
NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY
HAVE WORK SHOWN; ALL ONE- LINE DRAWINGS HAVE
BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE
PURPOSES.
FOR ALL JUNCTION BOXES, EXISTING AND NEW,
CONTRACTOR SHALL VERIFY CIRCUIT NUMBERS AND
PHASE, LABEL CIRCUIT NUMBERS ON WIRES WITHIN
JUNCTION BOX, AND UTILIZE CORRECT PHASE COLORED
WIRE FOR EXTENSION OF CIRCUITS TO POWER SOURCE.
Open
PD-PMT-12 PRI
COOPER
ELX, 8.3-23kV S/T 18.0 A
CBL-PMS-12
Size 2 1 Set(s)
5.0 ft Non-Magnetic
PD-HVS-1
S&C SMU-20, 14.4kV E-Rated S/T 65.0 A
ARRESTOR-PMT-12
PMT-12 PRI-A
PMT-12 PRI
3P 5092.31 A
SLG 3442.85 A
12470.0 V
PMT-12 PRI-B
FB-PMT-12 SEC
SQUARE D
LA
S/T 400.0 A
BAY 1C
P
S
PMT-12
225.0 kVA
3.5000 %Z Pri 12470 V Sec 480 V
PMT-12 SEC
3P 7652.63 A
SLG 7679.02 A
480.0 V
PD-PMT-04 PRI
COOPER
ELX, 8.3-23kV S/T 20.0 A
CBL-PMT-12-04
Size 2 1 Set(s)
150.0 ft Non-Magnetic
ARRESTOR-PMT-04
PMT-04 PRI-A
PMT-04 PRI
3P 5031.06 A
SLG 3406.48 A
12470.0 V
FB-PMT-04 SEC
SQUARE D
LA
S/T 400.0 A
P
S
PMT-04
300.0 kVA
3.8000 %Z Pri 12470 V Sec 208 V
PMT-04 SEC
3P 20437.40 A
SLG 20906.92 A
208.0 V
PD-PMT-03 PRI
COOPER
ELX, 8.3-23kV S/T 20.0 A
CBL-PMT-04-03
Size 2 1 Set(s)
810.0 ft Non-Magnetic
ARRESTOR-PMT-03
PMT-03 PRI-A
PMT-03 PRI
3P 4701.43 A
SLG 3209.79 A
12470.0 V
FB-PMT-03 SEC
SQUARE D
MA
S/T 600.0 A
CBL-BLDG15
Size 350 2 Set(s)
50.0 ft Non-Magnetic
P
S
PMT-03
500.0 kVA
3.9000 %Z Pri 12470 V Sec 480 V
PMT-03 SEC
3P 14447.08 A
SLG 14758.28 A
480.0 V
PMT-04 PRI-B
PD-PMT-14 PRI
CBL-PMT-14-03
Size 2 1 Set(s)
810.0 ft Non-Magnetic
ARRESTOR-PMT-14
PMT-14 PRI
12470.0 V
FB-PMT-14 SEC
CBL-PMP-14
P
S
PMT-14
1500kVA Pri 12470 V Sec 480 V
PMT-14 SEC
480.0 V
PMT-03 PRI-B
PMP-14
PD-PMT-07 PRI
COOPER
ELX, 8.3-23kV S/T 20.0 A
CBL-PMT-07-14
Size 2 1 Set(s)
610.0 ft Non-Magnetic
ARRESTOR-PMT-07
PMT-07 PRI-A
PMT-07 PRI
3P 4458.77 A
SLG 3063.92 A
12470.0 V
FB-PMT-07 SEC
SQUARE D
LA
S/T 400.0 A
CBL-PMP-07
Size 3/0 2 Set(s)
3.0 ft Non-Magnetic
P
S
PMT-07
300.0 kVA
3.8000 %Z Pri 12470 V Sec 480 V
PMT-07 SEC
3P 9072.46 A
SLG 9209.58 A
480.0 V
PMT-14 PRI-B
TO BUILDING 27TO BUILDING 28
SHEET 025EP601
CONTINUE TO
TRANSFORMER
PMT-06
CONTINUE TO 15-MDS
SHEET 015ED601
CONTINUE TO 13-MDS-4
SHEET 013ED601
CONTINUE TO 06-PMP-12
SHEET 006ED601
TO SHEET ED602
PFCC-PMP07
Capacitor kVAR 45.0
BB-PMP07-TEMP
SQUARE D
KA
S/T 225.0 A
CBL-TT-XFMR
Size 3/0 1 Set(s)
550.0 ft Non-Magnetic
CONTINUE TO TT-XFMR
SHEET TR3ED601
BB-PMP07-PFCC
SQUARE D
FG, 2 & 3-Pole S/T 80.0 A
BB-PMP07-2
SQUARE D
FA
S/T 20.0 A
BB-PMP07-3
SQUARE D
FG, 2 & 3-Pole S/T 100.0 A
CBL-T2143-A/C W
Size 2 1 Set(s)
205.0 ft Non-Magnetic
T2143-A/C W 3P 4407.52 A
SLG 3854.07 A
480.0 V
CONTINUE TO MB-21-A
SHEET 021ED601
FB-BLDG 21
SQUARE D
HG
S/T 150.0 A
CBL-21-A
Size 2/0 1 Set(s)
165.0 ft Non-Magnetic
BB-PMP07-5
SQUARE D
FH
S/T 100.0 A
CBL-T2143-A/C E
Size 2 1 Set(s)
205.0 ft Non-Magnetic
T2143-A/C E 3P 4407.52 A
SLG 3854.07 A
480.0 V
CONTINUE TO
MB-WELL2-P1
SHEET 023ED601
FB-WELL2-PNL1
SQUARE D
KH
S/T 125.0 A
CBL-WELL2P1
Size 1/0 1 Set(s)
330.0 ft Non-Magnetic
FB-DT13
SQUARE D
FG, 2 & 3-Pole S/T 70.0 A
SPARE
FB-DT21
SQUARE D
KH
S/T 125.0 A
CONTINUE TO DT-21
SHEET 014ED601
CONTINUE TO PANEL 1
SHEET T1819ED601
150A 3P
CBL-DT21
Size 1/0 1 Set(s)
290.0 ft Non-Magnetic
PMP-07
3P 9047.48 A
SLG 9172.37 A
480.0 V
MVSWGR
3P 5094.34 A
SLG 3444.06 A
12470.0 V
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 9:57:25 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
ED603
MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART
3 OF 3 - EXISTING
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
GENERAL NOTES
KEY NOTES
- NTS
1 MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART 3 OF 3 - EXISTING
Revisions: Date:
1.
2.
3.
4.
5.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE ENGINEER.
CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30 DAYS PRIOR TO IMPLEMENTATION.
SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED
AS-BUILTS.
NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY
HAVE WORK SHOWN; ALL ONE- LINE DRAWINGS HAVE
BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE
PURPOSES.
FOR ALL JUNCTION BOXES, EXISTING AND NEW,
CONTRACTOR SHALL VERIFY CIRCUIT NUMBERS AND
PHASE, LABEL CIRCUIT NUMBERS ON WIRES WITHIN
JUNCTION BOX, AND UTILIZE CORRECT PHASE COLORED
WIRE FOR EXTENSION OF CIRCUITS TO POWER SOURCE.
EXISTING CAPACITOR SHALL BE DEMOLISHED AND
REPLACED.
EXISTING OVERCURRENT PROTECTIVE DEVICE SHALL BE
DEMOLISHED AND REPLACED. REFERENCE
CORRESPONDING BUILDING REVISED ONE-LINE DIAGRAM
AND PROTECTIVE DEVICE CHANGES SCHEDULE FOR
ADDITIONAL INFORMATION.
S
P
GE
TJ, THJ, TJL, MVT 4
S/T 200.0 A
GE
TJ, THJ, TJL, MVT 4
S/T 300.0 A
Size 2 2 Set(s)
250.0 ft Magnetic
Size 2 2 Set(s)
250.0 ft Magnetic
112.5 kVA
4.4911 %Z Pri 480 V Sec 208 V
GE
TJJ
S/T 400.0 A
Size 3/0 2 Set(s)
3.0 ft Magnetic
Size 500 1 Set(s)
3.0 ft Magnetic
5.0 hp 5 Mtr(s)
20.0 hp 1 Mtr(s)
GE
THQB
S/T 60.0 A
GE
THQB
S/T 30.0 A
BUSSMANN
FRS-R, 600V Class RK5 S/T 35.0 A
18.5 hp 1 Mtr(s)
15.0 hp 1 Mtr(s)
Size 6 1 Set(s)
50.0 ft Magnetic
BUSSMANN
FRS-R, 600V Class RK5 S/T 35.0 A
18.5 hp 1 Mtr(s)
15.0 hp 1 Mtr(s)
Size 6 1 Set(s)
50.0 ft Magnetic
GE
TEC Mag-Break
GE
TEC Mag-Break
FB-01-MSB02/HB
FB-01-MSB03/HC
GE
TJ, THJ, TJL, MVT 4
S/T 200.0 A
FB-01-MSB04/MCC-1
GE
TJ, THJ, TJL, MVT 4
S/T 150.0 A
FB-01-MSB05/HA
GE
TJ, THJ, TJL, MVT 4
S/T 200.0 A
SB-01-MSB06F
GE
TJ, THJ, TJL, MVT 4
S/T 200.0 A
BB-01-MSB07/CH1
GE
TJ, THJ, TJL, MVT 4
S/T 150.0 A
FB-01-MSB08/DPA1
GE
TJ, THJ, TJL, MVT 4
S/T 400.0 A
CBL-01-DPA1
Size 400 1 Set(s)
50.0 ft Magnetic
SB-01-MSB01
CBL-01-HA
Size 2 1 Set(s)
10.0 ft Magnetic
CBL-01-HB CBL-01-HC
PANELBOARD
01-HC
480/277V
225A, 3PH, 4W
CBL-01-MCC-1
Size 2 1 Set(s)
50.0 ft Magnetic01-MCC-1
480/277V
600A, 3PH, 3W
01-XFMR-T-4/LC
MB-01-LC SEC 1
CBL-01LCSEC2
FB-01-T3/LB
GE
TFJ
S/T 175.0 A
01-XFMR-TX-T3/LB
112.5 kVA Pri 480 V Sec 208 V
MB-01-LB SEC 1
GE
TJD
S/T 400.0 A
CBL-01-LB SEC 2
BF-01-MCC1/SF2
BUSSMANN
FRS-R, 600V Class RK5 S/T 40.0 A
01-MCC-1 MTRS
MTRI-01-SF2
BB-01-LB
BB-01-LC
MTRI-01-CHILL1
18.7 hp 4 Mtr(s)
CBL-01-CHILL1
Size 1 1 Set(s)
20.0 ft Magnetic
BB-01-HA
GE
TED (E-150 Line) S/T 45.0 A
BF-01-MCC2/SF3
01-MCC-2 MTRS
MTRI-01-SF3
FB-01-MCC-2
GE
TED (E-100 Line) S/T 60.0 A
CBL-01-MCC2
BF-01-MCC2/SF1
01-MCC-3 MTRS
MTRI-01-SF4
FB-01-MCC-3
GE
TED (E-100 Line) S/T 60.0 A
CBL-01-MCC3
BB-MCP-MCC2
BB-MCP-MCC3
SWITCHBOARD
01-MSB
480/277V
1200A, 3PH, 4W SLG 14219.20 A
PANELBOARD
01-HB
480/277V
225A, 3PH, 4W SLG 5084.99 A
PANELBOARD
01-LB SECT 1
208/120V
400A, 3PH, 4W
SLG 5545.18 A
PANELBOARD
01-LB SECT 2
208/120V
400A, 3PH, 4W
SLG 2772.80 A
PANELBOARD
01-HA
480/277V
225A, 3PH, 4W
CONTINUE TO
PANELBOARD 01-DPA1
SHEET 001ED602
FB-01-XF-4/LC
GE
TFJ
S/T 175.0 A
CONTINUE FROM PMT-10 SEC
SHEET ED601
SLG 13088.18 A
18.7 hp 4 Mtr(s)
SQUARE D
ED
S/T 125.0 A
MTRI-01-CHILL2
BB-01-CHILL2
MB-01-MSB
GE
TPVV & THPVV, MVT 9
S/T 1200.0 A
3 3
01-MCC-2
480/277V
600A, 3PH, 3W
SIZE 3/0
2 SET(S)
SIZE 3/0
2 SET(S) 01-MCC-3
480/277V
600A, 3PH, 3W
PANELBOARD
01-LC SEC 1
208/120V
400A, 3PH, 4W
PANELBOARD
01-LC SEC 2
208/120V
400A, 3PH, 4W
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 9:55:01 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
001ED601
BLDG 001 - ONE-LINE DIAGRAM - PART 1 OF 3 -
EXISTING
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
GENERAL NOTES
KEY NOTES
- NTS
1 BLDG 001 - ONE-LINE DIAGRAM - PART 1 OF 3 - EXISTING
EXISTING SWITCHBOARD SHALL BE DEMOLISHED AND
REPLACED. PRESERVE ALL EXISTING CIRCUITS FOR
RETERMINATION.
