589A4-21-100 SIGNED DRAWINGS R1_Part1.pdf

PDF 18 MB Posted

Attached to
Z2DA--Relocate Medical Ward for Patient Privacy PN:589A4-21-100
Solicitation number
36c25522R0024
Issued by

About this file

This solicitation is for a federal contract opportunity to relocate a medical ward for patient privacy at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is seeking proposals to provide specifications and drawings as outlined in solicitation number 36c25522R0024 and product number 589A4-21-100. Offerors should submit responses by the deadline specified to relocate the existing medical ward and ensure patient privacy through architectural drawings and updated building specifications. The selected contractor will be responsible for designing and documenting the new layout and construction requirements to improve privacy for patients at the facility.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEDICAL CENTER DIRECTOR

DOCUMENT SIGNATURE BLOCK

PRINT NAME SIGNATURE

ASSOCIATE DIRECTOR

PRINT NAME SIGNATURE

ASSOCIATE DIRECTOR OF PATIENT SERVICES

PRINT NAME SIGNATURE

ASSISTANT DIRECTOR

PRINT NAME SIGNATURE

CHIEF ENGINEER

PRINT NAME SIGNATURE

INFECTION CONTROL PRACTITIONER

PRINT NAME SIGNATURE

SAFETY OFFICER

PRINT NAME SIGNATURE

CHIEF OF STAFF

PRINT NAME SIGNATURE

HRO DIRECTOR

PRINT NAME SIGNATURE

ABBREVIATIONS

PROJ(D)

PLBG

PLYWD

PREFIN

RAD(R)

RESIL

REINF

REQ'D

SECT

SHWR

SPECS

REFRIG

GALVANIZEDGALVBMRK BENCHMARK

CONCRETE

MASONRY UNIT

CEILINGCLG

CLR

CMU

COL

CLO

CLEAR/CLEARANCE

COLUMN

CLOSET

CAB

CJ

CC

CB

BW

CL

BOC

BRZ

BRK

BO

BRG

BUR

BTM

BS

BUILT-UP ROOF

CENTER TO CENTER

CHALKBOARD

BOTTOM OF WALL

CENTER LINE

CONTROL JOINT/

CONSTRUCTION JOINT

CABINET

BACK OF CURB

BOTH SIDES

BOTTOM OF

BRONZE

BRICK

BEARING

BOTTOM

FOUNDATION

FLOOR DRAIN

FIRE EXTINGUISHER

FIRE

EXTINGUISHER

CABINET

FE

FEC

FDN

FD

EAST

EACH

EQUIPMENT

EXPOSED

EACH WAY

EXISTING

ELECTRICAL

EXTERIOR INSULATION

FINISH SYSTEM

ELEVATION/ELEVATOR

EXPANSION JOINT

EXISTING GRADE

ELECTRICAL CONTRACTOR

EXTERIOR

ETHYLENE PROPYLENE

DIENE TERPOLYMER

ELEV

EQUIP

EW

EPDM

EXP

EXIST

EXT

E

EA

EC

EG

EIFS

EJ

ELEC

INSULATION

INTERIOR

INSIDE DIAMETER

INSUL

IN(")

INT

ID

INCH

GRAB BAR

GENERAL CONTRACTOR

GYPSUM

GLASS/GLAZING

HOLLOW METAL

HIGH PRESSURE

DECORATIVE LAMINATE

HORIZONTAL

HARDWARE

HARDWOOD

HOSE BIB

HOT WATER

HEATING, VENTILATING

& AIR CONDITIONING

HDWR

HM

HORZ

HT

HPDL

HVAC

HW

HEIGHT

GB

GL

GRD

GYP

GC

HDWD

HB

GRADE

PART

PLAS

OVHD

PARTITION

PLASTER

OVERHEAD

SRT

SS

SQ

MISCELANEOUS

MASONRY OPENING

NOT IN CONTRACT

NOT APPLICABLE

OUTSIDE DIAMETER

NUMBERNO(#)

NTS

OC

OA

NOM

OFF

OPNG

OD

ON CENTER

OVERALL

NOMINAL

NOT TO SCALE

OFFICE

OPENING

MISC

N

MO

MULL

MTL

NIC

NA

NORTH

MULLION

METAL

SHT

SF

SB

SND

SIM

S

RM

ROW

RO

SAT

SAN

ARCHITECT/

ARCHITECTURAL

AB ANCHOR BOLT

APPROX

BLDG

BD

ARCH

BM

BLK

ADJ

AFF

AC

ACCU

ALUM

ANOD

ALT

APPROXIMATE

BLOCK/BLOCKING

AT

BOARD

BEAM

BUILDING

AIR COOLED

CONDENSING UNIT

ABOVE FINISHED FLOOR

ADJUSTABLE

ALTERNATE

ANODIZED

ACOUSTICAL

ALUMINUM

A/C AIR CONDITIONING

PLUS OR MINUS

CONSTRUCTIONCONST

COURSE

CERAMIC TILE

CONTINUOUS

CARPET

CORRIDOR

DIAMETER

DOOR

DOWN

DITTO

DIMENSION

DOUBLE

DRINKING FOUNTAIN

DETAIL

DRAWING

DOWNSPOUT

DIA

DR

DS

DN

DO

DIM

DTL

DWG

CRS

CT

CONT

CORR

CPT

DBL

DF

CONFERENCE

CONCRETE

CONF

CONC

FINISHFIN

FLUORESENT

FLOW LINE

FOLDING

FIELD VERIFY

FURNACE

FOOTING

FIRE RETARDANT

FOOT SCRAPER

FIBERGLASS

REINFORCED PLASTIC

FV

FT(')

FURR

FURN

FTG

G

GA

FOOT

FURRING

GAS

GUAGE

FRP

FLR

FLDG

FL

FRT

FS

FLUOR

FLOOR

FINISH GRADE

FINISH FLOOR

FG

FF

JOISTJST

LOW VOLUMN CHANGE

MASONRYMAS

MANUF

MATL

MAX

MECH

MEMB

MH

MIN

MIRR

MANUFACTURER

MATERIAL

MECHANICAL

MEMBRANE

MAXIMUM

MINIMUM

MANHOLE

MIRROR

LDR

LF

LAV

LAM

LVC

LOCN

LINEAL FEET

LADDER

LAVATORY

LAMINATE

LOCATION

REF

R

RAG

RD

PT

PR

QT

PTD

JT

JAN JANITOR

JOINT

PL

UNDER CABINET LIGHTREQUIRED

PHYSICAL THERAPY

RESPIRATORY CARE

SURGICAL INTENSIVE CARE UNIT

STUDDED RUBBER TILE

STAINLESS STEEL

SQUARE

SPECIFICATIONS

YD

SUSPENDED

ACOUSTICAL TILE

SIMILAR

SANITARY NAPKIN

DISPENSER

SECTION

SHOWER

SHEET

SQUARE FEET

SPLASH BLOCK

RESILIENT

SOUTH

SANITARY

RIGHT OF WAY

ROUGH OPENING

ROOM

WD

WNDW

WH

WNSCT

WC

WT

WWF

WP

VCT

VWC

VEST

VERT

W

W/

W/O

YARD

WATERPROOFING

/WATERPROOF

WELDED WIRE FABRIC

WATER HEATER

WATER CLOSET

WINDOW

WOOD

WAINSCOT

WEIGHT

VINYL COMPOSITION TILE

VINYL WALL COVERING

VERTICAL

VESTIBULE

WEST

WITH

WITH OUT

RC

SICU

CENTRAL STERILE

LONG TERM CARE

INTENSIVE CARE UNIT

OCCUPATIONAL THERAPY

MAGNETIC RESONANCE IMAGING

POST ANESTHETIC CARE UNIT

MEDICAL INTENSIVE CARE UNIT

LABOR-DELIVERY-RECOVERY-POST PARTUM

OPERATING ROOM

FOR MEDICAL

FACILITIES ONLY

EMERGENCY ROOM

COMPUTED TOMOGRAPHY

STORPLUMBING

PROJECT/(PROJECTED)

REFER/REFERENCE

ROOF DRAIN

RADIUS

RETURN AIR GRILLE

REINFORCING

REFRIGERATOR

RISER

PRESSURE TREATED

PAINTED

QUARRY TILE

PLYWOOD

PREFINISHED

PAIR

TLT

TV

TW

TOC

TPH

TO

TYP

UCL

T&B

T

SUSP

STRUCT

TEL

TB

T&G

PLATE/PLASTIC/

PROPERTY LINE STL

STD

STORAGE

TOILET PAPER HOLDER

TOP OF CURB

TOILET

TELEVISION

TOP OF

TYPICAL

TOP OF WALL

TONGUE & GROOVE

TOP & BOTTOM

STRUCTURE/STRUCTURAL

TREAD

TELEPHONE

TACKBOARD

SUSPENDED

ICU

OR

LDRP

MRI

MICU

LTC

PT

PACU

OT

CS

CT

ER

STEEL

STANDARD

CUT STONE

STEEL

PLYWOOD

FINISH WOOD

CONT WD FRAMING

WOOD BLOCKING

MATERIAL SYMBOLS

LVC FILL

GRANULAR FILL

CONCRETE MASONRY

FACE BRICK

CONCRETE

EARTH

EXISTING CONSTRUCTION

ASPHALT

GLASS

RIGID OR TAPERED

INSULATION, EIFS

BATT INSULATION

GYPSUM BOARD

DRAWING SYMBOLS

95.00

TOC

98.5

TOC

98.5 E

B

NEW ELEVATION

EXISTING ELEVATION

EXISTING CONTOUR

NEW CONTOUR

TEST BORING (SITE PLANS ONLY)

EXISTING ELEVATION

EXISTING ELEVATION

PROPERTY LINE

/1 A101

/1 A101

MATCHLINE

SHT. REFERENCE

ELEVATION DATUM

(SECTIONS, ELEVATIONS ONLY)

BUILDING SECTION

WALL SECTION

DETAIL DRAWING

AS-201

BUILDING ELEVATION

AI-201 INTERIOR ELEVATION

A100

WINDOW ID TAG

DOOR NUMBER

ROOM NAME

ROOM NAME & NUMBER

PARTITION SYMBOL

1 REVISION TAG

COLUMN LINE GRID

ME100E EQUIPMENT NUMBER

? SITE PLAN NOTES

DEMOLITION PLAN NOTES

VICINITY MAP

NO SCALE

PRECAST CONCRETE

WALL PANEL TAG

XXX

AS-101

A-4 ALTERNATE TAG

PT-XX PAINT COLOR TAG

# PLAN NOTES &

ROOF PLAN NOTES

PROJECT

LOCATION

REFERENCE SECTION 010000 GENERAL REQUIREMENTS ITEM 1.3 STATEMENT OF BID ITEMS.

BID ITEM 1 (BASE BID) INCLUDES ALL SCOPE COMMUNICATED IN THE DRAWINGS AND SPECIFICATIONS.

BID ITEMS

BID ITEM 2 (DEDUCT): INCLUDES ALL WORK IN BID ITEM 1 WITH THE FOLLOWING EXCEPTIONS (ALL ITEMS BELOW TO BE BID AS ONE DEDUCT):

2A. OMIT ALL SCOPE OF WORK RELATED TO THE ROOF FALL PROTECTION SYSTEM.

BID ITEM 3 (DEDUCT): INCLUDES ALL WORK IN BID ITEM 2 WITH THE FOLLOWING EXCEPTIONS:

3. OMIT ALL SCOPE OF WORK RELATED TO THE PATIENT LIFT, REF. SPEC AND RCP (DEDUCT W/ BID DEDUCT #3) SYSTEM IN ALL

PATIENT ROOMS AND TOILETS, CORRIDOR C3A6, AND DIALYSIS D334

2B. OMIT ALL SCOPE OF WORK RELATED TO CREATING THE NEW ROOF ACCESS.

2C. OMIT ALL SCOPE OF WORK RELATED TO NEW RTU SCREEN WALL.

2D. OMIT ALL SCOPE OF WORK RELATED TO DEMOLITION OF 3RD FLOOR PATIO AND CANOPY, WITH THE EXCEPTION OF

PATIO ACCESS DOOR TO BE DEMOLISHED AND INFILL WITH WINDOW TYPE W1.

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

GI001

TITLE SHEET

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

RELOCATE MEDICAL WARD FOR PATIENT PRIVACY

HARRY S. TRUMAN MEMORIAL VETERANS' HOSPITAL

DEPT OF VETERANS AFFAIRS

800 HOSPITAL DRIVE COLUMBIA, MO 65201

FINAL CONSTRUCTION DOCUMENTS

FINAL CONSTRUCTION DOCUMENTS

589A4-21-100

SHEET INDEX

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES AND SYMBOLS

ED121 ELECTRICAL DEMOLITION PLAN - 2ND FLOOR - AREA A

ED131 ELECTRICAL DEMOLITION PLAN - 3RD FLOOR - AREA A

ED132 ELECTRICAL DEMOLITION PLAN - 3RD FLOOR - AREA B

EL131 ELECTRICAL LIGHTING PLAN - 3RD FLOOR - AREA A

EL132 ELECTRICAL LIGHTING PLAN - 3RD FLOOR - AREA B

EL141 ELECTRICAL LIGHTING PLAN - 4TH FLOOR - AREA A

EL141.2 ELECTRICAL LIGHTING PLAN - 4TH FLOOR - AREA A - BID ITEM #2 (DEDUCT)

EL431 ELECTRICAL ENLARGED LIGHTING PLANS

EL432 ELECTRICAL ENLARGED LIGHTING PLANS

EL501 ELECTRICAL LIGHTING DETAILS AND SCHEDULES

EP101 ELECTRICAL POWER PLAN - BASEMENT

EP131 ELECTRICAL POWER PLAN - 3RD FLOOR - AREA A

EP132 ELECTRICAL POWER PLAN - 3RD FLOOR - AREA B

EP141 ELECTRICAL POWER PLAN - ROOF

EP431 ELECTRICAL ENLARGED POWER PLANS

EP432 ELECTRICAL ENLARGED POWER PLANS

EP501 ELECTRICAL POWER DETAILS

EP601 ELECTRICAL PARTIAL ONE-LINE DIAGRAM

EP602 ELECTRICAL POWER SCHEDULES

EP603 ELECTRICAL POWER SCHEDULES

EY131 ELECTRICAL SYSTEMS PLAN - 3RD FLOOR - AREA A

EY132 ELECTRICAL SYSTEMS PLAN - 3RD FLOOR - AREA B

EY431 ELECTRICAL ENLARGED SYSTEMS PLANS

EY432 ELECTRICAL ENLARGED SYSTEMS PLANS

EY501 ELECTRICAL SYSTEMS DETAILS AND SCHEDULES

SHEET INDEX

STRUCTURAL

S-001 GENERAL NOTES

S-101 FRAMING PLAN - 3RD FLOOR

S101.2 FRAMING PLAN - 3RD FLOOR - BID ITEM #2 (DEDUCT)

S-201 FRAMING PLAN - 4TH FLOOR & ROOF

S201.2 FRAMING PLAN - 4TH FLOOR & ROOF - BID ITEM #2 (DEDUCT)

S-510 TYPICAL FRAMING DETAILS

S-511 TYPICAL FRAMING DETAILS

FIRE SUPPRESION AND ALARM

F-001 FIRE SUPPRESSION GENERAL NOTES & DETAILS

F-002 FIRE ALARM SYMBOLS, GENERAL NOTES & DETAILS

FD101 DEMOLITION PLAN - 2ND FLOOR FIRE SUPPRESSION - AREA A

FD102 DEMOLITION PLAN - 2ND FLOOR FIRE SUPPRESSION - AREA B

FD110 DEMOLITION PLAN - 3RD FLOOR FIRE SUPPRESSION - OVERALL

FD111 DEMOLITION PLAN - 3RD FLOOR FIRE SUPPRESSION - AREA A

FD112 DEMOLITION PLAN - 3RD FLOOR FIRE SUPPRESSION - AREA B

FD211 DEMOLITION PLAN - 3RD FLOOR FIRE ALARM - AREA A

FD212 DEMOLITION PLAN - 3RD FLOOR FIRE ALARM - AREA B

FX101 FLOOR PLAN - 2ND FLOOR FIRE SUPPRESSION - AREA A

FX102 FLOOR PLAN - 2ND FLOOR FIRE SUPPRESSION - AREA B

FX110 FLOOR PLAN - 3RD FLOOR FIRE SUPPRESSION - OVERALL

FX111 FLOOR PLAN - 3RD FLOOR FIRE SUPPRESSION - AREA A

FX112 FLOOR PLAN - 3RD FLOOR FIRE SUPPRESSION - AREA B

FA111 FLOOR PLAN - 3RD FLOOR FIRE ALARM - AREA A

FA112 FLOOR PLAN - 3RD FLOOR FIRE ALARM - AREA B

F-300 FIRE PROTECTION SECTIONS

PLUMBING

P-001 PLUMBING COVER SHEET

PD101 PLUMBING DEMOLITION PLAN - 2ND FLOOR- AREA A

PD102 PLUMBING DEMOLITION PLAN - 2ND FLOOR - AREA B

PD103 PLUMBING DEMOLITION PLAN - 3RD FLOOR - AREA A

PD104 PLUMBING DEMOLITION PLAN - 3RD FLOOR - AREA B

PD201 MEDICAL GAS DEMOLITION PLAN - 3RD FLOOR - AREA A

PD202 MEDICAL GAS DEMOLITION PLAN - 3RD FLOOR - AREA B

PL101 PLUMBING PLAN - 2ND FLOOR - AREA A

PL102 PLUMBING PLAN - 2ND FLOOR - AREA B

PL103 PLUMBING PLAN - 3RD FLOOR - AREA A

PL104 PLUMBING PLAN - 3RD FLOOR - AREA B

PL105 PLUMBING ROOF PLAN

PL201 MEDICAL GAS PLAN - 3RD FLOOR - AREA A

PL202 MEDICAL GAS PLAN - 3RD FLOOR - AREA B

PL401 ENLARGED PLUMBING PLAN - 3RD FLOOR

PL402 ENLARGED PLUMBING PLAN - 3RD FLOOR

PL403 ENLARGED PLUMBING PLAN - 3RD FLOOR

PL404 ENLARGED PLUMBING PLAN - 3RD FLOOR

PL405 ENLARGED PLUMBING PLANS AND RISERS

PL406 ENLARGED PLUMBING PLANS AND RISERS

PL407 ENLARGED PLUMBING PLANS AND RISERS

P-601 PLUMBING SCHEDULES AND DETAILS

MECHANICAL

M-001 MECHANICAL COVER SHEET

MD101 HVAC DEMOLITION PLAN - 2ND FLOOR - AREA A

MD111 HVAC DEMOLITION PLAN - 3RD FLOOR - AREA A

MD112 HVAC DEMOLITION PLAN - 3RD FLOOR - AREA B

MD121 HVAC DEMOLITION PLAN - 4TH FLOOR

MD121.2 HVAC DEMOLITION PLAN - 4TH FLOOR - BID ITEM #2 (DEDUCT)

MD211 HYDRONIC DEMOLITION PLAN - 3RD FLOOR - AREA A

MD212 HYDRONIC DEMOLITION PLAN - 3RD FLOOR - AREA B

MH101 HVAC PLAN - 3RD FLOOR - RATING COORDINATION

MH111 HVAC PLAN - 3RD FLOOR - AREA A

MH111.2 HVAC PLAN - 3RD FLOOR - AREA A - BID ITEM #2 (DEDUCT)

MH112 HVAC PLAN - 3RD FLOOR - AREA B

MH121 HVAC PLAN - ROOF

MP101 HYDRONIC PLAN - BASEMENT, 1ST & 2ND FLOOR

MP111 HYDRONIC PLAN - 3RD FLOOR - AREA A

MP112 HYDRONIC PLAN - 3RD FLOOR - AREA B

MJ101 AHU SERVICE AREAS AND AIRFLOW DIAGRAM

M-501 STEAM DETAILS

M-502 STEAM AND HYDRONIC DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-511 AHU CONTROL DETAIL

M-512 CONTROL DETAILS

M-513 CONTROL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

SHEET INDEX

GENERAL

GI001 TITLE SHEET

GI002 ABA SHEET

GI003 LIFE SAFETY PLANS

GI004 PHASING PLAN - 2ND & 4TH FLOORS

GI005 PHASING PLAN - 3RD FLOOR

HA101 HAZARDOUS MATERIAL PLAN

ARCHITECTURAL

AD101 DEMOLITION - PATIO

AD102 DEMOLITION PLAN - 2ND FLOOR - ABOVE CEILING

AD103 DEMOLITION PLAN - 3RD FLOOR - PENETRATIONS

AD104 DEMOLITION PLAN - 3RD FLOOR - OVERALL

AD104.2 DEMOLITION PLAN - 3RD FLOOR - OVERALL - BID ITEM #2 (DEDUCT)

AD105 DEMOLITION PLAN - 3RD FLOOR - AREA A

AD105.2 DEMOLITION PLAN - 3RD FLOOR - AREA A - BID ITEM #2 (DEDUCT)

AD106 DEMOLITION PLAN - 3RD FLOOR - AREA B

AD106.2 DEMOLITION PLAN - 3RD FLOOR - AREA B - BID ITEM #2 (DEDUCT)

AD107 DEMOLITION PLAN - 3RD FLOOR CEILING - AREA A

AD107.2 DEMOLITION PLAN - 3RD FLOOR CEILING - AREA A - BID ITEM #2 (DEDUCT)

AD108 DEMOLITION PLAN - 3RD FLOOR CEILING - AREA B

AD109 DEMOLITION PLAN - ROOF - AREA A

AE101 FLOOR PLAN - 3RD FLOOR - OVERALL

AE102 FLOOR PLAN - 3RD FLOOR - AREA A

AE103 FLOOR PLAN - 3RD FLOOR - AREA B

AE104 FLOOR PLAN - DIMENSIONS - 3RD FLOOR - AREA A

AE105 FLOOR PLAN - DIMENSIONS - 3RD FLOOR - AREA B

AE110 REFLECTED CEILING PLAN - 3RD FLOOR - AREA A

AE110.3 REFLECTED CEILING PLAN - 3RD FLOOR - AREA A - BID ITEM #3 (DEDUCT)

AE111 REFLECTED CEILING PLAN - 3RD FLOOR - AREA B

AE111.3 REFLECTED CEILING PLAN - 3RD FLOOR - AREA B - BID ITEM #3 (DEDUCT)

AE120 ROOF PLAN

AE120.2 ROOF PLAN - BID ITEM #2 (DEDUCT)

AE201 EXTERIOR ELEVATIONS

AE201.2 EXTERIOR ELEVATIONS - BID ITEM #2 (DEDUCT)

AE301 BUILDING SECTIONS

AE301.2 BUILDING SECTIONS - BID ITEM #2 (DEDUCT)

AE401 ENLARGED PLANS

AE402 ENLARGED PLANS - PATIENT TOILETS

AE403 ENLARGED PLANS - PATIENT TOILETS

AE410 ENLARGED RCP - PATIENT TOILETS

AE501 DETAILS

AE601 SCHEDULES

ARCHITECTURAL INTERIORS

AI101 FINISH SCHEDULE

AI102 FINISH PLAN - 3RD FLOOR - AREA A

AI103 FINISH PLAN - 3RD FLOOR - AREA B

AI201 EQUIPMENT SCHEDULE - 3RD FLOOR

AI202 EQUIPMENT PLAN - 3RD FLOOR - AREA A

AI203 EQUIPMENT PLAN - 3RD FLOOR - AREA B

AI204 ENLARGED EQUIPMENT PLAN - 3RD FLOOR - AREA A

AI301 WALL PROTECTION PLAN - 3RD FLOOR - AREA A

AI302 WALL PROTECTION PLAN - 3RD FLOOR - AREA B

AI401 SIGNAGE PLAN - 3RD FLOOR - AREA A

AI402 SIGNAGE PLAN - 3RD FLOOR - AREA B

AI501 MILLWORK SECTION DETAILS

AI502 MILLWORK SECTION DETAILS

AI701 INTERIOR ELEVATIONS

AI702 INTERIOR ELEVATIONS

AI703 INTERIOR ELEVATIONS

AI704 INTERIOR ELEVATIONS

AI705 INTERIOR ELEVATIONS

AI706 INTERIOR ELEVATIONS

AI707 INTERIOR ELEVATIONS & TILE DETAILS

N

Jesse Bell Snapshot

Jesse Bell Snapshot

WHEELCHAIR MANEUVERING

TURNING - PER VA GUIDELINES

CLEAR

2' - 6"

5' - 0"

1' - 0" 3' - 0"

1' - 0"

T-SHAPED

90 TURN 180 TURNS

60"

X < 48"

60"

48" 48"

60"

X < 48"

GENERAL NOTES

1. ALL CONSTRUCTION & RENOVATION SHALL MEET THE ARCHITECTURAL BARRIERS ACT

ACCESSIBILITY STANDARD (ABAAS).

2. SUPPLEMENTAL TO THE (ABAAS), CONSTRUCTION & RENOVATION IN HEALTH FACILITIES OF THE

DEPARTMENT OF VETERAN AFFAIRS (VA) SHALL COMPLY WITH THE BARRIER FREE DESIGN

GUIDE: A SUPPLEMENT TO THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(PG-18-13).

5' - 6"

NO SCALE

NO SCALENO SCALE

MANEUVERING CLEARANCES AT DOORS

LATCH SIDE APPROACHLATCH SIDE APPROACH

HINGE SIDE APPROACH

HINGE SIDE APPROACH

FRONT APPROACHFRONT APPROACH

Y

M

IN

.X

24" MIN.

X

Y

Y

M

IN

X

24" MIN.

X

M

IN

M

IN

18" MIN.

24" PREF.

54" MIN.

Y

M

IN

NOTE: Y=48" MIN. IF DOOR

HAD BOTH A LATCH AND

CLOSER

PATIENT BEDROOM MIN. DOOR WIDTH: 3'-10"

NOTE: X=12" IF

DOOR HAS BOTH A

CLOSER AND LATCH

NOTE: X=36" MIN. IF Y=60",

X=42" MIN. IF Y=54"

NOTE: Y=48" MIN. IF

DOOR HAS CLOSER

NOTE: Y=54" MIN. IF

DOOR HAS CLOSER

PULL SIDE

PUSH SIDE

PULL SIDE PUSH SIDEPUSH SIDE

NO SCALE

MEDICAL EQUIPMENT MOUNTING HEIGHTS

MEDICAL GAS

ZONE VALVE

NURSE CALL -

PATIENT TOILET

(DO NOT MOUNT

BEHIND TOILET)

CORD

ROBE HOOK

CALL STATION/

FLUSH-MOUNTED

STATION

RETURN AIR

REGISTER

O

R

FILM

ILLUMINATOR

RECEPTACLE

& GROUND

GROUND

FAULT

INDICATOR

REMOTE

GROUND

INDICATOR

VARIABLE

INTENSITY O.R.

LIGHT CONTROL

NITROGEN

SHUT-OFF

VALVE

O.R. RECEPTACLE

CODE BLUE

SWITCH

CLOCK

NO SCALE

SHARPS

CONTAINER

54" AFF TO

SLOT

GENERAL REACH DIMENSIONS

MOUNTING HEIGHT DIMENSIONS

MIRROR URINAL

TELEPHONE

CLOCK

LIGHT SWITCH

M A

X

M

A X

"6

M

A X

M

A X

M

A X

1'-2"

(TO HIGHEST

OPERABLE PART)

TOILET PAPER

DISPENSER

SANITARY NAPKIN

DISPOSAL

PAPER TOWEL

DISPENSER

OCCUPANCY SIGN

LATCH SIDE PREFERRED

THERMOSTAT

OR OTHER

CONTROL

48"

M

IN

Z

48"

Y

X 30" 24"

M

A X

30"

10" MAX

21" MAX

M

IN

M

A X

36" MIN

M

IN

M

A X

NOTE: X SHALL BE < 25";

Z SHALL BE > X, WHEN X < 20",

THEN Y SHALL BE 48" MAX

WHEN X IS 20"-25",

THEN Y SHALL BE 44" MAX.

NO SCALE

NO SCALE

M A

X

COUNTER OR

LAVATORY

T O

R A

IS

E

D L

T R

F

O R

R M

PLAN: ROLL-IN TYPE ELEVATION: ROLL-IN

ACCESSIBLE SHOWER

NO SCALE

60" MIN

M

IN

M

IN

CLEAR FLOOR SPACE

27" MAX

GRAB BAR

1/2 " MAX TRANSITION

16"-27"

GRAB BAR

SHOWER CONTROLS

FOLDING SEAT

FOLDING SEAT

LAVATORY DIMENSIONS

17" MIN

M

IN

M

A X

M

A X

M

IN

6" MAX

8" MIN

NO SCALE

FRONT APPROACHSIDE APPROACH

DRINKING FOUNTAINS

17" MIN.

19" MAX.

48" MIN.

M

IN

NOT TO EXCEED

FOUNTAIN DEPTH

30" MIN.

M

IN

TO BUBBLER

M

IN

M

A X

HIGH

FOUNTAIN

LOW

FOUNTAIN

17-19"

6" MAX

8" MIN

M

IN

M

A X

M

IN

L O

W F

O U

N T

A

IN

NO SCALE

CL

CL

H.C. LAVATORYH.C. URINAL

H.C. FLOOR MTD. TOILET H.C. WALL MTD. TOILET

LAV FLOOR SPACE

BATHROOM FIXTURES & ACCESSORIES

16"-18"

36" MIN

M

A X

-1

7-9"

SANITARY NAPKIN DISPOSAL

TOILET PAPER DISPENSER

24"-42"6" MAX

12" MAX

-1

7"-9"

12" MAX

24"-42"

42" MIN

TOILET PAPER DISPENSER

SANITARY NAPKIN DISPOSAL

-3

36" MIN

6" MAX

M

A X

M

IN

M

IN

1'-7"

MIN

8" MIN6" MAX

CLEARANCE PROFILE

INSULATE DRAIN

& SUPPLY LINES 4

M A

X T

O

V

IE

W A

B L

E S

U R

F A

C E

MIRROR

PAPER TOWEL DISPENSER

"SOAP DISPENSER 3

M

IN

19" MAX

48" MIN

17"

MIN

"12"

MIN

16"-18"

54" MIN

42" MIN

NO SCALE

M

A X

13 1/2" MIN

M

A X

TO FLUSH CONTROL

-1

18" MIN GRAB BAR PER

ANSI A117.1-2009

39"-41"

18" MIN GRAB BAR PER

ANSI A117.1-2009

CL

ACCESSIBLE

SINGLE TOILET

16"-18"

LAVATORY

60" MIN

NO SCALE

M

IN

SOAP DISPENSER

M

IN

M

IN

C E

N T

E R

M

IX

IN

G

V A

L V

E

S H

O W

E R

S P

R A

Y

H A

N D

L E

SHOWER CONTROLS

S H

O W

E R

H E

A D

R O

U G

H -I

N

SHOWER HEAD

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

GI002

ABA SHEET

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

CODE NOTES

1. DRAWING PURPOSE: RENOVATION

2. FACILITY REVIEWED FOR COMPLIANCE WITH THE FOLLOWING

CODES:

2018 NFPA 101 LIFE SAFETY CODE

2015 INTERNATIONAL BUILDING CODE

2017 NATIONAL ELECTRICAL CODE

2015 INTERNATIONAL MECHANICAL CODE

2015 INTERNATIONAL PLUMBING CODE

2015 INTERNATIONAL FIRE CODE

2010 ARCHITECTURAL BARRIERS ACT (ABA)

3. OWNER:

HARRY S TRUMAN MEMORIAL HOSPITAL

800 HOSPITAL DR

COLUMBIA, MO 65201

PH (573) 814-6000

4. DATE DEVELOPED: SEE DATE IN TITLEBLOCK

6. ARCHITECTS SEAL: SEE STAMP IN TITLEBLOCK

7. FIRE SERVICE: CITY OF COLUMBIA FIRE DEPARTMENT

8. INSPECTION: VISN 15 SAFETY OFFICER

9. OCCUPANCY GROUP TYPE:

5. ARCHITECT:

M+HFG

142 N MOSELY ST STE 300

WICHITA, KS 67212

PH (316) 262-2500

NEW HEALTHCARE (NFPA); I-2 (IBC)

10. CONSTRUCTION TYPE: NFPA TYPE II (222)

11. HEIGHT & AREA LIMITATIONS:

ALLOWABLE AREA: UNLIMITED

HEALTH CARE OCCUPANCY

ALLOWABLE HEIGHT /

STORIES

4 OR MORE

ACTUAL HEIGHT / STORIES 7 OCCUPIABLE STORIES

(UNCHANGED)

BUSINESS OCCUPANCY

ALLOWABLE HEIGHT /

STORIES

N/R

12. MINIMUM CONSTRUCTION REQUIREMENTS (A.8.2.1.2):

CONSTRUCTION

HEALTH CARE OCCUPANCY

BEARING WALLS:

A. EXTERIOR

B. INTERIOR

C. INT/EXT (ROOF ONLY)

TYPE II

(222)

2 HR

2 HR

1 HR

NON-BEARING WALLS:

A. EXTERIOR

B. INTERIOR

0 HR

NON-

COMBUSTIBLE

COLUMNS:

A. SUPPORT FLOORS

B. SUPPORT ROOF ONLY

2 HR

1 HR

BEAMS/GIRDERS/TRUSSES:

A. EXTERIOR:

B. INTERIOR:

2 HR

1 HR

FLOOR CONSTRUCTION: 2 HR

ROOF CONSTRUCTION: 1 HR

NOTE: ENTIRE FACILITY IS FULLY SPRINKLED

13. ACTIVE FIRE SAFETY FEATURES:

(A) AUTOMATIC SUPPRESSION SYSTEMS:

- SPRINKLER SYSTEM (FULLY SPRINKLED)

- EXHAUST HOOD IN KITCHEN - U.L. 300 COMPLIANT

- AUTOMATIC AIR-HANDLING SHUT-DOWN

(B) FIRE ALARM SYSTEM - SIMPLEX, ADDRESSABLE, AUTO DIAL-UP

(C) GENERATOR POWERED EMERGENCY LIGHTING, GENERATOR

POWERED EXIT LIGHTING.

(D) SMOKE DETECTORS AT ALL CORRIDORS, ALL SMOKE DOORS AND

MISC AREAS AS REQ'D (ALSO IN SOME DUCTS)

(E) PORTABLE EXTINGUISHERS

14. WATER SUPPLY: CITY OF COLUMBIA, MO/UMC (SECONDARY)

TYPE II

(000)

0 HR

0 HR

0 HR

0 HR

NON-

COMBUSTIBLE

0 HR

0 HR

0 HR

0 HR

0 HR

0 HR

14. SEWAGE TREATMENT: CITY OF COLUMBIA, MO

14. HANDICAP PROVISIONS: ACCESSIBLE ROUTE, TOILETS,

LAVATORIES, SIGNAGE AND PARKING

17. STORM SEWER: UMC/CITY OF COLUMBIA, MO

LEGEND

BUILDING & LIFE SAFETY REQUIREMENTS

DESCRIPTION

WALL

RATING

NEW

PARTITION KEY NFPA 101-2018

OPENINGS DAMPERS

RATING RFRNC. TYPE RFRNC.

BUILDING SEPARATION:

FIRE BARRIER

2 HR

90 MIN

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

2 HR

90 MIN

HORIZONTAL EXIT (& REFUGE AREA)

FIRE BARRIER

2 HR

90 MIN

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)

(1/2 HR = EXIST. ENCL. IN EXIST BLD'G)

1 HR

2 HR

60 MIN

90 MIN

HAZ./INCIDENTAL USE

FIRE BARRIER

1 HR 45 MIN

HAZ./INCIDENTAL USE

SMOKE PARTITIONS

(SPRINKLERED)

NR-

RESIST

SMK

NR

SELF OR AUTO

CLOSING

SUBDIVIDING SPACES

SMOKE BARRIER (I-2 OCCUPANCY)

20 MIN

1/2

HR

1 HR

SUITE SEPARATION

SMOKE PARTITION

NR

*NR

SELF OR AUTO

CLOSING

EXIT ACCESS CORRIDORS (I-2)

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NR

EXIT ACCESS CORRIDORS (B & AHC)

NON-RATED PARTITIONS

NR

NR

1 HR

VERT. OPG. (SHAFT)

FIRE BARRIER 60 MIN

1 HR

2 HR

60 MIN

90 MINEXIT PASSAGEWAY (HORIZ.)

FIRE BARRIER

6.1.14.4.1 18.1.3.5.1 19.1.3.5.1

7.2.4.1.3 (1)

18.1.3.8 /19.1.3.8

18.2.2.5 /19.2.2.5 7.1.3.2.1

18.3.1.1-8 19.3.1.1-8 8.6

8.7.1 18.3.2.1 19.3.2.1

8.4.2 18.2.5.7.1.4 19.2.5.7.1.2

8.4.2 18.3.6.2 19.3.6.2

21.3.6 35.3.6

18.3.1.1 19.3.1.1 8.6

8.2.1.3

7.2.6 18.2.2.7 19.2.2.7

18.3.2.1.2 19.3.2.1.2

8.5 18.3.7.3 19.3.7.3

7.2.1.4.1 7.2.4.3.7 8.3.4 18.2.2.5, 1-4 19.2.2.5, 1-4

8.3.3.2.2 TBL

18.2.2.2 19.2.2.2

7.1.3.2 (9)

8.3.3.2.2 TBL

18.3.2.1.3 19.3.2.1.3

8.3.3.2.2 TBL

8.5.4 18.3.7.8 19.3.7.8

8.3.3.2.2 TBL

18.2.2.2 19.2.2.2

8.3.3.2.2 TBL

8.3.3.2.2 TBL

8.3.3.2.2. TBL

8.7.1.3 8.4.3 18.3.2.1.3 19.3.2.1.3

18.3.6.3.2 19.3.6.3.2 8.4.3

18.3.6.3 19.3.6.3 8.4.3

N/A

FIRE

90 MIN

FIRE

90 MIN

FIRE

90 MIN

NOT

ALLOWED

UNLESS

SERVING

STAIR

ONLY

N/A

VARIES

SMOKE

90 MIN

VARIES

VARIES

NONE

N/A

NOT

ALLOWED

8.3.4.8 9.2.1

8.3.4.8 9.2.1

8.3.4.8 9.2.1 7.2.4.3.5

N/A

8.5.5.3 19.3.7.3(2)

8.6.4.5

N/A

N/A

8.4.4

8.4.4 8.4.6.2

8.4.4.1 8.4.6.2 18.3.6.4.2 19.3.6.4.2

N/A

SYMBOLS

NO. OCC. EXITING

(SMALLER ROOMS)

MAXIMUM OCCUPANCY

AREA

OCC. LOAD

FACTOR

FIRE ALARM CONTROL PANEL

FIRE SYSTEM ANNUNCIATOR ALARM

ANNUNCIATOR PANEL

FACP

FSA

FAA

REQ'D. EXIT WIDTH

NO. OF OCC. EXITING

ACTUAL EXIT

WIDTH

NO. OF OCC./

NO. OF EXITS

1:50

10/1

2"

34"

FEC

FP

PROPERTY LINE

STARTING

LOCATION

TRAVEL DISTANCE

TRAVEL PATH

FE

FIRE EXTINGUISHER CABINET

FIRE PULL STATION

FIRE EXTINGUISHER

NOTES

[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF

SMOKE BARRIERS WHERE HVAC SYSTEMS ARE FULLY DUCTED

(18.3.7.3x2)

[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL

HAVE DAMPERS (NFPA 8.2.4.4.3) (IBC 710.7)

[C] SMOKE DAMPERS ARE NOT REQUIRED WHERE OPENINGS IN

DUCT ARE LIMITED TO A SINGLE SMOKE COMPARTMENT &

DUCTS ARE MADE OF STEEL (IBC 716.5.5)

[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE

PROTECTED

ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)

TD = XX

633/9

21"

46"

633/9

21"

46"

STAIR #2

STAIR #1

633/9

21.3"

46"

633/9

21.3"

46"

633/9

21"

46"

633/9

21"

46"

633/9

21.3"

46"

633/9

21"

46"

STAIR #6

STAIR #7

STAIR #8

STAIR #3

STAIR #4

STAIR #5

COMPLIANCE NOTE

COMPLIANCE NOTE

PER NFPA

8.2.5.6

STAIR #1 SHALL BE PERMITTED

TO DISCHARGE THROUGH AREA

OF LEVEL OF EXIT DISCHARGE.

STAIR #2 SHALL BE PERMITTED

TO DISCHARGE THROUGH AREA

OF LEVEL OF EXIT DISCHARGE.

COMPLIANCE NOTE

DELAYED EGRESS ALARMED

DOOR

COMPLIANCE NOTE

DELAYED EGRESS / ACCESS

CONTROL DOOR

TD = 100'-0"(TEMP)

T D

T D

T D

T D

TD = 159'-8"

T D

TD = 102'-4"

633/9

21"

46"

STAIR #12

STAFF

LOUNGE

D343

DIALYSIS

D342

SOCIAL

D337

WAD

D339 CHG ROOM

D343B

SHARED

OFFICE

D335

OFFICE

D333

SWAMP #1

D331

SWAMP #4

D329

HOSPITALIST

D328

HSKPG

D326

CORR.

C3C4

SWAMP #3

D330

SWAMP #2

D332

CODER/REVIEW

D334

CORR.

C3D3

CORR.

C3D4

SOILED

D342A

NURSE MGR/

ASST MGR.

A325 NURSE

A328

MEDS

A319

ISO/BAR #1

A301

ISO/BAR #2

A302

ISO/BAR #3

A303

TLT./SHWR

A303A

ANTE

A302B

ANTE

A301B

ANTE

A303B

TLT./SHWR

A301A

TLT./SHWR

A302A

TLT./SHWR

A305A

PAT. RM #5

A305

CLEAN LINEN

A322

NOUR.

A324

SOILED

A320

GEN. STOR.

A326

CORR.

C3A3

MSA

D302

TLT./SHWR

D304A

PAT. RM #4

D304

PAT. RM #6

D306

PAT. RM #8

D308

PAT. RM #10

D310

PAT. RM #12

D312

PAT. RM #7

A307

PAT. RM #9

A309

PAT. RM #11

A311

TLT./SHWR

A307A

TLT./SHWR

A309A

TLT./SHWR

A311A

NURSE

WK/COPY

A333

NURSE

A332

CLEAN

A321 ELEC./SYSTEMS

A330

STRETCHER

D303

EQUIP.

D305

MED. GAS

D307

STRETCHER

D309

NOUR.

A334

MEDS

A335

CLEAN

A336

SOILED

A337

CLEAN LINEN

A336A

TLT.

A338

STAIR #4

A346 BARIATRIC

#13

A313

PAT. RM #14

A314

BARIATRIC

#15

A315

PAT. RM #16

A316

PAT. RM #17

A317

BARIATRIC

#18

A318

ISO/BAR #19

D319

BARIATRIC

#20

D320

PAT. RM #21

D321

PAT. RM #22

D322

PAT. RM #23

D323

PAT. RM #24

D324

CORR.

C3D5

TLT./SHWR

D324A

PT TLT.

D323A

TLT./SHWR

D322A

TLT./SHWR

D321A

TLT./SHWR

D320A

TLT./SHWR

D319A

TLT./SHWR

A318A

TLT./SHWR

A317A

TLT./SHWR

A316A

TLT./SHWR

A315A

TLT./SHWR

A314A

CORR.

C3A6

CORR.

C3A4

TLT./SHWR

D306A

TLT./SHWR

D308A

TLT./SHWR

D310A

TLT./SHWR

D312A

TLT.

D318

CLEAN LINEN

D317A

CLEAN

D317

SOILED

D316

MEDS

D315

NURSE

D314

NOUR.

D313

EQUIP

D311

TLT./SHWR

A313A

NURSE

WK/COPY

A329

COPY

D336

CORR.

C3A2

ELEC

D338

STAIR #5

D325

STAIR #6

D327

STAIR #2

D340

CONSULT RM.

D344

STORAGE

D345

STORAGE

A327

HSKPG

A331

T D

T E

M P

TD = 84'-0"

T D

T D

DIALYSIS

STOR.

D342B

T D

TD = 113'-0"

T D

THIRD FLOOR KEY PLAN

A

B

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

GI003

LIFE SAFETY PLANS

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

1" = 20'-0"

3 - THIRD FLOOR - MEDICAL WARD

N

ABCDEFGGaHJ

2.8

3.7

7.3

8.2

9.1

10.4

Ba

4.6

6.3

1.6

3.2

2.7

8.0

1.9

5.5

1.1

F.1 E.a2 Aa

13.6

S H

A D

E D

A R

E A

N O

T I N

S C

O P

E O

F P

R O

J E

C T

SHADED AREA NOT IN

SCOPE OF PROJECT

PHASE 1.1

PHASE 1.1

PHASE 1.1 ABOVE CEILING:

PLUMBING AND MECHANICAL WORK AS PER MEP DRAWINGS. ANY

WORK THAT DISRUPTS NORMAL OPERATIONS IN THESE AREAS SHALL

BE COMPLETED AFTER NORMAL BUSINESS HOURS. ALL CEILINGS MUST

BE REINSTALLED DAILY TO MAINTAIN SPRIKLER COVERAGE.

PHASE 1.1 ABOVE CEILING:

PLUMBING AND MECHANICAL WORK AS PER MEP DRAWINGS. ANY

WORK THAT DISRUPTS NORMAL OPERATIONS IN THESE AREAS SHALL

BE COMPLETED AFTER NORMAL BUSINESS HOURS. ALL CEILINGS MUST

BE REINSTALLED DAILY TO MAINTAIN SPRIKLER COVERAGE.

PHASE 1.1 ABOVE CEILING:

PLUMBING AND MECHANICAL WORK AS PER MEP DRAWINGS. ANY

WORK THAT DISRUPTS NORMAL OPERATIONS IN THESE AREAS SHALL

BE COMPLETED AFTER NORMAL BUSINESS HOURS. (NOTE SLEEP LAB

HOURS ABOVE) ALL CEILINGS MUST

BE REINSTALLED DAILY TO MAINTAIN SPRIKLER COVERAGE.

SLEEP LAB NORMAL WORKING HOURS:

MON-FRI 7P-7A & SAT & SUN 7P-7A

COORDINATE AFTER HOURS WORK

SCHEDULE W/COR

PHASE 1 (CONSTRUCT)

PHASE 2.1 (REMOVAL)

TEMPORARY ROOF ACCESS,

DO NOT BLOCK BASEMENT

LEVEL DOORS

ABCDEFG

2.8

3.7

7.3

8.2

9.1

10.4

4.5

Ba

4.6

6.3

8.0

1.9

5.5

1.1

F.1 E.a2 Aa

THIRD FLOOR ROOF

FIRST FLOOR ROOF BELOW

NEW RTU, REF MECHANICAL

PHASE 1 (CONSTRUCT)

PHASE 2.1 (REMOVAL)

TEMPORARY ROOF ACCESS,

DO NOT BLOCK BASEMENT

LEVEL DOORS

FIRST FLOOR ROOF BELOW

PHASE 2.1

PHASE 2

PHASING LEGEND

PHASE 1: THIRD FLOOR - DEMOLITION OF EXISTING AREA INCLUDING THIRD

FLOOR BALCONY, CONSTRUCTION OF TEMPORARY ACCESS TO THIRD

FLOOR ROOF, CONSTRUCTION OF NEW ADMINISTRATIVE AREA INCLUDING

NEW DIALYSIS SUITE WITH ALL NEW MEP SYSTEMS AS NEEDED

PHASE 2: THIRD FLOOR - DEMOLITION OF EXISTING CLC AREA,

CONSTRUCTION OF NEW PATIENT PRIVACY SUITE WITH ALL NEW MEP

SYSTEMS AS NEEDED.

PHASE 1.1: SECOND FLOOR CEILING - SPECIAL COORDINATION OF MEP

WORK RELATED TO PHASE 1, SHALL BE ACCOMPLISHED AFTER HOURS,

NIGHTS & WEEKENDS. SEE DRAWING FOR SLEEP LAB HOURS AND

COORDINATE WORK TIMES WITH COR

NOTES:

1. TEMPORARY CONSTRUCTION BARRIERS SHALL BE MIN. 1 HOUR RATED ASSEMBLY.

2. DOORS IN TEMPORARY CONSTRUCTION BARRIERS TO BE 45 MIN. RATED

3. ALL CEILINGS DISTURBED DURING OVER CEILING WORK SHALL BE RE-INSTALLED

PRIOR TO END OF EACH WORK SHIFT.

4. ALL OPENINGS THROUGH CONCRETE FLOORS (RATED), MUST BE FIRSTOPPED OR

INFILLLED PRIOR TO END OF EACH WORK SHIFT.

PHASE 2.1: REMOVAL/SALVAGE OF FOURTH FLOOR WINDOW FOR

CONSTRUCTION OF NEW THIRD FLOOR ROOF ACCESS. REMOVAL OF

TEMPORARY ROOF ACCESS.

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

GI004

PHASING PLAN - 2ND & 4TH FLOORS

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

1/16" = 1'-0"

PHASING PLAN - 2ND FLOOR

1/16" = 1'-0"

PHASING PLAN - 4TH FLOOR

N

N

2.8

3.7

7.3

8.2

9.1

10.4

BaH.5

4.6

6.3

8.0

1.9

5.5

1.1

F.1 E.a2 Aa

13.6

SHADED AREA NOT IN

SCOPE OF PROJECT

S H

A D

E D

A R

E A

N O

T I N

S C

O P

E O

F P

R O

J E

C T

SHADED AREA NOT IN

SCOPE OF PROJECT

IT BELOW

S P

L

IT

L O

C K

E R

S

T T

L

PHASE 1

PHASE 2

PHASE 1 (CONSTRUCT)

PHASE 2.1 (REMOVAL)

TEMPORARY ROOF ACCESS,

DO NOT BLOCK BASEMENT

LEVEL DOORS

CONSTRUCT TEMPORARY

CONSTRUCTION BOUNDARY

AT BEGINNING OF PHASE 2

REMOVE TEMPORARY CONSTRUCTION BOUNDARY

AT END OF PHASE 2, REPLACE DOOR AND

PROVIDE NEW FINISHES PER PLANS

CONSTRUCT TEMPORARY

CONSTRUCTION BOUNDARY

AT BEGINNING OF PHASE 1

CONSTRUCT TEMPORARY

CONSTRUCTION BOUNDARY

AT BEGINNING OF PHASE 1

CONSTRUCT TEMPORARY

CONSTRUCTION BOUNDARY

AT BEGINNING OF PHASE 1

CONSTRUCT TEMPORARY

CONSTRUCTION BOUNDARY

AT BEGINNING OF PHASE 1

CONSTRUCT TEMPORARY

CONSTRUCTION BOUNDARY

AT BEGINNING OF PHASE 2

PHASING LEGEND

PHASE 1: THIRD FLOOR - DEMOLITION OF EXISTING AREA INCLUDING THIRD

FLOOR BALCONY, CONSTRUCTION OF TEMPORARY ACCESS TO THIRD

FLOOR ROOF, CONSTRUCTION OF NEW ADMINISTRATIVE AREA INCLUDING

NEW DIALYSIS SUITE WITH ALL NEW MEP SYSTEMS AS NEEDED

PHASE 2: THIRD FLOOR - DEMOLITION OF EXISTING CLC AREA,

CONSTRUCTION OF NEW PATIENT PRIVACY SUITE WITH ALL NEW MEP

SYSTEMS AS NEEDED.

PHASE 1.1: SECOND FLOOR CEILING - SPECIAL COORDINATION OF MEP

WORK RELATED TO PHASE 1, SHALL BE ACCOMPLISHED AFTER HOURS,

NIGHTS & WEEKENDS. SEE DRAWING FOR SLEEP LAB HOURS AND

COORDINATE WORK TIMES WITH COR

NOTES:

1. TEMPORARY CONSTRUCTION BARRIERS SHALL BE MIN. 1 HOUR RATED ASSEMBLY.

2. DOORS IN TEMPORARY CONSTRUCTION BARRIERS TO BE 45 MIN. RATED

3. ALL CEILINGS DISTURBED DURING OVER CEILING WORK SHALL BE RE-INSTALLED

PRIOR TO END OF EACH WORK SHIFT.

4. ALL OPENINGS THROUGH CONCRETE FLOORS (RATED), MUST BE FIRSTOPPED OR

INFILLLED PRIOR TO END OF EACH WORK SHIFT.

PHASE 2.1: REMOVAL/SALVAGE OF FOURTH FLOOR WINDOW FOR

CONSTRUCTION OF NEW THIRD FLOOR ROOF ACCESS. REMOVAL OF

TEMPORARY ROOF ACCESS.

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

GI005

PHASING PLAN - 3RD FLOOR

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

1/16" = 1'-0"

PHASING PLAN - 3RD FLOOR

N

ASBESTOS CONTAINING

FLOORING MASTIC

DEMO LEGEND

*ASBESTOS CONTAINING

PIPING WRAPS

2ND FLOOR: 0 S.F.

3RD FLOOR: 8170 S.F.

2ND FLOOR: 0 L.F.

3RD FLOOR: 2958 L.F.

APPROXIMATE QUANTITIES

*ABATE ASBESTOS AND REINSULATE ALL EXISTING INDUCTION AND REHEAT MAIN

LINES THAT ARE TO REMAIN. REF. MECHANICAL PLANS FOR MORE INFORMATION

GENERAL HAZARDOUS MATERIALS NOTES

A. REMOVE ALL ASBESTOS PIPE FITTING INSULATION WITHIN THE ASBESTOS ABATEMENT WORK SPACE, ABOVE AND BELOW CEILINGS AND IN THOSE CHASES SCHEDULED FOR DEMOLITION. REMOVE ALL DEBRIS FOUND IN THE WORK AREA. USE TRADITIONAL ASBESTOS ABATEMENT METHODS IN THOSE AREAS WHERE INSULATION MAY BE DAMAGED AND SIGNIFICANT PORTIONS OF DEBRIS MAY EXIST. CHASE WALLS SHALL BE REMOVED USING TRADITIONAL ASBESTOS ABATEMENT TO PRECLUDE ANY POSSIBLE RELEASE OF MATERIAL INTO THE

AREA DUE TO DEMOLITION ACTIVITIES.

B. REMOVE ALL FLOOR TILE AND FLOOR TILE MASTIC WITHIN THE ASBESTOS ABATEMENT WORK AREA.

C. REMOVE AND REPLACE WITH NEW ANY PLUMBING/MECHANICAL SYSTEM THAT IS TO REMAIN IN USE. REFER TO MECHANICAL DRAWINGS AND SPECIFICATIONS. PLUMBING/MECHANICAL SYSTEMS TO BE PERMANENTLY REMOVED, MAY BE CUT AND WRAPPED AND REMOVED IN SECTIONS WITH THE INSULATION STILL ATTACHED.

D. ENCAPSULATE THE EXPOSED ENDS OF ANY PIPE INSULATION THAT ARE NOT REMOVED AT ADJOINING FLOOR

LEVELS.

E. SEE SPECIFICATIONS SECTIONS 028211 & 028213-19 FOR ASBESTOS ABATEMENT AND ASBESTOS SURVEY.

FLOORING MASTIC

APPROX. 560 S.F.

FLOORING MASTIC

APPROX. 160 S.F.

FLOORING MASTIC

APPROX. 700 S.F.

FLOORING MASTIC

APPROX. 300 S.F.

FLOORING MASTIC

APPROX. 700 S.F.

FLOORING MASTIC

APPROX. 400 S.F.

FLOORING MASTIC

APPROX. 1000 S.F.

FLOORING MASTIC

APPROX. 1400 S.F.

FLOORING MASTIC

APPROX. 1400 S.F.

FLOORING MASTIC

APPROX. 1000 S.F.

FLOORING MASTIC

APPROX. 150 S.F.

FLOORING MASTIC

APPROX. 260 S.F.

FLOORING MASTIC

APPROX. 140 S.F.

18' - 5"

C357

D320

D321

D322

D323

D324

D325

D326

D327

D328

D329

D301A

D316

D353 D353A

D332D

D332A

D332B

D333

D333A D333B D334 D335 D336

D337 D338

D339 D341 D342

D343

D344 D345

D346

D347

D348

D349 D350

D351

A335 A347

A316

A358

A317

A357

A319

A356

A321

A353A354

A321A

A325

A352 A351 A350

A332 A348

A328 A331

A337 A338

A339

A340

A341

A342

A343

A344 A345

A346

A330

A329A327A326

A323A322

A318

A318A

A320

B344

B318

A313

A314

A306A

D330D331

C3D4

D316C

C3D4

C3A6

C3A5

C3D5

C3A4

D352

D330A

D301B

D301

C3C7

#3 #2 #1

C3D1

#4

C3A2

C3D3

C357A

C356A

C343

C338

C359

C341

C360A

C345

C360

C346

C356

C339

C358

C340

D316A

C358C

#6

C3A4

C358A

A312

A300

C3A3

THIRD FLOOR KEY PLAN

A

B

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

HA101

HAZARDOUS MATERIAL PLAN

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

1/16" = 1'-0"

3RD FLOOR - HAZARDOUS MATERIALS

N

CDEF

7.3

8.2

9.1

10.4

8.0

F.1 E.a2

FIRST FLOOR

ROOF

AD101

AD101

2.14

2.14

AD101

2.13

THIRD FLOOR

PATIO ABOVE

AD101

AD101

2.12

2.13

2.132.13

2.13

2.13

GENERAL DEMOLITION NOTES

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING. THE

CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY CONDITIONS THAT

DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.

B. PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY

DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.

C. VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE DRAWINGS AND

WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE THE INTENDED WORK.

D. ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS RESPONSIBLE

FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL WORK ASSOCIATED WITH

THIS CONTRACT.

E. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH

SURROUNDING EXISTING FINISHES NOT DISTURBED.

F. TYPES OF FLOOR, WALL, AND CEILING FINISHES INDICATED FOR REMOVAL BY DEMOLITION

NOTES ARE FOR GENERAL INFORMATION ONLY FROM INFORMATION OBTAINED FROM

EXISTING PLANS AND OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY MATERIAL TYPES

ONSITE PRIOR TO BID AND INCLUDE NECESSARY WORK IN HIS BID.

G. ALL APPLIANCES, FURNITURE, AND EQUIPMENT TO REMAIN THE PROPERTY OF THE

OWNER - CONTRACTOR TO COORDINATE REMOVAL, RELOCATION AND STORAGE OF

EQUIPMENT FROM DEMO AREAS WITH OWNER.

H. MISCELLANEOUS FLOOR PENETRATIONS AND DEMO FOR NEW MECHANICAL AND

ELECTRICAL WORK SHALL BE COORDINATED FROM ARCHITECTURAL, MECHANICAL, AND

ELECTRICAL PLANS.

I. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DEMO PLANS FOR DEMOLITION,

SALVAGE AND RE-USE OF EXISTING ITEMS.

J. PATCH FLOOR AT REMOVED WALLS AND CASEWORK, PREPARE FLOOR TO RECEIVE NEW

FLOORING AS REQUIRED.

K. ALL HOLES IN EXISTING SLAB LEFT FROM REMOVAL OF FIXTURES TO RECEIVE INFILL PER

STRUCTURAL DETAIL.

L. REMOVE ALL STAINLESS STEEL CORNER GUARDS CAREFULLY AND GIVE TO OWNER.

M. ELEMENTS INDICATED WITH A DASHED LINE ARE TO BE DEMOLISHED AND DISPOSED OF AS

A PART OF THIS PROJECT, UNLESS NOTED OTHERWISE.

N. IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED WITH

MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE RIGHT TO

TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS SHOULD THE

OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE OF THE

OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.

O. CONTRACTOR SHALL REMOVE AND DISPOSE OF IN A LEGAL MANNER ALL MATERIAL NOT

SCHEDULED FOR REUSE UNDER THIS PROJECT .

P. IN ALL WALLS AND CEILINGS THAT ARE TO BE REMOVED THE CONTRACTOR SHALL BE

RESPONSIBLE FOR DISCONNECTING AT SOURCE AND REMOVING OR CAPPING ELECTRICAL,

PLUMBING, GAS LINES AND MECHANICAL DUCTWORK THAT ARE NOT SCHEDULED FOR

REUSE. CONTRACTOR SHALL REROUTE AND CONTINUE ANY SYSTEM THAT MUST BE

RETAINED FOR NEW CONSTRUCTION. CONTRACTOR SHALL REROUTE AND KEEP

OPERATIONAL ALL SYSTEMS SERVING SPACES IN THE SURROUNDING AREAS TO THE

PROJECT.

Q. ALL ELECTRICAL CIRCUITS FOR EQUIPMENT THAT ARE TO BE REMOVED SHALL BE

DISCONNECTED AT SOURCE AND REMOVED BACK TO PANEL.

R. ALL PIPING GAS, WATER SUPPLY, VENT, DRAIN LINES, ETC. SUPPLYING EQUIPMENT THAT

ARE TO BE REMOVED SHALL BE DISCONNECTED, REMOVED AND CAPPED ABOVE CEILING

OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AS NECESSARY, TO BE BEHIND NEW

CONSTRUCTION. (PATCH FLOOR BACK PRIOR TO TOPPING.)

S. ALL MED GASES AND PLUMBING TO BE REMOVED AT WALLS SCHEDULED FOR DEMOLITION.

T. REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT WITHIN ROOMS SCHEDULED TO BE

DEMOLISHED. SEE MEP PIPING DRAWINGS.

U. RETURN ALL SIGNAGE AFFECTED BY CONSTRUCTION TO OWNER.

2ND LEVEL

13' - 9 1/4"

3RD LEVEL

26' - 5 1/4"

4TH LEVEL

39' - 1 1/4"

FIFTH FLOOR

51' - 9 1/4"

SIXTH FLOOR

64' - 5 1/4"

PENTHOUSE

77' - 1 1/4"

77.38.2

8.0

2.10

2.142.11

2.10

2ND LEVEL

13' - 9 1/4"

3RD LEVEL

26' - 5 1/4"

4TH LEVEL

39' - 1 1/4"

DEF E.a2

2.10

2.112.11

2.15

AE301

E

EXISTING ROOF STRUCTURE

AND ROOF MEMBRANE

REMOVE EXISTING CONCRETE

CURB AND STEEL POST.

REMOVE STEEL POST ANCHORING

SYSTEM DOWN TO CONCRETE ROOF

SLAB. GRIND ANY ANCHORS FLUSH

WITH SLAB AND PREPARE SURFACE

FOR NEW ROOF MEMBRANE.

REMOVE EXISTING ROOF MEMBRANE

ASE REQUIRED TO DEMO CONCRETE

CURB AND POST ANCHORS.

REMOVE EXISTING ROOF MEMBRANE

ASE REQUIRED TO DEMO CONCRETE

CURB AND POST ANCHORS.

E

EXISTING ROOF STRUCTURE

AND ROOF MEMBRANE

PREP EXISTING SURFACE FOR NEW

ROOF MEMBRANE

NEW ROOF MEMBRANE, OVERLAP

EXISTING MIN 6" ALL DIRECTIONS.

MIN

6"

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

AD101

DEMOLITION - PATIO

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

1/8" = 1'-0"

DEMOLITION PLAN - 1ST FLOOR ROOF

1/8" = 1'-0"

DEMOLITION PLAN - 2ND FLOOR CEILING - PATIO

N

N

KEYNOTES

KEY VALUE KEYNOTE TEXT

2.10 REMOVE BALCONY ROOF SYSTEM & ROOF SUPPORTS INCLUDING ANGLE IRONS

ATTACHED TO BRICK, REF. STRUCT. DEMO PLANS FOR MORE INFORMATION

2.11 REMOVE METAL RAILING AND BALCONY FLOOR, REF. STRUCT. DEMO PLANS FOR

MORE INFORMATION

2.12 REROUTE ROOF TOP MECHANICAL UNIT PIPING/POWER FROM UNDERSIDE OF

BALCONY TO ROOF MOUNTED SUPPORTS & RECONNECT ALL POWER AND PIPING

LINES. COORDINATE ANY MECHANICAL UNIT SHUT DOWN WITH COR

2.13 REMOVE BALCONY FRAMING INCLUDING BRICK AS REQUIRED TO REMOVE BEAMS

AND KNIFE BLADES FROM COLUMNS. PATCH SHEATHING AND MOISTURE BARRIER

WITH LIKE CONSTRUCTION AND TOOTH-IN MATCHING BRICK

2.14 REMOVE ROOF MEMBRANE AS REQUIRED TO REMOVE BALCONY STEEL COLUMNS

AND CONCRETE CURBS TO DECK. REPAIR ROOF STRUCTURE WITH LIKE

CONSTRUCTION AND PATCH ROOF MEMBRANE, REF DETAILS

2.15 REMOVE BRICK AS REQUIRED TO DEMO DOOR. TOOTH-IN & REPAIR BRICK AS

REQUIRED FOR NEW WINDOW RO, NEW BRICK TO MATCH EXISTING

1/8" = 1'-0"

PARTIAL EAST ELEVATION @ DEMOLISHED PATIO

1/8" = 1'-0"

PARTIAL SOUTH ELEVATION @ DEMOLISHED PATIO

3/4" = 1'-0"

DEMO @ PATIO COLUMNS

3/4" = 1'-0"

DETAIL @ PATIO ROOF MEMBRANE REPAIR

SCOPE OF WORK LEGEND

SHADED AREA NOT IN SCOPE OF WORK

DIAGONAL HATCH AREA INDICATES WORK IN EXISTING SPACES NOT VACATED

AND THAT NEED TO REMAIN OPERATIONAL. COORDINATION WITH COR IS

NEEDED TO ACCOMPLISH WORK AFTER HOURS, NIGHTS AND WEEKENDS.

GENERAL DEMOLITION NOTES

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING. THE

CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY CONDITIONS THAT

DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.

B. PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY

DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.

C. VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE DRAWINGS AND

WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE THE INTENDED WORK.

D. ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS RESPONSIBLE

FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL WORK ASSOCIATED WITH

THIS CONTRACT.

E. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH

SURROUNDING EXISTING FINISHES NOT DISTURBED.

F. TYPES OF FLOOR, WALL, AND CEILING FINISHES INDICATED FOR REMOVAL BY DEMOLITION

NOTES ARE FOR GENERAL INFORMATION ONLY FROM INFORMATION OBTAINED FROM

EXISTING PLANS AND OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY MATERIAL TYPES

ONSITE PRIOR TO BID AND INCLUDE NECESSARY WORK IN HIS BID.

G. ALL APPLIANCES, FURNITURE, AND EQUIPMENT TO REMAIN THE PROPERTY OF THE

OWNER - CONTRACTOR TO COORDINATE REMOVAL, RELOCATION AND STORAGE OF

EQUIPMENT FROM DEMO AREAS WITH OWNER.

H. MISCELLANEOUS FLOOR PENETRATIONS AND DEMO FOR NEW MECHANICAL AND

ELECTRICAL WORK SHALL BE COORDINATED FROM ARCHITECTURAL, MECHANICAL, AND

ELECTRICAL PLANS.

I. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DEMO PLANS FOR DEMOLITION,

SALVAGE AND RE-USE OF EXISTING ITEMS.

J. PATCH FLOOR AT REMOVED WALLS AND CASEWORK, PREPARE FLOOR TO RECEIVE NEW

FLOORING AS REQUIRED.

K. ALL HOLES IN EXISTING SLAB LEFT FROM REMOVAL OF FIXTURES TO RECEIVE INFILL PER

STRUCTURAL DETAIL.

L. REMOVE ALL STAINLESS STEEL CORNER GUARDS CAREFULLY AND GIVE TO OWNER.

M. ELEMENTS INDICATED WITH A DASHED LINE ARE TO BE DEMOLISHED AND DISPOSED OF AS

A PART OF THIS PROJECT, UNLESS NOTED OTHERWISE.

N. IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED WITH

MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE RIGHT TO

TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS SHOULD THE

OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE OF THE

OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.

O. CONTRACTOR SHALL REMOVE AND DISPOSE OF IN A LEGAL MANNER ALL MATERIAL NOT

SCHEDULED FOR REUSE UNDER THIS PROJECT .

P. IN ALL WALLS AND CEILINGS THAT ARE TO BE REMOVED THE CONTRACTOR SHALL BE

RESPONSIBLE FOR DISCONNECTING AT SOURCE AND REMOVING OR CAPPING ELECTRICAL,

PLUMBING, GAS LINES AND MECHANICAL DUCTWORK THAT ARE NOT SCHEDULED FOR

REUSE. CONTRACTOR SHALL REROUTE AND CONTINUE ANY SYSTEM THAT MUST BE

RETAINED FOR NEW CONSTRUCTION. CONTRACTOR SHALL REROUTE AND KEEP

OPERATIONAL ALL SYSTEMS SERVING SPACES IN THE SURROUNDING AREAS TO THE

PROJECT.

Q. ALL ELECTRICAL CIRCUITS FOR EQUIPMENT THAT ARE TO BE REMOVED SHALL BE

DISCONNECTED AT SOURCE AND REMOVED BACK TO PANEL.

R. ALL PIPING GAS, WATER SUPPLY, VENT, DRAIN LINES, ETC. SUPPLYING EQUIPMENT THAT

ARE TO BE REMOVED SHALL BE DISCONNECTED, REMOVED AND CAPPED ABOVE CEILING

OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AS NECESSARY, TO BE BEHIND NEW

CONSTRUCTION. (PATCH FLOOR BACK PRIOR TO TOPPING.)

S. ALL MED GASES AND PLUMBING TO BE REMOVED AT WALLS SCHEDULED FOR DEMOLITION.

T. REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT WITHIN ROOMS SCHEDULED TO BE

DEMOLISHED. SEE MEP PIPING DRAWINGS.

U. RETURN ALL SIGNAGE AFFECTED BY CONSTRUCTION TO OWNER.

ABCDEFGGaHJ

2.8

3.7

7.3

8.2

9.1

10.4

Ba

6.2

5.4

6.7

4.6

6.3

1.6

3.2

2.7

8.0

1.9

5.5

1.1

F.1 E.a2 Aa

13.6

4.4

S H

A D

E D

A R

E A

N O

T I N

S C

O P

E O

F P

R O

J E

C T

SHADED AREA NOT IN

SCOPE OF PROJECT

2.17

2.17

2.17 2.17 2.17

2.17

2.17 2.17

2.17

2.18

2.17 2.17 2.17

A235

A222

A222A

A223

A225

A227

A228

A229

A230 A232

A251A

A246

A249A249A

STAIR #4

A244

A244A

A241

A251

A252A

A252

D229

D231A D229A

D232

D230

D228

D227D227A

D233

D234

D236

D240

STAIR #5

D241

D239

D237

D235A

D235

D231

A233

A236A234

A246A

A253A254A255A256A257A258

D222 D223 D224

D226 D221

C2A6BC2A6A

A262

A259A260

A220

A221

A214

A204

A205A206

A204A

D205

D205A

D200A

D205B

D205C

D212D

D212E

D212F

C235A C235B

C235

C236

C237

C238

C239

C240

C241

C242

C243

C237A

D218

D218A

D218BD218C

STAIR #6

D216

D210

D214 D215

D208

D209

D220

D219B

D204 D219C D219D

D219F

D219HD219G

D219E

STAIR #2

D219A

D219

D203

D207BD207C

A216A215

A213

A219

A211

A213

STAIR #1

C2A1

C2A5

C2A4

A200

D201A

D206A

D201

A200A

C2A3

C2A6

C2D6

C2E8

C2D1

C2D3

D225

#3 #1

C2A2

#4

#5

D217

D218

D213F

D213E

D213G

D213D

D213B

C2D4

D213A

D213C

D213L

DD213J

D213K

#6

D221A

D209A

#2

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

117 PIERCE ST, SUITE 110

SIOUX CITY, IOWA 51101

712.252.4014

142 N. MOSLEY ST.

WICHITA, KANSAS 67202

316.262.2500

303 S. TOPEKA

WICHITA, KANSAS 67202

316.262.2691

AD102

DEMOLITION PLAN - 2ND FLOOR -

ABOVE CEILING

RELOCATE MEDICAL WARD

FOR PATIENT PRIVACY

800 HOSPITAL DRIVE COLUMBIA, MO 65201

07-26-2021

589A4-21-100

FINAL CONSTRUCTION DOCUMENTS

AuthorChecker

N

1/16" = 1'-0"

DEMOLITION PLAN - 2ND FLOOR - ABOVE CEILING

KEYNOTES

KEY VALUE KEYNOTE TEXT

2.17 TEMPORARILY REMOVE EXISTING CEILING GRID AND TILES AS NECESSARY FOR

DEMO/INSTALL OF MECHANICAL(SEE MECH PLANS); REINSTALL GRID AND TILE AND

REPARE ANY DAMAGES THAT OCCURED DURING CONSTRUCTION.

2.18 REMOVE EXISTING GYP CEILING AS NECESSARY FOR DEMO/INSTALL OF

MECHANICAL(SEE MECH PLANS); REPLACE, PATCH AND PAINT CEILING WHERE

AFFFECTED BY CONSTRUCTION. ADD ACCESS PANELS AS REQUIRED TO SERVICE

NEW MECHANICAL.

2.8

3.7

7.3

8.2

9.1

10.4

BaH.5

4.6

6.3

8.0

1.9

5.5

1.1

F.1 E.a2 Aa

13.6

SHADED AREA NOT IN

SCOPE OF PROJECT

S H

A D

E D

A R

E A

N O

T I N

S C

O P

E O

F P

R O

J E

C T

SHADED AREA NOT IN

SCOPE OF PROJECT

SHADED AREA NOT IN

SCOPE OF PROJECT

ISO/BAR #1

A301 ISO/BAR #2

A302

ISO/BAR #3

A303

MEDS

A319

NOUR.

A324

NURSE MGR/

ASST MGR.

A325

PAT. RM #24

D324

PAT. RM #23

D323

PAT. RM #22

D322

PAT. RM #21

D321

BARIATRIC

#20

D320

ISO/BAR #19

D319

BARIATRIC

#18

A318

PAT. RM #17

A317

PAT. RM #16

A316

BARIATRIC

#15

A315

PAT. RM #14

A314

BARIATRIC

#13

A313

GEN. STOR.

A326

DIALYSIS

D342

MEDS

A335

SOILED

A337

CLEAN LINEN

A336A

NURSE

D314

MEDS

D315

SOILED

D316

CLEAN

D317

CLEAN LINEN

D317A

ANTE

D319B

NURSE

A328

ANTE

A301B

ANTE

A302B

ANTE

A303B

CLEAN

A336

HSKPG

D326

NURSE

WK/COPY

A329

TLT.

D318

TLT.

A338

STAFF

LOUNGE

D343

CHG ROOM

D343B

L O

C K

E R

D A

WAD

D339

SOCIAL

D337

SHARED

OFFICE

D335

OFFICE

D333

SWAMP #1

D331

SWAMP #4

D329

HOSPITALIST

D328

SWAMP #3

D330

SWAMP #2

D332

CODER/REVIEW

D334

COPY

D336

ELEC

D338

NURSE

A332

PAT. RM #11

A311

PAT. RM #9

A309

PAT. RM #7

A307

PAT. RM #5

A305

CLEAN LINEN

A322SOILED

A320

ELEC./SYSTEMS

A330

CLEAN

A321

MED. GAS

D307

EQUIP.

D305

STRETCHER

D303

STRETCHER

D309

NURSE

WK/COPY

A333

PAT. RM #10

D310

PAT. RM #8

D308

PAT. RM #6

D306

PAT. RM #4

D304

E Q

U

IP

D

NOUR.

D313

MSA

D302

NOUR.

A334

SOILED

D342A

A301A

A302A

A303A

A305A A307A A309A A311A

STAIR #4

A346 A313A

A314A

A315A

A316A

A317A

A318A

D319A

D320A

STAIR #5

D325

STAIR #6

D327

STAIR #2

D340

TLT.

D341

D321A

D322A

D323A

D324A

CORR.

C3A2

CORR.

C3A3

CORR.

C3D4

CORR.

C3D3

CORR.

C3C4

CORR.

C3A4

CORR.

C3A6

CORR.

C3D5

D304A D306A D308A D310A D312A

STORAGE

D345

STORAGE

A327

PAT. RM #12

D312

HSKPG

A331

CONSULT RM.

D344

NEW PIPING/PENETRATION

LOCATION

DEMO LEGEND - FLOOR PENETRATIONS

COLUMN STRIP

EXISTING PIPING TO BE

REMOVED AND

PENETRATION INFILLED

INTERSECTING COLUMN

STRIPS

MIDDLE STRIP

OR

- REF. MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION

- REF. STRUCTURAL DRAWINGS FOR EXISTING OPENING INFILL AND NEW OPENING CFRP PLACEMENT

DETAILS

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:202054

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .