(6)_Safety_Program_A_(1).pdf

PDF 83 KB Posted

Attached to
Hazardous Waste Removal Services
Solicitation number
HAZ2604A
Issued by
Los Angeles County, San Francisco City, California

About this file

This file is a Certification of Safety Program In-Place form required by the William S. Hart Union High School District for contractors bidding on construction and service projects. The document serves as a prerequisite condition for contractors to begin field work and confirms that all required safety programs, including those mandated by CAL-OSHA, are fully developed, implemented, and active prior to project initiation. The certification must be completed by an authorized representative of the contractor and submitted before any work commences on site. The form requires the contractor's company name as it appears on their contractor's license, the printed name and signature of an authorized signer, the project name, bid package number, and the date of certification.

The certification requirement applies to contractors working on projects managed by the William S. Hart Union High School District, including the Hazardous Waste Removal Services project (Package HAZ2604A). Contractors must hold an active class-type license, specifically Class A, B, C-12, C-21, C-36, C-57, or C-61/D40, along with a HAZ-Hazardous Substance Removal Certification to bid on hazardous waste removal work. This document is a mandatory contract form that establishes the contractor's compliance with safety program requirements as a condition of contract award and project performance.

View the file

Other files

File Type Posted
Hazardous_Waste_Removal_Services_(Addendum_#2_Revision).pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
(7)_Lead_Containing_176349_(1).pdf PDF
2-Certification_of_Safety_Program_(1).pdf PDF
Services_Agreement_for_RFP#_HAZ21-06A.pdf PDF
(10)_PWC100_DIR_INFO_(1).pdf PDF
(6)_Safety_Program_A_(1).pdf PDF
5-Conditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Invoices_-_Current_vendor_RFP#_HAZ21-06A.pdf PDF
Services_Agreement_for_RFP#_HAZ21-06A.pdf PDF
(2)_Perfomance_Bond_(1).pdf PDF
(4)_Drug_and_Tobacco_(1).pdf PDF
5-Conditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Blank_IRS_W-9_(2024).pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
(4)_Drug_and_Tobacco_(1).pdf PDF
6-Unconditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
(1)_Asbestos-Free_Materials.pdf PDF
(10)_PWC100_DIR_INFO_(1).pdf PDF
3-Conditional_Waiver_and_Release_(upon_Progress_Payment).pdf PDF
4-Unconditional_Waiver_and_Release_(Upon_Progress_Payment).pdf PDF
R_-_DOJ_-_Certification_of_Employee_Background_Check_5.8.2025.pdf PDF
Hazardous_Waste_Removal_Services.pdf PDF
Hazardous_Waste_Removal_Services_Agreement_3.2026_(2)Final.pdf PDF
Price_Work_Sheets_-_Exhibits_B,_C,_and_D_for_HAZ2604A.pdf PDF
Hazardous_Waste_Removal_Services_Agreement_3.2026_(2)Final.pdf PDF
Hazardous_Waste_Removal_Services_Agreement_3.2026_(2)Final.pdf PDF
Price_Work_Sheets_-_Exhibits_B,_C,_and_D_for_HAZ2604A.pdf PDF
Price_Work_Sheets_-_Exhibits_B,_C,_and_D_for_HAZ2604A.pdf PDF
HAZ2604A_-_PROJECT_MANUAL_3.05.26_(3)Final.pdf PDF
HAZ2604A_-_PROJECT_MANUAL_3.05.26_(3)Final.pdf PDF
(7)_Lead_Containing_176349_(1).pdf PDF
(3)_Payment_Bond_Blank_(1).pdf PDF
(4)_Drug_and_Tobacco_(1).pdf PDF
(2)_Perfomance_Bond_(1).pdf PDF
(5)_Company_Guarantee_to_Owner_(1).pdf PDF
(1)_Asbestos-Free_Materials.pdf PDF
(10)_PWC100_DIR_INFO_(1).pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
6-Unconditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method_&_Insurance).pdf PDF
CM-MP_Construction_Services_Agreement_2019_informal_and_formal_bids_CUPCCAA.pdf PDF
2-Certification_of_Safety_Program_(1).pdf PDF
3-Conditional_Waiver_and_Release_(upon_Progress_Payment).pdf PDF
GC_Construction_Services_Agreement_2019.pdf PDF
CM-MP_Construction_Services_Agreement_2019_informal_and_formal_bids_CUPCCAA.pdf PDF
4-Unconditional_Waiver_and_Release_(Upon_Progress_Payment).pdf PDF
Blank_IRS_W-9_(2024).pdf PDF
GC_Construction_Services_Agreement_2019.pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method_&_Insurance).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFICATION OF SAFETY PROGRAM IN-PLACE

To: William S. Hart Union High School District 21380 Centre Pointe Parkway Santa Clarita, CA 91350

PROJECT: _______________________________________________________________________________________

Bid Package: ________________________

I understand that, prior to initiating any work in the field, each Contractor is required to develop and fully implement safety program(s), as required by law, to include but not limited to CAL-OSHA requirements.

I hereby certify, as a condition precedent to being allowed to start work in the field, that all required safety programs are, as of this date, in-place and active.

Company Name of Contractor (exactly as it appears on Contractor’s License)

Print or Type Name of Authorized Signer

Signature of Prime Contractor Dated

This Certification is to be provided by Contractor prior to start of any work in the field)

William S. Hart Union High School District Project __________________

Bid Package ______________

Required Contract Forms

Company Name of Contractor exactly as it appears on Contractors License:
Print or Type Name of Authorized Signer:
Dated:
Bid Package:
Project:

File details come from the government source that posted it. Updated .