EXISTING PANELBOARD SHALL BE DEMOLISHED AND
REPLACED. PRESERVE ALL EXISTING CIRCUITS FOR
RETERMINATION.
EXISTING RACEWAYS AND CONDUCTORS SHALL BE
DEMOLISHED BACK TO SOURCE AND REPLACED.
Revisions: Date:
1.
2.
3.
4.
5.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE ENGINEER.
CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30 DAYS PRIOR TO IMPLEMENTATION.
SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED
AS-BUILTS.
NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY
HAVE WORK SHOWN; ALL ONE- LINE DRAWINGS HAVE
BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE
PURPOSES.
FOR ALL JUNCTION BOXES, EXISTING AND NEW,
CONTRACTOR SHALL VERIFY CIRCUIT NUMBERS AND
PHASE, LABEL CIRCUIT NUMBERS ON WIRES WITHIN
JUNCTION BOX, AND UTILIZE CORRECT PHASE COLORED
WIRE FOR EXTENSION OF CIRCUITS TO POWER SOURCE.
S
P
S
P
EN NENENE
SQUARE D
FI
S/T 100.0 A
SQUARE D
KH
S/T 200.0 A
SQUARE D
KH
S/T 125.0 A
SQUARE D
KH
S/T 150.0 A
SQUARE D
KH
S/T 150.0 A
SQUARE D
KH
S/T 125.0 A
SQUARE D
FG, 2 & 3-Pole S/T 50.0 A
Size 2 1 Set(s)
9.0 ft Magnetic
Size 1 1 Set(s)
1.2 ft Non-Magnetic
Size 3/0 1 Set(s)
3.9 ft Magnetic
Size 1 1 Set(s)
7.0 ft Magnetic
Size 1 1 Set(s)
20.0 ft Magnetic
Size 3/0 1 Set(s)
19.0 ft Magnetic
3P 12925.39 A
SLG 10630.86 A
480.0 V
Size 3/0 1 Set(s)
15.0 ft Magnetic
3P 13084.17 A
SLG 10817.59 A
Size 3/0 1 Set(s)
4.0 ft Magnetic
150.0 kVA
4.5087 %Z Pri 480 V Sec 208 V
GE
TED (E-100 Line) S/T 100.0 A
GE
TED (E-100 Line) S/T 50.0 A
GE
THQB
S/T 100.0 A
Size 2 1 Set(s)
20.0 ft Magnetic
GE
THHQB
S/T 100.0 A
GE
THQD
S/T 200.0 A
Size 3/0 1 Set(s)
10.0 ft Magnetic
01-LA SECT 1
208/120V
225A, 3PH, 4W
Size 3/0 1 Set(s)
5.0 ft Magnetic
GE
THQD
S/T 175.0 A
GE
TED (E-100 Line) S/T 30.0 A
Size 3/0 1 Set(s)
250.0 ft Magnetic
GE
TED (E-100 Line) S/T 30.0 A
Size 2 1 Set(s)
250.0 ft Magnetic
GE
TED (E-100 Line) S/T 50.0 A
30.0 kVA
4.2690 %Z Pri 480 V Sec 208 V
SQUARE D
QO, 3-Pole S/T 100.0 A
Size 4 1 Set(s)
250.0 ft Magnetic
GE
TED (E-100 Line) S/T 40.0 A
30.0 kVA
4.2690 %Z Pri 480 V Sec 208 V
GE
THHQB
S/T 40.0 A
RELIANCE
ECSR
S/T 40.0 A
3.3 hp 3 Mtr(s)
GE
TJK
S/T 600.0 A
Size 2/0 1 Set(s)
55.0 ft Magnetic
Size 350 2 Set(s)
5.0 ft Magnetic
GE
THQB
S/T 40.0 A
GE
THQB
S/T 40.0 A
SQUARE D
QO, 1-Pole
S/T 20.0 A SQUARE D
ED
S/T 15.0 A
SQUARE D
ED
S/T 20.0 A
GE
THQB
S/T 20.0 A
PANELBOARD
01-DPA-1
480/277V
350A, 3PH, 4W
FB-01-ATS-4 NOR FB-01-ATS-9 NORFB-01-ATS-8 NORFB-01-ATS-10 NORSB-01-DPA1.07 SB-01-DPA1.08SB-01-DPA1.10
CBL-01-ATS-4 NOR CBL-01-ATS-8 NOR CBL-01-ATS-9 NORCBL-01-ATS-10 NOR
CBL-01-C1
CBL-01-XFMR-T1
01-XFMR-T1-PRI
01-ATS-8
150A, 480V
AIC
SLG 11634.10 A
CBL-01-CCHA
01-ATS-4
CBL-01-LSHA
PANELBOARD
01-LSHA
480/277V
100A, 3PH, 4W
01-XFMR-T-1
PANELBOARD
01-KLA
208/120V
600A, 3PH, 4W
SLG 7567.33 A
MB-01-LSHA
FB-01-MCCE1
FB-01-KLA SUBPNL
CBL-01-KLA SUBPNL
MB-01-KLA SUBPNL
FB-01-LA
CBL-01-LA
PANELBOARD
CBL-01-LA SEC 2
FB-01-A-105H
