589-22-885 IFB Specifications Volume 1 of 2.pdf

PDF 7 MB Posted

Attached to
Z2DA--589-22-885 Expand Sterile Processing Service Space to Meet Requirements
Solicitation number
36C25524R0097
Issued by

About this file

This document appears to be a 100% Issued for Bid set of construction specifications for Project 589-22-885, which is to expand the Sterile Processing Service (SPS) space at the Kansas City VA Medical Center. The specifications detail the general requirements, phasing plans, demolition, architectural, structural, mechanical, electrical, and other work required for this project. It specifies that the construction will be performed under a fixed-price contract with a Notice to Proceed anticipated. The contractor will be required to develop and maintain a detailed project schedule using Critical Path Method (CPM) techniques. The work includes general construction, alterations, and necessary demolition. Key information such as drawing sheets, contract completion dates, and testing/instruction requirements are provided. This is a comprehensive set of construction specifications to be used for bidding and executing the expansion of the Sterile Processing Service at the Kansas City VA Medical Center.

View the file

Other files

File Type Posted
V1_589-22-885_IFC_Specifications.pdf PDF
02 Structural Drawings IFC.pdf PDF
04 Fire Protection Drawings IFC.pdf PDF
07 Electrical Drawings IFC.pdf PDF
05 Plumbing Drawings IFC.pdf PDF
36C25524R0097 0003.pdf PDF
Revision 01 Narrative.pdf PDF
08 Telecom Drawings IFC.pdf PDF
09 Security Drawings IFC.pdf PDF
01 Environmental Drawings IFC.pdf PDF
V2_589-22-885_IFC_Specifications.pdf PDF
06 Mechanical Drawings IFC.pdf PDF
03 Architectural Drawings IFC.pdf PDF
36C25524R0097 0002.docx DOCX document
Agenda and Procurement Timeline.docx DOCX document
589-22-885 Expand SPS - Attendance for Pre-Bid Conference.pdf PDF
Construction Pre-Bid Info.docx DOCX document
Appendix 1- Price Breakdown and Calculation of Self-Performed Work- 589-22-885-Issued.docx DOCX document
36C25524R0097 0001.pdf PDF
589-22-885 Expand SPS Combined Drawing Set Vol 2 - Environmental -7 Sheets 02.pdf PDF
589-22-885 Expand SPS Combined Drawing Set Vol 7 - Mechanical - 22 Sheets.pdf PDF
589-22-885 Expand SPS Combined Drawing Set Vol 4 - Architectural- 36 Sheets.pdf PDF
Appendix 1- Price Breakdown and Calculation of Self-Performed Work- 589-22-885-Issued 02.docx DOCX document
589-22-885 Expand SPS Combined Drawing Set Vol 6 - Plumbing- 22 Sheets.pdf PDF
589-22-885 Expand SPS Combined Drawing Set Vol 9 - Telecom and Security- 9 Sheets.pdf PDF
589-22-885 IFB Specifications Volume 2 of 2.pdf PDF
36C25524R0097.docx DOCX document
589-22-885 Expand SPS Combined Drawing Set Vol 8 - Electrical- 23 Sheets.pdf PDF
Appendix 2- Contractor Certification Regarding Safety and Environmental- 589-22-885 03.docx DOCX document
589-22-885 Expand SPS Combined Drawing Set Vol 5 - Fire Protection- 7 Sheets.pdf PDF
589-22-885 Expand SPS Combined Drawing Set Vol 1 - General- 17 Sheets.pdf PDF
589-22-885 Expand SPS Combined Drawing Set Vol 3 - Structural -12 Sheets.pdf PDF
Appendix 3- VAAR 852.219-75 VA Limitations on Subcontracting- Certificate of Compliance for Services and Construction 02.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

589-22-885 | EXPAND SPS - KCVAMC

KANSAS CITY VA MEDICAL CENTER

100% IFB CONSTRUCTION SPECIFICATIONS

VOLUME 1 of 2 (1,061 pages of 2,158)

589-22-885 | Expand SPS KCVAMC – Kansas City, MO

100% Issued For Bid Documents

April 17, 2024

Specifications Sign and Seal: 04/17/2024 Missouri Architectural Registration No: 5752

Missouri Engineer (Mechanical) Registration No: 30405

Missouri Engineer (Electrical) Registration No: PE-2021030250

Kansas Engineer (Structural) Registration No: 25271

Specifications Sign and Seal: 04/17/2024 Missouri Engineer (Fire Protection) Registration No: PE-2001025281

Environmental Health & Safety Registration No: 8594 CP

Registered Communications Distribution Designer Registration BICSIID # 328601

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

VA 589-22-885 EXPAND SPS

100% ISSUED FOR BID

04-17-24

00 01 10-1

TABLE OF CONTENTS

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

NOTE: ‘*’ DENOTES CUSTOM SPECIFICATION

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21

01 33 23 Shop Drawings, Product Data, and Samples 11-23

01 35 26 Safety Requirements 10-22

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 06-21

01 74 19 Construction Waste Management 04-22

01 91 00 General Commissioning Requirements 04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21

02 82 13.21 Asbestos Roofing Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 01 30.72 *Fiber Reinforced Polymer 11-23

03 30 00 Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY – NOT USED

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 31 00 Steel Decking 01-21

05 36 00 Composite Metal Decking 01-21

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

100% ISSUED FOR BID

04-17-24

00 01 10-2

TABLE OF CONTENTS

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 01-21

07 21 13 Thermal Insulation 01-21

07 81 00 Applied Fireproofing 10-17

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 04-22

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 31 13 Access Doors and Frames 04-22

08 34 00 *Special Function Doors 11-23

08 42 29.23 *Sliding Automatic Entrances 11-23

08 71 00 Door Hardware 05-22

08 71 13 Automatic Door Operators 01-21

08 80 00 Glazing 01-21

08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 30 13 Ceramic/Porcelain Tiling 01-21

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 01-21

09 65 16 Resilient Sheet Flooring 06-22

09 65 19 Resilient Tile Flooring 05-18

09 67 23.60 Resinous Urethane and Epoxy Mortar Flooring (RES-6A and

RES 6B)

12-21

09 68 00 Carpeting 01-21

09 91 00 Painting 01-21

09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2)

01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 21 13 Toilet Compartments 01-21

10 26 00 Wall and Door Protection 01-21

10 28 00 Toilet, Bath, and Laundry Accessories 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

10 51 16 *Plastic Lockers 11-23

100% ISSUED FOR BID

04-17-24

00 01 10-3

TABLE OF CONTENTS

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 11 – EQUIPMENT

11 71 01 Medical Washing and Sterilizing Equipment 01-21

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades 08-17

12 31 00 Manufactured Metal Casework 01-21

12 32 00 Manufactured Wood Casework 01-21

12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION

13 21 13 *Clean Room Pass-Thru Cabinet 11-23

DIVISION 14– CONVEYING EQUIPEMENT

14 12 11 Traction and Winding Drum Dumbwaiter 08-23

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-23

22 05 12 General Motor Requirements for Plumbing Equipment 09-20

22 05 19 Meters and Gages for Plumbing Piping 09-20

22 05 23 General-Duty Valves for Plumbing Piping 09-20

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 05-21

22 11 23 Domestic Water Pumps 09-15

22 13 00 Facility Sanitary and Vent Piping 09-20

22 15 00 General Service Compressed-Air Systems 09-20

22 31 11 Water Softeners 09-15

22 35 00 Domestic Water Heat Exchangers 09-20

22 40 00 Plumbing Fixtures 12-22

22 63 00 Gas Systems for Laboratory and Healthcare Facilities 05-23

22 66 00 Chemical-Waste Systems for Laboratory and Healthcare

Facilities

09-20

22 67 19.16 Reverse-Osmosis Water Equipment 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23

100% ISSUED FOR BID

04-17-24

00 01 10-4

TABLE OF CONTENTS

SECTION NO. DIVISION AND SECTION TITLES DATE

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

02-20

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 03-23

23 09 23 Direct-Digital Control System for HVAC 03-23

23 21 13 Hydronic Piping 03-23 23 21 23 Hydronic Pumps 03-23 23 22 13 Steam and Condensate Heating Piping 08-23

23 31 00 HVAC Ducts and Casings 03-23

23 34 00 HVAC Fans 03-23

23 36 00 Air Terminal Units 03-23

23 37 00 Air Outlets and Inlets 03-23

23 40 00 HVAC Air Cleaning Devices 03-23

23 73 00 Indoor Central-Station Air-Handling Units 03-23

23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 03-20

23 82 16 Air Coils 03-23

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22

26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22

26 05 26 Grounding and Bonding for Electrical Systems 11-22

26 05 33 Raceway and Boxes for Electrical Systems 11-22

26 05 73 Overcurrent Protective Device Coordination Study 11-22

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 11-22

26 22 00 Low-Voltage Transformers 11-22

26 24 16 Panelboards 11-22

26 24 19 Motor Control Centers 11-22

26 27 26 Wiring Devices 11-22

26 29 11 Motor Controllers 11-22

26 29 21 Enclosed Switches and Circuit Breakers 11-22

26 36 23 Automatic Transfer Switches 11-22

26 43 13 Surge Protective Devices 11-22

26 51 00 Interior Lighting 11-22

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 08 00 Commissioning of Communications Systems 11-16

27 11 00 Communications Equipment Room Fittings 06-15

27 15 00 Communications Structured Cabling 01-16

27 51 16 Public Address and Mass Notification Systems 10-18

100% ISSUED FOR BID

04-17-24

00 01 10-5

TABLE OF CONTENTS

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 16 00 Intrusion Detection System 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK – NOT USED

DIVISION 32 – EXTERIOR IMPROVEMENTS – NOT USED

DIVISION 33 – UTILITIES – NOT USED

DIVISION 34 – TRANSPORTATION – NOT USED

DIVISION 48 – Electrical Power Generation – NOT USED

100% ISSUED FOR BID

05-01-20

00 01 15 - 1

LIST OF DRAWING SHEETS

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

GENERAL INFORMATION

01 GI000 COVER SHEET

02 GI001 GENERAL INFORMATION

03 GI002 ICRA CONSTRUCTION DETAILS

04 GI010 PHASING PLAN - BASEMENT

05 GI011 PHASING PLAN - LEVEL 1

06 GI012 PHASING PLAN - LEVEL 2 - REFLECTED CEILING PLAN

07 GI013 PHASING PLAN - LEVEL 2 - PHASE 1

08 GI014 PHASING PLAN - LEVEL 2 - PHASE 2

09 GI015 PHASING PLAN - LEVEL 2 - PHASE 3

10 GI016 PHASING PLAN - LEVEL 2 - PHASE 4

11 GI017 PHASING PLAN - LEVEL 2 - PHASE 5 & 6

12 GI018 PHASING PLAN - LEVEL 3

13 GI019 PHASING PLAN - LEVEL 3

14 GI020 PHASING PLAN - LEVEL 4

15 GI021 PHASING PLAN - LEVEL 5

16 GI022 PHASING PLAN - ROOF

17 GI023 LIFE SAFETY PLANS

HAZARDOUS MATERIALS

18 HA000 BASEMENT - ENVIRONMENTAL HAZARDS

19 HA100 FLOOR 1 - ENVIRONMENTAL HAZARD

20 HA200 FLOOR 2 - ENVIRONMENTAL HAZARDS

21 HA300 FLOOR 3 - ENVIRONMENTAL HAZARDS

22 HA400 FLOOR 4 - ENVIRONMENTAL HAZARDS

23 HA500 FLOOR 5 - ENVIRONMENTAL HAZARDS

24 HA600 ROOF - ENVIRONMENTAL HAZARDS

STRUCTURAL

25 SA001 STRUCTURAL GENERAL NOTES

26 SA010 STRUCTURAL SPECIAL INSPECTIONS

27 SA011 STRUCTURAL SPECIAL INSPECTIONS

00 01 15 - 2

28 SF101 EXISTING SECOND FLOOR FRAMING PLAN

29 SF102 EXISTING THIRD FLOOR FRAMING PLAN

30 SF103 EXISTING FOURTH FLOOR FRAMING PLAN

31 SF104 EXISTING FIFTH FLOOR FRAMING PLAN

32 SF105 ENLARGED ROOF AND PENTHOUSE FRAMING PLAN

33 SF401 FRP SECTIONS

34 SF402 FRP SECTIONS

35 SF501 FRAMING DETAILS

36 SF502 FRAMING DETAILS

ARCHITECTURAL

37 AS001 ARCHITECTURAL SITE PLAN

38 AD001 DEMOLITION REFLECTED CEILING PLAN - LEVEL 1

39 AD002 DEMOLITION PLANS - LEVEL 2

40 AD003 DEMOLITION REFLECTED CEILING PLAN - LEVEL 2

41 AD004 DEMOLITION PLAN - LEVEL 3

42 AD005 DEMOLITION REFLECTED CEILING PLAN - LEVEL 3

43 AD006 DEMOLITION PLANS - LEVEL 4 AND 5

44 AD007 DEMOLITION PLANS - ROOF

45 AE001 PARTITION TYPES

46 AE100 REFERENCE PLAN - BASEMENT

47 AE101 REFERENCE PLAN AND REFLECTED CEILING PLAN - LEVEL 1

48 AE102 REFERENCE PLAN - LEVEL 2

49 AE103 DIMENSION PLAN - LEVEL 2

50 AE104 REFERENCE PLAN - LEVEL 3

51 AE105 DIMENSION PLAN - LEVEL 3

52 AE106 REFERENCE AND DIMENSION PLAN - LEVEL 4

53 AE107 REFERENCE, DIMENSION, AND REFLECTED CEILING PLAN - LEVEL 5

54 AE108 ROOF PLAN

55 AC131 REFLECTED CEILING PLAN - LEVEL 2

56 AC132 REFLECTED CEILING PLAN - LEVEL 3

57 AE311 WALL SECTIONS

58 AE400 OVERALL EQUIPMENT PLAN - LEVEL 3

59 AE401 ENLARGED PLANS & ELEVATIONS

60 AE402 ENLARGED PLANS & ELEVATIONS

61 AE403 ENLARGED PLANS & ELEVATIONS

00 01 15 - 3

62 AE404 ENLARGED PLANS & ELEVATIONS

63 AE405 ENLARGED PLANS & ELEVATIONS

64 AE406 ENLARGED PLANS & ELEVATIONS

65 AE407 ENLARGED PLANS & ELEVATIONS

66 AE501 SECTION DETAILS

67 AE511 PLAN DETAILS

68 AE601 DOOR SCHEDULE

69 AF701 FINISH FLOOR PLANS

70 AF711 FINISH SCHEDULE & DETAILS

71 AF712 INTERIOR DETAILS

72 AF721 SIGNAGE PLAN

FIRE PROTECTION

73 FA001 FIRE ALARMS GENERAL NOTES, LEGEND, AND DIAGRAMS

74 FA101 FIRE ALARM AUDIBILITY PLAN

75 FA102 FIRE ALARM PLAN

76 FA103 FIRE ALARM PLAN

77 FX001 FIRE SUPRESSION GENERAL NOTES

78 FX101 FIRE SUPRRESSION PLAN - LEVEL 2

79 FX102 FIRE SUPPRESSION HAZARD CLASSIFICATION PLAN

PLUMBING

80 P-000 PLUMBING LEGEND

81 P-100 EXISTING PLUMBING REFERENCE PLAN - LEVEL 2

82 PLD101 PLUMBING SANITARY DEMOLITION PLAN - LEVEL 2

83 PLD102 PLUMBING SANITARY DEMOLITION PLAN - LEVEL 3

84 PPD101 PLUMBING DOMESTIC WATER DEMOLITION PLAN - LEVEL 2

85 PPD102 PLUMBING DOMESTIC WATER DEMOLITION PLAN - LEVEL 3

86 PGD102 PLUMBING MEDICAL GAS DEMOLITION PLAN - LEVEL 3

87 PL100 PLUMBING SANITARY PLAN - BASEMENT

88 PL101 PLUMBING SANITARY PLAN - LEVEL 2

89 PL102 PLUMBING SANITARY PLAN - LEVEL 3

90 PP100 PLUMBING DOMESTIC WATER PLAN - BASEMENT

91 PP101 PLUMBING DOMESTIC WATER PLAN - LEVEL 2

92 PP102 PLUMBING DOMESTIC WATER PLAN - LEVEL 3

93 PG102 PLUMBING MEDICAL GAS SUPPLY PLAN - LEVEL 3

100% ISSUED FOR BID

05-01-20

00 01 15 - 4

LIST OF DRAWING SHEETS

94 P-301 ISOMETRIC VIEW

95 P-302 ISOMETRIC VIEW

96 P-303 ISOMETRIC VIEW

97 P-304 ISOMETRIC VIEW

98 P-401 PLUMBING ENLARGED PLANS

99 P-501 PLUMBING DETAILS

100 P-502 PLUMBING DETAILS

101 P-601 PLUMBING SCHEDULES

MECHANICAL

102 M-000 MECHANICAL LEGEND AND ABBREVIATIONS

103 M-100 EXISTING HVAC REFERENCE PLAN - LEVEL 2

104 MDH100 MECHANICAL HVAC DUCT DEMOLITION PLAN - LEVEL 3

105 MDH101 MECHANICAL HVAC DUCT DEMOLITION PLAN - LEVEL 4

106 MDH102 MECHANICAL HVAC DUCT DEMOLITION PLAN - ROOF

107 MDP100 MECHANICAL HVAC PIPING DEMOLITION PLAN - LEVEL 3

108 MDP101 MECHANICAL HVAC PIPING DEMOLITION PLAN - LEVEL 4 & ROOF

109 MH100 MECHANICAL HVAC DUCT PLAN - LEVEL 3

110 MH101 MECHANICAL HVAC DUCT PLAN - LEVEL 4

111 MP100 MECHANICAL HVAC PIPING PLAN - LEVEL 3

112 MP101 MECHANICAL HVAC PIPING PLAN - LEVEL 4

113 M-201 MECHANICAL AIRFLOW PLAN

114 M-501 MECHANICAL DETAILS

115 M-502 MECHANICAL DETAILS

116 M-503 MECHANICAL DETAILS

117 M-504 MECHANICAL DETAILS

118 M-601 MECHANICAL SCHEDULES

119 M-701 MECHANICAL CONTROLS

120 M-702 MECHANICAL CONTROLS

121 M-703 MECHANICAL CONTROLS

122 M-704 MECHANICAL CONTROLS

123 M-705 MECHANICAL CONTROLS

ELECTRICAL

124 E-001 ELECTRICAL SYMBOLS & ABBREVIATIONS

125 ED101 ELECTRICAL DEMOLITION PLAN - BASEMENT

00 01 15 - 5

126 ED102A ELECTRICAL POWER DEMOLITION PLAN - LEVEL 2

127 ED102B ELECTRICAL LIGHTING DEMOLITION PLAN - LEVEL 2

128 ED103A ELECTRICAL POWER DEMOLITION PLAN - LEVEL 3

129 ED103B ELECTRICAL LIGHTING DEMOLITION PLAN - LEVEL 3

130 ED104 ELECTRICAL DEMOLITION PLAN - LEVEL 4

131 ED105 ELECTRICAL DEMOLITION PLANS - LEVEL 5

132 ED106 ELECTRICAL DEMOLITION PLAN - ROOF

133 E-101 ELECTRICAL PLAN - BASEMENT

134 EP102 ELECTRICAL POWER PLAN - LEVEL 2

135 EL102 ELECTRICAL LIGHTING PLANS - LEVEL 2

136 EP103 ELECTRICAL POWER PLAN - LEVEL 3

137 EL103 ELECTRICAL LIGHTING PLAN - LEVEL 3

138 EP104 ELECTRICAL POWER PLAN - LEVEL 4

139 EP105 ELECTRICAL POWER AND LIGHTING PLANS - LEVEL 5

140 E-401 ELECTRICAL ENLARGED PLANS

141 E-402 ELECTRICAL ENLARGED PLANS

142 E-403 ELECTRICAL ENLARGED PLANS

143 E-501 ELECTRICAL DETAILS

144 E-601 ELECTRICAL ONE-LINE DIAGRAM

145 E-602 ELECTRICAL PANEL SCHEDULES

146 E-603 ELECTRICAL SCHEDULES

TELECOMMUNICATIONS

147 T-100 TELECOMMUNICATION FLOOR PLAN

ELECTRONIC SAFETY AND SECURITY

148 TY000 SECURITY LEGENDS AND SYMBOLS

149 TD100 SECURITY DEMOLITION PLAN - LEVEL 3

150 TY100 SECURITY FLOOR PLAN - BASEMENT

151 TY101 SECURITY FLOOR PLAN - LEVEL 3

152 TY102 SECURITY FLOOR PLAN - LEVEL 4

153 TY103 SECURITY FLOOR PLAN - LEVEL 5

154 TY500 SECURITY DETAILS

155 TY600 SECURITY RISERS AND DIAGRAMS

- - - END - - -

100% ISSUED FOR BID

11-01-21

01 00 00 -1

GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for VA 589-22-885

Expand Sterile Processing Service as required by drawings and specifications.

B. Only one site visit will be scheduled prior to the bid date. Attendance is highly recommended

C. Offices of Spur Design, LLC, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative. For these specifications, the terms ‘Resident Engineer’ and ‘Project Engineer’ are synonymous with ‘COR’.

D. Before placement and installation of work subject to tests by testing laboratory retained by the Contractor, the Contractor shall notify the

COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than five workdays unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, necessary removal of existing construction and certain other items.

100% ISSUED FOR BID

11-01-21

01 00 00 -2

GENERAL REQUIREMENTS

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate identification. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide door hardware compatible with

KCVA small format interchangeable lore locking mechanism that can be keyed to KCVA keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.

100% ISSUED FOR BID

11-01-21

01 00 00 -3

GENERAL REQUIREMENTS

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 5 days before

100% ISSUED FOR BID

11-01-21

01 00 00 -4

GENERAL REQUIREMENTS

the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. Parking in designated areas only. No parking in parking garage.

Contractor to coordinate with VA Medical Center Facility Manager.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

100% ISSUED FOR BID

11-01-21

01 00 00 -5

GENERAL REQUIREMENTS

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

I. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR six weeks or

100% ISSUED FOR BID

11-01-21

01 00 00 -6

GENERAL REQUIREMENTS

more in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor.

Refer to drawings for specific Phasing and affected areas.

J. Building No. 26 will be occupied during performance of work; but immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

K. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

L. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

100% ISSUED FOR BID

11-01-21

01 00 00 -7

GENERAL REQUIREMENTS

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 5 weeks in advance of proposed interruption.

Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 5 weeks prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

100% ISSUED FOR BID

11-01-21

01 00 00 -8

GENERAL REQUIREMENTS

M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged-in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

N. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur, and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, 100% ISSUED FOR BID

11-01-21

01 00 00 -9

GENERAL REQUIREMENTS

to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.

Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled, and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of

100% ISSUED FOR BID

11-01-21

01 00 00 -10

GENERAL REQUIREMENTS

the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (FAR 52.236-9)

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

C. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. The apparent low bidder, contractor and affected subcontractors shall furnish all information and

100% ISSUED FOR BID

11-01-21

01 00 00 -11

GENERAL REQUIREMENTS

certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:

1. Designating areas for equipment maintenance and repair.

2. Providing waste receptacles at convenient locations and provide regular collection of wastes.

3. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and

4. Providing adequately maintained sanitary facilities.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to

100% ISSUED FOR BID

11-01-21

01 00 00 -12

GENERAL REQUIREMENTS

contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.11 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.12 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction at least 30 days before the planned pre-warranty conference, submit two sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the

Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers

100% ISSUED FOR BID

11-01-21

01 00 00 -13

GENERAL REQUIREMENTS

within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

100% ISSUED FOR BID

11-01-21

01 00 00 -14

GENERAL REQUIREMENTS

B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for

Contractor response, and other details deemed necessary by the

Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.

This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

100% ISSUED FOR BID

11-01-21

01 00 00 -15

GENERAL REQUIREMENTS

E. Following oral or written notification by the Contracting Officer, the

Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.

Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated within 3 workdays and work continuously to completion or relief.

4. The “Construction Warranty Service Priority List” is as follows:

a) Code 1-Life Safety Systems

Fire suppression systems.

Fire alarm system(s).

b) Code 1-Air Conditioning Systems

Air conditioning leak in part of the building, if causing damage.

Air conditioning system not cooling properly.

c) Code 1 Doors

1) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

d) Code 3-Doors

Interior/exterior personnel doors or hardware not functioning properly.

e) Code 1-Electrical

Power failure (entire area or any building operational after

1600 hours).

Security lights.

100% ISSUED FOR BID

11-01-21

01 00 00 -16

GENERAL REQUIREMENTS

Smoke detectors.

f) Code 2-Electrical

Power failure (no power to a room or part of building).

Receptacle and lights not operational (in a room or part of building).

g) Code 1-Gas

Leaks and pipeline breaks.

h) Code 1-Heat

Power failure affecting heat.

i) Code 1-Plumbing

Hot water heater failure.

2) Leaking water supply pipes

j) Code 2-Plumbing

Flush valves not operating properly

Fixture drain, supply line or any water pipe leaking.

Toilet leaking at base.

k) Code 3- Plumbing

Leaky faucets.

l) Code 3-Interior

Floors damaged.

Paint chipping or peeling.

Casework damaged.

m) Code 1-Roof Leaks

Damage to property is occurring.

n) Code 2-Water (Hot)

No hot water in portion of building listed.

o) Code 3

All work not listed above.

F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting

Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.

100% ISSUED FOR BID

11-01-21

01 00 00 -17

GENERAL REQUIREMENTS

Warranty Tags

Type of product/material

Model number

Serial number

Contract number

Warranty period from/to

Inspector’s signature

Construction Contractor

Address

Telephone number

Warranty Contact

Address

Telephone number

Warranty response time priority code

1.13 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property.

1.14 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014

Edition), Article 590,…

This is the start of the file's text. The full file is on GovTribe.