This document is a set of electrical construction drawings for a multi-building VA facility renovation project. The drawings establish general notes, symbols, and technical specifications that apply across all electrical work for the project, along with detailed floor plans for individual buildings showing equipment locations, conduit routing, and circuiting requirements.
The project encompasses multiple buildings (Buildings 001-018) across various levels and includes demolition and new electrical installations. Key requirements include: branch circuit conductors minimum 12 AWG for runs up to 65 feet and 10 AWG for longer runs; voltage drop not to exceed three percent; all conduit concealed where possible with 1-inch minimum for exterior/underground and 3/4-inch for interior; emergency circuits routed independently per NEC 700.10; fire-rated wall and floor penetrations sealed with fire-rated assemblies; equipment clearances verified by contractor prior to submittal; circuit breaker settings modified per protective device schedules; grounding electrode systems with 3-point fall-of-potential testing per VHA Directive 1028-8.J(6)(e); and surge protective devices limited to 24 inches in conductor length. Contractors must field-verify existing conditions, perform circuit tracing to identify unknown loads, update circuit directories in type-written format, coordinate pull box locations for feeders exceeding 250 feet or 270 degrees of bend, and provide pull boxes for all such feeders. All existing circuits associated with project areas must be de-energized during construction unless VA determines work must proceed hot, in which case the contractor must provide protective equipment and follow an approved work plan. Electrical work is fully sprinklered throughout with specific provisions for ceiling tile replacement and fire barrier maintenance during construction in non-barriered work areas.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 8:36:10 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
EG001
SYMBOLS, ABBREVIATIONS AND GENERAL
NOTES
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
A B B R E V I A T I O N S 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
THESE "GENERAL NOTES" SHALL APPLY TO ALL DRAWINGS WITHIN THIS DRAWING SET.
BLACKENED OR BOLDED EQUIPMENT INDICATES THE EQUIPMENT SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR. ITEMS NOT DIRECTLY FURNISHED BY THE CONTRACTOR SHALL HAVE A DESIGNATION SUCH AS OFCI (OWNER FURNISHED CONTRACTOR INSTALLED), OFOI (OWNER FURNISHED OWNER INSTALLED), OR NIC (NOT IN CONTRACT). GRAY OR GRAY-SCALED EQUIPMENT SHALL BE ASSUMED TO BE EXISTING OR SHOWN FOR EQUIPMENT LOCATION COORDINATION.
EXISTING CIRCUITS ASSOCIATED WITH PROJECT AREA OF WORK ARE TO BE DE-ENERGIZED DURING CONSTRUCTION.
ALL ELECTRICAL WORK SHALL BE COMPLETED WITH ALL PROXIMATE ELECTRICAL CIRCUITS DE-ENERGIZED (i.e. A NEW BREAKER OR CIRCUIT CANNOT BE ADDED TO A PANEL UNLESS PANEL IS COMPLETELY DE-ENERGIZED), OR CONTRACTOR MUST COMPLY WITH NFPA 70E FOR WORK ON ENERGIZED SERVICE. VA WILL DETERMINE IF ELECTRICAL SERVICE CAN BE SHUT DOWN OR IT WILL HAVE TO BE WORKED HOT DEPENDING ON CRITICALITY OF AREA BEING AFFECTED. IF WORK MUST BE DONE WITH SERVICE LIVE, CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL REQUIRED PROTECTIVE TOOLS, EQUIPMENT, AND CLOTHING, AND MUST FOLLOW JOB SPECIFIC WORK PLAN PREPARED BY CONTRACTOR AND APPROVED BY VA. WORK THAT REQUIRES SHUTTING DOWN ELECTRICAL SERVICE MAY HAVE TO BE ACCOMPLISHED DURING OTHER THAN NORMAL DUTY HOURS.
PROVIDE RACEWAYS AND CONDUCTORS/CABLING FROM LUMINAIRES TO THEIR CORRESPONDING CONTROL DEVICES AS INDICATED ON PLANS.
LUMINAIRE INSTALLATIONS AND LAYOUTS SHALL BE COORDINATED WITH ALL OBSTACLES, EQUIPMENT AND ARCHITECTURAL FEATURES.
WHERE NOT SPECIFICALLY INDICATED ON DRAWINGS, BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG MINIMUM FOR RUNS EQUAL TO OR LESS THAN 65 FEET AND 10 AWG MINIMUM FOR RUNS GREATER THAN 65 FEET. RACEWAYS AND CONDUCTORS SHALL BE SIZED AND QUANTIFIED TO SERVE AND CONTROL APPLICABLE EQUIPMENT WITH VOLTAGE DROP NO GREATER THAN THREE PERCENT. CONDUCTOR SIZE SHALL BE INCREASED TO COMPENSATE FOR DERATING REQUIRED PER NEC 310.15 WHERE MORE THAN THREE CURRENT CARRYING CONDUCTORS WITHIN ONE RACEWAY; CONDUCTOR AMPACITIES SHALL BE TAKEN FROM 75°C COLUMN. INDIVIDUAL CIRCUITS SHALL NOT SHARE NEUTRAL CONDUCTORS. HOT WORK REQUIRES VA AUTHORIZATION
FROM MEDICAL CENTER DIRECTOR. MUST REQUEST AT LEAST 3 WEEKS IN ADVANCE.
MINIMUM CONDUIT SIZE SHALL BE 1" FOR EXTERIOR AND UNDERGROUND CONDUIT. MINIMUM CONDUIT SIZE SHALL BE 3/4" FOR INTERIOR CONDUIT. ADDITIONAL CONDUCTORS FOR UNSWITCHED HOT CONDUCTOR TO LUMINAIRES WITH EMERGENCY BATTERY POWERED BACKUP UNITS OR TRANSFER DEVICES SHALL BE PROVIDED. ALL CONDUIT SHALL BE CONCEALED. ABOVE COMMENTS SHALL BE ADHERED TO UNLESS OTHERWISE NOTED ON DRAWINGS.
EMERGENCY LIGHTING OR EQUIPMENT CIRCUITS SHALL BE ROUTED INDEPENDENT FROM OTHER CIRCUIT TYPES; ENSURE NEC 700.10 REQUIREMENTS ARE MET.
PROVIDE ALL CONDUIT AND WIRE FOR ALL CIRCUITS INDICATED AND/OR NOTED ON DRAWINGS AND/OR SPECIFICATIONS. ALL AUXILIARY OR REQUIRED APPURTENANCES FOR PROVIDED EQUIPMENT SHALL BE PROVIDED WITH ALL CONNECTIONS AS
REQUIRED.
ALL EQUIPMENT AND DEVICES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL DISTRIBUTION EQUIPMENT, RECEPTACLES, DATA OUTLETS, AND SPECIAL SYSTEM DEVICES, SHALL HAVE THEIR EXACT LOCATION COORDINATED WITH ARCHITECTURAL
DRAWINGS AND ALL TRADES PRIOR TO COMMENCING WORK.
COORDINATE WITH LIGHTING MANUFACTURER FOR ALL LIGHTING CONTROL EQUIPMENT AND APPURTENANCES; PROVIDE ANY ADDITIONAL SENSORS TO PROVIDE FULL COVERAGE OF SPACE AS REQUIRED. ALL CONDUIT, WIRE, POWER SUPPLIES, AND APPURTENANCES REQUIRED FOR LIGHTING CONTROL SYSTEM SHALL BE PROVIDED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL SYSTEM.
ALL EXTERIOR MOUNTED RECEPTACLES AND LUMINAIRE INSTALLATIONS SHALL COORDINATE EXACT LOCATIONS WITH ARCHITECTURAL SHEETS. ADDITIONALLY, WHERE MASONRY IS USED, SMOOTH BLOCK SHALL BE UTILIZED TO PROVIDE A PROPER
MOUNTING SURFACE TO ALL EQUIPMENT; RECEPTACLES SHALL BE INSTALLED FLUSH.
ALL CONDUIT/SLEEVE FLOOR AND WALL PENETRATIONS SHALL BE SEALED WITH FIRE RATED ASSEMBLIES, CAULKING, AND APPURTENANCES. ELECTRICAL BOXES LOCATED IN FIRE RATED WALLS SHALL BE RATED FOR USE IN FIRE RATED WALLS.
ALL EQUIPMENT AND INSTALLATION METHODS SHALL BE LISTED AND LABELED PER NEC, UL LISTED, OR REVIEWED EQUAL.
FOR ALL EQUIPMENT, COORDINATE WITH ALL TRADES (ARCHITECTURAL, MECHANICAL, PLUMBING, ETC) FOR ELECTRICAL REQUIREMENTS AND INSTALLATION LOCATIONS PRIOR TO INSTALLATION.
ALL LOW-VOLTAGE SYSTEM CABLING NOT RAN IN CONDUIT TO WALL MOUNTED DEVICE SHALL HAVE A MINIMUM 1"C ROUTED FROM DEVICE THROUGH WALL INTO ACCESSIBLE CEILING SPACE; CABLING SHALL NOT BE ROUTED IN WALLS OR IN AN
INACCESSIBLE LOCATION WITHOUT CONDUIT.
GFCI RECEPTACLES SHALL BE PROVIDED WITHIN 6' OF A SINK/OR WATER SOURCE, WITHIN DAMP ROOMS, OR WHEN MOUNTED OUTDOORS/EXTERIOR TO BUILDING.
NO STRUCTURAL MEMBERS SHALL BE CUT, DRILLED, OR NOTCHED WITHOUT PRIOR WRITTEN CONSENT FROM STRUCTURAL ENGINEER OR ARCHITECT.
LIGHTING FIXTURES WITH MORE THAN TWO LAMPS SHALL HAVE TWO OUTER LAMPS CONTROLLED WITH ONE SWITCH AND INNER LAMP(S) CONTROLLED BY A SECOND SWITCH.
EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR SIZED PER NEC TABLE 250.122. ALL WIRING IS BASED
ON COPPER PER NEC TABLE 310.15(B)(16), USING 75°C AMPACITIES FOR FEEDERS.
MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND NORMAL BRANCH WIRING DEVICES SHALL HAVE DIVIDERS BETWEEN DEVICES.
FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES, CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP CONDUITS AT AREA OF WORK PERIMETER AND REMOVE CONDUIT WITHIN WORK AREA, DISCONNECT WIRING AT OVERCURRENT PROTECTIVE DEVICE AND REMOVE WIRING COMPLETELY FROM ABANDONED CONDUITS.
DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT OVERCURRENT PROTECTIVE DEVICE. COMPLETELY REMOVE ALL ABANDONED WIRING.
MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.
ALL AFFECTED AREAS THAT REQUIRE REPLACEMENT OF CEILING TILES AT END OF EACH SHIFT FOR WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER. IF TILES CANNOT BE REPLACED, SPRINKLER SYSTEM MAY BE CONSIDERED OUT OF SERVICE IN THESE AREAS AND 1-HOUR FIRE RATED SEPARATION WILL BE REQUIRED BETWEEN CONSTRUCTION AREA AND OCCUPIED PORTIONS OF BUILDING.
PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND LIKE, SHALL BE REPAIRED OR REPLACED AT EXPENSE OF CONTRACTOR TO ACCEPTANCE OF OWNER.
ALL EQUIPMENT WITH VA "EE TAGS" SHALL REMAIN ON STATION WHILE PAPERWORK IS BEING PERFORMED. CONTRACTOR SHALL DISPOSE OF REMOVED DEVICES UNLESS VA CHOOSES TO RETAIN THEM. DISPOSAL OF DEVICES SHALL COMPLY WITH ALL
APPROPRIATE CODES.
ALL BONDS TO WATER PIPE SHALL BE BONDED TO PIPE FLANGE USING A MECHANICAL LUG TYPE BOND. ALL BONDS TO BUILDING STEEL SHALL BE EXOTHERMIC.
ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED WITH CONTRACTOR'S PHASING OF PROJECT. COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER TRADES.
ALL DEMOLITION OF ELECTRICAL SYSTEMS SHALL BE CLOSELY COORDINATED WITH CONTRACTOR'S PHASING OF PROJECT. VERIFY DEMOLITION OF ELECTRICAL WITH ALL TRADES PRIOR TO START OF DEMOLITION.
CONTRACTOR SHALL DISPOSE OF REMOVED DEVICES. DISPOSAL OF DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES. REUSE EXISTING CONDUITS AND JUNCTION BOXES WHERE NOTED AS IS PRACTICAL.
CONTRACTOR SHALL PROVIDE UPDATED TYPE WRITTEN CIRCUIT PANEL DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM SHUTDOWNS AND PHASING WITH THE VA COR PRIOR TO PERFORMING REQUIRED EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA
STANDARDS.
PRIOR TO COMMENCING WORK, CONTRACTOR SHALL SUBMIT A DETAILED CONSTRUCTION PHASING PLAN TO VA FOR REVIEW AND APPROVAL; VA SHALL HAVE 30-DAYS TO REVIEW AND APPROVE EACH PHASING NARRATIVE. PHASING SHALL BE PLANNED TO MINIMIZE DOWNTIME AND IMPACT TO FACILITY OPERATION. PHASING PLAN SHALL INCLUDE ANY ANTICIPATED SHUTDOWNS AND TEMPORARY POWER PROVISIONS.
G E N E R A L N O T E S
1PH
1P 2/C 3/C
3PH
4/C 4W A/C A/E
AC
ACC
ADDL
ADJ
AF
AFC
AFCI
AFF
AFG
AHJ
AIC
ALT
AMP
ARCH
ASC
AT
ATS
AUTO
AV
BAT
BB
BFF
BLDG
BRKR
BYP
C
CALC
CAP
CAT
CATV
CCR
CD
CF
CKT
C/B
CL
CLF
CLG
CO
COMM
CONC
CONT
CONTR
CT
CTV
CU
CUR
DC
DCP
DDC
DEG C
DEG F
DEMO
DIAG
DISC
DP
DS
DWG
EC
ELEC
ELEV
EMER/EM
EMI
EMT
ENCL
EPO
EXT./
EXIST./
(E)
SINGLE-PHASE
SINGLE POLE
TWO-CONDUCTOR
THREE-CONDUCTOR
THREE-PHASE
FOUR-CONDUCTOR
FOUR-WIRE
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
ALTERNATING CURRENT OR ARMORED CABLE
ACCESSIBLE
ADDITIONAL
ADJACENT, ADJOINING
AMPERE FRAME OR AMP FUSE
ABOVE FINISHED COUNTER, AUTOMATIC
FREQUENCY CONTROL, OR AVAILABLE
FAULT CURRENT
ARC-FAULT CURRENT INTERRUPTER
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AUTHORITY HAVING JURISDICTION
AMPERE INTERRUPTING CAPACITY
ALTERNATE
AMPERE
ARCHITECT
AMPS SHORT CIRCUIT
AMPERE TRIP
AUTOMATIC TRANSFER SWITCH
AUTOMATIC
AUDIO VISUAL
BATTERY
BRANCH BREAKER
BELOW FINISH FLOOR
BUILDING
BREAKER
BY PASS
CONDUIT
CALCULATE
CAPACITY
CATALOG
COMMUNITY ANTENNA TELEVISION
CONTROL CONTACTOR
CONSTRUCTION DOCUMENTS
CONTRACTOR FURNISHED
CIRCUIT
CIRCUIT BREAKER
CONNECTOR LIGHTING
CURRENT LIMITING FUSE
CEILING
CONDUIT ONLY
COMMUNICATION
CONCRETE
CONTINUE
CONTRACTOR
CURRENT TRANSFORMER
CABLE TELEVISION
COPPER
CURRENT
DIRECT CURRENT
DIMMER CONTROL PANEL
DIRECT DIGITAL CONTROLS
DEGREES CELSIUS
DEGREES FAHRENHEIT
DEMOLITION
DIAGRAM
DISCONNECT
DISTRIBUTION PANEL
DISCONNECT SWITCH
DRAWING
ELECTRICAL CONTRACTOR
ELECTRIC OR ELECTRICAL
ELEVATOR
EMERGENCY
ELECTROMAGNETIC INTERFERENCE
ELECTRICAL METALLIC TUBING
ENCLOSURE
EMERGENCY POWER OFF
EXISTING
FB
FIXT
FLA
FT
FU SW
FVNR
FVR
G
GEN
GFCI
GFP
GND
HID
HOA
HP
HT
HZ
IG
IMC
INCAND
IR
J-BOX
kV kVA kVAh kVAR kW kWh kWhM
LCP
LED
LF
LP
LRA
LT
LTG
LTG PNL
LTNG
LV
MAX
MB
MC
MCA
MCB
MCC
MDP
MECH
MH
MIN
MOCP
MLO
MS
MT
MTD
MTG
MTR
MTS
MV
MVA
MW
NA
NAC
NC
NEC
NEMA
NEUT, N
NFC
NFPA
NIC
NO
NTS
FEEDER BREAKER
FIXTURE
FULL LOAD AMPS
FEET OR FOOT
FUSED SWITCH
FULL VOLTAGE NON-REVERSING
FULL VOLTAGE REVERSING
ELECTRICAL GROUND
GENERATOR
GROUND FAULT
CIRCUIT INTERRUPTER
GROUND FAULT PROTECTION
GROUND
HIGH INTENSITY DISCHARGE
HAND-OFF-AUTOMATIC
HORSEPOWER
HEIGHT
HERTZ
ISOLATED GROUND
INTERMEDIATE METAL CONDUIT
INCANDESCENT
INFRARED
JUNCTION BOX
KILOVOLT
KILOVOLT AMPERE
KILOVOLT AMPERE PER HOUR
KILOVOLT AMPERE REACTIVE
KILOWATT
KILOWATT HOUR
KILOWATT HOUR METER
LIGHTING CONTROL PANEL
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIGHT POLE
LOCKED ROTOR AMPS
LIGHT
LIGHTING
LIGHTING PANEL
LIGHTNING
LOW VOLTAGE
MAXIMUM
MAIN BREAKER
METAL-CLAD
MINIMUM CIRCUIT AMPS
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MAIN DISTRIBUTION PANEL
MECHANICAL
MANHOLE
MINIMUM
MAXIMUM OVERCURRENT PROTECTION
MAIN LUGS ONLY
MOTOR STARTER
MOUNT
MOUNTED
MOUNTING
METER
MANUAL TRANSFER SWITCH
MEDIUM VOLTAGE
MEGAVOLT-AMPERE
MEGAWATT
NOT APPLICABLE
NOTIFICATION APPLIANCE CABINET
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUTRAL
NOT FOR CONSTRUCTION
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
OC
OCPD
OH
OL
OS
PB
PEC
PF
PH
PNL
PS
PVC
PWR
RCP
REC
RECPT
RM
RMC
RMS
REQD
SAC
SCC
SF
SI
SPD
SPEC
SURF
SW
SWBD OR SB
SWGR OR SG
TEL
TR
TV
TYP
UFD
UGND
UL
UPS
UTIL
V
VA
VAR
VFD
VOLT
W
WP/W
XFER
XFMR
ON CENTER
OVER CURRENT PROTECTION DEVICE
OVERHEAD
OVERLOAD
OCCUPANCY SENSOR
PULL BOX
PHOTOELECTRIC CELL
POWER FACTOR
PHASE
PANEL
POWER SUPPLY
POLYVINYL CHLORIDE (PLASTIC)
POWER
REFLECTED CEILING PLAN
RECESSED
RECEPTACLE
ROOM
RIGID METAL CONDUIT
ROOT MEAN SQUARE
REQUIRED
SMALL APPLIANCE CIRCUIT
SHORT CIRCUIT CAPACITY
SQUARE FOOT (FEET)
INTERNATIONAL SYSTEM OF UNITS
SURGE PROTECTIVE DEVICE
SPECIFICATION
SURFACE
SWITCH
SWITCHBOARD
SWITCHGEAR
TELEPHONE
TAMPER RESISTANT
TELEVISION
TYPICAL
UNDERFLOOR DUCT
UNDERGROUND
UNDERWRITERS LABORATORY
UNINTERRUPTIBLE POWER SUPPLY
UTILITY
VOLT
VOLT AMPERE
VOLT AMPERE REACTIVE
VARIABLE FREQUENCY DRIVE
VOLTAGE
WATT/WEATHERPROOF (WHILE IN USE)
WEATHERPROOF
TRANSFER
TRANSFORMER
P R O J E C T P H A S I N G N A R R A T I V E THESE CONTRACT DRAWINGS ARE ARRANGED IN CAD STANDARD FORMAT; 100-SERIES DRAWINGS ARE FLOOR PLANS, 400-SERIES ARE ENLARGED PLANS, 500-SHEETS ARE DETAIL SHEETS, 600-SHEETS ARE ONE-LINE DIAGRAMS, AND 700-SHEETS ARE SCHEDULES. A/E RECOMMENDS REVIEWING ONE-LINE DIAGRAMS FIRST, AS MAJORITY OF WORK IS INDICATED THERE.
IN GENERAL, SHEET TYPES LISTED BELOW INDICATE THE FOLLOWING TYPE OF WORK:
- 100-SERIES DRAWINGS IDENTIFY ELECTRICAL DISTRIBUTION EQUIPMENT THAT REQUIRE MODIFICATIONS INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING: EQUIPMENT UPGRADES, EQUIPMENT REPLACEMENTS, OVER-CURRENT PROTECTIVE DEVICE (OCPD) REPLACEMENT, AND TIME-CURRENT CURVE (TCC) ADJUSTMENTS.
- 400-SERIES DRAWINGS INDICATE DETAILED ELECTRICAL PLAN LAYOUTS FOR VARIOUS TASKS.
- 500-SERIES DRAWINGS INDICATE ELECTRICAL DETAILS, ELEVATIONS, AND WIRING DIAGRAMS.
- 600-SERIES DRAWINGS INDICATE ALL ELECTRICAL WORK IMPACTING FACILITY ONE-LINE DIAGRAMS.
- 700-SERIES DRAWINGS INDICATE ELECTRICAL LOAD/PANEL SCHEDULES, LUMINAIRE SCHEDULES, ELECTRICAL DEFICIENCY CORRECTIONS SCHEDULES, AND PROTECTIVE DEVICE
CHANGE SCHEDULES.
ALL ELECTRICAL PHASING REQUIREMENTS SHALL BE RESPONSIBILITY OF CONTRACTOR. PHASING INFORMATION SHOWN ON DRAWINGS IS PROVIDED FOR REFERENCE ONLY AND REPRESENTS ONE POSSIBLE METHOD OF ACHIEVING DESIGN INTENT.
CONTRACTOR SHALL VERIFY ALL PHASING, CONNECTIONS, AND COORDINATION REQUIREMENTS VIA A DETAILED PHASING PLAN WITH VA PRIOR TO COMMENCING ANY WORK.
CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR PLANNING AND EXECUTING ALL WORK IN A MANNER THAT MINIMIZES SYSTEM DOWNTIME AND DISRUPTIONS TO EXISTING OPERATIONS. CONTRACTOR SHALL PROVIDE, INSTALL, AND MAINTAIN ALL REQUIRED TEMPORARY POWER SOURCES, WIRING, AND CONNECTIONS NECESSARY TO MAINTAIN CONTINUOUS SERVICE DURING CONSTRUCTION OR CHANGEOVER ACTIVITIES.
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE CODES, STANDARDS, AND REGULATIONS, AND CONTRACTOR SHALL COORDINATE WITH VA TO CONFIRM ACCEPTANCE OF ANY PROPOSED PHASING OR SEQUENCING METHODS. ANY DISCREPANCIES OR CONFLICTS BETWEEN DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED AND RESOLVED PRIOR TO PROCEEDING WITH INSTALLATION.
ALL WORK SHALL BE CONDUCTED AFTER-HOURS, UNLESS DIRECTED OTHERWISE BY VA; REFERENCE "PROJECT WORK HOURS" SECTION ON SHEET G-001 FOR EXACT WORKING HOUR REQUIREMENTS.
GENERAL PROJECT CONSTRUCTION SEQUENCING SHALL BE IMPLEMENTED AS FOLLOWS:
1. BUILDING 1: REFERENCE BUILDING 1 PHASING ON SHEETS 001EP401a AND 001EP401b.
2. BUILDING 3: REFERENCE BUILDING 3 PHASING ON SHEET 003EP401.
3. BUILDING 11: REFERENCE BUILDING 11 PHASING ON SHEET 011EP401a.
4. BUILDING 12: REFERENCE BUILDING 12 PHASING ON SHEET 012EP401.
5. ALL BUILDINGS WITHIN SCOPE: REPLACE, MODIFY, OR UPGRADE EXISTING ELECTRICAL POWER DISTRIBUTION EQUIPMENT AS INDICATED IN DRAWINGS AND SPECIFICATIONS. NOTE - VARIOUS SHUTDOWNS WILL BE REQUIRED; CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND POWER DISTRIBUTION AS NEEDED.COORDINATE WITH VA AS REQUIRED.
6. ONCE ALL PROJECT PHASES ARE COMPLETE, THE CONTRACTOR SHALL PROVIDE THE FOLLOWING TASKS AT ANY TIME (WITH VA APPROVAL):
A. A FACILITY WIDE ARC-FLASH HAZARD RISK ASSESSMENT WITH REPORT AND LABELING SHALL BE PERFORMED IN ACCORDANCE WITH SPECIFICATION 26 05 73.
B. FACILITY WIDE GROUND RESISTANCE TESTING PER VHA DIRECTIVE 1028-8.J(6)(e). REFERENCE GROUNDING SPECIFICATION 26 05 26 FOR ADDITIONAL INFORMATION.
D R A W I N G S E T N A R R A T I V E
Revisions: Date:
CONTRACTOR SHALL PROVIDE UPDATED TYPEWRITTEN CIRCUIT PANEL DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL THAT THEIR PROPOSED EQUIPMENT SELECTION (I.E. PANELBOARD, GENERATOR, ETC.) WILL FIT WITH ALL REQUIRED ELECTRICAL CLEARANCES. CONTRACTOR SHALL PROVIDE STATEMENT CONFIRMING THAT
EQUIPMENT WILL FIT IN ALLOCATED SPACE ON SUBMITTAL.
WHERE CIRCUIT / CONDUCTORS ARE INDICATED AND RACEWAYS QUANTITY OR SIZE IS NOT INDICATED, CONTRACTOR SHALL PROVIDE AND SIZE RACEWAY PER NEC.
Division 25-27
SECTION
SHEET WHERE SECTION
IS TAKEN FROM
SECTION LETTER
DETAIL NUMBER
SHEET ON WHICH DETAIL APPEARS
DETAIL AREA
XXX CONDUIT & WIRE TAG
(REFER TO CONDUIT AND WIRE SCHEDULE)
KEY NOTE
XXX
FIGURE OR PHOTO
DETAIL NUMBER
IF PHOTO, ARROW DENOTES
DIRECTION TAKEN
SHEET WHERE DETAIL IS TAKEN FROM
DETAIL/PLAN
DETAIL/PLAN NUMBER
XXX
A
XXX
A
XXX
SHEET WHERE SECTION
IS TAKEN FROM
SCALE
SECTION LETTER
1 LOAD METERING POINT NOTE
CONDUIT OR EQUIPMENT TO BE REMOVED
CONDUIT UNDER FLOOR, IN FLOOR SLAB, OR ROUTED
UNDERGROUND
CONDUIT CONCEALED IN WALL, IN CEILING, OR ABOVE
ACCESIBLE CEILING WHERE POSSIBLE, OTHERWISE EXPOSED
EXTRA-HARD USAGE FLEXIBLE CORD
FLEXIBLE CONDUIT
CONDUIT TURNED UP OR TOWARD
CONDUIT TURNED DOWN OR AWAY
CONDUIT CAPPED
FIRE WALL (2 HOURS MIN.)
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
BOLD DOT INDICATES CONDUCTOR BOND / TERMINATION
BOND TO EQUIPMENT
BOND / TERMINATION
CONDUCTORS
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/30/2025 10:52:16 AM
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
EG002
ELECTRICAL LEGENDS
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
D I V 2 6 - L E G E N D
MOTOR
DELTA CONNECTION
POWER
THESE ARE GENERAL LEGENDS. NOT ALL SYMBOLS MAY BE SHOWN.
REFERENCE PLANS FOR ALL UTILIZED SYMBOLS
PE
DS
X
X
X
ALL INTERIOR AREAS TO HAVE MANUAL 0N/AUTO OFF LIGHTING
CONTROL WITH THE USE OF DUAL TECHNOLOGY OCCUPANCY SENSORS.
EXCEPT WHERE A WALL SWITCH OCCUPANCY SENSOR IS NOTED.
PHOTO ELECTRIC SENSOR
DAYLIGHT SENSOR FOR DAYLIGHT HARVESTING
CONTROL. SENSOR SHALL BE CEILING MOUNTED.
RECEPTACLE, SINGLE WITH SWITCH
RECEPTACLE, SPECIAL PURPOSE
A = 120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.
B = 208V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.
C = 120V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.
D = 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.
E = 208V, 60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.
F = 208V, 30A, 3 PHASE, 3-POLE 4W, NEMA 15-30R.
G = 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-30R.
H = 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.
RECEPTACLE, SWITCHED DUPLEX
DROP CORD, SINGLE CONVENIENCE OUTLET, 3-WIRE,
GROUNDING TYPE, 20A, W/#12 CONDUCTORS IN FLEXIBLE
CORD (CENTER LINE OF OUTLET: 6'-6" [1981mm] AFF. MINIMUM).
ELECTRICAL STRIP MOLD (OUTLETS ON 2'-0" [610mm]
CENTERS OR AS DESIGNATED ON DRAWINGS), MTD
3'-6" [1067mm] AFF OR AS INDICATED.
SWITCH
F = FUSED SWITCH K = KEY OPERATED
L = LOCK LM = LOW VOLTAGE MASTER
M = MANUAL MOTOR STARTING MC = MOMENTARY CONTACT
MP = MOTOR SNAP WITH PILOT LIGHT P = WITH PILOT LIGHT
(THERMAL TYPE)
PB = PUSH BUTTON STATION RC = REMOTE CONTROL
WP = WEATHER PROOF X = EXPLOSION PROOF
SWITCH (# SUBSCRIPT AS INDICATED BELOW):
BLANK = SINGLE POLE 2 = DOUBLE POLE
3 = THREE-WAY 4 = FOUR-WAY
D = DIMMER K = KEY OPERATED
LV = LOW VOLTAGE P = WITH PILOT LIGHT
LM = LOW VOLTAGE MASTER RC = REMOTE CONTROL
PB = PUSH BUTTON STATION WP = WEATHER PROOF
T = TIMER OPERATED Mo = OCCUPANCY SENSOR
LIGHTING, ONE HEAD EMERGENCY BATTERY POWER
LIGHTING, TWO HEAD EMERGENCY BATTERY POWER
LIGHTING, THREE HEAD EMERGENCY BATTERY POWER
EXIT SIGN, WALL MOUNTED WITH DIRECTIONAL
ARROWS AND FACES AS SHOWN
EXIT SIGN, CEILING MOUNTED WITH
DIRECTIONAL ARROWS AND FACES AS SHOWN
LIGHT FIXTURE, BOLLARD
LIGHTING
x = LUMINAIRE SWITCH ZONE (ANY LOWER CASE LETTER APPLIES)
S
S
OS
EMERGENCY NORMAL
X X
X X
X X
X X
X X
X X
XX
X X
X X
X X
X X
X X
X X
X X
X = DENOTES LUMINAIRE TAG NAME
RECESSED DOWNLIGHT FIXTURE
LIGHT FIXTURE, RECESSED, 2'x4'
LIGHT FIXTURE, RECESSED, 1'x4'
LIGHT FIXTURE, RECESSED, 1'x8'
LIGHT FIXTURE, RECESSED, 2'x2'
LIGHT FIXTURE, SURFACE
MOUNTED, 2'x4'
LIGHT FIXTURE, SURFACE
MOUNTED, 1'x4'
LIGHT FIXTURE, SURFACE
MOUNTED, 1'x8'
LIGHT FIXTURE, SURFACE
MOUNTED, 2'x2'
STRIP LIGHTING, 4' LONG
LIGHT FIXTURE, WALL MOUNTED
LIGHT POLE, POST TOP MOUNT
LUMINAIRE
LIGHTING WALL PACK, EXTERIOR
BUILDING
CIRCUITING DESIGNATIONS
WHERE A PANEL NAME AND CORRESPONDING CIRCUIT ARE CALLED OUT ADJACENT TO A RECEPTACLE, LUMINAIRE, OR MISC LOAD, THAT LOAD SHALL BE CIRCUITED TO THE CORRESPONDING PANELBOARD CIRCUIT BREAKER. CONDUIT AND WIRE FOR CIRCUIT SHALL BE 3/4" CONDUIT WITH (2) 12 AWG AND (1) 12 AWG GND, UNLESS OTHERWISE NOTED; IF FURTHER THAN 70', PHASE AND GROUND WIRE SHALL BE UPSIZED TO 10 AWG TO ACCOUNT FOR VOLTAGE DROP. SEE
EXAMPLES BELOW:
RECEPTACLE:
PANELBOARD OR POWER SOURCE NAME = "P1"
CIRCUIT NUMBER OF POWER SOURCE = "2"
LUMINAIRE:
PANELBOARD OR POWER SOURCE NAME = "PP3"
CIRCUIT NUMBER OF POWER SOURCE = "4"
TYPE LUMINAIRE TAG NAME, REFERENCE LUMINAIRE SCHEDULE = "L1"
LIGHTING CONTROL SWITCH LEG = "a"
ALL LUMINAIRES IN SAME ROOM ARE CIRCUITED TO SAME CIRCUIT = PP3-4
MISC. LOAD:
PANELBOARD OR POWER SOURCE NAME = "PP"
CIRCUIT NUMBER OF POWER SOURCE = "7"
P1-2 P1-2
HEAT PUMP
PP-7
L1 a
PP3-4
FACP
PP-7
G E N E R A L S Y M B O L S
TRANSFORMER
WYE CONNECTION
EARTH GROUND
JUNCTION BOX
PULL BOXPB
J
SWITCH, SINGLE BREAK
FUSE WITH RATING
NORMALLY CLOSED RELAY CONTACT
NORMALLY OPEN RELAY CONTACT
CIRCUIT BREAKER
DRAWOUT AIR CIRCUIT BREAKER
RELAY; NUMBER INDICATES RELAY TYPE
50 = INSTANTANEOUS OVER CURRENT OR RATE-OF-RISE
51 = AC-TIME OVER CURRENT
67 = AC-DIRECTIONAL OVER CURRENT
86 = LOCKING OUT
DISCONNECT SWITCH
BATTERY
CAPACITOR
METER
AMMETER
VOLTMETER
WATTMETER
WATT-HOUR METER
TRANSFORMER, PLANT
M
A
V
W
WH
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
RECEPTACLE, DUPLEX
RECEPTACLE, DUPLEX ON EMERGENCY POWER
RECEPTACLE, DUPLEX WITH GROUND FAULT
CIRCUIT INTERRUPTER
RECEPTACLE, QUADRUPLEX
RECEPTACLE, SINGLE
Revisions: Date:
PNL-P12
GROUND ROD
GROUND ROD WITH TEST WELL
EARLY STREAMER EMISSIONS
(ESE) AIR TERMINAL
CONDUIT HOME RUN - SEE CONDUIT AND WIRE SCHEDULE
XXXX
CONDUIT 3/4"C, 3#12 PHASE, 1#12 N, & 1#12 GND
UNLESS SHOWN OTHERWISE. (EXAMPLE SHOWN: TO
PANEL P1, CIRCUIT 1,3,5). LONG TICK FOR NEUTRAL
WIRE; ONE SHORT TICK FOR EACH PHASE WIRE;
GROUND SIZED PER NEC. NOTE THAT A SECOND
SHORT TICK FOR LUMINAIRES IS FOR A TRAVELER
WIRE.
P1-1,3,5
LIGHTNING ARRESTOR
LA
GREEN
HOUSE
GARDEN
SHEDO
VE
R
H
EA
D R
O W
GAZEBO
L
GREEN
HOUSE
GARDEN
SHED
O
VE
R H
EA
D
R O
W
GAZEBO
L
013EP101 1
022EP101
007EP101
003EP101
003EP102
012EP102
018EP101
020EP101
019EP101
015EP1011
011EP101a
020EP102
011EP101b
011EP101c
011EP101d
011EP102
011EP103
011EP104
011EP105
015EP102
023EP101
025EP103
021EP101
014EP102
T1819EP101
TR3EP101
001EP102
001EP101c
001EP101b
001EP101a
001EP100
025EP102
016EP101
013EP102
005EP101
006EP101
004EP102
002EP102
002EP101
012EP101
018EP102
004EP101
025EP101
014EP101
024EP101
015EP103
EP401
TR3
FITNESS
CENTER
(14)
MUSEUM
(T1819)
SNAP LAB
(21)
WELL
(23)
BARNES
REHABILITATION
UNIT
(11)
D WING
F WING
E WING
SPECIALTY
CARE
CLINICS
(20)
STORAGE
BLDG
(19)
PRIMARY
CARE
SUPPORT
BUILDING
(15)
PRIMARY
CARE
(24)
TRANSPLANT
LODGER
(18)
RRTP
(12)
LAUNDRY/
WAREHOUSE
(2)
BOILER
(3)
MAINTENANCE
SHOPS
(4)
EM. GEN
(6)
GROUNDS (5)
TELE
(13)
STORAGE
(22)
WELL
(7)
STORAGE
(16)
FISHER
HOUSE
(25)
COMMUNITY
LIVING
CENTER
(1)
C WING B WING
LOT #19
CLARK
COUNTY
CENTER
FOR
COMMUNITY HEALTH
("CCH")
(17)
LOT #9
LOT #8
LOT #8
LOT #1
NAVY LANE
LOT #2
SRO
AIR FORCE W
AY
LOT #6
LO
T #
FREEDOM PATH
(26)
LO
T #
LOT #17
LOT #21
LOT #2
LOT #1
POW / MIA ROAD
LOT #14
LOT #14
LOT #13
POW / MIA ROAD
AIR FORCE WAY
LOT #3
LOT #10
LOT #11
PO
W
/ M
IA
R
OA
D
PO
W
/ M
IA
R
OA
DLOT #18
NEW
IMAGING
(27)
COAST GUARD STREET
MARINE CORPS DRIVE MARINE CORPS DRIVE
LOT #12
AR
MY
A
VE
NU
E
ARMY AVENUE
E FOURTH PLAIN BLVD
FO
RT
VA
NC
OU
VE
R W
AY
LOT #4
027EP102
EP401
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 8:36:13 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_GENSHEETS_EL_SDB.rvt
ES001
OVERALL ELECTRICAL SITE PLAN
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
GENERAL NOTES
1. PLAN INCLUDED FOR OVERALL SITE REFERENCE.
- 1" = 80'-0"
1 OVERALL ELECTRICAL SITE PLAN
PROJECT
NORTH
2'0 4' 6'
Revisions: Date:
AREA SHOWN
MAIN WATER
SERVICE PIPE
'01-MCC-E1'
'01-MCC-1'
F G H I J
FROM PANELBOARD "LSHA"
ON FLOOR ABOVE.
F G H I J
MAIN WATER
SERVICE PIPE
'01-MCC-E1'
'01-MCC-1'
FROM 001EP401a
001-G-02
001-P-05
EP5016
001-G-01
FROM 001EP401b
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 8:24:11 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_01_EL_SDB.rvt
001EP100
BLDG 001 - LEVEL 00 - ELECTRICAL PLAN
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
TRUE
NORTH
- 1/8" = 1'-0"
1 BLDG 001 - LEVEL 00 - DEMOLITION ELECTRICAL PLAN
LEVEL 00
- 1/8" = 1'-0"
2 BLDG 001 - LEVEL 00 - ELECTRICAL PLAN0 10' 20'
PROJECT
NORTH
0 10' 20'
PROJECT
NORTH
Revisions: Date:
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT.
CONTRACTORS SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE COR.
EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATION SHALL BE FIELD VERIFIED AND REDLINED
VIA CONTRACTOR.
IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT BREAKERS
HAVE BEEN REPLACED AND/OR ADJUSTED, IMMEDIATELY
INFORM AND COORDINATE WITH VA AS REQUIRED.
REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF
REQUIRED.
REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR
ADDITIONAL INFORMATION.
WHERE PRACTICAL, RACEWAYS / CONDUCTORS SHALL BE
ROUTED VERTICALLY UP WALL AND HORIZONTALLY ON
CEILING TO PRESERVE WALL SPACE FOR FUTURE USE.
CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL
FEEDERS WHERE FEEDER RUNS EXCEED 250FT OR HAVE
MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE
PULL BOX LOCATIONS WITH ALL OBSTRUCTIONS, TRADES,
AND VA AS REQUIRED.
KEY PLAN
KEY NOTES
1 EXISTING '01-MCC-E1' SHALL BE REFED FROM 'ATS 10' VIA
PANELBOARD '01-C1'. REFERENCE ONE-LINE DIAGRAM ON
SHEET 001EP602 FOR ADDITIONAL INFORMATION.
EXISTING EQUIPMENT CONTAINING OVERCURRENT
PROTECTIVE DEVICE WITH SETTINGS TO BE MODIFIED.
REFERENCE CORRESPONDING BUILDING ONE-LINE
DIAGRAMS AND PROTECTIVE DEVICE CHANGES SCHEDULE
FOR PROTECTIVE DEVICE SETTINGS ADJUSTMENT AND / OR
REPLACEMENT.
EXISTING CONDUCTORS AND RACEWAY SERVING '01-MCC-E1'
SHALL BE DEMOLISHED BACK TO SOURCE AND REPLACED.
MODIFIED EQUIPMENT. REFERENCE CORRESPONDING
BUILDING ONE-LINE DIAGRAMS FOR ADDITIONAL
INFORMATION.
PROVIDE BOND TO TERMINATE TO BUILDING STEEL. BOND
CONDUCTOR TO PANELBOARD '01-MSB' PER NEC
REQUIREMENTS.
PROVIDE BOND TO TERMINATE TO MAIN WATER SERVICE
PIPE. BOND TO PANELBOARD '01-MSB' PER NEC
REQUIREMENTS.
APPROXIMATE FOOTPRINT OF ROOM A-117 ON FLOOR
ABOVE. REFERENCE ENLARGED FLOOR PLANS ON SHEETS
001EP401a AND 001EP401b FOR ADDITIONAL INFORMATION.
PBPB
PBPB
PANEL "01-KIOSK"
PANEL '01-A-105H'
CHAPEL
A-120
MAIL/COPY
CHAPLAIN
A-120A
OFFICE
A-122C
IV CLEAN
ROOM
A-122A
SATELLITE
PHARMACY
A-122B
VESTIBULE
A-122
CLOSET,
TELE.
A-121
CORRIDOR
C-8
OFFICE
RECREATION
A-105A
STORAGE
A-105H
STORAGE
A-105G
DISHWASHER
A-113C
DRY
STORAGE
A-115
DIETETICS
A-113
STORAGE,
CART
CORRIDOR
C-5A
N.F.S. CLEAN
PREP
C-41
WALK-IN
REFER.
A-113D
REC. /
THERAPY
STORAGE
A-110
CORRIDOR
C-5
VESTIBULE
C-5B
TOILET, M.
A-108
TOILET, F.
A-107
OFFICE
A-105D
LIBRARY
A-105F
LOBBY
C-2
STORAGE
A-105J
CORRIDOR
C-3
OFFICE, DIET.
A-104
OFFICE
A-103A
OFFICE
A-103
OFFICE
A-102
OFFICE
A-101
CORRIDOR
C-4
CLOSET,
TELE.
A-100
VESTIBULE
C-1
CONFERENCE
/ CLASS
ROOM
A-106
LOUNGE,
EMP.
A-109
LOCKER
ROOM
A-109D
TOILET, M.
A-109E
TOILET, F.
A-109C
LOCKER
ROOM
A-109B
VESTIBULE
A-109A
STORAGE
A-109F
E.M.S. H.A.C.
A-112
N.F.S. H.A.C.
A-111
N.F.S.
OFFICE
A-114
N.F.S.
STORAGE
A-119
ELECT. RM
A-117
CORRIDOR
C-7
REC. /
THERAPY
STORAGE
A-114A
CORRIDOR
C-6
OXY.
STORAGE
A-116
GENERATOR
YARD
DINING ROOM
/ KITCHEN
A-105
F G H I J K L
AREA A
AREA B
SEE SHEET 001EP101b
AREA A
AREA C
SEE SHEET 001EP101c
001-G-03
001-P-09
001-G-03
001-P-08
001EP401b
001EP401b
001EP401a
001EP401a
AREA SHOWN
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 8:24:14 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_01_EL_SDB.rvt
001EP101a
BLDG 001 - LEVEL 01 - AREA A - ELECTRICAL
PLAN
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
- 1" = 10'-0"
1 BLDG 001 - LEVEL 01 - AREA A - ELECTRICAL PLAN 0 10' 20'
PROJECT
NORTH
TRUE
NORTH
AREA A
Revisions: Date:
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT.
CONTRACTORS SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE COR.
EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATION SHALL BE FIELD VERIFIED AND REDLINED
VIA CONTRACTOR.
IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT BREAKERS
HAVE BEEN REPLACED AND/OR ADJUSTED, IMMEDIATELY
INFORM AND COORDINATE WITH VA AS REQUIRED.
REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF
REQUIRED.
REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR
ADDITIONAL INFORMATION.
WHERE PRACTICAL, RACEWAYS / CONDUCTORS SHALL BE
ROUTED VERTICALLY UP WALL AND HORIZONTALLY ON
CEILING TO PRESERVE WALL SPACE FOR FUTURE USE.
CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL
FEEDERS WHERE FEEDER RUNS EXCEED 250FT OR HAVE
MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE
PULL BOX LOCATIONS WITH ALL OBSTRUCTIONS, TRADES,
AND VA AS REQUIRED.
KEY PLAN
KEY NOTES
1 CONTRACTOR SHALL PERFORM CIRCUIT TRACING TO
IDENTIFY UNKNOWN CIRCUIT BREAKER LOADS.
CONTRACTOR SHALL UPDATE CIRCUIT DIRECTORY WITH
IDENTIFIED LOAD. CIRCUIT DIRECTORY SHALL BE
TYPE-WRITTEN AND PRINTED, NOT HANDWRITTEN.
REFERENCE ASSOCIATED PANEL SCHEDULE FOR
ADDITIONAL INFORMATION.
PB
MGA
(LOCAL)
MGV(02)
MGV(MA/MV)
MGV
(MA/MV)
MGV (02)
STORAGE
A-105J
TOILET,
STAFF
B-102
OFFICE, HEAD
NURSE
B-107
CORRIDOR
C-9
NURSE
STATION
C-11
001EP401c
001EP401c
AREA A
SEE SHEET 001EP101a
AREA B
LOUNGE
B-100
KIT. NOUR.
B-101
CLOSET,
TELE.
B-103
MED.
OMNI-CELL
B-104
MEDICATION
B-105
OMNI-CELL
B-106 OFFICE, S.W.
B-108
4 BED ROOM
B-109
UTILITY,
LAUNDRY
B-110
BEDROOM
B-111
HAC
B-112
STAFF
B-113
CLEAN LINEN
B-114
BATH /
SHOWER
B-115
ELEC.
B-116
2 BED ROOM
B-117
2 BED ROOM
B-118
2 BED ROOM
B-119
2 BED ROOM
B-120
2 BED ROOM
B-121
2 BED ROOM
B-122
2 BED ROOM
B-123
2 BED ROOM
B-124
2 BED ROOM
B-125
2 BED ROOM
B-126
2 BED ROOM
B-127
2 BED ROOM
B-128
HOSPICE
KITCHEN
B-129
FAMILY ROOM
B-130
TOILET
B-132A
BEDROOM
B-132
UTILITY
SOILED
B-133
KITCHEN
B-134
2 BED ROOM
B-135
2 BED ROOM
B-136
BED ROOM
B-137
2 BED ROOM
B-138
2 BED ROOM
B-139
2 BED ROOM
B-140
2 BED ROOM
B-141
2 BED ROOM
B-142
2 BED ROOM
B-143
2 BED ROOM
B-144
1 BED ROOM
B-145
1 BED ROOM
B-146
OFFICE
B-100B
STORAGE
B-100A
OFFICE
B-12C
B-132B
CORRIDOR
C-10
OFFICE,
WARD CLERK
C-12
CORRIDOR
C-16
TOILET
B-115A
CORRIDOR
C-14
BATHROOM
B-135A
CORRIDOR
C-13
OFFICE
B-111C
B-111B
CORRIDOR
C-17
TOILET
B-134A
TOILET
B-138A
TOILET
B-137A
TOILET
B-141A
TOILET
B-142A
BATHROOM
B-146A
BATHROOM
B-145A
CORRIDOR
C-15
TOILET
B-118A
TOILET
B-117A
TOILET
B-121A
TOILET
B-122A
TOILET
B-126A
TOILET
B-125A
BATHROOM
B-129A
BATHROOM
B-130A
TOILET
B-109A
TOILET
B-111A
M N O P Q
CONTINUE TO
SHEET 001EP102
EP501TYP.
001-G-05
001-G-04
001-G-03
001-P-08
AREA SHOWN
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/30/2025 10:55:13 AM
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_01_EL_SDB.rvt
001EP101b
BLDG 001 - LEVEL 01 - AREA B - ELECTRICAL
PLAN
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
- 1" = 10'-0"
1 BLDG 001 - LEVEL 01 - AREA B - ELECTRICAL PLAN 0 10' 20'
PROJECT
NORTH
TRUE
NORTH
AREA B
Revisions: Date:
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT.
CONTRACTORS SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE COR.
EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATION SHALL BE FIELD VERIFIED AND REDLINED
VIA CONTRACTOR.
IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT BREAKERS
HAVE BEEN REPLACED AND/OR ADJUSTED, IMMEDIATELY
INFORM AND COORDINATE WITH VA AS REQUIRED.
REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF
REQUIRED.
REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR
ADDITIONAL INFORMATION.
WHERE PRACTICAL, RACEWAYS / CONDUCTORS SHALL BE
ROUTED VERTICALLY UP WALL AND HORIZONTALLY ON
CEILING TO PRESERVE WALL SPACE FOR FUTURE USE.
CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL
FEEDERS WHERE FEEDER RUNS EXCEED 250FT OR HAVE
MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE
PULL BOX LOCATIONS WITH ALL OBSTRUCTIONS, TRADES,
AND VA AS REQUIRED.
KEY PLAN
KEY NOTES
APPROXIMATE LOCATION OF MECHANICAL ROOM P-100 ON
FLOOR ABOVE. REFERENCE ENLARGED FLOOR PLANS ON
SHEET 001EP402 FOR ADDITIONAL INFORMATION.
PROVIDE BUILDING GROUNDING ELECTRODE SYSTEM
3-POINT FALL-OF-POTENTIAL TEST. GROUND RESISTANCE
TESTING SHALL BE PER VHA DIRECTIVE 1028-8.J(6)(e).
REFERENCE GROUNDING SPECIFICATION 26 05 26 FOR
ADDITIONAL INFORMATION.
1 BED ROOM
C-133
162 SF
2 BED ROOM
C-134
241 SF
1 BED ROOM
C-135
164 SF
2 BED ROOM
C-136
241 SF
2 BED ROOM
C-137
250 SF
2 BED ROOM
C-138
251 SF
2 BED ROOM
C-139
250 SF
2 BED ROOM
C-140
251 SF
2 BED ROOM
C-141
237 SF
2 BED ROOM
C-142
240 SF
2 BED ROOM
C-143
251 SF
2 BED ROOM
C-144
251 SF
1 BED ROOM
C-145
171 SF
1 BED ROOM
C-146
169 SF
CORRIDOR
C-26
651 SF
BATHROOM
C-146A
61 SF
TOILET
C-142A
50 SF
TOILET
C-138A
50 SF
TOILET
C-134A
50 SF
TOILET
C-133A
50 SF
TOILET
C-137A
50 SF
TOILET
C-141A
51 SF
BATHROOM
C-145A
60 SF
CORRIDOR
C-25
150 SF
CORRIDOR
C-24
610 SF
CORRIDOR
C-19
415 SF
CORRIDOR
C-22
552 SF
LINEN CLEAN
C-129
128 SF
EMS
STORAGE
C-130
155 SF
SOILED LINEN
C-131
60 SF
ELEC. ROOM
C-132
79 SF
TOILET
C-128A
114 SF
C-128B
31 SF
OFFICE
C-128C
73 SF
1 BED ROOM
C-128
333 SF
1 BED ROOM
C-126
329 SF
TOILET
C-126A
109 SF
C-126B
31 SF
OFFICE
C-126C
73 SF
HAC
C-127
22 SF
HAC
C-127A
62 SF
OMNI-CELL
STORAGE
C-125
94 SF
STAFF / CONF.
C-123
161 SF
BATH /
SHOWER
C-105
520 SF
MED
OMNI-CELL
C-121
72 SF
LAUNDRY
C-105A
47 SF
SOILED
UTILITY
C-107
85 SF
BATHROOM
C-109A
68 SF
2 BED ROOM
C-106
240 SF
2 BED ROOM
C-108
240 SF
2 BED ROOM
C-109
245 SF
2 BED ROOM
C-110
250 SF
2 BED ROOM
C-111
250 SF
2 BED ROOM
C-112
251 SF
2 BED ROOM
C-113
250 SF
2 BED ROOM
C-114
240 SF
2 BED ROOM
C-115
240 SF
2 BED ROOM
C-116
251 SF
2 BED ROOM
C-117
251 SF
1 BED ROOM
C-118
171 SF
1 BED ROOM
C-119
171 SF
CORRIDOR
C-120
652 SF
TOILET
C-111A
50 SF
TOILET
C-110A
50 SF
TOILET
C-114A
50 SF
TOILET
C-115A
50 SF
BATHROOM
C-119A
60 SF
BATHROOM
C-118A
60 SF
TOILET
C-106A
50 SF
1 BED ROOM
C-104
356 SF
TOILET
C-104A
109 SF
C-104B
27 SF
OFFICE
C-104C
73 SF
ELEC
C-102
28 SF
STORAGE
C-100A
18 SF
OFFICE
C-100B
90 SF
LOUNGE
C-100
210 SF
NURSE
STATION
C-20
217 SF
OFFICE,
CLERK
C-21
84 SF
OFFICE, HEAD
NURSE
C-124
108 SF
MEDICATION
C-122
67 SF TOILET,
STAFF
34 SF
KITCHEN,
NOURISH.
C-101
67 SF
CORRIDOR
C-18
395 SF
AREA A
SEE SHEET 001EP101a
AREA C
13 14
A B C D E
CONTINUE TO
SHEET 001EP102
EP501 TYP.
001-G-04
001-G-05
001-G-03
001EP401c
001EP401c
001-P-09
AREA SHOWN
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 8:24:17 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_01_EL_SDB.rvt
001EP101c
BLDG 001 - LEVEL 01 - AREA C - ELECTRICAL
PLAN
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
- 1" = 10'-0"
1 BLDG 001 - LEVEL 01 - AREA C - ELECTRICAL PLAN 0 10' 20'
PROJECT
NORTH
TRUE
NORTH
AREA C
Revisions: Date:
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT.
CONTRACTORS SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE COR.
EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATION SHALL BE FIELD VERIFIED AND REDLINED
VIA CONTRACTOR.
IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT BREAKERS
HAVE BEEN REPLACED AND/OR ADJUSTED, IMMEDIATELY
INFORM AND COORDINATE WITH VA AS REQUIRED.
REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF
REQUIRED.
REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR
ADDITIONAL INFORMATION.
WHERE PRACTICAL, RACEWAYS / CONDUCTORS SHALL BE
ROUTED VERTICALLY UP WALL AND HORIZONTALLY ON
CEILING TO PRESERVE WALL SPACE FOR FUTURE USE.
CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL
FEEDERS WHERE FEEDER RUNS EXCEED 250FT OR HAVE
MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE
PULL BOX LOCATIONS WITH ALL OBSTRUCTIONS, TRADES,
AND VA AS REQUIRED.
KEY PLAN
KEY NOTES
11 APPROXIMATE LOCATION OF MECHANICAL ROOM P-101 ON
FLOOR ABOVE. REFERENCE ENLARGED FLOOR PLANS ON
SHEET 001EP402 FOR ADDITIONAL INFORMATION.
PROVIDE BUILDING GROUNDING ELECTRODE SYSTEM
3-POINT FALL-OF-POTENTIAL TEST. GROUND RESISTANCE
TESTING SHALL BE PER VHA DIRECTIVE 1028-8.J(6)(e).
REFERENCE GROUNDING SPECIFICATION 26 05 26 FOR
ADDITIONAL INFORMATION.
13 14 15
F G H I J K L
30 31 32
A B C D E
M N O P Q
CONTINUE TO
SHEET 001EP101b
CONTINUE TO
SHEET 001EP101c
EP502
EP502TYP.
001-G-04
001-G-04
AREA SHOWN
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
30/10/2025 8:24:19 am
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_01_EL_SDB.rvt
001EP102
BLDG 001 - ROOF - LIGHTNING PROTECTION
PLAN
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
- 1" = 20'-0"
1 BLDG 001 - ROOF - LIGHTNING PROTECTION PLAN
TRUE
NORTH
0 10' 20'
PROJECT
NORTH
ROOF
Revisions: Date:
GENERAL NOTES
KEY PLAN
1.
2.
3.
4.
5.
6.
7.
8.
9.
PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT.
CONTRACTORS SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE COR.
EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATION SHALL BE FIELD VERIFIED AND REDLINED
VIA CONTRACTOR.
IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT BREAKERS
HAVE BEEN REPLACED AND/OR ADJUSTED, IMMEDIATELY
INFORM AND COORDINATE WITH VA AS REQUIRED.
REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF
REQUIRED.
REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR
ADDITIONAL INFORMATION.
WHERE PRACTICAL, RACEWAYS / CONDUCTORS SHALL BE
ROUTED VERTICALLY UP WALL AND HORIZONTALLY ON
CEILING TO PRESERVE WALL SPACE FOR FUTURE USE.
CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL
FEEDERS WHERE FEEDER RUNS EXCEED 250FT OR HAVE
MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE
PULL BOX LOCATIONS WITH ALL OBSTRUCTIONS, TRADES,
AND VA AS REQUIRED.
B
E F H I K LA C D
FINISH AREA
B-100
MENDING
B-101
STORAGE
B-102
STERILE PACK
B-103
TELE/COM
B-104
MECHANICAL ROOM
B-105
SUPERVISOR
B-106
HAC
B-107
WOMEN'S TOILET
B-108
MEN
B-109
LUNCH ROOM
B-110
MAINTENANCE REPAIR
B-111
STAFF
B-112
WAREHOUSE
B-113
SORT / WASH AREA
B-114
CORRIDOR
C1-4
CORRIDOR
C1-5
LIQUID SUPPLY & STORAGE
B-114A
CORRIDOR
C1-7
CORRIDOR
C1-6
T T T
PANEL '02-LLC' SEC 2
PANEL '02-LLC' SEC 1
G J
LINT COLLECTOR
30A DISCONNECT
PANEL '02-LHC'
002EP401
002EP401
CHILLER EQ.
PANEL '02-L1A'
MAIN FIRE RISER
PANEL '02-WL'
PANEL '02-WH'
XFMR (ABOVE)
75 kVA STEPDOWN
TRANSFORMER
PANEL '02-WHA' 1POWER POLE
XFMR'S ON
MEZZANINE
ABOVE
CONTINUE TO
SHEET 002EP102
CONTINUE TO
SHEET 002EP102
002-G-04 002-G-04
EP501 TYP.
PANEL '02-P1'
GENERAL STORES
A-100
ADMIN OFFICE
A-101
STORAGE
A-102
FORMS STORAGE / OFFICE
A-103
LOUNGE
A-104
ENTRY
A-104A
MEN
A-104B
WOMEN
A-104C
HAC
A-105
FACILITIES LOGISTIC MGR
A-106
WAREHOUSE SUPERVISOR
A-106A
SHOWER
C-100
SHOWER
C-101
LOCKERS
C-102
LOCKERS
C-103
STORAGE, SPD
C-104 PREPARATION
C-105
SOILED RECEIVING
C-106
HAC
C-107
CORRIDOR
C-1.10
HALL 2
C-1.11
HALL 1
C-1.12
SUPPLY
A-100A
STORAGE
A-100B
VAULT
A-100C
OFFICE
A-100D
SUPPLY
A-100D
CORRIDOR
C1-2
CONTINUE TO
002EP402
CONTINUE TO
003EP401
MAIN WATER
SERVICE PIPE
002-G-05
002-G-06
002-G-03
002-G-03
002-G-02
003-G-01
002-G-01
EP501
PANEL '02-L1A'
SEC 2
ELEC. ROOM
AREA SHOWN
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/30/2025 10:57:10 AM
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_02_EL_SDB.rvt
002EP101
BLDG 002 - LEVEL 01 - ELECTRICAL PLAN
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
- 1/16" = 1'-0"
1 BLDG 002 - LEVEL 01 - ELECTRICAL PLAN
TRUE
NORTH
0 10' 20'
PROJECT
NORTH
BLDG 002
Revisions: Date:
KEY PLAN
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT.
CONTRACTORS SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE COR.
EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATION SHALL BE FIELD VERIFIED AND REDLINED
VIA CONTRACTOR.
IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT BREAKERS
HAVE BEEN REPLACED AND/OR ADJUSTED, IMMEDIATELY
INFORM AND COORDINATE WITH VA AS REQUIRED.
REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF
REQUIRED.
REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR
ADDITIONAL INFORMATION.
WHERE PRACTICAL, RACEWAYS / CONDUCTORS SHALL BE
ROUTED VERTICALLY UP WALL AND HORIZONTALLY ON
CEILING TO PRESERVE WALL SPACE FOR FUTURE USE.
CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL
FEEDERS WHERE FEEDER RUNS EXCEED 250FT OR HAVE
MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE
PULL BOX LOCATIONS WITH ALL OBSTRUCTIONS, TRADES,
AND VA AS REQUIRED.
KEY NOTES
EXISTING PANELBOARD SHALL BE DEMOLISHED AND
REPLACED. PRESERVE ALL EXISTING CIRCUITS FOR
RETERMINATION. REFERENCE ONE-LINE DIAGRAMS ON
SHEETS 002ED601 AND 002EP601.
PROVIDE BUILDING GROUNDING ELECTRODE SYSTEM
3-POINT FALL-OF-POTENTIAL TEST. GROUND RESISTANCE
TESTING SHALL BE PER VHA DIRECTIVE 1028-8.J(6)(e).
REFERENCE GROUNDING SPECIFICATION 26 05 26 FOR
ADDITIONAL INFORMATION.
EXISTING EQUIPMENT CONTAINING OVERCURRENT
PROTECTIVE DEVICE WITH SETTINGS TO BE MODIFIED.
REFERENCE CORRESPONDING BUILDING ONE-LINE
DIAGRAMS AND PROTECTIVE DEVICE CHANGES SCHEDULE
FOR PROTECTIVE DEVICE SETTINGS ADJUSTMENTS AND / OR
REPLACEMENT.
CONTRACTOR SHALL PERFORM CIRCUIT TRACING TO
IDENTIFY UNKNOWN CIRCUIT BREAKER LOADS.
CONTRACTOR SHALL UPDATE CIRCUIT DIRECTORY WITH
IDENTIFIED LOAD. CIRCUIT DIRECTORY SHALL BE
TYPE-WRITTEN AND PRINTED, NOT HANDWRITTEN.
REFERENCE ASSOCIATED PANEL SCHEDULE FOR
ADDITIONAL INFORMATION.
002-G-05
IN OFFICE
A-101
EP501
B
E F H I K LA C D
G J
002EP402
CONTINUE TO
SHEET 002EP101
CONTINUE TO
SHEET 002EP101
EP502 TYP.
EP502
002-G-03
002-G-03
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/30/2025 8:15:38 AM
Autodesk Docs://648-20-116 VA WA Vancouver Electrical FCA/VAVW_02_EL_SDB.rvt
002EP102
BLDG 002 - ROOF - LIGHTNING PROTECTION
PLAN
DCW/LRL JGD/KDB
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
0 10' 20'
PROJECT
NORTH
TRUE
NORTH
- 1/16" = 1'-0"
1 BLDG 002 - ROOF - LIGHTNING PROTECTION PLAN
BLDG 002
Revisions: Date:
KEY PLAN
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT.
CONTRACTORS SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO THE COR.
EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATION SHALL BE FIELD VERIFIED AND REDLINED
VIA CONTRACTOR.
IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT BREAKERS
HAVE BEEN REPLACED AND/OR ADJUSTED, IMMEDIATELY
INFORM AND COORDINATE WITH VA AS REQUIRED.
REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF
REQUIRED.
REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR
ADDITIONAL INFORMATION.
WHERE PRACTICAL, RACEWAYS / CONDUCTORS SHALL BE
ROUTED VERTICALLY UP WALL AND HORIZONTALLY ON
CEILING TO PRESERVE WALL SPACE FOR FUTURE USE.
CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL
FEEDERS WHERE FEEDER RUNS EXCEED 250FT OR HAVE
MORE THAN 270…