FB-01-LSHB
CBL-01-LSHB
FB-01-CCHC
CBL-01-CCHC
FB-01-CCLC
01-XFMR-TX-CCLC
MB-01-CCLC
CBL-01-CCHB
FB-01-CCHB
01-XFMR-TX-CCLB
MB-01-CCLB
01-MCC-E1
3P 6971.49 A
SLG 4532.79 A
480.0 V
BF-01-MCCE1
01-MCC-E1 MTRS
MB-01-KLA
CBL-01-A-105H
CBL-01-KLA
BB-01-LA
BB-01-KLA SUB
BB-01-CCLC
FB-01-XFMR CCLB
BB-01-CCHB LGST
BB-01-CCLB
PANELBOARD
01-C1 480/277V
250A, 3PH, 4W
SLG 9657.45 A
GE
THQB
S/T 40.0 A
BB-01-LSLA
PANELBOARD
01-LSLA
208/120V
100A, 3PH, 4W
SLG 1455.62 A
S
P
GE
TED (E-100 Line) S/T 30.0 A
15.0 kVA
2.7789 %Z Pri 480 V Sec 208 V
GE
TEB
S/T 60.0 A
FB-01-XF-LSLA
01-XFMR-TX-LSLA
MB-01-LSLA
PANELBOARD
01-LSHB
480/277V
225A, 3PH, 4W
SLG 4655.98 A
PANELBOARD
01-CCLB
208/120V
100A, 3PH, 4W
SLG 1513.63 A
PANELBOARD
01-CCHB
480/277V
125A, 3PH, 4W
SLG 1148.59 A
PANELBOARD SLG 11634.1 A
CCHA
480/277V
225A, 3PH, 4W
01-ATS-10
150A, 480V
AIC
SLG 10838.78 A
SLG 7057.95 A
PANELBOARD
01-LA SECT 2
208/120V
225A, 3PH, 4W
SLG 6820.30 A
PANELBOARD
01-KLA SUBPANEL
208/120V
225A, 3PH, 4 W
SLG 5775.17 A
CONTINUE FROM
SWITCHBOARD 01-MSB
SHEET 001ED601
S
P
S
P
Size 2 1 Set(s)
375.0 ft Magnetic
3P 2445.10 A
SLG 1484.35 A
480.0 V
GE
TED (E-100 Line) S/T 40.0 A
9.0 kVA
2.6000 %Z Pri 480 V Sec 208 V
GE
THHQB
S/T 40.0 A
GE
TED (E-100 Line) S/T 50.0 A
30.0 kVA
4.2690 %Z Pri 480 V Sec 208 V
SQUARE D
QO, 3-Pole S/T 100.0 A
SQUARE D
ED
S/T 15.0 A
GE
THQB
S/T 20.0 A
SQUARE D
QO, 3-Pole S/T 20.0 A
CBL-01-LSHC
01-LSHC
FB-01-LSHC
01-XFMR-TX-LSLC
MB-01-LSLC
FB-01-LSLB
01-XFMR-TX-LSLB
MB-01-LSLBFB-01-XFMR LSLC
BB-01-LSLC
BB-01-LSLB
PANELBOARD
01-LSLB
208/120V
100A, 3PH, 4W
SLG 1808.57 A
CONTINUE FROM
PANELBOARD 01-EDP
SHEET 001EP603
CONTINUE FROM
PANELBOARD 01-EDP
SHEET 001EP603
CONTINUE FROM
PANELBOARD 01-EDP
SHEET 001EP603
CONTINUE FROM
PANELBOARD 01-EDP
SHEET 001EP603
90A 3P
S
P
75 kVA Pri 480 V Sec 208 V
01-XFMR-TX-C2
200A 3P
125A 6P
PANELBOARD
01-C2 208/120V
225A, 3PH, 4W
480V, 150A
3P 13680.85 A
SLG 11518.21 A
01-ATS-9
480V, 230A
PANELBOARD
01-A-105H 208/120V
225A, 3PH, 4W
PANELBOARD
01-CCHC
480/277V
225A, 3PH, 4W
PANELBOARD
01-CCLC
208/120V
100A, 3PH, 4W
PANELBOARD
01-KIOSK
208/120V
125A, 3PH, 4W
PANELBOARD
01-LSLC
208/120V
100A, 3PH, 4W
6 6 6
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 9:55:05 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
001ED602
BLDG 001 - ONE-LINE DIAGRAM - PART 2 OF 3 -
EXISTING
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
GENERAL NOTES
KEY NOTES
- NTS
1 BLDG 001 - ONE-LINE DIAGRAM - PART 2 OF 3 - EXISTING
Revisions: Date:
1.
2.
3.
4.
5.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE ENGINEER.
CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30 DAYS PRIOR TO IMPLEMENTATION.
SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED
AS-BUILTS.
NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY
HAVE WORK SHOWN; ALL ONE- LINE DRAWINGS HAVE
BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE
PURPOSES.
