This file summary describes a federal contract solicitation for relocating a medical ward to ensure patient privacy. The solicitation number is 36c25522R0024 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. It seeks proposals to relocate a medical ward and includes specifications and drawings in the solicitation documents. Proposals are due on an unspecified date to relocate the medical ward identified as PN:589A4-21-100 to ensure patient privacy at the specified Veterans Affairs facility. The award date was also not provided.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL DEMOLITION NOTES

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING. THE

CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY CONDITIONS THAT

DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.

B. PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY

DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.

C. VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE DRAWINGS AND

WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE THE INTENDED WORK.

D. ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS RESPONSIBLE

FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL WORK ASSOCIATED WITH

THIS CONTRACT.

E. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH

SURROUNDING EXISTING FINISHES NOT DISTURBED.

F. TYPES OF FLOOR, WALL, AND CEILING FINISHES INDICATED FOR REMOVAL BY DEMOLITION

NOTES ARE FOR GENERAL INFORMATION ONLY FROM INFORMATION OBTAINED FROM

EXISTING PLANS AND OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY MATERIAL TYPES

ONSITE PRIOR TO BID AND INCLUDE NECESSARY WORK IN HIS BID.

G. ALL APPLIANCES, FURNITURE, AND EQUIPMENT TO REMAIN THE PROPERTY OF THE

OWNER - CONTRACTOR TO COORDINATE REMOVAL, RELOCATION AND STORAGE OF

EQUIPMENT FROM DEMO AREAS WITH OWNER.

H. MISCELLANEOUS FLOOR PENETRATIONS AND DEMO FOR NEW MECHANICAL AND

ELECTRICAL WORK SHALL BE COORDINATED FROM ARCHITECTURAL, MECHANICAL, AND

ELECTRICAL PLANS.

I. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DEMO PLANS FOR DEMOLITION,

SALVAGE AND RE-USE OF EXISTING ITEMS.

J. PATCH FLOOR AT REMOVED WALLS AND CASEWORK, PREPARE FLOOR TO RECEIVE NEW

FLOORING AS REQUIRED.

K. ALL HOLES IN EXISTING SLAB LEFT FROM REMOVAL OF FIXTURES TO RECEIVE INFILL PER

STRUCTURAL DETAIL.

L. REMOVE ALL STAINLESS STEEL CORNER GUARDS CAREFULLY AND GIVE TO OWNER.

M. ELEMENTS INDICATED WITH A DASHED LINE ARE TO BE DEMOLISHED AND DISPOSED OF AS

A PART OF THIS PROJECT, UNLESS NOTED OTHERWISE.

N. IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED WITH

MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE RIGHT TO

TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS SHOULD THE

OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE OF THE

OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.

O. CONTRACTOR SHALL REMOVE AND DISPOSE OF IN A LEGAL MANNER ALL MATERIAL NOT

SCHEDULED FOR REUSE UNDER THIS PROJECT .

P. IN ALL WALLS AND CEILINGS THAT ARE TO BE REMOVED THE CONTRACTOR SHALL BE

RESPONSIBLE FOR DISCONNECTING AT SOURCE AND REMOVING OR CAPPING ELECTRICAL,

PLUMBING, GAS LINES AND MECHANICAL DUCTWORK THAT ARE NOT SCHEDULED FOR

REUSE. CONTRACTOR SHALL REROUTE AND CONTINUE ANY SYSTEM THAT MUST BE

RETAINED FOR NEW CONSTRUCTION. CONTRACTOR SHALL REROUTE AND KEEP

OPERATIONAL ALL SYSTEMS SERVING SPACES IN THE SURROUNDING AREAS TO THE

PROJECT.

Q. ALL ELECTRICAL CIRCUITS FOR EQUIPMENT THAT ARE TO BE REMOVED SHALL BE

DISCONNECTED AT SOURCE AND REMOVED BACK TO PANEL.

R. ALL PIPING GAS, WATER SUPPLY, VENT, DRAIN LINES, ETC. SUPPLYING EQUIPMENT THAT

ARE TO BE REMOVED SHALL BE DISCONNECTED, REMOVED AND CAPPED ABOVE CEILING

OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AS NECESSARY, TO BE BEHIND NEW

CONSTRUCTION. (PATCH FLOOR BACK PRIOR TO TOPPING.)

S. ALL MED GASES AND PLUMBING TO BE REMOVED AT WALLS SCHEDULED FOR DEMOLITION.

T. REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT WITHIN ROOMS SCHEDULED TO BE

DEMOLISHED. SEE MEP PIPING DRAWINGS.

U. RETURN ALL SIGNAGE AFFECTED BY CONSTRUCTION TO OWNER.

WALL DOOR

CEILING

AND GRID

DEMO LEGEND

FLOOR

PENETRATION

GYP BOARD

CEILING/SOFFIT

CONCRETE

PATCH AREA

(-X" = DEPTH OF

PATCH AREA)

-X"

THIRD FLOOR KEY PLAN - AREA B

BN

ABCDEFGGaH

8.28.2

9.19.1

10.410.4

BaH.5

8.08.0

F.1 E.a2 Aa

13.6

2.03

2.03 2.032.03

2.03

2.03

2.03

2.17

2.03

2.03

2.17

2.03

2.03

2.03

2.03

2.032.03

2.03

2.03

2.03

2.03

2.03

2.032.03

2.032.03

2.03

2.032.03

2.03

2.03

2.03

2.03

2.03

2.03

2.202.202.202.202.20

2.20 2.20

2.20

2.20

2.20

2.03

2.03

2.202.20

2.202.20

2.05

2.05

2.052.05

2.05

2.052.05

2.05D2.05

2.05

2.052.05

2.03

2.05

2.052.05

2.05

2.05D2.05

2.05

2.05

2.05

2.05

2.05 2.052.05D2.05

2.052.052.05

2.052.05

2.03

2.05A

2.05A

2.05A 2.05

2.05A

2.05

2.05A

2.05B

2.05B

2.05B 2.05B

2.05B

2.05B

2.05B 2.05B

2.05A

2.05A

2.05A

2.05B

2.05B 2.05B 2.05B

2.05B

2.05B

2.05B

2.05B

2.05B

2.05B

2.05B

2.03

2.03

2.022.02

2.05A

2.05A

2.05A

2.05A

2.05A

2.05

2.17

2.08 2.08

2.03

2.08

2.08

2.08

2.08

2.08

2.08

2.08

2.08

2.08

2.08

2.08

2.08

2.08

2.08

2.03

2.03

2.08

2.08

2.08

2.08

2.08

2.08

2.08FIRST FLOOR ROOF BELOW

THIRD FLOOR

BALCONY

-1" 2.08A

2.03

2.05

BID ITEM #2

(REF. GI001)

2.05D

2.05D

2.05D

2.05D

2.05D

2.05D

2.05D 2.05D

2.05D

2.05D

2.05

2.052.05

2.05

2.05

2.05

2.052.05

2.05

2.052.05

D320

D321

D322

D323

D318

D319

D324

D325

D326

D327

D328

D329

D316

D353

D353A

D332DD332B

D344

D345

D346

D347 D348

D349

D350

D351

D351A

D330

D331

C3D4

D316C

C3D4

D331A

D331B

D331C C3D5

D352

D330A

D301B

C3D1

C3D3

C357A

C356A

C359

C360A

C360

C339

C358

C340

D316A

C358C

#6

C358A

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

AD106.2

DEMOLITION PLAN - 3RD FLOOR -

AREA B - BID ITEM #2 (DEDUCT)

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

KEYNOTES

KEY VALUE KEYNOTE TEXT

2.02 REMOVE CASEWORK & SALVAGE FOR REUSE, COORDINATE LOCATION WITH OWNER."

2.03 REMOVE DOOR, FRAME AND HARDWARE.

2.05 REMOVE WALL AND ALL OF ITS BUILDING COMPONENTS (FULL HEIGHT)

2.05A REMOVE FURRING WALL AND ALL OF ITS BUILDING COMPONENTS DOWN TO EXISTING

STRUCTURE

2.05B REMOVE COLUMN FURRING WALLS

2.05D REMOVE FURRING WALLS, COMMUNICATE EXISTANCE OF ANY DUCT WORK OR PIPING

WITH ARCHITECT FOR COORDINATION OF REPLACEMENT WALL

2.08 REMOVE FLOORING AND BASE. PREPARE AREA FOR NEW FLOOR FINISHES AND BASE,

REF. FINISH SCHEDULE.

2.08A REMOVE CONCRETE PATCH AND REPAIR WITH CONCRETE PER STRUCTURAL, SEE

PLAN FOR APPROX DEPTH OF PATCH. PREPARE AREA FOR NEW FLOOR FINISHES AND

BASE, REF. FINISH SCHEDULE.

