Bid Documents Summary
These are bid documents for a U.S. Department of Veterans Affairs (VA) construction project at the Eugene J. Towbin Healthcare Center in North Little Rock, Arkansas. The project, identified as VA Project No. 598-19-112, involves the replacement of underground 15KV feeder separable connectors and transformers serving the facility at 2200 Fort Roots Drive, Building 1. The work includes transformer replacement in existing locations, manhole refurbishment with cable splice replacement, installation of new sectionalizers with concrete pads, and bollard installations for safety. The design is based on 2021 International Building Code standards, ANSI/ASCE 7-16 seismic requirements, and VA-specific design manuals. Design loads include wind speeds of 117 mph (Risk Category IV), seismic design category D, and equipment specifications detailed in structural and electrical drawings.
The project scope comprises five electrical feeder loops serving multiple transformers, manholes, and associated infrastructure across the campus. Key deliverables include structural concrete details for equipment pads and foundations, electrical details for transformer installations and sectionalizer connections, and comprehensive utility plans showing the location of all components. The contractor must coordinate with existing utilities, field-verify all dimensions and conditions, and complete an electrical as-built table documenting feeder loop information. Structural requirements mandate 4,000 PSI concrete, professional geotechnical engineering oversight, and proper equipment anchorage for wind and seismic loads. All work must comply with NFPA 70-2023 National Electrical Code, ANSI C2-2020 National Electrical Safety Code, and VA maintenance and operations standards for equipment compatibility and interchangeability.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EUGENE J. TOWBIN HEALTHCARE CENTER -
REPLACE UNDERGROUND 15KV FEEDER
SEPARABLE CONNECTORS AND
TRANSFORMERS
2200 FORT ROOTS DRIVE,
NORTH LITTLE ROCK, AR 72114
598-19-112
As Shown Project Director
07/31/2025Revisions: Date: F.KEELS J.POWELL
PROJECT 598-19-112 "REPLACE
UNDERGROUND 15KV FEEDERS AND
TRANSFORMERS" NAME WAS REVISED TO
REFLECT AN APPROVED SCOPE CHANGE.
G001
REPLACE UNDERGROUND 15KV FEEDER SEPARABLE
CONNECTORS AND TRANSFORMERS
EUGENE J. TOWBIN HEALTHCARE CENTER
2200 FORT ROOTS DRIVE, BUILDING 1, NORTH LITTLE ROCK, AR 72114
VA PROJECT NO. 598-19-112
BID DOCUMENTS
TRUE
NORTH
AREA MAP
NOT TO SCALE
PROJECT LOCATION PROJECT LOCATION
TRUE
NORTH
LOCATION MAP
NOT TO SCALE
COVER SHEET
SHEET INDEX
G001
SHEET
NO.
DRAWING TITLE
GENERAL
COVER SHEET
ELECTRICAL
ELECTRICAL GENERAL NOTESE001
STRUCTURAL
STRUCTURAL NOTESS001
CONCRETE DETAILSS301
ELECTRICAL DETAILSE501
ELECTRICAL DETAILSE502
OVERALL UTILITY PLANE101
ENLARGED PLAN - NEW WORK - LOOP 1E401
ELECTRICAL AS-BUILT TABLEE503
E402 E403 E404 E405 E406
ENLARGED PLAN - NEW WORK - LOOP 2
ENLARGED PLAN - NEW WORK - LOOP 3
ENLARGED PLAN - NEW WORK - LOOP 4
ENLARGED PLAN - NEW WORK - LOOP 5-1
ENLARGED PLAN - NEW WORK - LOOP 5-2
Joseph Powell Model
DESIGN CODES
1.01 2021 INTERNATIONAL BUILDING CODE (IBC) AS MODIFIED BY:
A. ANSI/ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
B. VA SEISMIC DESIGN REQUIREMENTS H-18-8, 2020 EDITION
C. VA STRUCTURAL DESIGN MANUAL FOR HOSPITALS, OCTOBER 1, 2022
1.02 AMERICAN CONCRETE INSTITUTE (ACI)
A. ACI 318-19 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
1.03 VA CRITERIA
A. STRUCTURAL DESIGN MANUAL OCTOBER 1, 2022
B. VA SEISMIC DESIGN MANUAL VA18-8 MAY 1, 2020
C. VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL JUNE 1, 2023
DESIGN LOADS
1.01 DESIGN LOADS ARE AS FOLLOWS:
A. DEAD LOADS:
a. EQUIPMENT PADS: SELF WEIGHT OF MATERIALS
b. SECTIONALIZERS AND TRANSFORMERS: SEE BELOW
B. LIVE LOADS
1. YARDS AND TERRACES = 60 PSF
C. RAIN LOADS:
1. N/A NO ACCUMULATION
D. FLOOD LOADS:
1. N/A NOT IN FLOOD HAZARD AREA
E. SNOW LOADS:
1. GROUND SNOW LOAD = 10 PSF
F. WIND LOADS:
1. DESIGN WIND SPEED = Vult = 117 MPH
2. WIND EXPOSURE = B
3. RISK CATEGORY = IV
G. EARTHQUAKE LOADS:
1. OCCUPANCY CATEGORY = IV
2. SPECTRAL RESPONSE COEFFICIENT:
a. Ss = 0.396 g
b. S1 = 0.151 g
3. SPECTRAL RESPONSE ACCELERATION:
a. Sds = 0.391 g
b. Sd1 = 0.231 g
4. SEISMIC DESIGN CATEGORY = D
5. SITE CLASS = D
1.02 DEFLECTION CRITERIA: REFER TO TABLE 1604.3 FOR DEFLECTION LIMITS.
UNIT IDENTIFIER
L(IN) W(IN) H(IN)
MAX DIMENSIONS
MAX WEIGHT(LB)
103 60 76 1/4 2,806SEC32-A
103 60 76 1/4 2,806SEC32-B
103 60 76 1/4 2,806SEC34-A
103 60 76 1/4 2,806SEC34-B
GENERAL STRUCTURAL NOTES
1.01 WHERE A DETAIL, TYPICAL DETAIL, SECTION, TYPICAL SECTION OR NOTE IS SHOWN FOR ONE CONDITION, IT SHALL APPLY FOR ALL SIMILAR OR LIKE CONDITIONS UNLESS OTHERWISE NOTED.
1.02 THE STRUCTURAL DESIGN OF THE STRUCTURE IS BASED ON THE FULL INTERACTION OF ALL ITS COMPONENT PARTS, WITH NO PROVISION MADE FOR CONDITIONS OCCURRING DURING CONSTRUCTION.
THEREFORE, CONTRACTOR SHALL PROVIDE ADEQUATE BRACING AND TEMPORARY SHORING DURING
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE STANDARDS.
1.03 CONTRACTOR IS RESPONSIBLE FOR ALL JOB SITE SAFETY INCLUDING THE SAFE RIGGING, LIFTING AND
SETTING OF MATERIALS AND EQUIPMENT IN ACCORDANCE WITH APPLICABLE STANDARDS.
1.04 FURNISH AND INSTALL ALL NECESSARY ATTACHMENTS, ANCHORAGE'S AND ACCESSORIES TO PROVIDE A
COMPLETE STRUCTURALLY SOUND STRUCTURE WITH A CONTINUOUS LOAD PATH. BRING ANY
DISCONTINUITIES TO THE ATTENTION OF THE COR IMMEDIATELY.
1.05 FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF FABRICATION OR CONSTRUCTION.
BRING ANY DISCREPANCIES ALONG WITH DETAILED FIELD SKETCHES OF AS-BUILT CONDITIONS TO THE
ATTENTION OF THE COR IMMEDIATELY.
1.06 COORDINATE AND VERIFY ALL DIMENSIONS AND DETAILS WITH THE EXISTING, CIVIL, PROCESS, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, SHOP, AND
SUBMITTAL DRAWINGS. NOTIFY THE COR IMMEDIATELY OF ANY DISCREPANCIES
EXISTING CONDITIONS
1.01 AS WITH ANY WORK AFFECTING EXISTING CONSTRUCTION, UNFORESEEN CONDITIONS ARE UNAVOIDABLE WITHOUT DEMOLISHING OTHERWISE SERVICEABLE CONSTRUCTION, DISRUPTING OCCUPIED OPERATIONS AND INCURRING SIGNIFICANT COST FOR CLOSE UP EXAMINATION AND NON-DESTRUCTIVE TESTING
DURING THE DESIGN STAGE.
1.02 WITH THE PASSAGE OF TIME SINCE THE CREATION OF AS-BUILT DRAWINGS AND/OR THE DESIGNERS SURVEY, BOTH CONCEALED AND VISIBLE CONDITIONS MAY HAVE CHANGED DUE TO ALTERATIONS, ADDITIONS, RENOVATIONS, AND DETERIORATION.
1.03 PRIOR TO THE COMMENCEMENT OF ANY WORK IN PREPARATION OF CONSTRUCTION RELATED ACTIVITIES, INCLUDING BUT NOT LIMITED TO SHOP DRAWING PREPARATION, ALL BURIED, EMBEDDED, OR CONCEALED ITEMS LIKELY TO BE ENCOUNTERED DURING CONSTRUCTION SHALL BE LOCATED AND MARKED ON THE
SURFACE. THIS WORK SHALL BE ACCOMPLISHED BY DESTRUCTIVE AND/OR NON-DESTRUCTIVE MEANS WITHOUT IMPAIRING THE STRUCTURAL INTEGRITY OF THE ASSOCIATED MEMBERS. SHORING AS REQUIRED SHALL BE DESIGNED BY A PROFESSIONAL STRUCTURAL ENGINEER, LICENSED IN THE STATE OF THE
PROJECT, AND FURNISHED AND INSTALLED AT NO ADDITIONAL COST.
1.04 EXISTING CONDITIONS THAT INTERFERE OR OTHERWISE AFFECT THE DESIGN, CONSTRUCTION OR SERVICEABILITY OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE STRUCTURAL ENGINEER, INCLUDING PLAN AND SECTION SKETCHES, IMMEDIATELY FOR RESOLUTION. THE CONTRACTOR SHALL ALLOW TWO CALENDAR WEEKS IN THE SCHEDULE FOR DESIGN RESOLUTION THE INTERFERENCE AFTER ALL INFORMATION ABOUT THE INTERFERENCE, INCLUDING SIZE, LOCATION, AND FUNCTION OF THE
EMBEDMENT, HAS BEEN RECEIVED BY THE STRUCTURAL ENGINEER.
FOUNDATION NOTES
1.01 ALL FOUNDATIONS SHALL BE INSTALLED UNDER THE GUIDANCE OF A REGISTERED
PROFESSIONAL GEOTECHNICAL ENGINEER IN THE STATE OF THE PROJECT. THE
GEOTECHNICAL ENGINEER SHALL GIVE CONSIDERATION TO THE TYPE OF BUILDING
STRUCTURE AND FOUNDATION LOADS INVOLVED AS WELL AS THE REQUIREMENTS OF
THESE DOCUMENTS. THE GEOTECHNICAL ENGINEER SHALL CONDUCT SUBSURFACE
EXPLORATION TO THE EXTENT NECESSARY TO PROVIDE THIS GUIDANCE. AT A MINIMUM, 2
HAND AUGER BORINGS SHALL BE TAKEN AND SLAB-ON-GROUND BASE SHALL BE PROOF-
ROLLED AT EACH APPLICABLE LOCATION.
1.02 THE SAFE BEARING CAPACITY OF THE FOUNDATION SOIL SUPPORTING SPREAD FOOTINGS
SHALL BE A MINIMUM OF 2000 PSF AND SHALL BE TESTED AND APPROVED BY A
PROFESSIONAL GEOTECHNICAL ENGINEER FOR CONFORMATION OF THIS VALUE PRIOR TO
CASTING FOOTING CONCRETE. ALL FOOTINGS SHALL BEAR ON ORIGINAL UNDISTURBED
SOIL OR CONTROLLED FILL.
1.03 STRUCTURAL FILL SHALL CONTAIN NO ORGANIC MATERIAL AND BE APPROVED BY A
GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. STRUCTURAL FILL UNDER SLABS AND
WITHIN 10' - 0" OF THE STRUCTURE FOOTPRINT SHALL BE PLACED IN LIFTS OF THICKNESS
DETERMINED BY THE INDEPENDENT TESTING AGENCY AND COMPACTED TO AT LEAST 95%
OF ITS STANDARD PROCTOR MAXIMUM DRY DENSITY IN ACCORDANCE WITH ASTM D698. THE
TOP 12" OF SUB-BASE UNDER SLABS ON GROUND SHALL BE COMPACTED TO AT LEAST 98%
OF ITS STANDARD PROCTOR MAXIMUM DRY DENSITY. AN INDEPENDENT TESTING
LABORATORY SHALL OBSERVE ALL BACKFILL, COMPACTION AND PROOF ROLLING
OPERATIONS.
DEMOLITION AND REMOVAL
1.01 PERFORM ALL DEMOLITION WORK INCLUDING REMOVAL, TRANSPORT, AND DISPOSAL PER
ALL FEDERAL, STATE AND LOCAL RULES AND REGULATIONS.
1.02 BEFORE BEGINNING ANY DEMOLITION WORK, SURVEY THE SITE AND EXAMINE THE
DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. PHOTOGRAPH
EXISTING CONDITIONS AND RECORD EXISTING ELEVATIONS OF FINISH FLOORS, TOP OF
WALLS, and FOUNDATIONS ETC. RECORD LOCATION AND EXTENT OF EXISTING CRACKS AND
OTHER DAMAGE.
1.03 SCAN EXISTING CONCRETE FOR EMBEDDED ITEMS UTILIZING RADAR OR OTHER RELIABLE
MEANS. NOTIFY COR IMMEDIATELY IN THE EVENT THAT EMBEDDED ITEMS ARE DISCOVERED
THAT INTERFERE WITH THE WORK. DETERMINE WHAT THE EMBEDDED ITEM IS AND THE
PURPOSE IT SERVES. DO NOT PROCEED WITH DEMOLITION OF THE AFFECTED AREA UNTIL
AUTHORIZED.
1.04 CONFINE NOISE AND DUST TO IMMEDIATE WORK AREA.
1.05 CONTRACTOR SHALL REMOVE AND DISPOSE OFF-SITE ALL MATERIALS INDICATED TO BE
DEMOLISHED AND REMOVED, RUBBISH AND DEBRIS DAILY INCLUDING DUST AND DIRT.
1.06 WHERE PEDESTRIAN AND DRIVER SAFETY IS ENDANGERED IN THE AREA OF THE WORK, USE
BARRICADES ANCHORED IN A MANNER TO PREVENT DISPLACEMENT BY WIND.
1.07 TAKE PRECAUTIONS TO AVOID DAMAGE TO EXISTING ITEMS TO REMAIN IN PLACE, TO BE
REUSED OR TO REMAIN THE PROPERTY OF THE OWNER. DO NOT DISTURB EXISTING
CONSTRUCTION BEYOND THE EXTENT INDICATED OR NECESSARY FOR INSTALLATION OF
THE NEW WORK.
1.08 PROTECT NEW WORK FROM DAMAGE AS A RESULT OF SUBSEQUENT WORK.
1.09 DO NOT OVERLOAD EXISTING STRUCTURAL ELEMENTS OR WORK TO REMAIN.
1.10 INCREASE STRUCTURAL SUPPORT OR ADD NEW SUPPORTS AS MAY BE REQUIRED AS A
RESULT OF DEMOLITION WORK INCLUDING BUT NOT LIMITED TO CUTTING, REMOVAL, AND
DECONSTRUCTION. PROVIDE NEW SUPPORTS AND REINFORCEMENT FOR EXISTING
CONSTRUCTION WEAKENED BY DEMOLITION, DECONSTRUCTION, OR REMOVAL WORK.
1.11 PROVIDE TEMPORARY SHORING AND BRACING FOR SUPPORT OF BUILDING COMPONENTS
TO PREVENT SETTLEMENT OR OTHER MOVEMENT.
1.12 COMPLY WITH ALL OSHA REGULATIONS.
1.13 REPAIR OR REPLACE DAMAGED ITEMS AT NO COST TO THE OWNER. STRUCTURAL REPAIRS, REINFORCEMENT OR REPLACEMENT REQUIRE AN ENGINEERED PLAN AND CALCULATIONS
SEALED BY A PROFESSIONAL STRUCTURAL ENGINEER REGISTERED IN THE STATE OF THE
PROJECT, AND PAID FOR BY THE CONTRACTOR, AND PRIOR APPROVAL BY THE STRUCTURAL
ENGINEER OF RECORD.
1.14 PROVIDE NEAT CHIPPING OR SAWCUTS AT LIMITS OF MATERIALS TO BE REMOVED.
1.15 DO NOT INTERRUPT EXISTING UTILITIES SERVING OCCUPIED OR USED FACILITIES WITHOUT
FIRST COORDINATING WITH AND RECEIVING WRITTEN AUTHORIZATION FROM THE OWNER.
REINFORCED CONCRETE NOTES
1.01 CONCRETE DESIGN IS IN ACCORDANCE WITH THE BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE, ACI 318.
1.02 CONCRETE WORK SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE FIELD REFERENCE MANUAL: STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE ACI 301 WITH SELECTED ACI AND
ASTM REFERENCES ( SP-15 )
1.03 ALL CONCRETE SHALL COMPLY TO THE REQUIREMENTS OF THE SPECIFICATIONS AND MATERIALS SHALL BE USED IN A MANNER COMPLYING WITH ALL OF THE MANUFACTURER'S REQUIREMENTS AND
RECOMMENDATIONS.
1.04 SUBMIT REINFORCING STEEL SHOP DRAWINGS AND RECEIVE APPROVAL PRIOR TO FABRICATION OF
SAME.
1.05 ALL CONCRETE SHALL BE NORMAL WEIGHT (145PCF) AND HAVE A MINIMUM 28-DAY COMPRESSIVE
STRENGTH AS FOLLOWS UNLESS NOTED OTHERWISE:
A. f'c = 4,000 PSI UNLESS OTHERWISE NOTED.
1.06 CONCRETE MIX DESIGN SUBMITTAL REQUIREMENTS:
A. FOR EACH UNIQUE MIX DESIGN/CODE PROPOSED, CLEARLY INDICATED WHICH COMPONENT THE MIX
WILL BE USED FOR. (E.G. FOOTING, EXTERIOR WALLS, INTERIOR WALLS, EXTERIOR SLAB ON GRADE, INTERIOR SLAB ON GRADE, ELEVATED SLAB, MASONRY GROUT FILL, PAVING ETC.)
B. CEMENT: AMOUNT PER CUBIC YARD AND SUPPLIER.
C. FLYASH: AMOUNT PER CUBIC YARD, SUPPLIER, A HISTORY OF SUCCESSFUL USE OF FLYASH
CONCRETE IN SIMILAR APPLICATIONS.
D. AGGREGATE: AMOUNT PER CUBIC YARD, TYPE AND COMPOSITE GRADATION ANALYSIS INCLUDING
BOTH COARSE AND FINE.
E. WATER: AMOUNT PER CUBIC YARD AND WATER/CEMENT RATIO.
F. ADMIXTURES: TYPE, AMOUNT PER CUBIC YARD, PRODUCT DATA INDICATING ASTM COMPLIANCE AND
CHLORIDE ION CONTENT.
G. COMPRESSIVE TESTS OF PAST USAGE OF THE SUBMITTED MIX DESIGN INDICATING THE SAME MIX
DESIGN CODE.
1.07 WHEN STRENGTH DATA FROM FIELD EXPERIENCE OR TRIAL MIXTURES ARE NOT AVAILABLE, CONCRETE
MIX DESIGN SHALL COMPLY WITH THE FOLLOWING:
A. 4000 PSI NORMAL WEIGHT CONCRETE SHALL BE BASED ON A MAXIMUM AGGREGATE SIZE OF 1 IN., MAXIMUM WATER/CEMENT RATIO OF .44 FOR NON-AIR-ENTRAINED AND.35 FOR AIR-ENTRAINED
CONCRETE AND A MAXIMUM SLUMP OF 3"
B. 3000 PSI NORMAL WEIGHT CONCRETE SHALL BE BASED ON A MAXIMUM AGGREGATE SIZE OF 1", MAXIMUM WATER/CEMENT RATIO OF.58 FOR NON-AIR-ENTRAINED AND.46 FOR AIR-ENTRAINED
CONCRETE AND A MAXIMUM SLUMP OF 4"
C. THE MAXIMUM SLUMPS SPECIFIED ABOVE SHALL NOT BE EXCEEDED PRIOR TO THE ADDITION OF
WATER REDUCING ADMIXTURES REGARDLESS OF THE EXISTENCE OF TEST DATA.
D. AIR ENTRAINED CONCRETE SHALL BE USED FOR EXTERIOR EXPOSED CONCRETE IN ACCORDANCE
WITH THE FOLLOWING:
1: MODERATE EXPOSURE BASED ON THE MAXIMUM NOMINAL AGGREGATE SIZE:
a. 3/4": 5 % +/- 1-1/2%
b. 1": 4.5 % +/- 1-1/2%
c. 1-1/2": 4.5 % +/- 1-1/2%
E. NORMAL WEIGHT AGGREGATE SHALL COMPLY WITH ASTM C 33.
F. WHEN PERMITTED, THE WEIGHT OF FLYASH SHALL NOT EXCEED 25% OF THE WEIGHT OF CEMENT
PLUS POZZOLAN.
1.08 CONCRETE SLABS ON GRADE SHALL NOT BE LOADED UNTIL A MINIMUM CONCRETE STRENGTH OF 1800
PSI HAS BEEN ATTAINED AND THE CONCRETE IS AT LEAST THREE DAYS OLD. ALL OTHER CONCRETE MEMBERS SHALL NOT BE LOADED UNTIL THE SPECIFIED CONCRETE DESIGN STRENGTH HAS BEEN
ATTAINED.
1.09 CONCRETE SHALL BE TESTED IN ACCORDANCE WITH ACI 301 AND THE SPECIFICATIONS, WHEN
PROVIDED, FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS. AT A MINIMUM, CONCRETE
SPECIMENS SHALL BE TAKEN FOR EVERY 100 YARDS OR PORTION THEREOF FOR EACH MIX DESIGN PLACED IN A DAY. CONCRETE TEST REPORTS SHALL BE AVAILABLE ON SITE FOR INSPECTION.
1.10 ALL STEEL REINFORCEMENT SHALL CONFORM WITH THE FOLLOWING:
A. DEFORMED BARS SHALL CONFORM WITH ASTM A 615 GRADE 60.
B. DEFORMED BARS THAT WILL BE WELDED SHALL CONFORM TO ASTM A 706 GRADE 60. WELDING
SHALL BE IN ACCORDANCE WITH AWS D1.4 STRUCTURAL WELDING CODE.
C. WELDED WIRE REINFORCING (WWR) SHALL CONFORM WITH ASTM A 185, LATEST ADOPTED EDITION, 65 KSI YIELD AND SHALL BE SUPPLIED IN FLAT SHEETS.
1. SLAB-ON-GRADE WWF SHALL BE SUPPORTED BY PLASTIC COATED CHAIRS OR CONCRETE BRICK
2" BELOW THE TOP OF SLAB. THE USE OF CLAY BRICKS OR PULLING UP WWF DURING CONCRETE
PLACEMENT IS STRICTLY PROHIBITED. USE A MINIMUM OF 6 X 6 - W1.4 X W1.4.
2. WWF ABOVE FORMED SURFACES SHALL BE SUPPORTED BY PLASTIC COATED CHAIRS AT THE
MID DEPTH BETWEEN THE CONCRETE SURFACE AND TOP OF FORM OR FLOOR DECK FLUTE.
1.11 PROVIDE CONTINUOUS REINFORCEMENT WHEREVER POSSIBLE. SPLICE ONLY AS SHOWN OR
APPROVED. STAGGER SPLICES WHERE POSSIBLE. UNLESS OTHERWISE NOTED, ALL REINFORCING SHALL BE CONTACT LAP SPLICED WITH A CLASS B SPLICE IN ACCORDANCE WITH ACI 318-05. FOR BARS WITH A MINIMUM COVER AND SPACING GREATER THAN 2.0DB AND 3.0DB (DB = BAR DIAMETER) RESPECTIVELY, THE MINIMUM SPLICE LENGTH, EXPRESSED IN BAR DIAMETERS, SHALL NOT BE LESS THAN SPECIFIED IN THE REBAR SPLICE SCHEDULE. SPLICE LENGTHS SHALL BE INCREASED BY A FACTOR OF 1.3 FOR TOP REINFORCEMENT AND WHEN LIGHTWEIGHT CONCRETE IS USED. LAP WELDED
WIRE FABRIC (WWF) ONE SPACE PLUS 2 IN. ON ALL SIDES AT SPLICES.
1.12 ALL DOWELS AND TERMINATING BARS SHALL HAVE A STANDARD 90-DEG HOOK UNO.
1.13 ALL HORIZONTAL REINFORCING SHALL BE CONTINUOUS AROUND CORNERS, THROUGH CONTROL
JOINTS, AND THROUGH CONSTRUCTION JOINTS UNO.
1.14 CONCRETE COVER AT REINFORCEMENT:
A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH -3".
B. FORMED CONCRETE EXPOSED TO WEATHER OR EARTH:
1. (#5 AND SMALLER) -1 1/2"
2. (#6 TO #18) -2"
3. ALL OTHER -1 1/2"
1.15 CORNER EDGES OF CONCRETE TO BE LEFT EXPOSED TO VIEW SHALL HAVE A CHAMFER OR RADIUS OR
AS INDICATED ON THE DRAWINGS.
1.16 CHECK FOR EMBEDDED ITEMS AND PENETRATIONS PRIOR TO CONCRETE PLACEMENT.
1.17 ALL CONSTRUCTION JOINTS SHALL HAVE A ROUGH SURFACE AND BE CLEAN PRIOR TO SUBSEQUENT
CONCRETE POUR.
1.18 NO HORIZONTAL CONSTRUCTION JOINTS WILL BE PERMITTED IN SLABS AND FOOTINGS UNO.
1.19 WHERE OPENINGS OCCUR IN SLABS AND WALLS, PLACE THE REINFORCING THAT NORMALLY OCCURS
IN LINE WITH THE OPENING EQUALLY TO EITHER SIDE OF THE OPENING.
1.20 CONCRETE SHALL RECIVE THE FOLLOWING FINISHES:
A. EXTERIOR SLABS - BROOM FINISH IN DIRECTION OF SLOPE.
B. ALL OTHER CONCRETE - STEEL TROWEL FINISH.
1.21 ALL CONCRETE SHALL BE CONSOLIDATED BY VIBRATION, SPADING, RODDING OR FORKING SO THAT THE CONCRETE IS THOROUGHLY WORKED AROUND THE REINFORCEMENT, AROUND EMBEDDED ITEMS, AND
INTO CORNERS OF FORMS, ELIMINATING ALL AIR OR STONE POCKETS WHICH MAY CAUSE
HONEYCOMBING, PITTING, OR PLANES OF WEAKNESS. F VIBRATORS, OF ADEQUATE SIZE, ARE USED THEY SHALL BE INSERTED AND WITHDRAWN AT POINTS APPROXIMATELY 18 INCHES APART. AT EACH
INSERTION, THE DURATION SHALL BE SUFFICIENT TO CONSOLIDATE THE CONCRETE BUT NOT
SUFFICIENT TO CAUSE SEGREGATION (GENERALLY FROM 5 TO 15 SECONDS).
1.22 FOLLOW THE MANUFACTURER'S RECOMMENDED CURING GUIDELINES. IN THE ABSENSE OF SPECIFIC GUIDELINES, MAINTAIN CONCRETE AFTER PLACEMENT WITH MINIMAL MOISTURE LOSS AT RELATIVELY CONSTANT TEMPERATURE FOR THE PERIOD NECESSARY FOR HYDRATION OF CEMENT AND HARDENING OF CONCRETE (NOT LESS THAN 7 DAYS). COMPLY WITH THE REQUIREMENTS OF ACI 308 - STANDARD PRACTICE FOR CURING CONCRETE; AMERICAN CONCRETE INSTITUTE. A COMBINATION CURING AND SEALING COMPOUND SHALL BE APPLIED AFTER THE CONCRETE HAS BEEN FINISHED OR THE FORMS REMOVED. COMPOUND SHALL BE IN ACCORDANCE WITH ASTM C309, LATEST ADOPTED EDITION, TYPE
I, CLASS B. (W.R. MEADOWS CS-309).
CONCRETE SPALL REPAIR NOTES
1.01 REMOVE ALL LOOSE CONCRETE TO SOUND SUBSTRATE 1/4" BEYOND REINFORCING.
1.02 CLEAN REINFORCING STEEL ENCOUNTERED TO A BRIGHT METAL FINISH.
1.03 ANY REINFORCING ENCOUNTERED SHOULD BE COMPLETELY EXPOSED AND NOT LEFT
PARTIALLY EMBEDDED IN CONCRETE.
1.04 IF REINFORCING HAS LOST MORE THAN 10% OF ITS CROSS SECTIONAL AREA STOP AND
CONTACT THE COR IMMEDIATELY.
1.05 PROVIDE A MINIMUM DEPTH EXCAVATION IN THE AREA TO BE PATCHED. PROVIDE SAW-CUT, GROUND, OR CHIPPED EDGES. DO NOT FEATHER EDGES.
1.06 CLEAN AREA IN ACCORDANCE WITH BONDING AGENT MANUFACTURER'S
RECOMMENDATIONS.
1.07 INJECT ANY VISIBLE CRACKS WITH EPOXY .
1.08 APPLY CORROSION INHIBITOR/ BONDING AGENT TO REINFORCING STEEL AND THE
CONCRETE SUBSTRATE.
1.09 REFORM SPALL WITH A HIGH STRENGTH STRUCTURAL REPAIR MORTAR (NON-METALLIC), ADD
AGGREGATE AS SPECIFIED BY REPAIR MORTAR MANUFACTURER, CONSOLIDATE THE REPAIR
MORTAR, FINISH, AND CURE IN ACCORDANCE WITH A MANUFACTURER'S
RECOMMENDATIONS.
STRUCTURAL DRAWING ABBREVIATIONS:
BOT BOTTOM
B/STL BOTTOM OF STEEL
C.J. CONSTRUCTION OR CONTROL JOINT
CJT CORNER JACK TRUSS
CMU CONCRETE MASONRY UNIT
CONN CONNECTION
DBA DEFORMED BAR ANCHOR
DIAG DIAGONAL
EA EACH
EF EACH FACE
EL ELEVATION
EMBED EMBEDMENT
EOD EDGE OF DECK
EOS EDGE OF SLAB
EW EACH WAY
EXF EXISTING FOOTING
FOB FACE OF BRICK
FF FAR FACE
FP FACE OF PANEL
FP FACE OF PANEL
FX FOOTING MARK NUMBER (SEE SCHEDULE)
GT GIRDER TRUSS
HORIZ HORIZONTAL
IFW INSIDE FACE OF WALL
JB JOIST BEARING
JT JACK TRUSS
LLH LONG LEG HORIZONTAL
LLO LONG LEG OUT
LLV LONG LEG VERTICAL
LSH LONG SIDE HORIZONTAL
LSV LONG SIDE VERTICAL
MAX. MAXIMUM
MIN. MINIMUM
NDS NATIONAL DESIGN STANDARD
FWC FOR WOOD CONSTRUCTION
NF NEAR FACE
OC ON CENTER
OFW OUTSIDE FACE OF WALL
PAF POWDER ACTUATED FASTENER
PC PRECAST
PDF POWDER DRIVEN FASTENER
PJF PREMOLDED JOINT FILLER
PLF POUNDS PER LINEAR FOOT
PXXX PIER MARK NUMBER (SEE SCHEDULE)
RRS REBAR REINFORCING STEEL
SOG SLAB-ON-GROUND
STD STANDARD
T&B TOP AND BOTTOM
T/FTG TOP OF FOOTING
T/STL TOP OF STEEL
T/U TILT-UP
TYP TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VERT VERTICAL
WWR WELDED WIRE REINFORCEMENT
CONCRETE REBAR LAP SPLICE SCHEDULE
BAR SIZE
#6 OR SMALLER
CLASS
A
B
NORMAL WEIGHT CONCRETE 28 DAY f`C (PSI)
3,000
58 DIA.
4,000
50 DIA.
5,000
44 DIA.
6,000
40 DIA.#6 OR SMALLER
#7 OR LARGER A
B 72 DIA. 62 DIA. 55 DIA. 50 DIA.#7 OR LARGER
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date Checked
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
As Shown
PROJECT 598-19-112 "REPLACE
UNDERGROUND 15KV FEEDERS AND
TRANSFORMERS" NAME WAS REVISED TO
REFLECT AN APPROVED SCOPE CHANGE.
STRUCTURAL NOTES
EUGENE J. TOWBIN HEALTHCARE CENTER -
REPLACE UNDERGROUND 15KV FEEDER
SEPARABLE CONNECTORS AND
TRANSFORMERS
2200 FORT ROOTS DRIVE,
NORTH LITTLE ROCK, AR 72114
S001
598-19-112
07/31/2025
BID DOCUMENTS
DCASLW
EQUIPMENT NOTES:
1.01 EQUIPMENT COORDINATION
A.THE CONTRACTOR SHALL COORDINATE DIMENSIONAL AND UTILITY REQUIREMENTS OF ACTUAL
EQUIPMENT PURCHASED WITH PROVISIONS SHOWN ON THE CONSTRUCTION DOCUMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ANY CHANGES NECESSARY TO MAKE
SUCH COORDINATION WITHOUT ADDITIONAL COST TO THE GOVERNMENT.
1.02 EQUIPMENT ANCHORAGE
A.THE CONTRACTOR SHALL ENGINEER, FURNISH AND INSTALL NECESSARY ANCHORAGE AND
VIBRATION ISOLATION FOR ALL EQUIPMENT AND CURBS TO RESIST ALL LOADING INCLUDING
BUT NOT LIMITED VIBRATORY, WIND AND EARTHQUAKE LOADS AT NO ADDITIONAL COST TO
THE GOVERNMENT.
B.THE CONTRACTOR SHALL PREPARE AND SUBMIT ANCHORAGE DETAILS AND SUPPORTING
CALCULATIONS PREPARED AND SEALED BY A STRUCTURAL ENGINEER REGISTERED IN THE
STATE OF THE PROJECT FOR ALL MOUNTED EQUIPMENT, AND ASSOCIATED CURBS, FOR
REVIEW AND APPROVAL PRIOR TO FABRICATION AND INSTALLATION.
1.03 EQUIPMENT STRUCTURAL SUPPORT
A.THE STRUCTURAL DESIGN DEPICTED ON THESE DRAWINGS IS BASED ON THE EQUIPMENT
DIMENSIONS AND WEIGHTS OUTLINED ABOVE. IN THE EVENT THE CONTRACTOR SELECTS
EQUIPMENT WITH WEIGHT GREATER THAN THAT DEPICTED IN THE TABLE SHOWN ON THIS
SHEET, OR DIMENSIONS MORE THAN 10% GREATER OR LESS THAN THOSE DEPICTED IN THE
TABLE SHOWN ON THIS SHEET, THE CONTRACTOR SHALL HAVE THE AFFECTED SUPPORTING
STRUCTURE (NEW AND EXISTING) EVALUATED AND REINFORCED AS NECESSARY BY A
STRUCTURAL ENGINEER REGISTERED IN THE STATE OF THE PROJECT, AND SUBMIT SEALED
CALCULATIONS AND DRAWINGS FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OF
FABRICATION. COSTS ASSOCIATED WITH ENGINEERING ANALYSIS, DESIGN AND
CONSTRUCTION OF REPAIRS SHALL BE BORN BY THE CONTRACTOR AT NO ADDITIONAL COST
TO THE GOVERNMENT.
PLUMBING/
UTILITY LINE
EXISTING OR NEW
FOUNDATION
FINISH GRADEWALL OR COLUMN, SEE PLAN
NEW FOOTINGS, PLUMBING LINES, ETC. SHALL BE INSTALLED SUCH THAT THEY
ARE ABOVE THE TRAPEZOID CREATED BELOW AND ADJACENT FOOTING WITH
SIDES NO STEEPER THAN 1 VERTICAL TO 2 HORIZONTAL.
CONTRACTOR NOTE:
T/GRADE
SEE CIVIL
SUBSEQUENT PROPOSED
FOUNDATION, SEE PLAN
12" LEG TYP. CONT. FOOTING
REINFORCING
PIPE SLEEVE 3" LARGER
THAN PIPE DIAMETER
#4 @12" O.C.
KEEP 6" MIN. OF
CONCRETE ALL AROUND
4#4 BARS
TRANSVERSE
POLYURETHANE BASED
INSULATING FOAM SEALANT
PROVIDE DEEPENED FTG.
AT PIPE
TOP OF SLEEVE DOES NOT INTERRUPT REINFORCING
NOTE: THIS DETAIL DOES
NOT APPLY IF TOP OF PIPE
IS MORE THAN 4'-0" BELOW
BOTTOM OF WALL FOOTING.
TYP.
3" CLR.
2" C
LR
B Y
M A
N U
F A
C T
U R
E R
S P
A C
IN
G
A S
R E
Q U
IR
E
D
EPOXY INJECTION PORT,
SEE SPECIFICATIONS
EPOXY PASTE
SURFACE SEALANT
EXISTING CONCRETE
SUBSTRATE
CONCRETE CRACK.
PREP AS REQUIRED BY
MANUFACTURER FOR
INJECTION PROCESS
1" MIN. CLEARANCE BEYOND REINFORCING
C
LE
A R
A N
C E
3/ 4"
M
IN
EXISTING
CONCRETE
REMOVE UNSOUND CONCRETE FROM
REPAIR AREA. CAST TO RESTORE
ORIGINAL CROSS-SECTION
EXISTING REINFORCING BARS, BLAST, CLEAN, AND COAT WITH
CORROSION INHIBITOR WHERE BARS ARE EXPOSED. WHERE
REINFORCEMENT IS FOUND TO BE SEVERELY CORRODED OR
HAS LOST 10% OR MORE OF ITS CROSS SECTIONAL AREA,
SUPPLEMENTARY REINFORCEMENT MAY BE REQUIRED.
CHIP CONCRETE TO A MIN. DEPTH
OF 3/4" BELOW REINFORCING STEEL
3/4" SAWCUT AROUND
PERIMETER OF PATCH
AREA - BEVEL SAWCUT
AWAY FROM CENTER OF
PATCH AREA
NOTES:
1. LARGE AND/OR DEEP AREAS OF REMOVAL MAY REQUIRE SHORING.
REPORT TO ENGINEER IF REMOVAL OF LARGE AREA IS REQUIRED.
1'-2"
1' -0
3'
-0
4' -0
4'
-0
3" DOME
FILL POST WITH CONCRETE
4" DIA - SCHEDULE 40
STEEL PIPE
EPOXY PAINT
1" CROWN FINISH GRADE
OR EXIST
PAVING.
TYP UNO
2' - 0"
T Y
P U
N O
2'
0"
EXIST OR NEW
TRANSFORMER/SECTIONALIZER PAD
NEW TRANSFORMER OR
SECTIONALIZER
BETWEEN BOLLARDS TYP
6'-0" MAX SPACING
NEW BOLLARDS TYP AT SIDES OF
SECTIONALIZER/TRANSFORMER
PAD FACING ROADWAYS. REFER
TO SCHEDULE ON E501 FOR
ANTICIPATED QUANTITIES AT EACH
PAD.
S301
TO EXIST. BUILDINGS TYP
6'-0" MAX SPACING
EXIST. BUILDING
NOTES:
1. CONTRACTOR TO SUBMIT PLAN LAYOUT OF BOLLARDS AT ALL LOCATIONS FOR REVIEW
INCLUDING DOOR CLEARANCES.
2. CONTRACTOR SHALL FIELD LOCATE ALL EXISTING BELOW GRADE UTILITIES PRIOR TO
SUBMISSION OF PLAN LAYOUTS.
T Y
P S
H O
R T
S
ID
E O
F P
A D
5'
0" M
A X
B E
T W
E E
N B
O
LL
A R
D S
3' - 8" CLR MIN @ TRANSFORMER DOORS.
4' - 6" CLR MIN @ SECTIONALIZER DOORS.
S P
LI
C
E
C
LA
S S
B
SPLICE
CLASS B
CONT. BEAM REINF.
INTERSECTION BAR
TOP AND BOTTOM
SPLICE
CLASS B
CONT. BEAM REINF.
CORNER BAR TOP
AND BOTTOM
SPLICE
CLASS B
S P
LI
C
E
C
LA
S S
B
PLAN VIEW AT CORNERS
PLAN VIEW AT INTERSECTIONS
1'
2" 4"
4" TYP3/4" CHAMFERED
EDGE TYP
#4 @ 12" O.C. E.W.
NEW 60" x 103" SECTIONALIZER TYP. ONE
SECTIONALIZER PER PAD. ANCHORAGE
TO PAD BY MANUFACTURER
AA
A - A
(2) #5 CONTINUOUS
MIN TYP
1' - 0"
0'-6" SLAB ON
GRADE OVER 4"
CRUSHED STONE
BASE. REINFORCED
W/ #4@12" O.C. E.W.
2" BELOW TOP OF
SLAB
9'
3"
5' - 8"
M
IN
T Y
P
1'
0"
3" CLR TYP.
NOTES:
1. CONTRACTOR SHALL FIELD LOCATE ALL EXISTING BELOW GRADE
UTILITIES PRIOR TO SUBMISSION OF SHOP DRAWINGS FOR REVIEW.
2. REFER TO DETAILS 1,2, AND 9 ON THIS SHEET AS APPLICABLE.
3. REFER TO DETAIL 9/S301 IN EVENT EXISTING DUCT BANK IS
ENCOUNTERED.
3' - 0"3' - 0"
1'
0" M
IN
2" C
LR
3" CLOSED CELL POLYETHYLENE
SHEET VOID FORM TYP
(2) #5 CONTINUOUS
EXIST DUCT BANK
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date Checked
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
As Shown
PROJECT 598-19-112 "REPLACE
UNDERGROUND 15KV FEEDERS AND
TRANSFORMERS" NAME WAS REVISED TO
REFLECT AN APPROVED SCOPE CHANGE.
CONCRETE DETAILS
EUGENE J. TOWBIN HEALTHCARE CENTER -
REPLACE UNDERGROUND 15KV FEEDER
SEPARABLE CONNECTORS AND
TRANSFORMERS
2200 FORT ROOTS DRIVE,
NORTH LITTLE ROCK, AR 72114
S301
598-19-112
07/31/2025
BID DOCUMENTS
DCASLW
3/4" = 1'-0"S301
1 TYPICAL FOOTING INSTALLATION DETAIL
3/4" = 1'-0"S301
2 TYPICAL PIPE SLEEVE THRU FOOTING DETAIL
1 1/2" = 1'-0"S301
4 EPOXY INJECTION CRACK REPAIR
1 1/2" = 1'-0"S301
3 TYPICAL CONCRETE SPALL REPAIR DETAIL
3/4" = 1'-0"S301
5 TYPICAL PIPE BOLLARD DETAIL
1/2" = 1'-0"S301
TYPICAL TRANSFORMER OR SECTIONALIZER PAD
BOLLARD DETAIL
3/4" = 1'-0"S301
8 TYPICAL CORNER BAR DETAILS
1/2" = 1'-0"S301
7 TYPICAL NEW SECTIONALIZER PAD
3/4" = 1'-0"S301
9 SECTION AT EXISTING DUCT BANK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EUGENE J. TOWBIN HEALTHCARE CENTER -
REPLACE UNDERGROUND 15KV FEEDER
SEPARABLE CONNECTORS AND
TRANSFORMERS
2200 FORT ROOTS DRIVE,
NORTH LITTLE ROCK, AR 72114
598-19-112
As Shown Project Director
07/31/2025Revisions: Date: F.KEELS J.POWELL
PROJECT 598-19-112 "REPLACE
UNDERGROUND 15KV FEEDERS AND
TRANSFORMERS" NAME WAS REVISED TO
REFLECT AN APPROVED SCOPE CHANGE.
E001
ELECTRICAL GENERAL NOTES:
1.
A.
B.
C.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
THE WORK SHALL CONFORM WITH ALL REQUIREMENTS OF:
NFPA 70-2023 (NATIONAL ELECTRICAL CODE)
ANSI C2-2020 (NATIONAL ELECTRICAL SAFETY CODE)
APPLICABLE LOCAL CODES AND FEDERAL AND STATE LAWS.
CONTRACTOR SHALL CAREFULLY COORDINATE WORK WITH OTHER TRADES THROUGH THE GENERAL CONTRACTOR AND SHALL BE RESPONSIBLE FOR SECURING SPACE REQUIREMENTS FOR ELECTRICAL EQUIPMENT CLEARANCE FOR RECESSED LUMINAIRES AND
CORRECT ROUGH-IN LOCATIONS OF ELECTRICAL CONNECTIONS.
CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING CATALOG NUMBERS ON THESE DRAWINGS TO MATCH WITH MATERIAL
DESCRIPTIONS INDICATED.
ALL FEEDERS AND BRANCH CIRCUITS SHALL INCLUDE A GREEN INSULATED GROUND CONDUCTOR, SIZE PER NATIONAL ELECTRICAL CODE, OR AS SHOWN, CONNECTED TO EACH DEVICE AND OUTLET BOX ON THE CIRCUIT AND TO THE PANELBOARD GROUND BUS. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT. MULTIPLE BRANCH CIRCUITS IN ONE
RACEWAY REQUIRE ONLY ONE GROUND CONDUCTOR.
NEW WORK SHALL BE MADE TO TIE INTO THE EXISTING IN A UNIFORM MANNER, SIMILAR ITEMS OF NEW WORK SHALL BE CHECKED AGAINST EXISTING WORK FOR TYPE MOUNTING, MOUNTING HEIGHTS, ETC. ITEMS SHOWN IN NEW WORK AT VARIANCE FROM THE
EXISTING SHALL BE REFERRED TO THE ARCHITECT FOR DECISION BEFORE ROUGH-IN.
PROVIDE IS AN INCLUSIVE TERM USED TO DESCRIBE ASPECTS OF THE WORK TO BE ACCOMPLISHED, AND IS HEREBY DEFINED TO REQUIRE TO STORE, FURNISH, INSTALL, MOUNT, CONNECT, CONTROL AND POWER EQUIPMENT INDICATED, AS WELL AS ALL APPURTENANCES REQUIRED TO MAKE ELECTRICAL SYSTEMS OPERATE AS INDICATED WITHIN THESE DRAWINGS AND
SPECIFICATIONS AND TO FULFILL THE SCOPE OF WORK.
DEMOLISH IS AN INCLUSIVE TERM USED TO DESCRIBE ASPECTS OF THE WORK TO BE ACCOMPLISHED, AND IS HEREBY DEFINED TO REQUIRE CONTRACTOR TO DISCONNECT EQUIPMENT FROM ALL CONNECTIONS, REMOVE FROM THE OWNER'S SITE, AND DISPOSE OF IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL LAWS AND ORDINANCES. COST OF DISPOSAL IS ENTIRELY THE
CONTRACTOR'S RESPONSIBILITY.
ALL CONDUCTORS ARE COPPER UNLESS SPECIFICALLY NOTED AS ALUMINUM.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS BEFORE PROCUREMENT OF ANY
MATERIALS AND DEVELOPMENT OF ANY SHOP DRAWINGS OR SUBMITTALS.
SEE STRUCTURAL FOR ALL EQUIPMENT PADS.
ELECTRICAL ABBREVIATIONS
A OR AMP
ACC
AC
AC
AF
AFF
AFG
AHU
AIC
AL
AM
ASYM
AT
ATS
AUTO
AWG
BC
BCW
BFF
BFG
BLDG
CAT
CB
CCT
CCTV
CFCI
CH
CHWCP
CHWP
CHWSP
CKT
CMH
CP
CPT
CRAC
CRI
CT
CT
CU
CWP
DC
DF
DH or DUH
DHWCP
DISC
DOAS
DPST
DPDT
DSCU
DSHP
DSS
DWBP
DX
EC
EF
ELEC
EMH
EMT
E or EMER
EPA
EQUIP
ERV
ERU
EXIST or EX
EUH
EXP
EWC
EWH
FACP
FCU
FLEX
FWE
G OR GND
GFGI
GFI
GRS
GUH
GWH
H or HT
HAC
HOA
HP
HP
HT
HVU
HWCP
HWP
AMPERE(S)
AIR COOLED CHILLER
ALTERNATING CURRENT
AIR COMPRESSOR / AIR CURTAIN
AMP FRAME
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR HANDLING UNIT
AMPERE INTERRUPTING CAPACITY
ALUMINUM
AMMETER
ASYMMETRICAL
AMP TRIP
AUTOMATIC TRANSFER SWITCH
AUTOMATIC
AMERICAN WIRE GAUGE
BOILER
BRANCH CONTROLLER
BARE COPPER WIRE
BELOW FINISHED FLOOR
BELOW FINISHED GRADE
BUILDING
CONDUIT
CATEGORY
CIRCUIT BREAKER
CORRELATED COLOR TEMPERATURE
CLOSED CIRCUIT TELEVISION
CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CHILLER
CHILLED WATER CIRCULATING PUMP IN A
PRIMARY-SECONDARY SYSTEM
CHILLED WATER PUMP
CHILLED WATER SUPPLY PUMP IN A PRIMARY-
SECONDARY SYSTEM
CIRCUIT
COMMUNICATIONS MANHOLE
CONDENSATE PUMP
CONTROL POWER TRANSFORMER
COMPUTER ROOM AC UNIT
COLOR RENDERING INDEX
CURRENT TRANSFORMER
COOLING TOWER
COPPER OR CONDENSING UNIT
CONDENSER WATER PUMP
DEPTH
DIRECT CURRENT
DESTRATIFICATION FAN
DUCT HEATERS
DOMESTIC HOT WATER CIRCULATING PUMP
DISCONNECT SWITCH
DEDICATED OUTSIDE AIR SYSTEM (UNIT)
DOUBLE POLE SINGLE THROW
DOUBLE POLE DOUBLE THROW
DUCTLESS SPLIT CONDENSING UNIT (POWERS
THE DSS INDOOR UNIT)
DUCTLESS SPLIT HEAT PUMP (POWERS THE
DSS INDOOR UNIT)
DUCTLESS SPLIT SYSTEM (INDOOR UNIT)
DOMESTIC WATER BOOSTER PUMP
DIRECT EXPANSION (DX) COOLING COIL
EMPTY CONDUIT
EXHAUST FAN
ELECTRICAL
ELECTRICAL MANHOLE
ELECTRICAL METALLIC TUBING
EMERGENCY
EFFECTIVE PROJECTED AREA
EQUIPMENT
ENERGY RECOVERY VENTILATOR
ENERGY RECOVERY UNIT
EXISTING
ELECTRIC UNIT HEATER
EXPLOSION PROOF
ELECTRIC WATER COOLER
ELECTRIC WATER HEATER
FUSE
FIRE ALARM CONTROL PANEL
FAN COIL UNIT
FLEXIBLE
FURNISHED WITH EQUIPMENT
GROUND
GOVERNMENT FURNISHED GOVERNMENT
INSTALLED
GROUND FAULT INTERRUPTER
GALVANIZED RIGID STEEL CONDUIT
GAS UNIT HEATER
GAS WATER HEATER
HEIGHT
HEATED AIR CURTAIN
HAND-OFF AUTOMATIC
HORSE POWER
HEAT PUMP (OUTDOOR PORTION OF SPLIT
SYSTEM HEAT PUMP, USE CU FOR
STANDARD DX OUTDOOR UNIT)
HEAT TRACKING
HEATING/VENTILATING UNIT
HEATING WATER CIRCULATING PUMP IN A
PRIMARY-SECONDARY SYSTEM
HEATING WATER SUPPLY IN A PRIMARY-ONLY
SYSTEM
HWRP
HWSP
HWUH
HZ
IDS
IMC
IRH
J OR JB
K
KAIC
KCM OR KCMIL
KEF
KH
KV
KVA
KW
KWHR
L
LA
LAN
LAV
LTG
MAU
MAX
MCA
MCB or MB
MCC
MGB
MH
MIN
MLO
MOD
MT or MTD
MRS
N
NEC
NEMA
NFPA
NC
NESC
NL
NO
NTS
P
PA
PDU
PF
PH
PIU
PMT
PNL
PTAC
PVC
RECEPT or RECP
RF
RH
RMC
RMS
RTU
RVNR
SA
SCCR
SD
SF
S/N
SP
SPD
SPDT
SPEC
SPST
SWBD
SWGR
TMGB
TOL
TP
TYP
U
UH
UG
UIO
UL
UTP
V
VA
VAV
VEF
VM
VRF
W
WC
WEF
WH
WHDM
WSHP
WP
XFMR
Z
HOT WATER RECIRCULATION PUMP
HEATING WATER SUPPLY PUMP IN A PRIMARY-
SECONDARY SYSTEM
HOT WATER UNIT HEATER
HERTZ
INTRUSION DETECTION SYSTEM
INTERMEDIATE METAL CONDUIT
INFRARED HEATER
JUNCTION BOX
KILO
THOUSAND AMPERE INTERRUPTING CAPACITY
THOUSAND OF CIRCULAR MILS
KITCHEN EXHAUST FAN
KITCHEN HOOD
KILOVOLT
KILOVOLT-AMPERES
KILOWATT
KILOWATT-HOUR
LENGTH
LIGHTNING ARRESTOR
LOCAL AREA NETWORK
LAVATORY
LIGHTING
MAKE-UP AIR UNIT
MAXIMUM
MINIMUM CIRCUIT AMPACITY
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MAIN GROUND BAR
MANHOLE or MOUNTING HEIGHT
MINIMUM
MAIN LUGS ONLY
MOTOR OPERATED DAMPER
MOUNT or MOUNTED
MOTOR RATED SWITCH
NEUTRAL
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURER'S
ASSOCIATION
NATIONAL FIRE PROTECTION ASSOCIATION
NORMALLY CLOSED
NATIONAL ELECTRICAL SAFETY CODE
NIGHT LIGHT
NORMALLY OPEN
NOT TO SCALE
POLE(S) or PUMP
PUBLIC ADDRESS
POWER DISTRIBUTION UNIT
POWER FACTOR
PHASE
VAV TERMINAL UNIT WITH PARALLEL OR
SERIES FAN (PRIMARY INDUCTION UNIT)
PAD MOUNTED TRANSFORMER
PANEL OR PANELBOARD
PACKAGED THRU-WALL AIR CONDITIONER
POLYVINYL CHLORIDE
RECEPTACLE
RETURN FAN
RADIANT HEATERS (ELECTRIC)
RIGID METAL CONDUIT
ROOT MEAN SQUARE
ROOF TOP UNIT
REDUCED VOLTAGE NON-REVERSING
SURGE ARRESTOR
SHORT CIRCUIT CURRENT RATING
SMOKE DAMPER
SUPPLY FAN
SOLID NEUTRAL
SUMP PUMP
SURGE PROTECTIVE DEVICE
SINGLE POLE DOUBLE THROW
SPECIFICATIONS
SINGLE POLE SINGLE THROW
SWITCHBOARD
SWITCHGEAR
TELECOMMUNICATIONS MAIN GROUNDING
BUSBAR
THERMAL OVERLOAD
TWISTED PAIR
TYPICAL
URINAL
UNIT HEATER
UNDERGROUND
UNLESS INDICATED OTHERWISE
UNDERWRITERS LABORATORY
UNSHIELDED TWISTED PAIR
VOLTS
VOLT AMPERES
VAV TERMINAL UNIT
VEHICLE EXHAUST FAN
VOLTMETER
VARIABLE REFRIGERANT FLOW SYSTEM
WATTS or WIRE or WIDTH
WATER CLOSET
WELDING EXHAUST FAN
WATER HEATER
WATTHOUR DEMAND METER
WATER SOURCE HEAT PUMP
WEATHERPROOF
TRANSFORMER
IMPEDANCE
NOTE:
1. NOT ALL ABBREVIATIONS SHOWN WILL BE USED ON THIS
PROJECT.
EXISTING CONDITIONS AND MATERIAL NOTES:
FIELD VERIFY ALL EXISTING CONDITIONS OF TRANSFORMERS AND
CONDUCTORS BEFORE BID AND INSTALLATION.
ALL CONDUITS ASSUMED TO BE 4" C. UNLESS OTHERWISE NOTED.
ALL CONDUCTORS ARE ASSUMED TO BE OKONITE BRAND 2/0
COPPER COMPACT STRANDED SHIELDED CABLE TYPE 105/133%
INSULATION CATALOG NUMBER 155-23-3117 WITH A #4/0 COPPER
GROUND PULLED WITH EACH SET OF THREE(3) 15KV CABLES
BETWEEN MANHOLES, TRANSFORMERS AND SWITCHGEAR.
TERMINATIONS ARE ASSUMED TO BE THE FOLLOWING
· 200A LOAD-BREAK ELBOW - ELASTIMOLD BRAND 2/0 CATALOG
NUMBER 166LRR-GAB-250 TRANSFORMER TERMINATIONS OR
EQUIVALENT.
· 200A STRAIGHT PLUG-ELASTIMOLD BRAND 2/0 CATALOG NUMBER
151-SP-GB40 MANHOLE TERMINATIONS OR EQUIVALENT.
· 200A STRAIGHT RECEPTACLE-ELASTIMOLD BRAND CATALOG
NUMBER 151-SR-GB40 MANHOLE TERMINATIONS OR EQUIVALENT.
· 200A TEE SPLICE-ELASTIMOLD BRAND CATALOG NUMBER 150T
MANHOLE TERMINATIONS OR EQUIVALENT.
· GROUNDING DEVICE/SHIELD ADAPTER-ELISTIMOLD BRAND
CATALOG NUMBER 20MA REQUIRED FOR ALL ELBOW, PLUG, AND
RECEPTACLE TERMINATIONS OR EQUIVALENT.
PHASING NOTES:
· GOVERNMENT PERSONNEL IS REQUIRED FOR ALL POWER
SWITCHING.
· WORK HOURS FOR ITEMS THAT REQUIRE POWER TO BE
DISCONNECTED SHALL BE CONDUCTED DURING THE HOURS OF
7AM ON SATURDAYS TO 7PM ON SUNDAYS. OTHER WORK IS
ACCEPTABLE ANY OTHER TIMES SUCH THAT THE WORK DOES
NOT IMPEDE NORMAL BUSINESS FUNCTIONALITY.
· TRANSFORMERS SHALL BE PHASED PER LOOP DISCONNECTED.
· EACH TRANSFORMER SHALL BE REPLACED DURING A SINGLE
OUTAGE SUCH THAT NORMAL FUNCTIONALITY OF THE
BUILDING CAN RESUME UPON COMPLETION.
· EACH MANHOLE SPLICE REPAIR SHALL BE COORDINATED WITH
LOOP DISCONNECTED.
· TRANSFORMER AND MANHOLE WORK PLAN SHALL BE
COORDINATED WITH VA PRIOR TO WORK COMMENCEMENT.
· WORK SHALL BE PERFORMED ON ONLY ONE LOOP AT A TIME
TO MINIMIZE OUTAGES.
· CONTRACTOR SHALL ADHERE TO ALL VA AND OSHA
LOCK-OUT-TAG-OUT PROCEDURES.
· SEE SCHEDULE ON E501 FOR ADDITIONAL INFORMATION ON
LOOPS FEEDING TRANSFORMERS AND CONNECTIONS IN
MANHOLES. FIELD VERIFY ALL CONNECTION FEEDERS PRIOR
TO WORK COMMENCEMENT.
· MISSION CRITICAL BUILDINGS (22, 69, 102) SHALL HAVE
TEMPORARY POWER PROVIDED BY GENERATORS DURING
TIMES OF OUTAGES. EXISTING STANDBY GENERATORS ARE
PRESENT AT BUILDINGS 69 AND 102. COORDINATE WITH VA
PRIOR TO DISCONNECTION OF POWER AND ALL CONNECTION
REQUIREMENTS.
D. CURRENT REVISIONS OF THE VA TIL/DESIGN GUIDE
ELECTRICAL GENERAL
NOTES
12.
ALL MANHOLES INDICATED ON DRAWINGS SHALL HAVE NEW LOCKABLE COVER PER VA PSRDM.
SCOPE OF WORK NOTES:
PROJECT CONSISTS OF THE FOLLOWING ITEMS:
1. TRANSFORMER REPLACEMENT IN SAME LOCATION AS INDICATED.
1.1. NEW PME DEVICES WILL BE PROVIDED AT EACH TRANSFORMER.
1.2. TRANSFORMER REPLACEMENT SHALL HAVE A PHASING PLAN AS
DETAILED IN SPECIFICATIONS.
1.3. ALL EXISTING CONDUIT AND CONDUCTORS ARE TO REMAIN.
1.4. PROVIDE GROUNDING AS INDICATED IN SPECIFICATIONS FOR ALL
TRANSFORMERS INDICATED.
1.5. LOOP FEED OPTION, UNDER OIL 3‐ TWO POSITION SWITCHES,
ENVIROTEMP FR3, FE.
1.6. SHALL BE COOPER WINDINGS.
1.7. PRIMARY CONNECTIONS SHALL BE 200A DEAD FRONT LOAD BREAK
WELLS & INSERTS.
1.8. SURGE ARRESTORS DISTRIBUTION CLASS ONE FOR EACH PHASE.
1.9. SHALL BE EQUIPPED WITH EXTERNAL FLUSH OR SURFACE MOUNTED
ENCLOSURE CONTAINING OIL SAMPLING PORT, PRESSURE GAUGE,
PRESSURE RELIEVE VALVE AND NITROGEN FILL VALVE.
1.10. SHALL BE EQUIPPED WITH PRIMARY AND SECONDARY DOOR IR
WINDOWS.
2. MANHOLE REFURBISHMENT AS INDICATED
2.1. CABLE SPLICES (STRAIGHT, T'S, L'S, AND X'S) PER MANHOLE SHALL BE
REPLACED IN KIND.
2.2. STRUCTURAL REFURBISHMENT AS INDICATED ON STRUCTURAL
DRAWINGS.
2.3. ALL EXISTING CONDUIT AND CONDUCTORS ARE TO REMAIN.
2.4. PROVIDE GROUNDING AS INDICATED IN SPECIFICATIONS FOR ALL
MANHOLES INDICATED.
3. INSTALLATION OF SECTIONALIZERS
3.1. NEW CONCRETE PAD PER STRUCTURAL
3.2. PROVIDE DUCT BANK PER DETAILS ON SHEET E-502. PROVIDE LONG
RADIUS SWEEPING 90 DEGREE CONNECTIONS.
3.3. SEE DETAILS ON SHEET E501.
3.4. CONNECTIONS SHALL BE EXTENDED FROM MANHOLE INDICATED ON
MANHOLE SCHEDULE.
4. CONTRACTOR TO VERIFY ALL ELECTRICAL FEEDER LOOPS WITHIN
MANHOLES AND DOCUMENT INFOMRATION IN AS-BUILT TABLE ON SHEET
E-503.
SEE SHEET E501 FOR ADDITIONAL INFORMATION.
CAVHS M&O STANDARDS FOR SYSTEM, EQUIPMENT, MATERIAL COMPATIBILITY AND
INTERCHANGEABILITY WITH EXISTING EQUIPMENT SHALL BE FOLLOWED. CAVHS SHALL PROVIDE
COPIES OF DOCUMENTATION TO CONTRACTORS PRIOR TO BID.
E. CAVHS M&O ELECTRICAL STANDARDS
F. CURRENT REVISIONS OF THE VA ELECTRICAL DESIGN GUIDE
GENERAL PHASING NOTES
A. LOOPS THAT FEED TRANSFORMERS AND MANHOLES ARE
INDICATED ON THE ENLARGED PLANS WITH RESPECTIVE TAGS.
CONTRACTOR SHALL ADJUST THE NUMBER OF ITEMS REPLACED
AS NEEDED BASED ON MANPOWER. COORDINATE ANTICIPATED
ITEMS AND SUBMIT TO COR FOR APPROVAL.
B. THE INTENT IS FOR MULTIPLE TRANSFORMERS OR SPLICES ON
THE SAME LOOP TO BE REPLACED AT THE SAME TIME AT THE
DIRECTION OF THE COR.
C. CONTRACTOR CAN WORK MULTIPLE CREWS ON MORE THAN ONE
TRANSFORMER OR MANHOLE ON THE LOOPS THAT ARE
DISCONNECTED BY THE VA.
D. WORK SCHEDULE AND ANTICIPATED TRANSFORMER AND
MANHOLE WORK MUST BE COORDINATED WITH THE COR AND
VAMC STAFF PRIOR TO WORK COMMENCEMENT.
E. CONTRACTOR SHALL COORDINATE WITH AND OBTAIN APPROVAL
FROM THE COR AND VAMC STAFF ON WHICH TRANSFORMERS
AND MANHOLES ARE AVAILABLE FOR WORK.
F. REFER TO BELOW PHASING NOTES AND SHEETS E-401 THROUGH
E-406 FOR ADDITIONAL INFORMATION.
G. SEE MANHOLE AND TRANSFORMER SCHEDULES ON E-501 FOR
SPECIFIC INFORMATION ON EACH MANHOLE AND TRANSFORMER.
H. ALL WORK MUST BE COMPLETED DURING THE TIMES INDICATED
IN BELOW PHASING NOTES.
G. NFPA 70E, OSHA AND VA LOTO PROCEDURES
MANHOLE 32-1
MANHOLE 32-2
MANHOLE 34
MANHOLE 34-2
MANHOLE 40
MANHOLE 30
MANHOLE 31
MANHOLE 29
MANHOLE 15A
MANHOLE 3
MANHOLE 2
MANHOLE 46NF
MANHOLE 4
MANHOLE D*
MANHOLE 5*
MANHOLE 5A*
MANHOLE C MANHOLE 43 MANHOLE 22*
MANHOLE NF*
MANHOLE 35
MANHOLE HH
MANHOLE 36
MANHOLE 8D
MANHOLE 8C*
MANHOLE J
MANHOLE 8A*
MANHOLE 8
MANHOLE 148
MANHOLE 7
MANHOLE 6
MANHOLE 33
MANHOLE NF*
MANHOLE 27A MANHOLE 27B
MANHOLE 27C
MANHOLE 27*
MANHOLE 26*
MANHOLE B
MANHOLE 24NF*
MANHOLE 45-2MANHOLE 45
TWO (2) NEW SECTIONALIZER CABINETS AT THIS LOCATION.
INSTALLATION OF TWENTY (20) BOLLARDS ANTICIPATED AT
THIS LOCATION SEE DETAIL 5/S301.
TWO (2) NEW SECTIONALIZER
CABINETS AT THIS LOCATION
MANHOLE 49
MANHOLE 10
TRANSFORMER 16*
MANHOLE 17NF
MANHOLE K
MANHOLE J
MANHOLE 39
MANHOLE 38
MANHOLE 37
MANHOLE 8B
MANHOLE 13
MANHOLE I*
MANHOLE 14NF* MANHOLE 14A*
MANHOLE NF*
TRANSFORMER 1
TRANSFORMER 3 AND 4
TRANSFORMER 5
TRANSFORMER 6
TRANSFORMERS 7 AND 8
TRANSFORMER 9
TRANSFORMERS 10 AND 11
TRANSFORMER 13
TRANSFORMER 12
TRANSFORMER 34
TRANSFORMER 35
TRANSFORMER 32
TRANSFORMER 29
TRANSFORMER 30
TRANSFORMER 17
TRANSFORMER 33*
TRANSFORMERS 19 AND 20*
TRANSFORMER 18
TRANSFORMERS 21 AND 22
TRANSFORMER 15
TRANSFORMER 14
TRANSFORMER 27*
TRANSFORMERS 25* AND 26*
TRANSFORMER 28
TRANSFORMER 31
TRANSFORMER 24
TRANSFORMER 23
MANHOLE 12* MANHOLE J1*
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EUGENE J. TOWBIN HEALTHCARE CENTER -
REPLACE UNDERGROUND 15KV FEEDER
SEPARABLE CONNECTORS AND
TRANSFORMERS
2200 FORT ROOTS DRIVE,
NORTH LITTLE ROCK, AR 72114
598-19-112
As Shown Project Director
07/31/2025Revisions: Date: F.KEELS J.POWELL
PROJECT 598-19-112 "REPLACE
UNDERGROUND 15KV FEEDERS AND
TRANSFORMERS" NAME WAS REVISED TO
REFLECT AN APPROVED SCOPE CHANGE.
E101
OVERALL UTILITY PLAN
ELECTRICAL SHEET NOTES:
1. SEE SHEET E501 FOR ADDITIONAL INFORMATION.
2. SEE SHEETS E401 THROUGH E406 FOR ADDITIONAL INFORMATION.
3. FEEDER LOOPS INDICATED ON SHEETS E401 THROUGH E406.
4. TYPICAL TRANSFORMER DETAILS SHOWN ON SHEET E502.
5. SECTIONALIZER DETAILS SHOWN ON SHEET E501.
6. “*” SYMBOL INDICATES TRANSFORMERS AND MANHOLES THAT ARE NOT
INCLUDED IN THE CURRENT SCOPE OF WORK AND ARE SHOWN FOR
REFERENCE ONLY.
AutoCAD SHX Text
FOURTH STREET
AutoCAD SHX Text
ENGINEERING TRAINING CENTER
AutoCAD SHX Text
ENGINEERING TRAINING CENTER
AutoCAD SHX Text
EDUCATION & MENTAL HEALTH SVC.
AutoCAD SHX Text
HUMAN RESOURCES MANAGEMENT SVC.
AutoCAD SHX Text
HUMAN RESOURCES MANAGEMENT SVC.
AutoCAD SHX Text
AutoCAD SHX Text
EAST DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text T160
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T161
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
AutoCAD SHX Text
HILL ROAD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH DRIVE
AutoCAD SHX Text
AutoCAD SHX Text 4.
AutoCAD SHX Text
ENGINEERING STORAGE
AutoCAD SHX Text 33.
AutoCAD SHX Text
WATER TANK & TOWER
AutoCAD SHX Text
FLAGPOLE
AutoCAD SHX Text
SINGLE GARAGE
AutoCAD SHX Text
FISCAL/A&MMS
AutoCAD SHX Text
QUARTERS
AutoCAD SHX Text
PATIENT DORM.
AutoCAD SHX Text
EMS STORAGE
AutoCAD SHX Text
TELEPHONE & STORAGE
AutoCAD SHX Text 45.
AutoCAD SHX Text 42.
AutoCAD SHX Text 54.
AutoCAD SHX Text 39.
AutoCAD SHX Text 38.
AutoCAD SHX Text 41.
AutoCAD SHX Text 40.
AutoCAD SHX Text 35.
AutoCAD SHX Text 34.
AutoCAD SHX Text 37.
AutoCAD SHX Text 36.
AutoCAD SHX Text
FIREMAN'S DORM.
AutoCAD SHX Text
DISTRICT COUNSEL
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
ENGINEERING - MASON SHOP
AutoCAD SHX Text
ENGINEERING SHOPS
AutoCAD SHX Text
DUPLEX QUARTERS
AutoCAD SHX Text
FIRE STATION
AutoCAD SHX Text
ENGINEERING SHOPS
AutoCAD SHX Text
TRANSPORTATION
AutoCAD SHX Text
SINGLE QUARTERS
AutoCAD SHX Text
DUPLEX QUARTERS
AutoCAD SHX Text
DUPLEX QUARTERS
AutoCAD SHX Text
DUPLEX QUARTERS
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text
ENG. TRAINING CTR. STORAGE
AutoCAD SHX Text 15.
AutoCAD SHX Text 24.
AutoCAD SHX Text 28.
AutoCAD SHX Text 26.
AutoCAD SHX Text 32.
AutoCAD SHX Text 16.
AutoCAD SHX Text 22.
AutoCAD SHX Text 18.
AutoCAD SHX Text 12.
AutoCAD SHX Text 11.
AutoCAD SHX Text 14.
AutoCAD SHX Text 13.
AutoCAD SHX Text 6.
AutoCAD SHX Text 5.
AutoCAD SHX Text 8.
AutoCAD SHX Text 7.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
ENG. COMM. OFFICES
AutoCAD SHX Text
ENG. COMM. OFFICES
AutoCAD SHX Text
ENGINEERING OFFICES
AutoCAD SHX Text 1.
AutoCAD SHX Text 3.
AutoCAD SHX Text 2.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GROUNDS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MAIN CIRCLE DRIVE
AutoCAD SHX Text
HISTORICAL
AutoCAD SHX Text
FORT ROOTS
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
THIRD STREET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
SCENIC DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PATIENT TOILET (INACTIVE)
AutoCAD SHX Text
TRANSFORMER PAD (BLDG. 68)
AutoCAD SHX Text
TRANSFORMER PAD (BLDG 69)
AutoCAD SHX Text
ELECT. UNIT SUB-STATION
AutoCAD SHX Text
CONDENSING UNIT (BLDG 182)
AutoCAD SHX Text
STORAGE BLDG.(CADDY HOUSE)
AutoCAD SHX Text
UNDERGROUND PIPING (BLDG)
AutoCAD SHX Text
SECURITY TRAINING CENTER
AutoCAD SHX Text
UNDERGROUND FUEL TANK
AutoCAD SHX Text
ENGINEERING - GROUNDS
AutoCAD SHX Text
AutoCAD SHX Text 61.
AutoCAD SHX Text
THREE CAR GARAGE
AutoCAD SHX Text
AUDIOLOGY, EMS, RMS, REGIONAL OFFICE
AutoCAD SHX Text
ENGINEERING TRAINING CENTER HOUSING
AutoCAD SHX Text
RMS PSYCH. MENTAL HYGIENE CLINIC
AutoCAD SHX Text
OFFICE OF INFO. MANAGEMENT
AutoCAD SHX Text
LAW ENFORCEMENT TRAINING CENTER
AutoCAD SHX Text 102.
AutoCAD SHX Text
AUDITORIUM
AutoCAD SHX Text
VACANT
AutoCAD SHX Text
LAUNDRY
AutoCAD SHX Text
GREENHOUSE
AutoCAD SHX Text
ENGINEERING SHOPS
AutoCAD SHX Text
ENGINEERING SHOPS
AutoCAD SHX Text
SINGLE QUARTERS
AutoCAD SHX Text
VAMC DIRECTOR'S OFFICE
AutoCAD SHX Text 158.
AutoCAD SHX Text 117.
AutoCAD SHX Text 159.
AutoCAD SHX Text 106.
AutoCAD SHX Text 115.
AutoCAD SHX Text 114.
AutoCAD SHX Text 111.
AutoCAD SHX Text 107.
AutoCAD SHX Text 104.
AutoCAD SHX Text 103.
AutoCAD SHX Text 105.
AutoCAD SHX Text
VACANT
AutoCAD SHX Text
RESERV0IR
AutoCAD SHX Text
GATEHOUSE
AutoCAD SHX Text M.H.S., O.R.M., E.M.P.
AutoCAD SHX Text
BALLFIELD BLEACHERS
AutoCAD SHX Text
WATER TANK & TOWER
AutoCAD SHX Text
ATHLETIC DRESSING ROOMS
AutoCAD SHX Text
MECHANIC STORAGE BLDG.
AutoCAD SHX Text
ENGINEERING SHOPS
AutoCAD SHX Text
NUTRITION & FOOD SVC.
AutoCAD SHX Text
SEVEN CAR GARAGE
AutoCAD SHX Text
BOILER PLANT
AutoCAD SHX Text
EDUCATION &DAYCARE
AutoCAD SHX Text
CLINICAL SUPPORT
AutoCAD SHX Text
REGIONAL OFFICE
AutoCAD SHX Text 80.
AutoCAD SHX Text 89.
AutoCAD SHX Text 90.
AutoCAD SHX Text 91-96.
AutoCAD SHX Text 101.
AutoCAD SHX Text 81.
AutoCAD SHX Text 88.
AutoCAD SHX Text 87.
AutoCAD SHX Text 75.
AutoCAD SHX Text 70.
AutoCAD SHX Text 78.
AutoCAD SHX Text 76.
AutoCAD SHX Text 66.
AutoCAD SHX Text 65.
AutoCAD SHX Text 69.
AutoCAD SHX Text 68.
AutoCAD SHX Text 186.
AutoCAD SHX Text
HEXAGON PED. SHELTER
AutoCAD SHX Text 1154.
AutoCAD SHX Text 289.
AutoCAD SHX Text 276.
AutoCAD SHX Text T160.
AutoCAD SHX Text T161.
AutoCAD SHX Text T167.
AutoCAD SHX Text T166.
AutoCAD SHX Text 187.
AutoCAD SHX Text 188.
AutoCAD SHX Text 190.
AutoCAD SHX Text 189.
AutoCAD SHX Text
WATER PUMPING PLANT
AutoCAD SHX Text
COOLING TOWER
AutoCAD SHX Text
EMERGENCY GENERATOR
AutoCAD SHX Text
FREE-STANDING GEN.
AutoCAD SHX Text
ENGINEERING STORAGE
AutoCAD SHX Text
ENGINEERING STORAGE
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
RMS - CWT
AutoCAD SHX Text 176.
AutoCAD SHX Text 182.
AutoCAD SHX Text 184.
AutoCAD SHX Text 183.
AutoCAD SHX Text 185.
AutoCAD SHX Text 179.
AutoCAD SHX Text 181.
AutoCAD SHX Text 180.
AutoCAD SHX Text 172.
AutoCAD SHX Text 173.
AutoCAD SHX Text 175.
AutoCAD SHX Text 174.
AutoCAD SHX Text 168.
AutoCAD SHX Text 167.
AutoCAD SHX Text 169.
AutoCAD SHX Text 170.
AutoCAD SHX Text
ANIMAL STOR. BLDG.
AutoCAD SHX Text
EMERGENCY GENERATOR
AutoCAD SHX Text
GASOLINE STATION
AutoCAD SHX Text
PATIENT TOILET
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text
CADDY HOUSE
AutoCAD SHX Text
ANIMAL STOR. BLDG.
AutoCAD SHX Text
PATIENT BUILDING
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
GOLF COURSE
AutoCAD SHX Text
BUILDING SCHEDULE
AutoCAD SHX Text
X-RAY TRAINING & SWITCHBOARD
AutoCAD SHX Text
TEN CAR GARAGE
AutoCAD SHX Text
FIVE CAR GARAGE
AutoCAD SHX Text 58.
AutoCAD SHX Text 60.
AutoCAD SHX Text 59.
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text 162.
AutoCAD SHX Text 166.
AutoCAD SHX Text 164.
AutoCAD SHX Text 163.
AutoCAD SHX Text
RECREATION SHELTER
AutoCAD SHX Text
BARSCREEN HOUSE
AutoCAD SHX Text
VACANT
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PINE STREET
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FIRST STREET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 91-96
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
ATHLETIC FIELD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T-166
AutoCAD SHX Text T-167
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CYPRESS STREET
AutoCAD SHX Text
PULASKI TECHINICAL COLLEGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 200.
AutoCAD SHX Text
EMERGENCY STORAGE
AutoCAD SHX Text
SECURITY TRAINING CENTER
AutoCAD SHX Text 191.
AutoCAD SHX Text
AutoCAD SHX Text 199.
AutoCAD SHX Text
ENGINEERING STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 192.
AutoCAD SHX Text
SECURITY TRAINING CENTER
AutoCAD SHX Text
NEW HYDRANT
AutoCAD SHX Text
IN 97 PROJECT
AutoCAD SHX Text
WITH NEW VALVE
AutoCAD SHX Text
AND TAP HERE
AutoCAD SHX Text
OLD HYDRANT
AutoCAD SHX Text
REMOVED AND
AutoCAD SHX Text
LINE CAPPED
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text T98
AutoCAD SHX Text T99
AutoCAD SHX Text T-100
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T101
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
NORTH
FEEDER LOOP 1
MANHOLE 32-2
MANHOLE 34
MANHOLE 34-2
MANHOLE 15A
MANHOLE 3
MANHOLE 2
MANHOLE 46NF
MANHOLE 4
MANHOLE D*
MANHOLE 5*
MANHOLE 5A*
MANHOLE 35
MANHOLE HH
MANHOLE 36
MANHOLE 8D
MANHOLE 8C*
MANHOLE 7
MANHOLE 6
MANHOLE 33
TRANSFORMER 16*
TRANSFORMER 5 TRANSFORMER 6
TRANSFORMER 34
TRANSFORMER 35
TRANSFORMER 17
TRANSFORMER 33*
TRANSFORMERS 19 AND 20*
TRANSFORMER 18
TRANSFORMER 1
TRANSFORMER 3 AND 4
Project Number
Building Number
Drawing Number
Project…