FOR ALL JUNCTION BOXES, EXISTING AND NEW,
CONTRACTOR SHALL VERIFY CIRCUIT NUMBERS AND
PHASE, LABEL CIRCUIT NUMBERS ON WIRES WITHIN
JUNCTION BOX, AND UTILIZE CORRECT PHASE COLORED
WIRE FOR EXTENSION OF CIRCUITS TO POWER SOURCE.
EXISTING PANELBOARD SHALL BE DEMOLISHED AND
REPLACED. PRESERVE ALL EXISTING CIRCUITS FOR
RETERMINATION.
EXISTING MOTOR CONTROL CENTER SHALL BE RE FED
FROM ATS-10 VIA REPLACEMENT PANELBOARD "01-C1".
REFERENCE ONE-LINE DIAGRAM ON SHEET 001EP602 FOR
ADDITIONAL INFORMATION.
EXISTING OVERCURRENT PROTECTIVE DEVICE SHALL BE
DEMOLISHED AND REPLACED. REFERENCE
CORRESPONDING BUILDING REVISED ONE-LINE DIAGRAM
AND PROTECTIVE DEVICE CHANGES SCHEDULE FOR
ADDITIONAL INFORMATION.
EXISTING LOAD SHALL BE RECIRCUITED. DEMOLISH
EXISTING CONDUCTORS SERVING LOAD. CIRCUIT BREAKER
SHALL BE LABELED AS SPARE.
EXISTING PANELBOARD SHALL BE DEMOLISHED AND
REPLACED. REFERENCE ONE-LINE DIAGRAM ON SHEET
001EP602 FOR ADDITIONAL INFORMATION.
ASSOCIATED CONDUCTORS SHALL BE DEMOLISHED BACK
TO SOURCE. RACEWAYS SHALL BE PRESERVED FOR REUSE.
REFERENCE ONE-LINE DIAGRAM ON SHEET 001EP602 FOR
ADDITIONAL INFORMATION.
EXISTING ATS AND ASSOCIATE FEEDERS SHALL BE
DEMOLISHED AND REPLACED. REFERENCE ONE-LINE
DIAGRAM ON SHEET 001EP602 FOR ADDITIONAL
INFORMATION.
6 6 6
LITTELFUSE
IDSR, 600V Class RK5 S/T 350.0 A
SQUARE D
KA
S/T 100.0 A
SQUARE D
KH
S/T 200.0 A
SQUARE D
KH
S/T 125.0 A
SQUARE D
KH
S/T 150.0 A
SQUARE D
FG, 2 & 3-Pole S/T 50.0 A
SQUARE D
KH
S/T 125.0 A
Size 2 1 Set(s)
6.0 ft Magnetic
Size 1 1 Set(s)
4.2 ft Non-Magnetic
Size 3/0 1 Set(s)
6.9 ft Magnetic
Size 1 1 Set(s)
10.0 ft Magnetic
FF-01-EDP
FB-01-ATS-4 EMER FB-01-ATS-9 EMERFB-01-ATS-8 EMER FB-01-ATS-10 EMER SB-01-EDP1.06 SB-01-EDP1.08
CBL-01-ATS-4 EMER CBL-01-ATS-8 EMER CBL-01-ATS-9 EMERCBL-01-ATS-10 EMER
BUILDING 11
450.000 kW 480 V
3P 4755.19 A
SLG 4755.19 A
Size 400 1 Set(s)
10.0 ft Magnetic
01-11 ENG-GEN
MB-GEN-01-11
SIEMENS
SHMD6-H, Sensitrip III S/T 800.0 A Plug 800.0 A
01-11-GEN-ALT
3P 4755.19 A
SLG 4755.19 A
480.0 VCBL-11-EH1
Size 400 3 sets
400.0 ft Magnetic
CBL-01-EDP
CONTINUE TO
01-ATS-9
SHEET 001ED602
CONTINUE TO
01-ATS-10
SHEET 001ED602
CONTINUE TO
01-ATS-8
SHEET 001ED602
CONTINUE TO
01-ATS-4
SHEET 001ED602
CONTINUE TO
PANELBOARD '11-EH1'
SHEET 011ED601
3 PANELBOARD
01-EDP
480/277V
350A, 3PH, 4W
4 4
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 9:55:08 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
001ED603
BLDG 001 - ONE-LINE DIAGRAM - PART 3 OF 3 -
EXISTING
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
GENERAL NOTES
KEY NOTES
- NTS
1 BLDG 001 - ONE-LINE DIAGRAM - PART 3 OF 3 - EXISTING
1 EXISTING GENERATOR SHALL BE DEMOLISHED. DEMOLISH
ALL ASSOCIATED FEEDER CONDUCTORS AND CONTROLS
WIRING. PRESERVE RACEWAYS FOR REUSE. REFERENCE
SHEET 001EP603 FOR ADDITIONAL INFORMATION .
EXISTING PANELOBARD SHALL BE DEMOLISHED AND
REPLACED. REFERENCE ONE-LINE DIAGRAM ON SHEET
001EP603 FOR ADDITIONAL INFORMATION.
EXISTING FUSE AND ENCLOSURE SHALL BE DEMOLISHED.
ASSOCIATED RACEWAYS AND CONDUCTORS SHALL BE
DEMOLISHED BACK TO SOURCE. REFERENCE ONE-LINE
DIAGRAM ON SHEET 001EP603 FOR ADDITIONAL
INFORMATION.
EXISTING CONDUCTOR SHALL BE DEMOLISHED AND
REPLACED. EXISTING RACEWAY SHALL BE MODIFIED.
MAJORITY OF RACEWAY SHALL BE PERSERVED FOR RE-USE;
DEMOLISH PORTION OF RACEWAY FOR INSTALLATION OF
REPLACEMENT SWITCHBOARD '01-EDP' AS REQUIRED.