2.17 TEMPORARILY REMOVE EXISTING CEILING GRID AND TILES AS NECESSARY FOR

DEMO/INSTALL OF MECHANICAL(SEE MECH PLANS); REINSTALL GRID AND TILE AND

REPARE ANY DAMAGES THAT OCCURED DURING CONSTRUCTION.

2.20 REMOVE PLUMBING FIXTURE AND CAP LINES AS REQUIRED, REF. MEP DEMO PLANS

FOR MORE INFORMATION

N

1/8" = 1'-0"

DEMOLITION PLAN - 3RD FLOOR - AREA B - BID ITEM #2 (DEDUCT)

Jesse Bell Snapshot

2.06

2.06

2.06

2.06

2.06

2.06

2.20A 2.06

2.06 2.06

2.06

2.06 2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.062.06

2.06

2.06

2.06

2.06A

2.06

2.06

2.06A

2.06

2.06A

2.06

2.06

2.06

2.06

2.06

2.06 2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06A

2.06A 2.06A

2.06A

2.06A 2.06A

2.06A

2.06A 2.06A

2.06A

2.06A 2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A 2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A 2.20A

2.20A

2.06

2.20A

2.20A

2.20A

2.20A

2.20A 2.20A 2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A 2.20A 2.09

2.09

2.30

2.30

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.09

2.09

2.09

2.20A 2.20A 2.30

2.30

2.30

2.30

2.09

2.302.30

2.30

2.302.30

2.20A

2.09

2.20A

2.20A 2.20A2.20A

2.20A2.20A

2.20A 2.20A

2.20A

2.20A

2.092.09

2.092.09

2.09

2.09

2.09

2.20A2.20A 2.20A 2.20A 2.20A

2.20A

2.20A

2.302.302.302.30

2.302.30

2.30

2.302.30

2.20A

2.20A

2.20A

2.20A

2.20A 2.20A

2.20A 2.20A

2.20A

2.092.09

2.09 2.09 2.09

2.20A 2.20A

2.20A

2.20A

2.09

2.09

2.09

2.09

2.30

2.06A

2.06

2.06

2.06

2.06 2.06

2.06

2.06

2.06

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06

2.06

2.06A

2.06A

2.06

2.09

2.20A

2.20A 2.20A

2.20A

2.09

2.09

2.20A

2.09

2.20A

2.30

2.30

2.09

2.09

2.20A

2.20A

2.20A

2.20A

2.09

2.20A

2.20A

2.09

2.30

2.30

2.20A 2.20A

2.20A

2.20A

2.102.10

2.102.10

AD101

2.30

2.06

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30 2.30

2.30 2.30 2.30 2.30

2.30

2.30

2.30 2.30

2.30

2.30

2.06 2.30

2.30

2.30

2.30

2.30

2.30 2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30 2.30 2.30

2.30 2.30

2.30 2.30

2.302.30

2.30 2.30

2.30 2.30

2.30

2.30

2.06

2.06

2.06

2.30 2.092.20A

2.06A

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.06

2.30

2.30 2.30

2.30

2.30

2.30

2.30

2.30 2.30

2.30

2.30

2.30

2.30 2.30

2.20A

2.20A

2.20A

2.16

2.16

2.16

2.16

2.16

2.16

2.16 2.16 2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

BID ITEM #2

(REF. GI001)

2.06

2.32

2.32

2.32

2.32

2.32

2.32

GENERAL DEMOLITION NOTES

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING. THE

CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY CONDITIONS THAT

DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.

B. PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY

DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.

C. VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE DRAWINGS AND

WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE THE INTENDED WORK.

D. ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS RESPONSIBLE

FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL WORK ASSOCIATED WITH

THIS CONTRACT.

E. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH

SURROUNDING EXISTING FINISHES NOT DISTURBED.

F. TYPES OF FLOOR, WALL, AND CEILING FINISHES INDICATED FOR REMOVAL BY DEMOLITION

NOTES ARE FOR GENERAL INFORMATION ONLY FROM INFORMATION OBTAINED FROM

EXISTING PLANS AND OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY MATERIAL TYPES

ONSITE PRIOR TO BID AND INCLUDE NECESSARY WORK IN HIS BID.

G. ALL APPLIANCES, FURNITURE, AND EQUIPMENT TO REMAIN THE PROPERTY OF THE

OWNER - CONTRACTOR TO COORDINATE REMOVAL, RELOCATION AND STORAGE OF

EQUIPMENT FROM DEMO AREAS WITH OWNER.

H. MISCELLANEOUS FLOOR PENETRATIONS AND DEMO FOR NEW MECHANICAL AND

ELECTRICAL WORK SHALL BE COORDINATED FROM ARCHITECTURAL, MECHANICAL, AND

ELECTRICAL PLANS.

I. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DEMO PLANS FOR DEMOLITION,

SALVAGE AND RE-USE OF EXISTING ITEMS.

J. PATCH FLOOR AT REMOVED WALLS AND CASEWORK, PREPARE FLOOR TO RECEIVE NEW

FLOORING AS REQUIRED.

K. ALL HOLES IN EXISTING SLAB LEFT FROM REMOVAL OF FIXTURES TO RECEIVE INFILL PER

STRUCTURAL DETAIL.

L. REMOVE ALL STAINLESS STEEL CORNER GUARDS CAREFULLY AND GIVE TO OWNER.

M. ELEMENTS INDICATED WITH A DASHED LINE ARE TO BE DEMOLISHED AND DISPOSED OF AS

A PART OF THIS PROJECT, UNLESS NOTED OTHERWISE.

N. IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED WITH

MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE RIGHT TO

TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS SHOULD THE

OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE OF THE

OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.

O. CONTRACTOR SHALL REMOVE AND DISPOSE OF IN A LEGAL MANNER ALL MATERIAL NOT

SCHEDULED FOR REUSE UNDER THIS PROJECT .

P. IN ALL WALLS AND CEILINGS THAT ARE TO BE REMOVED THE CONTRACTOR SHALL BE

RESPONSIBLE FOR DISCONNECTING AT SOURCE AND REMOVING OR CAPPING ELECTRICAL,

PLUMBING, GAS LINES AND MECHANICAL DUCTWORK THAT ARE NOT SCHEDULED FOR

REUSE. CONTRACTOR SHALL REROUTE AND CONTINUE ANY SYSTEM THAT MUST BE

RETAINED FOR NEW CONSTRUCTION. CONTRACTOR SHALL REROUTE AND KEEP

OPERATIONAL ALL SYSTEMS SERVING SPACES IN THE SURROUNDING AREAS TO THE

PROJECT.

Q. ALL ELECTRICAL CIRCUITS FOR EQUIPMENT THAT ARE TO BE REMOVED SHALL BE

DISCONNECTED AT SOURCE AND REMOVED BACK TO PANEL.

R. ALL PIPING GAS, WATER SUPPLY, VENT, DRAIN LINES, ETC. SUPPLYING EQUIPMENT THAT

ARE TO BE REMOVED SHALL BE DISCONNECTED, REMOVED AND CAPPED ABOVE CEILING

OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AS NECESSARY, TO BE BEHIND NEW

CONSTRUCTION. (PATCH FLOOR BACK PRIOR TO TOPPING.)

S. ALL MED GASES AND PLUMBING TO BE REMOVED AT WALLS SCHEDULED FOR DEMOLITION.

T. REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT WITHIN ROOMS SCHEDULED TO BE

DEMOLISHED. SEE MEP PIPING DRAWINGS.

U. RETURN ALL SIGNAGE AFFECTED BY CONSTRUCTION TO OWNER.

WALL DOOR

CEILING

AND GRID

DEMO LEGEND

FLOOR

PENETRATION

GYP BOARD

CEILING/SOFFIT

CONCRETE

PATCH AREA

(-X" = DEPTH OF

PATCH AREA)

-X"

D301A

D353 D353A

D332D

D332A D332B

D333

D333A

D333B

D334 D335

D336 D337

D338

D339

D340

D341

D339A

D338A

D334A

D335A

D338B

D342

D343

D344

D345

A335 A347

A316

A358

A317

A357

A319

A356

A321

A353

A354

A321A

A325

A352

A351

A350

A332 A348

C3A4A

A328

A331

A337

A338

A339

A340

A341

A342

A343

A344

A345

A346

A339A

A330 A330A

A330B

A329A327

A326

A323 A322

A318

A318A

A329AA327AA326AA323A

A320

B344

B318

A313

A314

A306A

A346A

H.R.

C3A6

C3A5

C3A4

D308C D301B

D301

C3C7

#3 #2 #1

B347

CORR.

#4

#5

B318A

C3A2

B345

C3A4

A312

A300

C3A3

D331C

D331

C3D4

D330A

D329

D330

D346

D348

D347

C3D5

THIRD FLOOR KEY PLAN - AREA A

A

N

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

AD107

DEMOLITION PLAN - 3RD FLOOR

CEILING - AREA A

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

1/8" = 1'-0"

DEMOLITION PLAN - 3RD FLOOR CEILING - AREA A

KEYNOTES

KEY VALUE KEYNOTE TEXT

2.06 REMOVE ACT CEILING & GRID, DEMO TO INCLUDE DRYWALL & PLASTER SOFFITS

2.06A REMOVE GYP CEILING, DEMO TO INCLUDE DRYWALL & PLASTER SOFFITS

2.09 REMOVE CEILING ACCESS PANEL

2.10 REMOVE BALCONY ROOF SYSTEM & ROOF SUPPORTS INCLUDING ANGLE IRONS

ATTACHED TO BRICK, REF. STRUCT. DEMO PLANS FOR MORE INFORMATION

2.16 REMOVE PATIENT LIFT TRACKS, RAILS AND VETICAL SUPPORTS. REMOVE ALL

THREADED RODS AND SUPPORTS ABOVE CEILING TO STRUCTURE

2.20A REMOVE HVAC ELEMENT, REF. MEP DEMO PLANS FOR MORE INFORMATION

2.30 REMOVE LIGHT FIXTURE, REF. ELEC. DEMO PLANS FOR MORE INFORMATION

2.32 REMOVE WIRELESS ACCESS POINT, REF. ELEC. DEMO PLANS FOR MORE

INFORMATION

N

2.06

2.06

2.06

2.06

2.06

2.20A 2.06

2.06 2.06

2.06

2.06 2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.062.06

2.06

2.06

2.06

2.06A

2.06

2.06

2.06A

2.06

2.06A

2.06

2.06

2.06

2.06

2.06

2.06 2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06A

2.06A 2.06A

2.06A

2.06A 2.06A

2.06A

2.06A 2.06A

2.06A

2.06A 2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A 2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A 2.20A

2.20A

2.06

2.20A

2.20A

2.20A

2.20A

2.20A 2.20A 2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A 2.20A 2.09

2.09

2.30

2.30

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.09

2.09

2.09

2.20A 2.20A 2.30

2.30

2.30

2.30

2.09

2.302.30

2.30

2.302.30

2.20A

2.09

2.20A

2.20A 2.20A2.20A

2.20A2.20A

2.20A 2.20A

2.20A

2.20A

2.092.09

2.092.09

2.09

2.09

2.09

2.20A2.20A 2.20A 2.20A 2.20A

2.20A

2.20A

2.302.302.302.30

2.302.30

2.30

2.302.30

2.20A

2.20A

2.20A

2.20A

2.20A 2.20A

2.20A 2.20A

2.20A

2.092.09

2.09 2.09 2.09

2.20A 2.20A

2.20A

2.20A

2.09

2.09

2.09

2.09

2.30

2.06A

2.06

2.06

2.06

2.06 2.06

2.06

2.06

2.06

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06A

2.06

2.06

2.06A

2.06A

2.06

2.09

2.20A

2.20A 2.20A

2.20A

2.09

2.09

2.20A

2.09

2.20A

2.30

2.30

2.09

2.09

2.20A

2.20A

2.20A

2.20A

2.09

2.20A

2.20A

2.09

2.30

2.30

2.20A 2.20A

2.20A

2.20A

2.30

2.06

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30 2.30

2.30 2.30 2.30 2.30

2.30

2.30

2.30 2.30

2.30

2.30

2.06 2.30

2.30

2.30

2.30

2.30

2.30 2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30 2.30 2.30

2.30 2.30

2.30 2.30

2.302.30

2.30 2.30

2.30 2.30

2.30

2.30

2.06

2.06

2.06

2.30 2.092.20A

2.06A

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.06

2.30

2.30 2.30

2.30

2.30

2.30

2.30

2.30 2.30

2.30

2.30

2.30

2.30 2.30

2.20A

2.20A

2.20A

2.16

2.16

2.16

2.16

2.16

2.16

2.16 2.16 2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

BID ITEM #2

(REF. GI001)

2.06

2.32

2.32

2.32

2.32

2.32

2.32

D301A

D353 D353A

D332D

D332A D332B

D333

D333A

D333B

D334 D335

D336 D337

D338

D339

D340

D341

D339A

D338A

D334A

D335A

D338B

D342

D343

D344

D345

A335 A347

A316

A358

A317

A357

A319

A356

A321

A353

A354

A321A

A325

A352

A351

A350

A332 A348

C3A4A

A328

A331

A337

A338

A339

A340

A341

A342

A343

A344

A345

A346

A339A

A330 A330A

A330B

A329A327

A326

A323 A322

A318

A318A

A329AA327AA326AA323A

A320

B344

B318

A313

A314

A306A

A346A

H.R.

C3A6

C3A5

C3A4

D308C D301B

D301

C3C7

#3 #2 #1

B347

CORR.

#4

#5

B318A

C3A2

B345

C3A4

A312

A300

C3A3

D331C

D331

C3D4

D330A

D329

D330

D346

D348

D347

C3D5

GENERAL DEMOLITION NOTES

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING. THE

CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY CONDITIONS THAT

DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.

B. PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY

DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.

C. VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE DRAWINGS AND

WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE THE INTENDED WORK.

D. ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS RESPONSIBLE

FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL WORK ASSOCIATED WITH

THIS CONTRACT.

E. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH

SURROUNDING EXISTING FINISHES NOT DISTURBED.

F. TYPES OF FLOOR, WALL, AND CEILING FINISHES INDICATED FOR REMOVAL BY DEMOLITION

NOTES ARE FOR GENERAL INFORMATION ONLY FROM INFORMATION OBTAINED FROM

EXISTING PLANS AND OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY MATERIAL TYPES

ONSITE PRIOR TO BID AND INCLUDE NECESSARY WORK IN HIS BID.

G. ALL APPLIANCES, FURNITURE, AND EQUIPMENT TO REMAIN THE PROPERTY OF THE

OWNER - CONTRACTOR TO COORDINATE REMOVAL, RELOCATION AND STORAGE OF

EQUIPMENT FROM DEMO AREAS WITH OWNER.

H. MISCELLANEOUS FLOOR PENETRATIONS AND DEMO FOR NEW MECHANICAL AND

ELECTRICAL WORK SHALL BE COORDINATED FROM ARCHITECTURAL, MECHANICAL, AND

ELECTRICAL PLANS.

I. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DEMO PLANS FOR DEMOLITION,

SALVAGE AND RE-USE OF EXISTING ITEMS.

J. PATCH FLOOR AT REMOVED WALLS AND CASEWORK, PREPARE FLOOR TO RECEIVE NEW

FLOORING AS REQUIRED.

K. ALL HOLES IN EXISTING SLAB LEFT FROM REMOVAL OF FIXTURES TO RECEIVE INFILL PER

STRUCTURAL DETAIL.

L. REMOVE ALL STAINLESS STEEL CORNER GUARDS CAREFULLY AND GIVE TO OWNER.

M. ELEMENTS INDICATED WITH A DASHED LINE ARE TO BE DEMOLISHED AND DISPOSED OF AS

A PART OF THIS PROJECT, UNLESS NOTED OTHERWISE.

N. IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED WITH

MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE RIGHT TO

TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS SHOULD THE

OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE OF THE

OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.

O. CONTRACTOR SHALL REMOVE AND DISPOSE OF IN A LEGAL MANNER ALL MATERIAL NOT

SCHEDULED FOR REUSE UNDER THIS PROJECT .

P. IN ALL WALLS AND CEILINGS THAT ARE TO BE REMOVED THE CONTRACTOR SHALL BE

RESPONSIBLE FOR DISCONNECTING AT SOURCE AND REMOVING OR CAPPING ELECTRICAL,

PLUMBING, GAS LINES AND MECHANICAL DUCTWORK THAT ARE NOT SCHEDULED FOR

REUSE. CONTRACTOR SHALL REROUTE AND CONTINUE ANY SYSTEM THAT MUST BE

RETAINED FOR NEW CONSTRUCTION. CONTRACTOR SHALL REROUTE AND KEEP

OPERATIONAL ALL SYSTEMS SERVING SPACES IN THE SURROUNDING AREAS TO THE

PROJECT.

Q. ALL ELECTRICAL CIRCUITS FOR EQUIPMENT THAT ARE TO BE REMOVED SHALL BE

DISCONNECTED AT SOURCE AND REMOVED BACK TO PANEL.

