ExhK_RLP - Net Utilities (May 2026)_5WY0078 Buffalo.pdf

PDF 79 KB Posted

Attached to
General Services Administration (GSA) seeks to lease Office, Warehouse and Secured Wareyard space in Buffalo, WY
Solicitation number
5WY0078
Issued by

About this file

GSA Real Property Lease Exhibit K: Net of Utilities

This is a GSA Template R100 exhibit specifying requirements for real property lease solicitations where utilities are separated from rental costs. The document establishes mandatory submittal requirements effective February 2026 for offerors proposing lease space with utilities excluded from the rental consideration.

Offerors must specify which utilities, if any, are excluded from rental charges and must submit a statement from a registered professional engineer confirming that all HVAC, plumbing, and energy-intensive building systems can operate under the lease control conditions. The engineer's statement must identify any building systems that do not conform to ANSI/ASHRAE Standard 90.1 performance values or more restrictive state and local codes. Additionally, offerors must submit a building operating plan detailing startup and shutdown schedules for all building systems including lighting, HVAC, and plumbing, with the plan effective on the lease term commencement date. The required documentation is designated as Exhibit K: Net Utilities under submittal requirement NU 1.01.

View the file

Other files

File Type Posted
ExhJ_RLP-Broker Project_5WY0078 Buffalo.pdf PDF
ExhF2_Prelease FPLS Evaluation Form 12000WH Part A_RLP 5WY0078 Buffalo.docx DOCX document
ExhI_DB Wage 260618 Johnson County_RLP 5WY0078 Buffalo.pdf PDF
ExhG2_TICS Feb2026 Template_5WY0078 Buffalo.xlsx XLSX spreadsheet
ExhM_RLP - New Construction (May 2026)_5WY0078 Buffalo.pdf PDF
ExhO_Swing Space_RLP 5WY0078 Buffalo.docx DOCX document
ExhC_FSL2 Security Requirements_RLP 5WY0078 Buffalo.pdf PDF
ExhF1_Prelease FPLS Evaluation Form 12000 Part A_RLP 5WY0078 Buffalo.docx DOCX document
ExhH_Form 1364 Spreadsheet_5WY0078 Buffalo.xlsx XLSX spreadsheet
ExhA_L100 Template_RLP 5WY0078 Buffalo.pdf PDF
Request for Lease Proposal (RLP) R100_5WY0078 Buffalo.pdf PDF
ExhQ_PPQ Ref Check_RLP 5WY0078 Buffalo.docx DOCX document
ExhN_Lease - New Construction (Feb. 2026)_RLP 5WY0078 Buffalo.pdf PDF
ExhE_3517B General Clauses APR26_RLP 5WY0078 Buffalo.pdf PDF
ExhR_Sensitive RLP Information_RLP 5WY0078 Buffalo.pdf PDF
ExhD_3516 Solicitation Provisions (Mar. 2026)_RLP 5WY0078 Buffalo.pdf PDF
ExhG1_Security Unit Price List FSL II (Oct 2024)_RLP 5WY0078 Buffalo.pdf PDF
ExhB_ASR 260605_RLP 5WY0078 Buffalo.pdf PDF
ExhG1_Security Unit Price List FSL II (Oct 2024)_RLP 5WY0078 Buffalo.xlsx XLSX spreadsheet
ExhP_Lease-Swing Space_5WY0078 Buffalo.pdf PDF
ExhL_Lease - Net Utilities (Feb. 2026)_RLP 5WY0078 Buffalo.pdf PDF
ExhS_Lease Broker Project Exhibit_RLP 5WY0078 Buffalo.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RLP NO. XXXXXXX, PAGE 1 GSA TEMPLATE R100, NET of

UTILITIES EXHIBIT X (5/26)

RLP EXHIBIT K NET of UTILITIES

NU 1.01 UTILITIES SEPARATE FROM RENTAL / BUILDING OPERATING PLAN (FEB 2026)

The Offeror must specify which utilities, if any, are excluded from the rental consideration. If any such utilities are excluded, the Offeror must obtain a statement from a registered professional engineer stating that all HVAC, plumbing, and other energy intensive Building systems can operate under the control conditions stated in the Lease. The statement must also identify all Building systems that do not conform to the system performance values, including the "recommended" or "suggested" values of ANSI/ASHRAE Standard 90.1, “Energy Efficient Design of New Buildings Except Low Rise Residential Buildings,” or more restrictive state and local codes.

The Offeror must submit a building operating plan with the offer. Such plan must include a schedule of startup and shutdown times for operation of each building system, such as lighting, HVAC, and plumbing. Such plan must be in effect on the Lease Term Commencement Date.

NU 1.02 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS – NET UTILITIES (FEB 2026)

The following is added to the RLP paragraph titled: “Instructions for Offeror and Submittals” as a requirement and additional submittal.

Document Name Exhibit K: Net Utilities

Utilities Separate from Rent Documentation NU 1.01

File details come from the government source that posted it. Updated .