CONDUCTORS WITHIN RACEWAY SHALL BE DEMOLISHED
BACK TO SOURCE.
EXISTING CONDUCTORS SHALL BE DEMOLISHED AND
REPLACED. PRESERVE RACEWAYS FOR REUSE. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 011ED601, 001EP603, AND
011EP601 FOR ADDITIONAL INFORMATION.
Revisions: Date:
1.
2.
3.
4.
5.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE ENGINEER.
CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30 DAYS PRIOR TO IMPLEMENTATION.
SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED
AS-BUILTS.
NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY
HAVE WORK SHOWN; ALL ONE- LINE DRAWINGS HAVE
BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE
PURPOSES.
FOR ALL JUNCTION BOXES, EXISTING AND NEW,
CONTRACTOR SHALL VERIFY CIRCUIT NUMBERS AND
PHASE, LABEL CIRCUIT NUMBERS ON WIRES WITHIN
JUNCTION BOX, AND UTILIZE CORRECT PHASE COLORED
WIRE FOR EXTENSION OF CIRCUITS TO POWER SOURCE.
S
P
BUSSMANN
LPS-RK, 600V Class RK1 S/T 600.0 A
BUSSMANN
LPS-RK, 600V Class RK1 S/T 450.0 A
Size 350 2 Set(s)
125.0 ft
GE
TED (E-100 Line) S/T 30.0 A
15.0 kVA
4.8000 %Z
Size 10 1 Set(s)
10.0 ft
GE
THQB
S/T 30.0 A
GE
TE
S/T 60.0 A
GE
TED (E-150 Line) S/T 100.0 A
75.0 kVA
5.5000 %Z
Size 2 1 Set(s)
10.0 ft
SQUARE D
QB
S/T 200.0 A
SQUARE D
QO, 3-Pole S/T 25.0 A
Size 3/0 1 Set(s)
25.0 ft
GE
TFJ
S/T 175.0 A
Size 2/0 1 Set(s)
80.0 ft
30.2 hp 4 Mtr(s)
GE
TJK
S/T 600.0 A
FF-BLDG02-LHB FF-BLDG03-MAIN
CBL-02-LHB
FB-02-XFMR-T9
02-XFMR-T9
CBL-02-XFMR T9
BB-02-LLB-LGST
MB-02-LLB
FB-02-XFMR-LLC
02-XFMR-LLC
CBL-02-XFMR-LLC
MB-02-LLC
BB-02-LLC-LGST
CBL-02-LLC
BB-02-CH1
CBL-02-CH1
02-CH1
MB-02-LHB
PANELBOARD
02-WHA
208/120V
225A, 3PH, 4W
SLG 3220.73 A
PANELBOARD
02-LHA
480/277V
225A, 3PH, 4W
SLG 6028.60 A
PANELBOARD
02-LLA
208/120V
100A, 3PH, 4W
SLG 792.56 A
S
P
S
P
S
P
BUSSMANN
FRS-R, 600V Class RK5 S/T 125.0 A
BUSSMANN
LPS-RK, 600V Class RK1 S/T 125.0 A
Size 3/0 1 Set(s)
200.0 ft
GE
TED (E-100 Line) S/T 50.0 A
GE
TED (E-150 Line) S/T 100.0 A
75.0 kVA
5.5000 %Z
Size 1 1 Set(s)
120.0 ft
30.0 kVA
5.1000 %Z
Size 6 1 Set(s)
5.0 ft
GE
THQB
S/T 50.0 A
GE
THED
S/T 125.0 A
Size 1 1 Set(s)
125.0 ft
GE
TED (E-100 Line) S/T 30.0 A
15.0 kVA
5.1000 %Z
Size 10 1 Set(s)
10.0 ft
GE
THQB
S/T 20.0 A
GE
TE
S/T 60.0 A
SQUARE D
QB
S/T 225.0 A
SQUARE D
QO, 3-Pole S/T 35.0 A
FF-BLDG02-WH FF-BLDG02-LHA
CBL-02-WH
PANELBOARD
02-WH
480/277V
225A, 3 PH, 4W
SLG 6297.14 A
FB-02-XFMR T7FB-02-XFMR-WHA
02-XFMR-WHA
CBL-02-XFMR-WHA
02-XFMR-T7
PANELBOARD
02-WL
208/120V
225A, 3PH, 4W
SLG 1547.04 A
CBL-02-XFMR T7
BB-02-WL-LGST
MB-02-WL
CBL-02-LHA
FB-02-XFMR-T8
02-XFMR-T8
CBL-02-XFMR T8
BB-02-LLA-LGST
MB-02-LLAMB-02-WHA
BB-02-WHA-LGST
GE
TED (E-150 Line) S/T 150.0 A
Size 1/0 1 Set(s)
120.0 ft
FB-02-LHC
CBL-02-LHC
PANELBOARD SLG 6177.34 A
02-LHC
480/277V
225A, 3PH, 4W
CONTINUE FROM PMT-09 SEC
SHEET ED602
1 1
CONTINUE TO
"CBL-03-MAIN"
SHEET 003ED601
PANELBOARD
02-LLC
208/120V
225A, 3PH, 4W
PANELBOARD
02-LLB
208/120V
100A, 3PH, 4W
SLG 848.75 A
PANELBOARD
02-LHB
480/277V
600A, 3PH, 4W
PANELBOARD
02-PMP-09 (DP9A/1)
480/277V
1000A, 3PH, 4W
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 9:55:11 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
002ED601
BLDG 002 - ONE-LINE DIAGRAM - PART 1 OF 2 -
EXISTING
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
- NTS
1 BLDG 002 - ONE-LINE DIAGRAM - PART 1 OF 2 - EXISTING
GENERAL NOTES
KEY NOTES
1 EXISTING PANELBOARD SHALL BE DEMOLISHED AND
REPLACED. PRESERVE ALL EXISTING CIRCUITS FOR
RETERMINATION.
EXISTING OVERCURRENT PROTECTIVE DEVICE SHALL BE
DEMOLISHED AND REPLACED. REFERENCE
CORRESPONDING BUILDING REVISED ONE-LINE DIAGRAM
AND PROTECTIVE DEVICE CHANGES SCHEDULE FOR
ADDITIONAL INFORMATION.
Revisions: Date:
1.
2.
3.
4.
5.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE ENGINEER.
CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30 DAYS PRIOR TO IMPLEMENTATION.
SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED
AS-BUILTS.
NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY
HAVE WORK SHOWN; ALL ONE- LINE DRAWINGS HAVE
BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE
PURPOSES.
FOR ALL JUNCTION BOXES, EXISTING AND NEW,
CONTRACTOR SHALL VERIFY CIRCUIT NUMBERS AND
PHASE, LABEL CIRCUIT NUMBERS ON WIRES WITHIN
JUNCTION BOX, AND UTILIZE CORRECT PHASE COLORED
3P 600A
3P 200A
3P 175A
3P 175A
3P SPACE
(X12)
P1, 480V, 600A, 3PH, 4W
CU-01 CU-02
3P 200A
3P 100A
PANELBOARD
02-MDP
480/277V
200A, 3PH, 4W
S
P 45.0 kVA
4.000 %Z
100A 3P
225A, 208V
3PH, 4W
PANEL L1A DISC.
100A, 208V
3PH, 4W
PANEL L1A SECT. 2
CONTINUE FROM PMT-05
SHEET ED602
1P SPACE
3P 15A
3P 20A
3P 15A
HWP-4 "WH-1"
(OFF)
EF-1
3P 15A
HEAT
PUMP
HWP-3
3P 60A
SPD
50A 20A 20A 70A 30A
RTU-1 1ST
FLOOR
LIGHTING
PENTHOUSE
LIGHTING
WH-2
3P 1P 1P 3P 3P
S
P 15.0 kVA
4.800 %Z
PENTHOUSE
PANEL
15A 3P
SPARE
3P SPACE (7x)
3P 200A
SPARE
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 9:55:14 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
002ED602
BLDG 002 - ONE-LINE DIAGRAM - PART 2 OF 2 -
EXISTING
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
- NTS
1 BLDG 002 - ONE-LINE DIAGRAM - PART 2 OF 2 - EXISTING
GENERAL NOTES
NO WORK TO BE PERFORMED
Revisions: Date:
1.
2.
3.
4.
5.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE ENGINEER.
CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30 DAYS PRIOR TO IMPLEMENTATION.
SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED
AS-BUILTS.
NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY
HAVE WORK SHOWN; ALL ONE- LINE DRAWINGS HAVE
BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE
PURPOSES.
FOR ALL JUNCTION BOXES, EXISTING AND NEW,
CONTRACTOR SHALL VERIFY CIRCUIT NUMBERS AND
PHASE, LABEL CIRCUIT NUMBERS ON WIRES WITHIN
JUNCTION BOX, AND UTILIZE CORRECT PHASE COLORED
WIRE FOR EXTENSION OF CIRCUITS TO POWER SOURCE.
02-
E N
Size 4/0 2 Set(s)
55.0 ft Magnetic
Size 250 2 Set(s)
55.0 ft Magnetic
3P 15613.91 A
SLG 14670.63 A
480.0 V
3P 14393.84 A
SLG 12863.12 A
480.0 V
Size 250 2 Set(s)
5.0 ft Magnetic
3P 2499.79 A
SLG 2498.31 A
480.0 V
250.000 kW 480 V 3P 2502.73 A
SLG 2502.73 A
3P 2502.73 A
SLG 2502.73 A
480.0 V
3P 14393.82 A
SLG 12863.11 A
480.0 V
Size 250 2 Set(s)
5.0 ft Magnetic
BUSSMANN
LPS-RK, 600V Class RK1, (12/99) S/T 450.0 A
CONTINUE FROM
"PMP-09(DP9A/1)"
SHEET 002ED601
CBL-03-MAIN
CBL-03-ATS-NOR
03-MAIN
03-ATS-NOR
CBL-03-ATS-EMER
03-ATS-EMER
03-ENG-GEN
03-GEN-ALT
FB-03-EMER
GE
TJ, THJ, TJL, MVT 4
S/T 500.0A
03-ATS-LOAD
CBL-03-ATS-LOAD
MS-03-MAIN.
03-ATS SLG 12188.12 A
480V 600A
CONTINUE TO
SWITCHBOARD 03-DP9/1
SHEET 003ED602
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 9:55:16 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
003ED601
BLDG 003 - ONE-LINE DIAGRAM - PART 1 OF 2 -
EXISTING
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
- NTS
1 BLDG 003 - ONE-LINE DIAGRAM - PART 1 0F 2 - EXISTING
GENERAL NOTES
KEY NOTES
1 EXISTING CIRCUIT BREAKER SHALL BE DEMOLISHED AND
REPLACED. REFERENCE SHEET 003EP601 FOR ADDITIONAL
INFORMATION.
Revisions: Date:
1.
2.
3.
4.
5.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE ENGINEER.
CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30 DAYS PRIOR TO IMPLEMENTATION.
SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED
AS-BUILTS.
NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY
HAVE WORK SHOWN; ALL ONE- LINE DRAWINGS HAVE
BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE
PURPOSES.
FOR ALL JUNCTION BOXES, EXISTING AND NEW,
CONTRACTOR SHALL VERIFY CIRCUIT NUMBERS AND
PHASE, LABEL CIRCUIT NUMBERS ON WIRES WITHIN
JUNCTION BOX, AND UTILIZE CORRECT PHASE COLORED
S
P
S
P
SQUARE D
HJ
S/T 150.0 A
Size 3/0 1 Set(s)
100.0 ft Non-Magnetic
75 kVA
6.0100 %Z Pri 480 V Sec 208 V
3P 10494.31 A
SLG 8727.79 A
480.0 V
3P 4298.84 A
SLG 4562.29 A
208.0 V
BUSSMANN
FRS-R, 600V Class RK5 S/T 90.0 A
SQUARE D
HJ
S/T 125.0 A
SQUARE D
HJ
S/T 125.0 A
SQUARE D
PowerPact L-Frame, 3.3 S/T 600.0 A Plug 600.0 A
Size 4/0 2 Set(s)
10.0 ft Non-Magnetic
20.0 hp 1 Mtr(s)
5.0 hp 2 Mtr(s)
Size 4 1 Set(s)
40.0 ft Magnetic
3P 9915.50 A
SLG 7176.27 A
480.0 V
SQUARE D
HJ
S/T 60.0 A
20.0 hp 1 Mtr(s)
Size 4 1 Set(s)
20.0 ft Magnetic
3P 11898.10 A
SLG 9395.96 A
480.0 V
SQUARE D
HJ
S/T 60.0 A
20.0 hp 1 Mtr(s)
Size 4 1 Set(s)
15.0 ft Magnetic
3P 12447.96 A
SLG 10101.36 A
480.0 V
SQUARE D
HJ
S/T 60.0 A
SQUARE D
GJL Mag-Gard
Size 10 1 Set(s)
28.0 ft Magnetic
3P 6279.22 A
SLG 3989.33 A
480.0 V
10.0 hp 3 Mtr(s)
SQUARE D
HJ
S/T 60.0 A
Size 6 1 Set(s)
28.0 ft Magnetic
3P 9708.59 A
SLG 6900.63 A
480.0 V
3.0 hp 2 Mtr(s)
SQUARE D
HJ
S/T 15.0 A
Size 10 1 Set(s)
15.0 ft Magnetic
3P 8960.95 A
SLG 6165.89 A
480.0 V
1.5 hp 1 Mtr(s)
SQUARE D
GJL Mag-Gard
Size 12 1 Set(s)
70.0 ft Magnetic
3P 1993.75 A
SLG 1178.09 A
480.0 V
1.5 hp 1 Mtr(s)
SQUARE D
GJL Mag-Gard
Size 10 1 Set(s)
70.0 ft Magnetic
3P 3019.95 A
SLG 1809.38 A
480.0 V
20.0 hp 1 Mtr(s)
Size 6 1 Set(s)
30.0 ft Magnetic
3P 9420.55 A
SLG 6634.57 A
480.0 V
SQUARE D
HJ
S/T 60.0 A
40.0 hp 1 Mtr(s)
Size 4 1 Set(s)
10.0 ft Magnetic
3P 13020.05 A
SLG 10872.51 A
480.0 V
SQUARE D
HJ
S/T 80.0 A
75.0 kVA
6.0000 %Z Pri 480 V Sec 208 V
75.0 kVA
6.0000 %Z Pri 480 V Sec 208 V
Size 2 1 Set(s)
20.0 ft Non-Magnetic
Size 2 1 Set(s)
20.0 ft Non-Magnetic
Size 2 1 Set(s)
20.0 ft Non-Magnetic
SQUARE D
QB
S/T 200.0 A
SQUARE D
QB
S/T 200.0 A
FB-03-TR5
CBL-03-BL-C-XFMR
BL-C-XFMR
BL-C-XFMR-PRI
BL-C-XFMR-SEC
FF-BL-C-XFMR
FB-03-XFMR-BLB FB-03-XFMR-BL
FB-03-MCC
CBL-03-MCC
MTRI-03-B1 MTRI-03-COND. PUMPS
CBL-03-MTRI-B1
03-MTRI-B1
BB-03-MCC/B1
MTRI-03-B2
CBL-03-MTRI-B2
03-MTRI-B2
BB-03-MCC/B2
MTRI-03-B3
CBL-03-MTRI-B3
03-MTRI-B3
BB-03-MCC/B3 BB-03-MCC/C.P.
CBL-03-COND PUMPS
03-COND PUMPS
MTRI-03-DEAERATOR
BB-03-MCC/DAERATOR
CBL-03-DEAERATOR
03-DEARATOR
MTRI-03-DOMWTR
BB-03-MCC/DOMWTR
CBL-03-DOMWTR
03-DOM WTR PUMP
MTRI-03-FOP1
BB-03-FOP1
CBL-03-FOP1
03-FUELOILP1
MTRI-03-FOP2
BB-03-FOP2
CBL-03-FOP2
03-FUELOILP2
MTRI-03-SPSAIRC
CBL-03-SPSAIRC
03-SPS AIR COMP
BB-03-SPS AIRC
MTRI-03-AIRC1
CBL-03-AIRC1
03-AIR COMP 1
BB-03-AIRC1
03-XFMR-BLB PROP 03-XFMR-BL PROP
CBL-03-XFMR-BLB PROP CBL-03-XFMR-BL PROP
CBL-03-BLB PROP
MB-03-BLB PROP MB-03-BL PROP
20A 1P
1P 150A 3P
20A 1P
20A 1P
3P
SPARESPACESPACE
LIGHTINGLIGHTINGLIGHTING
1P
SPACE
SWITCHBOARD
03-DP9/1
480/277V
600A, 3PH, 4W
SLG 12717.54 A
PANELBOARD
03-BL-B
208/120V
225A, 3PH, 4W
SLG 2973.95 A
PANELBOARD
03-BL
208/120V
200A, 3PH, 4W
SLG 3219.03 A
MOTOR CONTROL CENTER
03-MCC
600V
600A HORIZONTAL
300A VERTICAL
CONTINUE FROM
AUTO-03-ATS
SHEET 003ED601
03-BL-C
208/120V
225A, 3PH, 4W
PANELBOARD200A
3P
50A 3P
50A 3P
2 1
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 9:55:19 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
003ED6…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .