648-20-116 Drawings - Copy_Part7.pdf

PDF 19 MB Posted

Attached to
Z2DA--CON 648-20-116 Correct Electrical FCA Deficiencies Bldgs. /Site (Vancouver)
Solicitation number
36C26026R0040-0002
Issued by

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1/ 2'

'-0

1' 4'

4' 8'

8' 8'

4' 2'

2'

1/ 8'

'-0

1/

'-0

1/ 4'

'-0

1' 2'

1' 1/

2' 2'

1/ 2'

1'

'-0

3'

'-0

1' m m

M

M

M

M

M

M

M m m

M m m

M

0.

5M

M 0.

5M 0.

M m m

M m m

M

.2

5M 0.

M

0.

M 0.

M m m

M

M

0.

5M m m

M

3/ 8'

'-0

1'

2' 4'

0.

M 0.

M m m

M

1/

2'

'-0

''0 2'

1/ 2'

1' 3' m m

M

0.

M 0.

M

6'

'-0

1/

4" 1/

2"

M

M

7.

m m

M

3/

'-0

8'

4' 4'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

10/30/2025 9:30:24 AM

Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt

001EP703

BLDG 001 - ELECTRICAL SCHEDULES

DCW/LRL JGD/KDB

100% CONSTRUCTION

DOCUMENTS

10/30/2025

648-20-116CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VA

VANCOUVER, WA

VHAPORHCS, VANCOUVER CAMPUS

1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661

Revisions: Date:

GENERAL NOTES

KEY NOTES

1. REFERENCE FLOOR PLANS AND ONE-LINE DIAGRAMS

FOR ADDITIONAL INFORMATION.

PERFORM CIRCUIT TRACING TO IDENTIFY CIRCUIT BREAKER

LOAD. PROVIDE NEW TYPEWRITTEN CIRCUIT DIRECTORY

WITH UPDATED / IDENTIFIED CIRCUIT DESCRIPTIONS.

Location: BLDG 1, RM B-116 Volts: 480/277 Wye A.I.C Rating: 22k

Supply From: "01-MSB" Phases: 3 Bus Rating: 400 A

Mounting: Surface Wires 4 Main Circuit Breaker: 250 A

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 20 A 1 0 0 1 20 A 2

3 20 A 1 0 0 1 20 A 4

5 20 A 1 0 0 1 20 A 6

7 20 A 1 0 0 1 20 A 8

9 20 A 1 0 0 1 20 A 10

11 20 A 1 0 0 1 20 A 12

13 20 A 1 0 0 1 20 A 14

15 20 A 1 0 0 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 20 A 1 0 0 1 20 A 20

21 20 A 1 0 0 1 20 A 22

23 20 A 1 0 0 1 20 A 24

25 20 A 1 0 0 1 20 A 26

27 20 A 1 0 0 1 20 A 28

29 20 A 1 0 0 1 20 A 30

31 20 A 1 0 0 1 20 A 32

33 20 A 1 0 0 1 20 A 34

35 60 A 3 0 0 1 20 A 36

37 " " 0 0 3 175 A 38

39 " " 0 0 " " 40

41 20 A 1 0 0 " " 42

43 20 A 1 0 0 1 20 A 44

45 20 A 1 0 0 1 20 A 46

47 20 A 1 0 0 1 20 A 48

49 20 A 1 0 0 1 20 A 50

51 20 A 1 0 0 1 20 A 52

53 20 A 1 0 0 1 20 A 54

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%

0 100.00%

Notes:

PANELBOARD: 01-HB(REPLACEMENT)

VA PER PHASE

CIRCUIT DESCRIPTION A B C

RECEPT B115, B104, B106, B108, B113, B114, B116 SPARE

LIGHTS RM B102, EAST CORRIDOR SPARE

LIGHTS WEST CORRIDOR SPARE

CIRCUIT DESCRIPTION

RECEPT RM B100 SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE

SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

" PANELBOARD "LB SECT 1"

SPARE SPARE

SPARE SPARE

SPARE SPARE

Telecom Rack 0

MOTOR CONTROL CNETER "MCC 2"

0 Total Est. Power Demand:

0 Total Conn. Amperage:

0 Total Est. Amperage Demand:

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:

0 0 0

0 0 0

Location: BLDG 1, RM B-116 Volts: 120/208 Wye A.I.C Rating: 22k

Supply From: "01-HB" Phases: 3 Bus Rating: 400 A

Mounting: Surface Wires 4 Main Circuit Breaker: 400 A

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT 1 20 A 1 0 0 1 20 A 2

3 20 A 1 0 0 1 20 A 4

5 20 A 1 0 0 1 20 A 6

7 20 A 1 0 0 1 20 A 8

9 20 A 1 0 0 1 20 A 10

11 20 A 1 0 0 1 20 A 12

13 20 A 1 0 0 1 20 A 14

15 20 A 1 0 0 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 20 A 1 0 0 1 20 A 20

21 20 A 1 0 0 1 20 A 22

23 20 A 1 0 0 1 20 A 24

25 20 A 1 0 0 1 20 A 26

27 20 A 1 0 0 1 20 A 28

29 20 A 1 0 0 2 30 A 30

31 20 A 1 0 0 " " 32

33 20 A 1 0 0 1 20 A 34

35 20 A 1 0 0 1 20 A 36

37 20 A 1 0 0 1 21 A 38

39 20 A 2 0 0 2 30 A 40

41 " " 0 0 " " 42

43 20 A 1 0 0 1 20 A 44

45 20 A 1 0 0 1 20 A 46

47 20 A 1 0 0 1 20 A 48

49 20 A 1 0 0 1 20 A 50

51 20 A 1 0 0 1 20 A 52

53 20 A 1 0 0 1 20 A 54

- - 3 0 0 - - -

- " " 0 0 - - -

- " " 0 0 - - -

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%

0 100.00%

Notes:

PANELBOARD: 01-LB SECT 1 (REPLACEMENT)

VA PER PHASE

CIRCUIT DESCRIPTION A B C

RECEPT RM B123, B125, B127 RECEPT RM B109, B111

RECEPT RM B123, B125, B127 RECEPT RM B109, B111

RECEPT RM B123, B125, B127 RECEPT RM B126, B128

CIRCUIT DESCRIPTION

RECEPT CORRIDORS RECEPT RM B111, B117

RECEPT RM B129, B130 RECEPT RM B111, B117

RECEPT RM B129, B130 RECEPT RM B109, B111

RECEPT ATTIC RECEPT RM B118, B120, B122, B124

RECEPT TV CART, HALL RECEPT RM B118, B120, B122, B124

UNKNOWN LOAD DISHWASHER/COUNTER RECEPT RM B134

RECEPT RM B117, B119, B121, B123 RECEPT RM B124,B126, B128

RECEPT RM B117, B119, B121, B123 RECEPT RM B124, B126

RECEPT RM B117, B119, B121, B123 RECEPT RM B122, B124

UNKNOWN LOAD RECEPT KITCHEN

UNKNOWN LOAD B WING DELTA CONTROLS

REFRIGERATOR/COUNTER RECEPT RM B134 IRONING CKT

LIGHTS SHOWER LIGHTS NURSE STATION

WASHER GARBAGE DISPOSAL RM B134

RECEPT B134 HVAC

SPARE SPARE

SPARE SPARE

SPARE SPARE

RECEPT UNKNOWN LOAD

UPS TELECOM DRYER

SUBFED LUGS - PANELBOARD "01-LB SECT 2" -

SPARE SPARE

SPARE SPARE

SPARE SPARE

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:

0 0 0 0 0 0

Telecom Rack 0

0 Total Est. Power Demand:

0 Total Conn. Amperage:

0 Total Est. Amperage Demand:

Location: BLDG 1, RM A-117 Volts: 120/208 Wye A.I.C Rating: 22k

Supply From: "01-LSHA" Phases: 3 Bus Rating: 100 A

Mounting: Surface Wires 4 Main Circuit Breaker: 100 A

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 20 A 1 0 0 1 20 A 2

3 20 A 1 0 0 1 20 A 4

5 20 A 1 0 0 1 20 A 6

7 20 A 1 0 0 1 20 A 8

9 20 A 1 0 0 1 20 A 10

11 20 A 1 0 0 1 20 A 12

13 20 A 1 0 0 1 20 A 14

15 20 A 1 0 0 1 20 A 16

17 20 A 2 0 0 2 20 A 18

19 " " 0 0 " " 20

21 20 A 1 0 0 1 20 A 22

23 20 A 1 0 0 1 20 A 24

25 20 A 1 0 0 1 20 A 26

27 20 A 1 0 0 1 20 A 28

29 15 A 1 0 0 1 20 A 30

31 20 A 1 0 0 1 20 A 32

33 20 A 1 0 0 1 20 A 34

35 20 A 1 0 0 1 20 A 36

37 20 A 1 0 0 1 20 A 38

39 20 A 1 0 0 1 20 A 40

41 20 A 1 0 0 1 20 A 42

43 20 A 1 0 0 1 20 A 44

45 20 A 1 0 0 1 20 A 46

47 20 A 1 0 0 1 20 A 48

49 20 A 1 0 0 1 20 A 50

51 20 A 1 0 0 1 20 A 52

53 20 A 1 0 0 1 20 A 54

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%

0 100.00%

Notes:

PANELBOARD: 01-LSLA (REPLACEMENT)

VA PER PHASE

CIRCUIT DESCRIPTION A B C

LIGHTS ENTRY NORTH, COVERED PORCH LIGHTS TRACK DINING

LIGHTS ENTRY EAST, MAIN ENTRANCE F.A. CAB

SUMP PUMPS 1-SP1 LIGHTS ENTRY, RM 105H

CIRCUIT DESCRIPTION

HOOD CONTROL KITCHEN RECEPT RM A117

RECEPT TEL, RM A121, A100 REC CKT BSMNT, CONDENSATE RETURN FAN

RECEPT TEL, RM A121 AIR DRYER BASEMENT 1-PAD-1

RECEPT GENERATOR, OXYGEN MANIFOLD GENERATOR BATTERY CHARGER

EMERGENCY DINING HALL GENERATOR VENT LOUVERS

SECURITY COTAG SYSTEM DOOR CLOSURE B WING

UNKNOWN LOAD LIGHTS RM 105J

BLOCK HEATER-GEN A/C RM 105J

SPARE SPARE

SPARE SPARE

SPARE SPARE

EMERGENCY DINING HALL GENERATOR FUEL PUMPS

AUTO DOORS, CORRIDOR RECEPT RM PHARMACY

AIR COMPRESSOR LL-100 RECEPT RM PHARMACY

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:

0 0 0

0 0 0

Telecom Rack 0

0 Total Est. Power Demand:

0 Total Conn. Amperage:

0 Total Est. Amperage Demand:

VOLTAGE: 480/277V, 3P, 4W LOCATION BLDG 001, RM A-117

BUS AMPS: 1200A / 3P / LSI SUPPLY FROM: PMT-10

AIC: 25KAIC MOUNTING: SURFACE

MAIN: 1200A / 3P / LSI ENCLOSURE: TYPE 1

A B C

1 600AF / 350AT / 3P PANELBOARD "01-DPA1" 0 0 0 1

2 225AF / 150AT / 3P MTRI-01-CHILL1 0 0 0 1

3 225AF / 200AT / 3P SPARE 0 0 0 1

4 225AF / 200AT / 3P PANELBOARD "01-HA" 0 0 0 1

5 225AF / 150AT / 3P PANELBOARD "01-MCC-1" 0 0 0 1

6 225AF / 200AT / 3P PANELBOARD "01-HC" 0 0 0 1

7 400AF / 250AP / 3P PANELBOARD "01-HB" 0 0 0 1

8 400AF / 300AT / 3P SPARE 0 0 0 1

9 110AF / 100AT / 3P MTRI-01-CHILL2 0 0 0 1

10 - SPACE 0 0 0

11 - SPACE 0 0 0

12 - SPACE 0 0 0

13 - SPACE 0 0 0

14 90A / 3P SURGE PROTECTION DEVICE 100 100 100

15 30A / 3P DIGITAL POWER METER 100 100 100

200 200 200

1 1 1

CONNECTED LOAD (VA) DEMAND FACTOR

ESTIMATED

DEMAND (VA)

TOTALS

125.00% 0

CONN. POWER

LOAD (VA)

100.00% 0 CONN. AMP (A) 0

100.00% 0

EST. POWER

DEMAND (VA)

125.00% 0

EST. AMP DEMAND

(A)

OTHER

SWITCHBOARD "01-MSB" (REPLACEMENT)

CKT # CB / POLE CIRCUIT DESCRIPTION

VA LOAD

NOTES

TOTAL CONNECTED VA BY PHASE

TOTAL CONNECTED AMPS BY PHASE

LOAD TYPE

LARGEST MOTOR

RECEPTACLE

LIGHTING

1. EXISTING LOAD RECIRCUITED TO REPLACEMENT EQUIPMENT.

2. SCHEDULE SHOWN FOR BRANCH CIRCUITING ONLY. REFERENCE SWITCHBOARD "01-MSB" LOAD SCHEDULE FOR OVERALL LOADING

INFORMATION.

Division 25-27

'-0

1' 4'

4' 8'

8' 8'

4' 2'

2'

1/ 8'

'-0

1/

'-0

1/ 4'

'-0

1' 2'

1' 1/

2' 2'

1/ 2'

1'

'-0

3'

'-0

1' m m

M

M

M

M

M

M

M m m

M m m

M

0.

5M

M 0.

5M 0.

M m m

M m m

M

.2

5M 0.

M

0.

M 0.

M m m

M

M

0.

5M m m

M

3/ 8'

'-0

1'

2' 4'

0.

M 0.

M m m

M

1/

2'

'-0

''0 2'

1/ 2'

1' 3' m m

M

0.

M 0.

M

6'

'-0

1/

4" 1/

2"

M

M

7.

m m

M

3/

'-0

8'

4' 4'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

10/30/2025 9:30:38 AM

Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt

001EP704

BLDG 001 - ELECTRICAL SCHEDULES

DCW/LRL JGD/KDB

100% CONSTRUCTION

DOCUMENTS

10/30/2025

648-20-116CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VA

VANCOUVER, WA

VHAPORHCS, VANCOUVER CAMPUS

1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661

Revisions: Date:

GENERAL NOTES

KEY NOTES

1. REFERENCE FLOOR PLANS AND ONE-LINE DIAGRAMS

FOR ADDITIONAL INFORMATION.

1 1

PERFORM CIRCUIT TRACING TO IDENTIFY CIRCUIT BREAKER

LOAD. PROVIDE NEW TYPEWRITTEN CIRCUIT DIRECTORY

WITH UPDATED / IDENTIFIED CIRCUIT DESCRIPTIONS.

Location: BLDG 1, RM-6 Volts: 480/277 Wye A.I.C Rating: 48k

Supply From: "01-11 ENG-GEN" Phases: 3 Bus Rating: 400 A

Mounting: Surface Wires 4 Main Circuit Breaker: 400AF/400AT

Enclosure: NEMA 3R

CKT Trip Poles Poles Trip CKT 1 110 A 3 0 0 3 150 A 2

3 " " 0 0 " " 4

5 " " 0 0 " " 6

7 150 A 3 0 0 3 225 A 8

9 " " 0 0 " " 10

11 " " 0 0 " " 12

13 - - 0 0 3 50 A 14

15 - - 0 0 " " 16

17 - - 0 0 " " 18

19 - - 0 0 3 125 A 20

21 - - 0 0 " " 22

23 - - 0 0 " " 24

25 - - 0 0 3 60 A 26

27 - - 0 0 " " 28

29 - - 0 0 " " 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%

0 100.00%

Notes:

1. SCHEDULE SHOWN FOR BRANCH CIRCUITING ONLY. REFERENCE SWITCHBOARD "01-EDP" LOAD SCHEDULE FOR OVERALL LOADING INFORMATION.

PANELBOARD: 01-EDP (REPLACEMENT)

VA PER PHASE

CIRCUIT DESCRIPTION A B C

ATS-8 ATS-10

CIRCUIT DESCRIPTION

ATS-4 ATS-9

SPACE SPARE

SPACE "

SPACE "

SPACE SPARE

SPACE "

SPACE "

SPACE SURGE PROTECTION DEVICE

SPACE "

SPACE "

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:

0 0 0 0 0 0

Telecom Rack 0

0 Total Est. Power Demand:

0 Total Conn. Amperage:

0 Total Est. Amperage Demand:

Location: BLDG 1, RM A-117 Volts: 120/208 Wye A.I.C Rating: 22k

Supply From: "01-DPA-1" Phases: 3 Bus Rating: 600 A

Mounting: Surface Wires 4 Main Circuit Breaker: 600 A

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT 1 20 A 1 0 0 3 100 A 2

3 20 A 1 0 0 " " 4

5 20 A 1 0 0 " " 6

7 20 A 1 0 0 1 20 A 8

9 20 A 1 0 0 2 20 A 10

11 20 A 1 0 0 " " 12

13 20 A 1 0 0 1 20 A 14

15 20 A 1 0 0 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 30 A 2 0 0 1 20 A 20

21 " " 0 0 1 20 A 22

23 20 A 1 0 0 1 20 A 24

25 20 A 1 0 0 1 20 A 26

27 20 A 1 0 0 1 20 A 28

29 20 A 1 0 0 1 20 A 30

31 15 A 1 0 0 1 20 A 32

33 20 A 1 0 0 1 20 A 34

35 20 A 1 0 0 1 20 A 36

37 200 A 3 0 0 3 175 A 38

39 " " 0 0 " " 40

41 " " 0 0 " " 42

43 20 A 1 0 0 1 20 A 44

45 20 A 1 0 0 1 20 A 46

47 20 A 1 0 0 1 20 A 48

49 20 A 1 0 0 1 20 A 50

51 20 A 1 0 0 1 20 A 52

53 20 A 1 0 0 1 20 A 54

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%

0 100.00%

Notes:

Telecom Rack 0

0 Total Est. Power Demand:

0 Total Conn. Amperage:

0 Total Est. Amperage Demand:

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:

0 0 0 0 0 0

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

PANEL "LA" KITCHEN FRIDGE CONTROL PANEL "01-A-105H"

RECEPT THERAPY ASSISTANTS RECEPT KITCHEN

RECEPT KITCHEN OFFICE KITCHEN FREEZER

KITCHEN REFRIGERATOR KITCHEN EXHAUST FAN

RECEPT COPY ROOM KITCHEN MICROWAVE

LIGHTS/RECEPT CHAPEL, COPY RM RECEPT/LIGHTS COFFEE AREA

RECEPT THERAPY ASSISTANTS COFFEE AREA DISPOSAL

COFFEE MAKER PK-1

" PK-2

RECEPT PHARMACY, CHAPLAINS OFFICE C-WING SMOKE ROOM FAN

FREEZER VEEDER ROOT MONITOR/RECEPT CHILLERS

HVAC OUTLET VEEDER ROOT MONITOR/RECEPT CHILLERS

SOILED CARTS FANS OVERFILL ALARM

FREEZER "

CIRCUIT DESCRIPTION

DINING ROOM FREEZER SUBPANEL "KLA"

DINING ROOM COFFEE "

DINING ROOM ICE MACHINE "

PANELBOARD: 01-KLA (REPLACEMENT)

VA PER PHASE

CIRCUIT DESCRIPTION A B C

KITCHEN COOLER FANS TANK MONITOR

KITCHEN RETHERM UNIT #1 HVAC RM 121

Location: BLDG 1, RM C-132 Volts: 120/208 Wye A.I.C Rating: 22k

Supply From: "01-LSHB" Phases: 3 Bus Rating: 100 A

Mounting: Surface Wires 4 Main Circuit Breaker: 40 A

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 20 A 1 0 0 1 20 A 2

3 20 A 1 0 0 1 20 A 4

5 20 A 1 0 0 1 20 A 6

7 20 A 1 0 0 1 20 A 8

9 20 A 1 0 0 1 20 A 10

11 20 A 1 0 0 1 20 A 12

13 20 A 1 0 0 1 20 A 14

15 20 A 1 0 0 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 20 A 1 0 0 1 20 A 20

21 20 A 1 0 0 1 20 A 22

23 20 A 1 0 0 1 20 A 24

25 20 A 1 0 0 1 20 A 26

27 20 A 1 0 0 1 20 A 28

29 20 A 1 0 0 1 20 A 30

31 20 A 1 0 0 1 20 A 32

33 20 A 1 0 0 1 20 A 34

35 20 A 1 0 0 1 20 A 36

37 20 A 1 0 0 1 20 A 38

39 20 A 1 0 0 1 20 A 40

41 20 A 1 0 0 1 20 A 42

43 20 A 1 0 0 1 20 A 44

45 20 A 1 0 0 1 20 A 46

47 20 A 1 0 0 1 20 A 48

49 20 A 1 0 0 1 20 A 50

51 20 A 1 0 0 1 20 A 52

53 20 A 1 0 0 1 20 A 54

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%

0 100.00%

Notes:

PANELBOARD: 01-LSLC (REPLACEMENT)

VA PER PHASE

CIRCUIT DESCRIPTION A B C

LIGHTS BEDROOM RM C109, C118, C199 MED CABINET C122

LIGHTS BEDROOM RM C133, C135, C145, C146 ALARM, MED GASES

SPARE SPARE

CIRCUIT DESCRIPTION

LIGHTS BEDROOM, TIMECLOCK WEST LIGHTS BEDROOM LAV, RM C104, C126, C128

LIGHTS BEDROOM, TIMECLOCK EAST RECEPT TELEPHONE RM

RECEPT ELECTRICAL RM RECEPT NURSES STATION

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPARE

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:

0 0 0

0 0 0

Telecom Rack 0

0 Total Est. Power Demand:

0 Total Conn. Amperage:

0 Total Est. Amperage Demand:

'-0

1' 4'

4' 8'

8' 8'

4' 2'

2'

1/ 8'

'-0

1/

'-0

1/ 4'

'-0

1' 2'

1' 1/

2' 2'

1/ 2'

1'

'-0

3'

'-0

1' m m

M

M

M

M

M

M

M m m

M m m

M

0.

5M

M 0.

5M 0.

M m m

M m m

M

.2

5M 0.

M

0.

M 0.

M m m

M

M

0.

5M m m

M

3/ 8'

'-0

1'

2' 4'

0.

M 0.

M m m

M

1/

2'

'-0

''0 2'

1/ 2'

1' 3' m m

M

0.

M 0.

M

6'

'-0

1/

4" 1/

2"

M

M

7.

m m

M

3/

'-0

8'

4' 4'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

10/30/2025 9:30:46 AM

Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt

001EP705

BLDG 001 - ELECTRICAL SCHEDULES

DCW/LRL JGD/KDB

100% CONSTRUCTION

DOCUMENTS

10/30/2025

648-20-116CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VA

VANCOUVER, WA

VHAPORHCS, VANCOUVER CAMPUS

1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661

Revisions: Date:

GENERAL NOTES

KEY NOTES

1. REFERENCE FLOOR PLANS AND ONE-LINE DIAGRAMS

FOR ADDITIONAL INFORMATION.

PERFORM CIRCUIT TRACING TO IDENTIFY CIRCUIT BREAKER

LOAD. PROVIDE NEW TYPEWRITTEN CIRCUIT DIRECTORY

WITH UPDATED / IDENTIFIED CIRCUIT DESCRIPTIONS.

001EP703 - BLDG 001 - ELECTRICAL SCHEDULES
001EP704 - BLDG 001 - ELECTRICAL SCHEDULES
001EP705 - BLDG 001 - ELECTRICAL SCHEDULES
001EP706 - BLDG 001 - ELECTRICAL SCHEDULES
002EP701 - BLDG 002 - ELECTRICAL SCHEDULES
002EP702 - BLDG 002 - ELECTRICAL SCHEDULES
002EP703 - BLDG 002 - ELECTRICAL SCHEDULES
002EP704 - BLDG 002 - ELECTRICAL SCHEDULES
003EP701 - BLDG 003 - ELECTRICAL SCHEDULES
003EP702 - BLDG 003 - ELECTRICAL SCHEDULES
004EP701 - BLDG 004 - ELECTRICAL SCHEDULES
004EP702 - BLDG 004 - ELECTRICAL SCHEDULES
005EP701 - BLDG 005 - ELECTRICAL SCHEDULES

File details come from the government source that posted it. Updated .