(1)_Asbestos-Free_Materials.pdf

PDF 178 KB Posted

Attached to
Hazardous Waste Removal Services
Solicitation number
HAZ2604A
Issued by
Los Angeles County, San Francisco City, California

About this file

This is a Certification of Asbestos-Free Material form required by the William S. Hart Union High School District for construction projects and bid packages. The certification document mandates that contractors affirm no asbestos or asbestos-containing products will be incorporated, used, or brought to the project site in any form, including in tools, devices, clothing, or equipment. The form specifically defines asbestos-containing materials as those with items containing chrysotile, crocidolite, amosite, anthophyllite, tremolite, and actinolite, with particular attention to materials containing greater than one-tenth of one percent of these substances.

This document serves as a compliance requirement within the broader Hazardous Waste Removal Services contract (Package HAZ2604A) solicitation. Contractors bidding on this three-year hazardous waste removal contract with the District must execute this certification as a mandatory condition of bid submission. The asbestos-free certification aligns with the District's comprehensive safety and regulatory compliance framework, which includes prevailing wage requirements, California Department of Industrial Relations registration, workers' compensation insurance, and employee background clearances. All bidders must acknowledge and certify compliance with this asbestos-free requirement as part of their overall contractual obligations.

View the file

Other files

File Type Posted
Hazardous_Waste_Removal_Services_(Addendum_#2_Revision).pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
(7)_Lead_Containing_176349_(1).pdf PDF
2-Certification_of_Safety_Program_(1).pdf PDF
Services_Agreement_for_RFP#_HAZ21-06A.pdf PDF
(10)_PWC100_DIR_INFO_(1).pdf PDF
(6)_Safety_Program_A_(1).pdf PDF
5-Conditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Invoices_-_Current_vendor_RFP#_HAZ21-06A.pdf PDF
Services_Agreement_for_RFP#_HAZ21-06A.pdf PDF
(2)_Perfomance_Bond_(1).pdf PDF
(4)_Drug_and_Tobacco_(1).pdf PDF
5-Conditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Blank_IRS_W-9_(2024).pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
(4)_Drug_and_Tobacco_(1).pdf PDF
6-Unconditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
(1)_Asbestos-Free_Materials.pdf PDF
(10)_PWC100_DIR_INFO_(1).pdf PDF
3-Conditional_Waiver_and_Release_(upon_Progress_Payment).pdf PDF
4-Unconditional_Waiver_and_Release_(Upon_Progress_Payment).pdf PDF
Hazardous_Waste_Removal_Services.pdf PDF
Hazardous_Waste_Removal_Services_Agreement_3.2026_(2)Final.pdf PDF
Price_Work_Sheets_-_Exhibits_B,_C,_and_D_for_HAZ2604A.pdf PDF
Hazardous_Waste_Removal_Services_Agreement_3.2026_(2)Final.pdf PDF
Hazardous_Waste_Removal_Services_Agreement_3.2026_(2)Final.pdf PDF
Price_Work_Sheets_-_Exhibits_B,_C,_and_D_for_HAZ2604A.pdf PDF
Price_Work_Sheets_-_Exhibits_B,_C,_and_D_for_HAZ2604A.pdf PDF
HAZ2604A_-_PROJECT_MANUAL_3.05.26_(3)Final.pdf PDF
HAZ2604A_-_PROJECT_MANUAL_3.05.26_(3)Final.pdf PDF
(7)_Lead_Containing_176349_(1).pdf PDF
(3)_Payment_Bond_Blank_(1).pdf PDF
(4)_Drug_and_Tobacco_(1).pdf PDF
(2)_Perfomance_Bond_(1).pdf PDF
(5)_Company_Guarantee_to_Owner_(1).pdf PDF
(6)_Safety_Program_A_(1).pdf PDF
(1)_Asbestos-Free_Materials.pdf PDF
(10)_PWC100_DIR_INFO_(1).pdf PDF
(11)_Workers_Compensation_Exemption_Declaration_Construction_(1).pdf PDF
6-Unconditional_Waiver_and_Release_(Upon_Final_Payment).pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method_&_Insurance).pdf PDF
CM-MP_Construction_Services_Agreement_2019_informal_and_formal_bids_CUPCCAA.pdf PDF
2-Certification_of_Safety_Program_(1).pdf PDF
3-Conditional_Waiver_and_Release_(upon_Progress_Payment).pdf PDF
GC_Construction_Services_Agreement_2019.pdf PDF
CM-MP_Construction_Services_Agreement_2019_informal_and_formal_bids_CUPCCAA.pdf PDF
4-Unconditional_Waiver_and_Release_(Upon_Progress_Payment).pdf PDF
Blank_IRS_W-9_(2024).pdf PDF
GC_Construction_Services_Agreement_2019.pdf PDF
Agree__Hart__Front_End_GC__General_Provisions_Rev_6.26.23JF_(Rev_6.21.24_Added_Blue_Beam_Illustration_Method_&_Insurance).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project __________________________ Required Contract Forms William S. Hart Union High School District Bid Package ____________________

CERTIFICATION OF ASBESTOS-FREE MATERIAL

PROJECT: ___________________________________________________________________

Bid Package: ___________________________

WE HEREBY CERTIFY THAT NO ASBESTOS OR ASBESTOS-CONTAINING PRODUCTS SHALL

BE INCORPORATED OR USED IN THIS CONSTRUCTION OR IN ANY TOOLS, DEVICES, CLOTHING

OR EQUIPMENT USED TO EFFECT THIS CONSTRUCTION.

Asbestos and/or asbestos-containing products as defined as all items containing but not limited to chrysotile, crocidolite, amosite, anthopyhllite, tremolite and actinolite.

Any or all material containing greater than one-tenth of one percent (<.1%) asbestos shall be defined as asbestos-containing material.

Any disputes involving the question of whether or not material installed with asbestos-containing equipment is settled by electron microscopy; the cost of any such tests shall be paid by the

Prime Contractor.

All work or materials installed by the Prime Contractor which is found to contain asbestos, or work or material installed with asbestos-containing equipment, will be immediately rejected and this work shall be removed and replaced by the Prime Contractor at no additional cost to the Owner.

Decontamination and removal of work found to contain asbestos or work installed with asbestos-containing equipment shall be done only under supervision of a qualified consultant, knowledgeable in the field of asbestos abatement and accredited by the Environmental Protection Agency (EPA).

The ASBESTOS REMOVAL CONTRACTOR shall be an EPA accredited contractor qualified in the removal of asbestos and shall be approved by the Asbestos Consultant who shall have sole discretion and final determination in this matter.

The asbestos consultant shall be chosen and approved by the Architect who shall have sole discretion and final determination in this matter.

The work will not be accepted until asbestos contamination is reduced to levels deemed acceptable by the Asbestos Consultant.

Company Name of Contractor (exactly as it appears on Contractor’s License)

Print or Type Name of Authorized Signer

Signature of Prime Contractor Dated

PROJECT:
Company Name of Contractor exactly as it appears on Contractors License:
Print or Type Name of Authorized Signer:
Text1:
Bid Package:

File details come from the government source that posted it. Updated .