R. ALL PIPING GAS, WATER SUPPLY, VENT, DRAIN LINES, ETC. SUPPLYING EQUIPMENT THAT

ARE TO BE REMOVED SHALL BE DISCONNECTED, REMOVED AND CAPPED ABOVE CEILING

OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AS NECESSARY, TO BE BEHIND NEW

CONSTRUCTION. (PATCH FLOOR BACK PRIOR TO TOPPING.)

S. ALL MED GASES AND PLUMBING TO BE REMOVED AT WALLS SCHEDULED FOR DEMOLITION.

T. REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT WITHIN ROOMS SCHEDULED TO BE

DEMOLISHED. SEE MEP PIPING DRAWINGS.

U. RETURN ALL SIGNAGE AFFECTED BY CONSTRUCTION TO OWNER.

THIRD FLOOR KEY PLAN - AREA A

A

N

WALL DOOR

CEILING

AND GRID

DEMO LEGEND

FLOOR

PENETRATION

GYP BOARD

CEILING/SOFFIT

CONCRETE

PATCH AREA

(-X" = DEPTH OF

PATCH AREA)

-X"

KEYNOTES

KEY VALUE KEYNOTE TEXT

2.06 REMOVE ACT CEILING & GRID, DEMO TO INCLUDE DRYWALL & PLASTER SOFFITS

2.06A REMOVE GYP CEILING, DEMO TO INCLUDE DRYWALL & PLASTER SOFFITS

2.09 REMOVE CEILING ACCESS PANEL

2.16 REMOVE PATIENT LIFT TRACKS, RAILS AND VETICAL SUPPORTS. REMOVE ALL

THREADED RODS AND SUPPORTS ABOVE CEILING TO STRUCTURE

2.20A REMOVE HVAC ELEMENT, REF. MEP DEMO PLANS FOR MORE INFORMATION

2.30 REMOVE LIGHT FIXTURE, REF. ELEC. DEMO PLANS FOR MORE INFORMATION

2.32 REMOVE WIRELESS ACCESS POINT, REF. ELEC. DEMO PLANS FOR MORE

INFORMATION

N

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

AD107.2

DEMOLITION PLAN - 3RD FLOOR

CEILING - AREA A - BID ITEM #2

(DEDUCT)

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

1/8" = 1'-0"

DEMOLITION PLAN - 3RD FLOOR CEILING - AREA A - BID ITEM #2 (DEDUCT)

SHADED AREA NOT IN

SCOPE OF PROJECT

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06 2.06 2.06 2.06 2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06A

2.06A 2.06A

2.06A

2.06A

2.06A

2.06A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.20A

2.09

2.20A

2.09

2.20A

2.20A

2.20A

2.20A

2.09

2.20A

2.20A 2.20A

2.20A

2.20A

2.20A 2.20A

2.20A

2.20A

2.20A

2.20A

2.09 2.20A

2.20A

2.09

2.20A

2.20A

2.20A

2.302.30

2.06

2.06

2.06

2.06

2.06

2.06

2.06

2.06A

2.06A

2.06A

2.20A

2.20A

2.30

2.20A

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.16

2.16

2.16

2.16

2.16

2.16

2.32

2.32

WALL DOOR

CEILING

AND GRID

DEMO LEGEND

FLOOR

PENETRATION

GYP BOARD

CEILING/SOFFIT

CONCRETE

PATCH AREA

(-X" = DEPTH OF

PATCH AREA)

-X"

GENERAL DEMOLITION NOTES

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING. THE

CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY CONDITIONS THAT

DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.

B. PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY

DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.

C. VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE DRAWINGS AND

WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE THE INTENDED WORK.

D. ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS RESPONSIBLE

FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL WORK ASSOCIATED WITH

THIS CONTRACT.

E. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH

SURROUNDING EXISTING FINISHES NOT DISTURBED.

F. TYPES OF FLOOR, WALL, AND CEILING FINISHES INDICATED FOR REMOVAL BY DEMOLITION

NOTES ARE FOR GENERAL INFORMATION ONLY FROM INFORMATION OBTAINED FROM

EXISTING PLANS AND OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY MATERIAL TYPES

ONSITE PRIOR TO BID AND INCLUDE NECESSARY WORK IN HIS BID.

G. ALL APPLIANCES, FURNITURE, AND EQUIPMENT TO REMAIN THE PROPERTY OF THE

OWNER - CONTRACTOR TO COORDINATE REMOVAL, RELOCATION AND STORAGE OF

EQUIPMENT FROM DEMO AREAS WITH OWNER.

H. MISCELLANEOUS FLOOR PENETRATIONS AND DEMO FOR NEW MECHANICAL AND

ELECTRICAL WORK SHALL BE COORDINATED FROM ARCHITECTURAL, MECHANICAL, AND

ELECTRICAL PLANS.

I. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DEMO PLANS FOR DEMOLITION,

SALVAGE AND RE-USE OF EXISTING ITEMS.

J. PATCH FLOOR AT REMOVED WALLS AND CASEWORK, PREPARE FLOOR TO RECEIVE NEW

FLOORING AS REQUIRED.

K. ALL HOLES IN EXISTING SLAB LEFT FROM REMOVAL OF FIXTURES TO RECEIVE INFILL PER

STRUCTURAL DETAIL.

L. REMOVE ALL STAINLESS STEEL CORNER GUARDS CAREFULLY AND GIVE TO OWNER.

M. ELEMENTS INDICATED WITH A DASHED LINE ARE TO BE DEMOLISHED AND DISPOSED OF AS

A PART OF THIS PROJECT, UNLESS NOTED OTHERWISE.

N. IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED WITH

MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE RIGHT TO

TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS SHOULD THE

OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE OF THE

OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.

O. CONTRACTOR SHALL REMOVE AND DISPOSE OF IN A LEGAL MANNER ALL MATERIAL NOT

SCHEDULED FOR REUSE UNDER THIS PROJECT .

P. IN ALL WALLS AND CEILINGS THAT ARE TO BE REMOVED THE CONTRACTOR SHALL BE

RESPONSIBLE FOR DISCONNECTING AT SOURCE AND REMOVING OR CAPPING ELECTRICAL,

PLUMBING, GAS LINES AND MECHANICAL DUCTWORK THAT ARE NOT SCHEDULED FOR

REUSE. CONTRACTOR SHALL REROUTE AND CONTINUE ANY SYSTEM THAT MUST BE

RETAINED FOR NEW CONSTRUCTION. CONTRACTOR SHALL REROUTE AND KEEP

OPERATIONAL ALL SYSTEMS SERVING SPACES IN THE SURROUNDING AREAS TO THE

PROJECT.

Q. ALL ELECTRICAL CIRCUITS FOR EQUIPMENT THAT ARE TO BE REMOVED SHALL BE

DISCONNECTED AT SOURCE AND REMOVED BACK TO PANEL.

R. ALL PIPING GAS, WATER SUPPLY, VENT, DRAIN LINES, ETC. SUPPLYING EQUIPMENT THAT

ARE TO BE REMOVED SHALL BE DISCONNECTED, REMOVED AND CAPPED ABOVE CEILING

OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AS NECESSARY, TO BE BEHIND NEW

CONSTRUCTION. (PATCH FLOOR BACK PRIOR TO TOPPING.)

S. ALL MED GASES AND PLUMBING TO BE REMOVED AT WALLS SCHEDULED FOR DEMOLITION.

T. REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT WITHIN ROOMS SCHEDULED TO BE

DEMOLISHED. SEE MEP PIPING DRAWINGS.

U. RETURN ALL SIGNAGE AFFECTED BY CONSTRUCTION TO OWNER.

D320

D321

D322

D323

D318

D319

D324

D325

D326

D327

D328

D329

D316

D353

D353A

D332DD332B

D344

D345

D346

D347D348

D349 D350

D351

D351A

D330

D331

C3D4

D316C

C3D4

D331A

D331BD331C C3D5

D352

D330A

D301B

C3D1

C3D3

C357A

C356A

C359

C360A

C360

C339

C358

C340

D316A

C358C

#6

C358A

THIRD FLOOR KEY PLAN - AREA B

BN

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

AD108

DEMOLITION PLAN - 3RD FLOOR

CEILING - AREA B

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

1/8" = 1'-0"

DEMOLITION PLAN - 3RD FLOOR CEILING - AREA B

KEYNOTES

KEY VALUE KEYNOTE TEXT

2.06 REMOVE ACT CEILING & GRID, DEMO TO INCLUDE DRYWALL & PLASTER SOFFITS

2.06A REMOVE GYP CEILING, DEMO TO INCLUDE DRYWALL & PLASTER SOFFITS

2.09 REMOVE CEILING ACCESS PANEL

2.16 REMOVE PATIENT LIFT TRACKS, RAILS AND VETICAL SUPPORTS. REMOVE ALL

THREADED RODS AND SUPPORTS ABOVE CEILING TO STRUCTURE

2.20A REMOVE HVAC ELEMENT, REF. MEP DEMO PLANS FOR MORE INFORMATION

2.30 REMOVE LIGHT FIXTURE, REF. ELEC. DEMO PLANS FOR MORE INFORMATION

2.32 REMOVE WIRELESS ACCESS POINT, REF. ELEC. DEMO PLANS FOR MORE

INFORMATION

N

THIRD FLOOR KEY PLAN - AREA A

A

N

WALL DOOR

CEILING

AND GRID

DEMO LEGEND

FLOOR

PENETRATION

GYP BOARD

CEILING/SOFFIT

CONCRETE

PATCH AREA

(-X" = DEPTH OF

PATCH AREA)

-X"

GENERAL DEMOLITION NOTES

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING. THE

CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY CONDITIONS THAT

DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.

B. PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY

DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.

C. VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE DRAWINGS AND

WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE THE INTENDED WORK.

D. ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS RESPONSIBLE

FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL WORK ASSOCIATED WITH

THIS CONTRACT.

E. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH

SURROUNDING EXISTING FINISHES NOT DISTURBED.

F. TYPES OF FLOOR, WALL, AND CEILING FINISHES INDICATED FOR REMOVAL BY DEMOLITION

NOTES ARE FOR GENERAL INFORMATION ONLY FROM INFORMATION OBTAINED FROM

EXISTING PLANS AND OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY MATERIAL TYPES

ONSITE PRIOR TO BID AND INCLUDE NECESSARY WORK IN HIS BID.

G. ALL APPLIANCES, FURNITURE, AND EQUIPMENT TO REMAIN THE PROPERTY OF THE

OWNER - CONTRACTOR TO COORDINATE REMOVAL, RELOCATION AND STORAGE OF

EQUIPMENT FROM DEMO AREAS WITH OWNER.

H. MISCELLANEOUS FLOOR PENETRATIONS AND DEMO FOR NEW MECHANICAL AND

ELECTRICAL WORK SHALL BE COORDINATED FROM ARCHITECTURAL, MECHANICAL, AND

ELECTRICAL PLANS.

I. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DEMO PLANS FOR DEMOLITION,

SALVAGE AND RE-USE OF EXISTING ITEMS.

J. PATCH FLOOR AT REMOVED WALLS AND CASEWORK, PREPARE FLOOR TO RECEIVE NEW

FLOORING AS REQUIRED.

K. ALL HOLES IN EXISTING SLAB LEFT FROM REMOVAL OF FIXTURES TO RECEIVE INFILL PER

STRUCTURAL DETAIL.

L. REMOVE ALL STAINLESS STEEL CORNER GUARDS CAREFULLY AND GIVE TO OWNER.

M. ELEMENTS INDICATED WITH A DASHED LINE ARE TO BE DEMOLISHED AND DISPOSED OF AS

A PART OF THIS PROJECT, UNLESS NOTED OTHERWISE.

N. IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED WITH

MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE RIGHT TO

TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS SHOULD THE

OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE OF THE

OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.

O. CONTRACTOR SHALL REMOVE AND DISPOSE OF IN A LEGAL MANNER ALL MATERIAL NOT

SCHEDULED FOR REUSE UNDER THIS PROJECT .

P. IN ALL WALLS AND CEILINGS THAT ARE TO BE REMOVED THE CONTRACTOR SHALL BE

RESPONSIBLE FOR DISCONNECTING AT SOURCE AND REMOVING OR CAPPING ELECTRICAL,

PLUMBING, GAS LINES AND MECHANICAL DUCTWORK THAT ARE NOT SCHEDULED FOR

REUSE. CONTRACTOR SHALL REROUTE AND CONTINUE ANY SYSTEM THAT MUST BE

RETAINED FOR NEW CONSTRUCTION. CONTRACTOR SHALL REROUTE AND KEEP

OPERATIONAL ALL SYSTEMS SERVING SPACES IN THE SURROUNDING AREAS TO THE

PROJECT.

Q. ALL ELECTRICAL CIRCUITS FOR EQUIPMENT THAT ARE TO BE REMOVED SHALL BE

DISCONNECTED AT SOURCE AND REMOVED BACK TO PANEL.

R. ALL PIPING GAS, WATER SUPPLY, VENT, DRAIN LINES, ETC. SUPPLYING EQUIPMENT THAT

ARE TO BE REMOVED SHALL BE DISCONNECTED, REMOVED AND CAPPED ABOVE CEILING

OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AS NECESSARY, TO BE BEHIND NEW

CONSTRUCTION. (PATCH FLOOR BACK PRIOR TO TOPPING.)

S. ALL MED GASES AND PLUMBING TO BE REMOVED AT WALLS SCHEDULED FOR DEMOLITION.

T. REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT WITHIN ROOMS SCHEDULED TO BE

DEMOLISHED. SEE MEP PIPING DRAWINGS.

U. RETURN ALL SIGNAGE AFFECTED BY CONSTRUCTION TO OWNER.

ABCDEF

2.82.8

3.73.7

7.37.3

8.28.2

Ba

4.6

6.3

8.08.0

1.9

1.1

F.1 E.a2 Aa

AD101

2.03B

2.10

2.11BID ITEM #2

(REF. GI001)

2.19

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

AD109

DEMOLITION PLAN - ROOF - AREA A

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

KEYNOTES

KEY VALUE KEYNOTE TEXT

2.19 SALVAGE WINDOW & FRAME AND RETURN TO VA. SEE DOOR SCHEDULE FOR NEW

DOOR @ EXISTING WINDOW OPENING; DEMOLITION TO BE COMPLETED AFTER 3RD

FLOOR IS OCCUPIED.

1/8" = 1'-0"

DEMOLITION PLAN - ROOF - AREA A

N

ABCDEFGGaHJ

2.8

3.73.7

7.37.3

8.2 8.2

9.19.1

10.410.4

BaH.5

6.2

5.4

6.7

4.64.6

6.3

6.3

8.08.0

1.9

5.5

5.5

1.1

F.1 E.a2 Aa

13.6

4.4

AE102

AE103

SHADED AREA NOT IN

SCOPE OF PROJECT

S H

A D

E D

A R

E A

N O

T I N

S C

O P

E O

F P

R O

J E

C T

SHADED AREA NOT IN

SCOPE OF PROJECT

SHADED AREA NOT IN

SCOPE OF PROJECT

DEPARTMENT LEGEND

CIRCULATION

CLINICAL SUPPORT

DIALYSIS

OFFICE/SUPPORT

PATIENT CARE

ISO/BAR #1

A301 ISO/BAR #2

A302

ISO/BAR #3

A303

MEDS

A319

NOUR.

A324

NURSE MGR/

ASST MGR.

A325

PAT. RM #24

D324

PAT. RM #23

D323

PAT. RM #22

D322

PAT. RM #21

D321

BARIATRIC

#20

D320

ISO/BAR #19

D319

BARIATRIC

#18

A318

PAT. RM #17

A317

PAT. RM #16

A316

BARIATRIC

#15

A315

PAT. RM #14

A314

BARIATRIC

#13

A313

GEN. STOR.

A326

DIALYSIS

D342

MEDS

A335

SOILED

A337

CLEAN LINEN

A336A

NURSE

D314

MEDS

D315

SOILED

D316

CLEAN

D317

CLEAN LINEN

D317A

ANTE

D319B

NURSE

A328

ANTE

A301B

ANTE

A302B

ANTE

A303B

IT BELOW

CLEAN

A336

H S

K P

G

D

NURSE

WK/COPY

A329

TLT.

D318

TLT.

A338

S P

L

IT

L O

C K

E R

S

T T

L

STAFF

LOUNGE

D343

CHG ROOM

D343B

L O

C K

E R

D A

WAD

D339

SOCIAL

D337

SHARED

OFFICE

D335

OFFICE

D333

SWAMP #1

D331

SWAMP #4

D329

HOSPITALIST

D328

SWAMP #3

D330

SWAMP #2

D332

CODER/REVIEW

D334

IC IC DS.DIET DS.

COPY

D336

ELEC

D338

NURSE

A332

PAT. RM #11

A311

PAT. RM #9

A309

PAT. RM #7

A307

PAT. RM #5

A305

CLEAN LINEN

A322

SOILED

A320

ELEC./SYSTEMS

A330

CLEAN

A321

MED. GAS

D307

EQUIP.

D305

STRETCHER

D303

STRETCHER

D309

NURSE

WK/COPY

A333

PAT. RM #10

D310

PAT. RM #8

D308

PAT. RM #6

D306

PAT. RM #4

D304

E Q

U

IP

D

NOUR.

D313

MSA

D302

NOUR.

A334

SOILED

D342A

TUBE

STATION

T U

B E

S T

A T

IO

N

A301A

A302A A303A

A305A A307A A309A A311A

STAIR #4

A346

A313A

A314A

A315A

A316A

A317A

A318A

D319A

D320A

STAIR #5

D325

STAIR #6

D327

STAIR #2

D340

TLT.

D341

D321A

D322A

D323A

D324A

CORR.

C3A2

CORR.

C3A3

CORR.

C3D4

CORR.

C3D3

CORR.

C3C4

CORR.

C3A4

CORR.

C3A6

CORR.

C3D5

D304A D306A D308A D310A D312A

STORAGE

D345

STORAGE

A327

PAT. RM #12

D312

HSKPG

A331

CONSULT RM.

D344

S

P L

IT

L

O C

K E

R S

T

T L

EQUIP

A323

DIALYSIS

STOR.

D342B

A. FILL SURFACE OF CONCRETE WALLS WITH AN APPROPRIATE FILLER AND MAKE SMOOTH.

SEAL OR PRIME ABSORBANT SURFACES WITH A SUITABLE DILUITED ACRYLIC PRIMER.

ALLOW PAINT/PRIMER TO DRY IN ACCORDANCE WITH THE MANUFACTURERS APPLICATION

INSTRUCTIONS. UNFILLED GROUT LINES MAY TELEGRAPH THROUGH THE SHEET; GC TO

CORDINATE WITH MAUNFACTURER PROPER THICKNESS AND INSTALLATION METHOD.

B. GYPSUM WALLS NEED TO BE PAINTED PRIOR TO INSTALLATION OF PLYWOOD.

C. CONSTRUCT NEW RATED 1-HR SHAFT WALL FROM 3RD FLOOR TO 4TH FLOOR. CONSTRUCT

1-HR RATED CHASE AROUND DUCT AND PIPING TRANSITION THROUGH 4TH FLOOR SLAB.

D. REF. SHEETS AE402 & AE403 FOR SLOPING OF PATIENT ROOM TOILET FLOORS

GENERAL PLAN NOTES

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

AE101

FLOOR PLAN - 3RD FLOOR - OVERALL

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

1/16" = 1'-0"

FLOOR PLAN - 3RD FLOOR - OVERALL

N

2.8

3.7

7.3

BaH.5

4.6

6.3

1.9

5.5

1.1

F.1 E.a2 Aa

SHADED AREA NOT IN

SCOPE OF PROJECT

SHADED AREA NOT IN

SCOPE OF PROJECT

CORR.

C3A4

MEDS

A335

GEN. STOR.

A326

CLEAN

A336

SOILED

A337

C L

E A

N L

IN

E

N

A

A

NURSE

D314

ISO/BAR #1

A301 ISO/BAR #2

A302

ISO/BAR #3

A303

MEDS

A319

NOUR.

A324

NURSE MGR/

ASST MGR.

A325

PAT. RM #22

D322

PAT. RM #21

D321

BARIATRIC

#20

D320

ISO/BAR #19

D319

BARIATRIC

#18

A318

PAT. RM #17

A317

PAT. RM #16

A316

BARIATRIC

#15

A315

PAT. RM #14

A314

BARIATRIC

#13

A313

DIALYSIS

D342

A313A

A314A

A315A

A316A

A317A

A318A

D319A

D320A

D321A

D322A

NURSE

A328

A302A

A301A

ANTE

D319B

ANTE

A301B

ANTE

A302B

ANTE

A303B

CORR.

C3A6

NURSE

WK/COPY

A329

TLT.

A338

SOILED

D342A

STAFF

LOUNGE

D343

A303A

PAT. RM #6

D306

D306A

PAT. RM #8

D308

PAT. RM #10

D310

PAT. RM #12

D312

D312AD310AD308A

E Q

U

IP

D

D304A

PAT. RM #4

D304

STRETCHER

D303

EQUIP.

D305 STRETCHER

D309

MED. GAS

D307

N O

U R

D

MSA

D302

NURSE

A332

PAT. RM #11

A311

PAT. RM #9

A309

PAT. RM #7

A307

A311AA309AA307A

ELEC./SYSTEMS

A330

CLEAN

A321

PAT. RM #5

A305

A305A

CLEAN LINEN

A322

SOILED

A320

NURSE

WK/COPY

A333

NOUR.

A334

CORR.

C3D4

CORR.

C3A3

CORR.

C3A2

CORR.

C3D5

STAIR #4

A346

EX

A

A301B A302B A303B

A336

A303

A335

C3D5

D319

A337

C3A3

D344

D343

A302 A301

D

D

D

D

D

D307

A

A

A

A

A331

A330

C3A5

A

A

A313

A314

A316

A318

D

B

A315

D321

A317

D320

EX

10.44

10.44

10.44

10.44

10.44

AI70225

AI703

AI703

AI703

STORAGE

D345

D345

AI701

AI704

AE401

AE401

AE401

AE401

AE401

AE403

AE403

AE403

AE402

AE402

AE402

AE403

AE402

AE402

7________

AE402

AE403

13________

AE403

AE403

AE403

AE402

AE402

AE501

Sim

AE501

Sim

AE501

Sim

STORAGE

A327

A

A

A302A

A303A

A327

A

A

HSKPG

A331

AE601

AI702

AI703

1A320

AI704 21

AI704

AI7043

AI704 4

AI7045 AI704 9

AI704

AI704

13 15

CONSULT

RM.

D344

AI702

AI402 3

AI704 1012

A322

A336A

A305A A307A A309A A311A

D304A

D306A D308A

D310A D312A

A338

A313A

A

A

A315A

A

A

A317A

A318A

D319A

D320A

D

A

8.31

8.31

D342A D342

CORR.

C3A1

CORR.

C3A5

AI301

AI301

AI7053

AI705 46

EQUIP

A323

AI703

AI703

AI70226

AI702 27

AE301

AE301

DIALYSIS

STOR.

D342B

A

A300

STAIR #1

A312

7.95

7.95

CORR.

C3C7

AI704

1SIM

3' - 6 3/4"

PATIENT

NICHE

D342B

A. FILL SURFACE OF CONCRETE WALLS WITH AN APPROPRIATE FILLER AND MAKE SMOOTH.

SEAL OR PRIME ABSORBANT SURFACES WITH A SUITABLE DILUITED ACRYLIC PRIMER.

ALLOW PAINT/PRIMER TO DRY IN ACCORDANCE WITH THE MANUFACTURERS APPLICATION

INSTRUCTIONS. UNFILLED GROUT LINES MAY TELEGRAPH THROUGH THE SHEET; GC TO

CORDINATE WITH MAUNFACTURER PROPER THICKNESS AND INSTALLATION METHOD.

B. GYPSUM WALLS NEED TO BE PAINTED PRIOR TO INSTALLATION OF PLYWOOD.

C. CONSTRUCT NEW RATED 1-HR SHAFT WALL FROM 3RD FLOOR TO 4TH FLOOR. CONSTRUCT

1-HR RATED CHASE AROUND DUCT AND PIPING TRANSITION THROUGH 4TH FLOOR SLAB.

D. REF. SHEETS AE402 & AE403 FOR SLOPING OF PATIENT ROOM TOILET FLOORS

GENERAL PLAN NOTES

THIRD FLOOR KEY PLAN - AREA A

A

N

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

AE102

FLOOR PLAN - 3RD FLOOR - AREA A

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

1/8" = 1'-0"

FLOOR PLAN - 3RD FLOOR - AREA A

KEYNOTES

KEY VALUE KEYNOTE TEXT

7.95 EXPANSION JOINT COVER ASSEMBLIES

8.31 24"X24" RATED ACCESS DOOR, REF. LIFE SAFETY PLANS FOR REQUIRED RATING,

HARDWARE BY ACCESS DOOR SUPPLIER

10.44 FIRE EXTINGUISHER CABINET

N

ABCFGGaH

7.3

8.2

9.1

10.4

BaH.5

8.08.0

F.1 E.a2 Aa

13.6

SHADED AREA NOT IN

SCOPE OF PROJECT

NURSE

D314

MEDS

D315

SOILED

D316

CLEAN

D317

C L

E A

N L

IN

E

N

D

A

PAT. RM #24

D324

PAT. RM #23

D323

PAT. RM #22

D322

PAT. RM #21

D321

DIALYSIS

D342

D322A

D323A

D324A

CORR.

C3D5

HSKPG

D326

TLT.

D318

ELEC

D338

CODER/REVIEW

D334

SWAMP #2

D332

STAFF

LOUNGE

D343

SWAMP #3

D330

COPY

D336

TLT.

D341

CHG ROOM

D343B

SHARED

OFFICE

D335

WAD

D339

OFFICE

D333

HOSPITALIST

D328

SWAMP #1

D331

SWAMP #4

D329

CORR.

C3D3

SOCIAL

D337

LOCKER

D343A

CORR.

C3C4

CORR.

C3D4

STAIR #2

D340

STAIR #6

D327

STAIR #5

D325

EX

EX

D324

D316

D317

D

A

D336

D326

D338

D315

D330

D332

D334

C3D3

D343

D337

D333

D328

D329

D331

D339

D335

D322

D323

D321

EX

10.44

10.44

AI70119

AI70115

AI702 2

AI701 22

AI70111

AI70110

AI703

C3C4

AE401

AE401

AE401

Sim

AE403

AE403

AE501

Sim

AE501

Sim

AI702

AI701 20

D317A

D325

8.31

D341

D343B

D318

D324A

D

A

D

A

D340

D321A

D

A

D342

D345

D344

SOILED

D342A

STORAGE

D345

CONSULT

RM.

D344

DIALYSIS

STOR.

D342B

D327

AI703

15SIM

8.31

/8

PATIENT NICHE

A. FILL SURFACE OF CONCRETE WALLS WITH AN APPROPRIATE FILLER AND MAKE SMOOTH.

SEAL OR PRIME ABSORBANT SURFACES WITH A SUITABLE DILUITED ACRYLIC PRIMER.

ALLOW PAINT/PRIMER TO DRY IN ACCORDANCE WITH THE MANUFACTURERS APPLICATION

INSTRUCTIONS. UNFILLED GROUT LINES MAY TELEGRAPH THROUGH THE SHEET; GC TO

CORDINATE WITH MAUNFACTURER PROPER THICKNESS AND INSTALLATION METHOD.

B. GYPSUM WALLS NEED TO BE PAINTED PRIOR TO INSTALLATION OF PLYWOOD.

C. CONSTRUCT NEW RATED 1-HR SHAFT WALL FROM 3RD FLOOR TO 4TH FLOOR. CONSTRUCT

1-HR RATED CHASE AROUND DUCT AND PIPING TRANSITION THROUGH 4TH FLOOR SLAB.

D. REF. SHEETS AE402 & AE403 FOR SLOPING OF PATIENT ROOM TOILET FLOORS

GENERAL PLAN NOTES

THIRD FLOOR KEY PLAN - AREA B

BN

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

AE103

FLOOR PLAN - 3RD FLOOR - AREA B

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

1/8" = 1'-0"

FLOOR PLAN - 3RD FLOOR - AREA B

N

KEYNOTES

KEY VALUE KEYNOTE TEXT

8.31 24"X24" RATED ACCESS DOOR, REF. LIFE SAFETY PLANS FOR REQUIRED RATING,

HARDWARE BY ACCESS DOOR SUPPLIER

10.44 FIRE EXTINGUISHER CABINET

2.82.8

3.73.7

7.37.3

BaH.5

6.2

5.4

6.7

4.64.6

6.36.3

8.0

1.9

5.55.5

1.1

F.1 E.a2 Aa

4.4

SHADED AREA NOT IN

SCOPE OF PROJECT

SHADED AREA NOT IN

SCOPE OF PROJECT

CORR.

C3A4

MEDS

A335

GEN. STOR.

A326

CLEAN

A336

SOILED

A337

CLEAN LINEN

A336A

NURSE

D314

ISO/BAR #1

A301

ISO/BAR #2

A302

ISO/BAR #3

A303

MEDS

A319

NOUR.

A324

NURSE MGR/

ASST MGR.

A325

PAT. RM #21

D321

BARIATRIC

#20

D320

ISO/BAR #19

D319

BARIATRIC

#18

A318

PAT. RM #17

A317

PAT. RM #16

A316

BARIATRIC

#15

A315

PAT. RM #14

A314

BARIATRIC

#13

A313

DIALYSIS

D342

TLT./SHWR

A313A

TLT./SHWR

A314A

TLT./SHWR

A315A

TLT./SHWR

A316A

TLT./SHWR

A317A

TLT./SHWR

A318A

TLT./SHWR

D319A

TLT./SHWR

D320A

TLT./SHWR

D321A

TLT./SHWR

D322A

NURSE

A328

TLT./SHWR

A302A

TLT./SHWR

A301A

ANTE

D319B

ANTE

A301B

ANTE

A302B

ANTE

A303B

CORR.

C3A6

NURSE

WK/COPY

A329

TLT.

A338

SOILED

D342A

STAFF

LOUNGE

D343

TLT./SHWR

A303A

PAT. RM #6

D306

TLT./SHWR

D306A

PAT. RM #8

D308

PAT. RM #10

D310

PAT. RM #12

D312

TLT./SHWR

D312ATLT./SHWR

D310A

TLT./SHWR

D308A

EQUIP

D311

TLT./SHWR

D304A

PAT. RM #4

D304

STRETCHER

D303

EQUIP.

D305

STRETCHER

D309

MED. GAS

D307

NOUR.

D313

MSA

D302

NURSE

A332

PAT. RM #11

A311

PAT. RM #9

A309

PAT. RM #7

A307

TLT./SHWR

A311A

TLT./SHWR

A309A

TLT./SHWR

A307A

ELEC./SYSTEMS

A330

CLEAN

A321

PAT. RM #5

A305

TLT./SHWR

A305A

CLEAN LINEN

A322

SOILED

A320

NOUR.

A334

CORR.

C3A2

CORR.

C3A3

CORR.

C3D4

F6

F2

F2 F2

F2

F2

P8

F2

F2 F2

P6

F2

P8

P6

P6

F3

F2 F2F2

F2

F3

F2F2

F2

P3

F2

P8

F2

F2

P3

P3P3

F2

P3

F2

P3

P3

P3

P3

P3

P31

P31

P31

P31

F2

P31

F6

F2

F2

F2

F2

P3P3P8

F2

P3

F2

F2

F2

F2

P81

P8

P8

F2

F2

PS3

P8

F2

P3

P3

F2

F2

F1

F2

P6F2

P8

F2

F2

PS3 P8

P3

F2

F2

F2 P3

F3

F3

P3

F2

P6F2

P3 P3

F2

F2

F3

P3 P3

P3

F2

P8

F2

F2

F2

F2P3

P3

P3

F2

P3

P61

P31

19' - 6 1/2" 15' - 8 3/4"

/8

/2

10' - 9" 10' - 11 3/4"

19' - 5 7/8"

14' - 4 1/8"

/8

1' - 5"

8' - 6 1/4" 6' - 8 1/8" 7' - 5 1/8" 8' - 1 1/4" 8' - 3 1/8" 7' - 0 1/2"

/8

/8

17' - 6 1/2" 15' - 0"

/4

/8

9' - 3 3/4"

/8

/8

/8

/8

/4

10' - 3 1/8" 12' - 2" 3' - 4 5/8"

14' - 9 3/4"

15' - 3 7/8"

15' - 2 3/8"

14' - 9 3/4"

7' - 6 3/4" 18' - 3"

14' - 9 3/4"

15' - 3 1/4"

20' - 5 1/2" 3' - 4 5/8"

9' - 3 3/4"

1' - 0 7/8"

1' - 1 1/2"

32' - 11 1/2" 2' - 9 5/8" 8' - 0"

16' - 4 3/8" 16' - 7 1/8"

8' - 0 3/8"

9' - 0 5/8" 14' - 11 7/8" 15' - 3 1/4" 8' - 11 1/2" 6' - 7 5/8" 6' - 7 5/8"

9' - 7 7/8" 8' - 6 1/4" 6' - 8 1/8" 7' - 4 7/8" 7' - 10 3/8" 8' - 5 1/2" 6' - 11 3/8" 8' - 4" 6' - 6 1/2"

/4

/8

/4

/2

/8

/8

/4

/8

/8

/8

/4

/4

/2

/8

/8

/4

/4

/2

/4

/4

/2

/4

/2

/4

/4

/8

/8

P31

P3

P6

F1 P3

P6

P8

P3

P6

P8 P6

NURSE

WK/COPY

A333

AE401

Sim

AE401

Sim

AE401

Sim

AE401

Sim

AE401

Sim

AE403

Sim

AE403

Sim

AE403

Sim

AE402

Sim

AE402

Sim

AE402

Sim

AE403

Sim

AE402

Sim

AE402

Sim

P6

AE402

Sim

AE402

Sim

AE402

Sim

AE402

Sim

AE403

Sim

AE403

Sim

AE403

Sim

P3

P8

P31

F2

F2 P31

S21 P31

P3

F2

P31

P31

P31

P31

17' - 2 1/2" 10' - 2 5/8"

8' - 11 3/8" 6' - 2 1/8" 2' - 3"

/4

/8

/8

/4

HSKPG

A331

STORAGE

D345

CONSULT

RM.

D344

P31

P31

P3

P31

F2

F2

F2

F2

F2

F2 S21

S21

F2

F2

P81

S21

F2

S21

S21

S21 F2

F2

P31

/8

/8

/8

/4

AE301

AE301

F2

AE601

AE601

/8

/8

/8

2' - 11 1/8"

/8

/8

/8

/8

2' - 10 1/2"

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

6' - 1 1/8"

12' - 5 7/8"

8' - 8 7/8"

12' - 6 1/2"

12' - 6 1/2"

12' - 6 1/2"

7' - 3 5/8"

9' - 11 1/2"

12' - 6 3/8"

7' - 8 3/4"

12' - 5 3/8"

7' - 3 5/8"

6' - 2 3/4"

5' - 4 3/8"

12' - 6 1/2"

7' - 3 5/8"

8' - 2 7/8"

12' - 6 1/2"

9' - 5 3/8"

AE601

2' - 11 7/8"

AI501

P3

P3

STORAGE

A327

P3

P3 F2

TYPE F - FURRING

F0 7/8" HAT CHANNEL, 5/8" G.W.B. 1 1/2"

F1 1 5/8" MTL STUD, 5/8" G.W.B. 2 1/4"

F2 2 1/2" MTL STUD, 5/8" G.W.B. 3 1/8"

F3 3 5/8" MTL STUD, 5/8" G.W.B. 4 1/4"

F6 6" MTL STUD, 5/8" G.W.B. 6 5/8"

FS2 2 1/2" 16GA MTL STUD, 5/8" G.W.B. 3 1/8"

FS3 3 5/8" 16GA MTL STUD, 5/8" G.W.B. 4 1/4"

FS6 6" 16GA MTL STUD, 5/8" G.W.B. 6 5/8"

TYPE P - PARTITION

P21 5/8" G.W.B, 2 1/2" MTL STUD, 5/8" G.W.B. (1 HOUR RATED) 3 3/4"

P3 5/8" G.W.B, 3 5/8" MTL STUD, 5/8" G.W.B. 4 7/8"

P31 5/8" G.W.B, 3 5/8" MTL STUD, 5/8" G.W.B. (1 HOUR RATED) 5 1/4"

P32 (2) 5/8" G.W.B, 3 5/8" MTL STUD, (2) 5/8" G.W.B. (2 HOUR RATED) 6 1/8"

P6 5/8" G.W.B, 6" MTL STUD, 5/8" G.W.B. 7 1/4"

P61 5/8" G.W.B, 6" MTL STUD, 5/8" G.W.B. (1 HOUR RATED) 7 1/4"

P8 5/8" G.W.B, 8" MTL STUD, 5/8" G.W.B. 9 1/4"

P81 5/8" G.W.B, 8" MTL STUD, 5/8" G.W.B. 9 1/4"

PS3 5/8" G.W.B, 3 5/8" 16GA MTL STUD, 5/8" G.W.B. 4 7/8"

PS31 5/8" G.W.B, 3 5/8" 16GA MTL STUD, 5/8" G.W.B. (1 HOUR RATED) 4 7/8"

PS6 5/8" G.W.B, 6" 16GA MTL STUD, 5/8" G.W.B. 7 1/4"

PS61 5/8" G.W.B, 6" 16GA MTL STUD, 5/8" G.W.B. (1 HOUR RATED) 7 1/4"

EXISTING WALL

HAT CHANNEL

OR MTL STUD

5/8" TYPE "X" G.W.B.

(2 LAYERS @ F31)

5/8" TYPE "X" G.W.B.

(2 LAYERS @ P32)

MTL STUD

5/8" TYPE "X" G.W.B.

(2 LAYERS @ P32)

SAFB INSULATION,

FILL CAVITY

SAFB INSULATION,

FILL CAVITY

LEGEND FOR WALL TAGS

PARTITION GROUP DESIGNATOR

HAT CHANNEL, STUD OR CMU SIZE

XXX

RATING (IF APPLIES)

UNDERSIDE OF STRUCTURE UNDERSIDE OF STRUCTURE

ACOUSTICAL SEALANT @ NON-RATED

WALLS. FIRE SEALANT @ RATED WALLS

ACOUSTICAL SEALANT @ NON-RATED

WALLS. FIRE SEALANT @ RATED WALLS

METAL CHANNEL DEFLECTION TRACK

ACOUSTICAL SEALANT @ NON-RATED

WALLS. FIRE SEALANT @ RATED WALLS

WALL BASE AS SCHED.

BASE BASE

METAL CHANNEL

ACOUSTICAL SEALANT @ NON-RATED

WALLS. FIRE SEALANT @ RATED WALLS

WALL BASE AS SCHED.

METAL CHANNEL

TYPE WALL MATERIALS

WALL

WIDTH TYPE WALL MATERIALS

WALL

WIDTH

PLAN

HEAD

PLAN

HEAD

TYPE S - SHAFT

S21 5/8" G.W.B, 2 1/2" C-H STUDS, 1" G.W.B (1 HOUR RATED) 3 1/8"

5/8" TYPE "X" G.W.B.

C-H MTL STUD

1" TYPE "X" G.W.B.

SAFB INSULATION,

FILL CAVITY

UNDERSIDE OF STRUCTURE

FIRE SEALANT @ ALL TYP "S" WALLS

METAL CHANNEL

BASE

ACOUSTICAL SEALANT @ NON-RATED

WALLS. FIRE SEALANT @ RATED WALLS

WALL BASE AS SCHED.

METAL CHANNEL

TYPE WALL MATERIALS

PLAN

HEAD

THIRD FLOOR KEY PLAN - AREA A

A

N

NOTES:

PROVIDE ACOUSTICAL SEALANT AT TOP & BOTTOM AND ALL

PENETRATIONS OF WALLS WITH SOUND BATT.

ALL STUD FRAMING TO BE 16" O.C., TYP.

PROVIDE COATED GLASS MAT TILE BACKER BOARD AT ALL

SHOWER & WET AREAS AND AS BACKER FOR CERAMIC WALL TILE.

TOILET & SINK AREAS TO RECEIVE MOISTURE-RESISTANT GYP

BOARD. PROVIDE 20GA. STUDS AS REQUIRED IN TCNA AND GA-216.

PROVIDE SEALANT AT TOP & BOTTOM AND ALL PENETRATIONS OF

SMOKE PARTITION WALLS AS REQUIRED BY CODE.

PROVIDE ALL NEW WALLS THAT GO TO STRUCTURE w/ 1 1/2" MTL.

DEFLECTION TRACK - REF STRUCT.

WALL HEIGHT

SHADED WALLS INDICATE WALLS

THAT EXTEND TO DECK

INSTALL 5/8" TYPE X GYP BD ON ONE SIDE OF FURRING,

TYP. INSTALL 5/8" TYPE X GYP BD ON BOTH SIDES OF

STUD FRAMING, TYP., UNLESS NOTED OTHERWISE.

EXTEND GYP BD TO 6" ABOVE CEILING UNLESS REQUIRED

OTHERWISE. PROVIDE ACCOUSTICAL SEALANT AT TOP

AND BOTTOM OF ALL PENETRATIONS OF WALL WITH

SOUND BATT.

WALLS TO RECEIVE GYPSUM BOARD PRODUCT ON BOTH

FACES OF METAL STUD AND WALLS THAT REQUIRE

ACOUSTICAL SOUND BATT INSULATION SHALL BE

CONSTRUCTED TO MEET A MINIMUM 45 STC UNLESS

OTHERWISE NOTED.

FIRE TAPE AND/OR FILL VOIDS AT TOP OF WALL - FIRE

RATED WALL AS REQUIRED BY CODE - REF. SPEC.

PROVIDE SEALANT AT TOP & BOTTOM AND ALL

PENETRATIONS ON ONE SIDE OF SMOKE PARTITION

WALLS AS REQUIRED BY CODE - REF. SPECS

INSTALL FIRE RATED SEAL/CLOSURE @ ALL OPENINGS,

GAPS AND TOP & BOTTOM OF FRAMING AS SPECIFIED.

BRACE ALL STUD WALLS TO STRUCTURE ABOVE @ 4'-0" O.C.

OR EXTEND ALL STUDS TO DECK ABOVE, TYP.

PROVIDE 20GA. DOUBLE STUDS FULL HEIGHT AT ALL

INTERIOR DOOR JAMBS.

LIGHT GAUGE METAL STUDS, 20 ga. TYP. (16ga. AT

TOILET ROOM PLUMBING WALLS & SHOWER SEAT

WALLS) (REF. SPECS.)

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

AE104

FLOO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .