This document is a contract area map for the BCLH Stewardship IRSC Phase 3 project located in the Willamette National Forest near Detroit, Oregon. The map details 1,843 acres of treatment areas within burn scars from the 2020 Beachie Creek and Lionshead Fires, covering mandatory and optional subdivisions with specific road usage restrictions and treatment requirements. The project involves cutting and removing fire-killed timber within 100 feet of roads, performing hazard tree mitigation, small fuels treatment, road reconstruction, and road maintenance, with an estimated 16,850 tons of timber volume for mandatory acres and 23,622 tons for optional acres.
The contract's period of performance runs from the award date through October 15, 2029, with staggered deadlines for mandatory and optional work. Key project objectives include reducing hazardous fuel risks along fire-affected road systems and restoring access through burned areas. A site visit is scheduled for April 1, 2025, at the Detroit Ranger Station, and the contract will be awarded using a best value source selection method. Technical proposals are required, and the contract will be a firm, fixed-price agreement subject to Service Contract Act and Davis-Bacon Wage Determinations, with construction bonding requirements of a 20% bid bond and 100% payment and performance bonds.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Æ_
Æ_
Æ_ Æ_
Æ_ÆQ
ÆI
BC-3
BC-4
BC-5
LH-7ALH-7
LH-10
BC-2
LH-7B
BC-2B
BC-2A
BC-6
LH-7AA
LH-7C
BC-7
LH-7AB
BC-2BB
3 1
5 4
4 5
6 4
126 4 3
145 23 6 5 3 2 1 6 4
3 2
34 3536
28 25
1516171813
16171314 32151617
636633
203 133
697504
270307
110 465
T 0 8 S
T 0 9 S
T 1 0 S
T 0 8 S
T 1 1 S
T 1 1 S
T 0 9 S
R 06 ER 05 ER 03 E
R 04 E R 05 E R 06 E
R 04 E
Hwy 22
R0 1 20.5 Miles
TJR - 3/10/2025
Hwy 22
Portland
BendEugene
Roseburg
§̈¦80
§̈¦5
§̈¦5 ¬«97
¬«97
¬«58
Willamette National Forest
BCLH Phase 3 DxP IRSC Project Area
¬«58
¬«22
¬«20
¬«126
Bull of the Woods Wilderness
BCLH Phase 3 DxP IRSC Contract Area Map
Detroit Ranger District Willamette National Forest
Contract Provision References C5.12# Use of Roads by Purchaser: Applies to All Roads Identified on the Contract Area Map and as Agreed to by Forest Service Appendix A.II.1 & 2 - Applies to All Subdivisions Appendix A.II.3 - Pay Item 4 & 11- Slash Treatment Requirements: Applies to All Subdivisions
§̈¦80
ÆQ Campground
!. Gate
ÆI Picnic Site
Æ_ Trailhead
}} }} }} Powerlines
Opal Creek SRA
BC-2
BC-2A
BC-2B
BC-2BB
BC-3
BC-4
BC-5
BC-6
BC-7
LH-10
LH-7
LH-7A
LH-7AA
LH-7AB
LH-7B
LH-7C
BCLH Phase 3 DxP IRSC Boundary
Waterbody
! ! ! ! ! Protect Streams
PRIVATE
Wilderness
# Subdivision
Road Name From To 2207000 CEDAR CREEK RD. Mand atory 0.00 16.37 X 1,3,4 2209000 ELKHORN RD. Mand atory 0.00 5.43 R 2,3,4 2209201 ELKHORN RIDGE RD. Mand atory 0.00 7.78 R 1,3,4 2223000 FRENCH CREEK RD. Mand atory 0.00 1.63 R 1,3,4 2225000 MARTEN BUTTE RD. Mand atory 0.00 9.39 R 1,3,4 4600000 BREITENBUSH RD. Mand atory 0.00 11.80 R 1,3,4
4685000 SOUTH
BREITENBUSH RD. Mand atory 0.00 0.15 R 1,3,4,5 2225450 CANY ON CREEK RD. Optional 0.00 1.30 R 1,3,4 2225458 BY ARS P EAK RD. Optional 0.00 3.70 R 1,3,4 2225461 NO NAME Optional 0.00 0.95 R 1,3,4 4695000 WIND CREEK Optional 0.00 5.20 R 1,3,4 4695110 SLIDE CREEK Optional 0.00 1.64 R 1,3,4 4695120 UP P ER SLIDE CREEK Optional 0.00 2.98 R 1,3,4 4695130 HOOVERS RIDGE Optional 0.00 4.04 R 1,3,4 4695132 NO NAME Optional 0.00 1.02 R 1,3,4 4695133 NO NAME Optional 0.00 0.28 R 1,3,4 4696701 NO NAME Optional 0.00 4.39 R 1,3,4
4. Keep Open— Roa d is to rem ain open and accessible at all tim es to fire suppression resources. This includ es nights and weekend s.
5. Sum m er Weekend Haul— Hauling is restricted on weekend s starting at 1700 Frid ay through 2400 Sund ay. Hauling on Fed eral Holid ays is restricted if holid ay is on a Frid ay or Mond ay. This restriction is effective Mem orial Day through Labor Day.
X: Hauling prohibited R: Hauling restricted U: Unsuitable for hauling prior to com pletion of agree d reconstruction P: Use prohibited A: P ublic use restriction W: Regulation waiver
The cond itional use is lim ited to the specific road segm ents where the ad d itional aggregate is placed and associated operations for the ad jacent units. Cond itional use approval d oes not apply to the entire road length.
3. P re-haul— Roa d is unsuitable for hauling prior to all pre-haul road m aintenance requirem ents id entifie d in C5.31# being com pleted and accepted .
1. Dry Season Only — Road use m ay only occur d uring the norm al operating period (May 15 through October 15)
2. Cond itional Use Road — This road has lim ited strength and is likely to be d am aged if used when ad verse cond itions exist in the road bed .
Road use d uring the wet season (approxim ately October 16 through May 14) is not perm itted unless Operational rock identified in contract under pay item 30109 has been placed and approved by CO. Operational rock to be capped with surface aggregate identified in contract under pay item 30115 after operations are complete.
-P aved road s are restricted to rubber tire or rubber tracke d equipm ent only.
-Skid d ing is not perm itted on all paved and aggregate road s and brid ges.
-Ditches shall always be free from logs and brush.
Description of
Restrictions
Associated with Optional or Mandatory Subdivision
Restrictions
-All road reconstruction and pre and post haul m aintenance work is to occur d uring the d ry season (May 15 to October 15).
-Road closed by gates are to rem ain closed at all tim es except d uring period s of active haul, unless otherwise agree d .
-All Forest Service Brid ges— Use of road by com m ercial users with loa d s excee d ing Oregon state legal loa d ing for a Single Trip P erm it and that will cross brid ges und er Forest Service jurisd iction shall apply for a Brid ge Overloa d P erm it (FSM 7736.05). A State highway overloa d perm it (issued by ODOT, WSDOT) is not a valid perm it for crossing Forest Service brid ges. Brid ge perm it processing m ay take up to 30 d ays.
All roads -All use to be in accordance with Willamette National Forest Commercial Road Rules, dated December 2016.
-P urchaser is required to m onitor road cond itions and perform erosion control m itigation or m aintenance work as nee d e d . Road use shall be suspend e d d uring period s of heavy rainfall to prevent sed im entation from entering stream courses or if use is causing road d istress, road d am age or environm ental d am age as d e fine d in the 2016 Willam ette National Forest Road Rules.
Map Legend / Code Use Limitations
Road Number
Termini Map Legend
Subdivision # B1.1
Total Tree Felling Ac.
App. A.II.2 - Pay Item 1&2
Total Required Fuels
Treamtent (0- 30') App. A.II.3
- Pay Item 4
BC-2 145 68
BC-3 278 112
BC-4 76 39
BC-5 145 53
TOTAL 644 272
Subdivision # B1.1
Total Tree Felling Ac.
App. A.II.2 - Pay Item 8&9
Total Required Fuels
Treamtent (0- 30') App. A.II.3
- Pay Item 11
BC-2A 19 7
BC-2B 34 17
BC-2BB 5 3
BC-6 4 1
BC-7 2 1
LH-10 48 19
LH-7 94 37
LH-7A 65 29
LH-7AA 5 2
LH-7AB 17 7
LH-7B 42 19
LH-7C 13 6
TOTAL 348 148
Optional Subdivisions
Mandatory Subdivisions
File details come from the government source that posted it. Updated .