This is an RLP (Request for Lease Proposal) Exhibit O template addressing swing space requirements for a federal lease procurement in Buffalo, Wyoming. The document provides instructions and requirements for offerors to propose temporary swing space solutions to house government operations during renovations of the primary leased space.
The GSA seeks to lease office (16,018–16,861 sq. ft.), warehouse/light industrial (6,242–6,570 sq. ft.), and wareyard (minimum 19,380 sq. ft.) space in Buffalo, WY for an estimated occupancy of Fall 2028, with a full 20-year firm term. Offerors must submit a comprehensive swing space plan as part of their initial offer, including: a detailed narrative demonstrating how renovations will proceed with minimal disruption to BLM operations; computer-generated floor plans at 1/8" = 1'0" scale showing swing space blocks and finishes; and a schedule addressing all interim moves and phasing aligned with lease requirements. Swing space must functionally meet current operational needs for office, warehouse, and wareyard functions and must not interfere with fire season operations (April–October). The incumbent lessor is responsible for all moving costs except one final move per government employee, which the Government will cover. Offerors must demonstrate ownership of proposed swing space through deed or an executed Letter of Intent reflecting a lease term coterminous with renovation completion. Offers are due January 8, 2027, and must be submitted electronically through the GSA Leasing Portal. The Lease Contracting Officer is Darrin Hotaling, with Timothy Pavek serving as Broker Contractor.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RLP EXHIBIT O SWING SPACE
ACTION REQUIRED: TO BE INCLUDED IN CONJUNCTION WITH LEASE EXHIBIT SWING SPACE WHEN THE CURRENTLY-OCCUPIED GOVERNMENT SPACE IS A POTENTIAL HOUSING SOLUTION FOR THE NEW PROCUREMENT AND ANTICIPATED RENOVATIONS ARE EXPECTED TO DISRUPT TENANT OPERATIONS.
ACTION REQUIRED: IF INCLUDING “SWING SPACE - RLP” ANY SUBMITTAL MUST BE INCLUDED IN THE RLP SUBMITTALS. FINAL NEGOTIATED DOCUMENTS MUST BE INCORPORATED AS AN EXHIBIT IN THE LEASE CONTRACT.
NOTE: SWING SPACE GUIDANCE AND CONSIDERATIONS ARE AVAILABLE INTERNALLY here. THE LCO MUST CONFIRM SWING SPACE REQUIREMENTS WITH THE CUSTOMER AGENCY BEFORE INCLUDING THIS PARAGRAPH. REQUIREMENTS MUST INCLUDE THE NUMBER OF GOVERNMENT STAFF MEMBER MOVES, E.G., NUMBER OF STAFF MEMBERS, FUNCTIONAL GROUPS TO MOVE (WITH NUMBER OF INDIVIDUALS). THIS LANGUAGE MAY NEED TO BE ALTERED BASED ON THE CIRCUMSTANCES OF THE PROCUREMENT AND AGENCY REQUIREMENTS. CHANGES MUST BE REVIEWED BY THE OFFICE OF GENERAL COUNSEL – LEASING DIVISION (OGC – LR) FOR LEGAL SUFFICIENCY PRIOR TO FINALIZING.
NOTE: SWING SPACE REQUIREMENTS MAY IMPACT THE INCUMBENT LESSOR’S RENTAL RATE AND SHOULD NOT EXCEED WHAT IS MINIMALLY REQUIRED BY THE AGENCY TO PERFORM ITS MISSION.
NOTE: IF THE GOVERNMENT IS AWARE OF DEFICIENCIES WITH THE INCUBMENT BUILDING THAT NEEDS TO BE ADDRESSED DURING RENOVATIONS, PROVIDE THE DEFICIENCIES IN B. 1. OR AS A SEPARATE ATTACHMENT.
SS 1.01 SWING SPACE - RLP (MAY 2026)
A. A renovation of the Space at the current location will be required to meet all the requirements of this RLP package, including the schedule requirements outlined under the Lease. The RLP package outlines a level of base building/shell requirements, tenant improvements and BSAC that will require all or portions of the Space to be vacant during renovations.
B. As part of the initial offer, the incumbent Lessor must submit a plan and schedule outlining specific swing space alternatives meeting the requirements stated herein and under Lease paragraph “Swing Space - Lease.” Any plan or schedule that does not efficiently or timely house the Government’s requirements or fails to adequately prevent disruption of Government operations may be rejected and the offer may be considered technically unacceptable. The swing space plan and schedule must include, at a minimum, the following:
1. Detailed narrative demonstrating how renovations are proposed at the current location in accordance with all of the requirements of this RLP package, including requirements set forth in this paragraph and Lease Exhibit Swing Space. Narrative must clearly identify the number of Government staff member moves and outline how renovations will occur with minimum disruption and interference with ongoing Government operations;
2. Floor plan (computer generated plans set to 1/8” = 1’0” preferred) indicating block(s) of swing space including swing space finishes; and
3. Schedule of swing space and final Space to address interim moves demonstrating adherence to Lease schedule, inclusive of all phases, commissioning, and testing requirements.
ACTION REQUIRED: THERE ARE TWO VERSIONS OF SUB-PARAGRAPH C. CHOOSE THE FIRST IF ATTACHING AGENCY SPECIFIC “SWING SPACE REQUIREMENTS.” CHOOSE THE SECOND SUBPARAGRAPH C TO LIST THE AGENCY’S MINIMUM SWING SPACE REQUIREMENTS, E.G., CONTIGUOUS SPACE ON SAME FLOOR, SQUARE FOOTAGE, FINISH REQUIREMENTS, MINIMUM NUMBER OF CONFERENCE ROOMS, BENCH SEATING, FILE STORAGE ROOM, TELE/DATA THAT MUST BE MET.
VERSION 1:
C. ========================================================
VERSION 2:
Swing space must meet the following: Comment by TimothyJPavek: Need GSA and BLM input
1. Office: must functionally meet the current operational needs of BLM and provide a swing space floor plan and phasing plan if applicable. The swing space plan will be reviewed and evaluated as part of the initial offer technical review. Necessary swing space modifications will be discussed during the initial offer DID review and discussion session with Offeror.
2. Warehouse: must functionally meet the current operational needs of BLM and provide a swing space floor plan and phasing plan if applicable. The swing space plan will be reviewed and evaluated as part of the initial offer technical review. Necessary swing space modifications will be discussed during the initial offer DID review and discussion session with Offeror._______________________
3. Wareyard: must functionally meet the current operational needs of BLM and provide a swing space floor plan and phasing plan if applicable. The swing space plan will be reviewed and evaluated as part of the initial offer technical review. Necessary swing space modifications will be discussed during the initial offer DID review and discussion session with Offeror
4. On-site renovations must NOT interfere with fire season operations (April through October).._______________________
ACTION REQUIRED: THERE ARE TWO VERSIONS OF SUB-PARAGRAPH D. CHOOSE THE FIRST IF THE SWING SPACE MUST BE LOCATED IN THE CURRENTLY OCCUPIED BUILDING. CHOOSE THE SECOND SUB-PARAGRAPH D IF SWING SPACE CAN BE LOCATED ANYWHERE IN THE SWING SPACE DELINEATED AREA; OTHERWISE DELETE IF THE SWING SPACE NEEDS TO BE OFFERED ONLY IN THE CURRENT LEASED LOCATION.
VERSION 1:
D. Swing space must be located within the area of consideration cited in RLP Paragraph 1.03.
VERSION 2:
E. Offeror shall demonstrate ownership of the proposed swing space through deed or other valid document. If the incumbent is not the owner of the offered property for swing space, an executed Letter of Intent for leasing such swing space to the Offeror, reflecting a minimum lease term coterminous with the completion of the renovation of the Space, must be submitted no later than Final Proposal Revisions. If selected, control through ownership, lease, or binding option of such specific alternatives must be demonstrated within thirty (30) days after Lease Award.
F. The Government reserves the right to require a single group of employees (including contractor personnel) or successive groups of the Government employees to be moved into and out of the swing space, based upon the Incumbent Lessor's proposal. The Government must be responsible for the cost of moving each Government employee one time only, which must be identified as the last and final move from the swing space to the final Space. The Incumbent Lessor must be responsible for the cost of all moves, interim moves, and restacking in excess of one move per Government employee.
ACTION REQUIRED: INCLUDE IF REQUIRING THE SPACE LAYOUT PRIOR TO LEASE AWARD; DELETE IF REQUIRING SPACE LAYOUT AFTER LEASE AWARD.
G. Prior to Final Proposal Revisions, the Incumbent Lessor must submit a swing space layout that allows the Government to function efficiently during renovation of final Space, as determined by the LCO.
SS 1.02 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS – SWING SPACE (FEB 2026)
The following is added to the RLP paragraph titled: “Instructions for Offeror and Submittals” as a requirement and additional submittal.
| Document Name |
| Exhibit O: Swing Space |
| Swing Space Submittals |
| SS 1.01 |
Document Change History
| Template Date |
| Description of change |
| FEB 2026 |
| Newly created exhibit to supplement streamlined changes to R100. Updates to change “shall” to “must.” |
| MAY 2026 |
| Update blue instructional text to correct reference to Lease Exhibit for Swing Space and organizational change to Office of General Counsel. Update 1.01 to correct reference to Lease Exhibit for Swing Space. |
RLP NO. 5WY0078, PAGE 2
GSA TEMPLATE R100, SWING SPACE EXHIBIT O (5/26)
File details come from the government source that posted it. Updated .