589-22-885 Expand SPS Combined Drawing Set Vol 1 - General- 17 Sheets.pdf

PDF 14 MB Posted

Attached to
Z2DA--589-22-885 Expand Sterile Processing Service Space to Meet Requirements
Solicitation number
36C25524R0097
Issued by

About this file

This document is a 17-sheet drawing set for the expansion of the Sterile Processing Service (SPS) space to meet requirements, as part of Solicitation 36C25524R0097 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The solicitation is for the expansion of the SPS space to fulfill requirements. The drawing set provides general details on the construction and layout of the expanded SPS space. Key information includes the project name, solicitation number, federal agency, and a high-level overview of the required products and services. No specific details on response dates, award dates, pricing terms, set asides, incumbents, or other salient information are provided in this drawing set document.

View the file

Other files

File Type Posted
V1_589-22-885_IFC_Specifications.pdf PDF
02 Structural Drawings IFC.pdf PDF
04 Fire Protection Drawings IFC.pdf PDF
07 Electrical Drawings IFC.pdf PDF
05 Plumbing Drawings IFC.pdf PDF
36C25524R0097 0003.pdf PDF
Revision 01 Narrative.pdf PDF
08 Telecom Drawings IFC.pdf PDF
09 Security Drawings IFC.pdf PDF
01 Environmental Drawings IFC.pdf PDF
V2_589-22-885_IFC_Specifications.pdf PDF
06 Mechanical Drawings IFC.pdf PDF
03 Architectural Drawings IFC.pdf PDF
36C25524R0097 0002.docx DOCX document
Agenda and Procurement Timeline.docx DOCX document
589-22-885 Expand SPS - Attendance for Pre-Bid Conference.pdf PDF
Construction Pre-Bid Info.docx DOCX document
Appendix 1- Price Breakdown and Calculation of Self-Performed Work- 589-22-885-Issued.docx DOCX document
36C25524R0097 0001.pdf PDF
589-22-885 Expand SPS Combined Drawing Set Vol 2 - Environmental -7 Sheets 02.pdf PDF
589-22-885 Expand SPS Combined Drawing Set Vol 7 - Mechanical - 22 Sheets.pdf PDF
589-22-885 IFB Specifications Volume 1 of 2.pdf PDF
589-22-885 Expand SPS Combined Drawing Set Vol 4 - Architectural- 36 Sheets.pdf PDF
Appendix 1- Price Breakdown and Calculation of Self-Performed Work- 589-22-885-Issued 02.docx DOCX document
589-22-885 Expand SPS Combined Drawing Set Vol 6 - Plumbing- 22 Sheets.pdf PDF
589-22-885 Expand SPS Combined Drawing Set Vol 9 - Telecom and Security- 9 Sheets.pdf PDF
589-22-885 IFB Specifications Volume 2 of 2.pdf PDF
36C25524R0097.docx DOCX document
589-22-885 Expand SPS Combined Drawing Set Vol 8 - Electrical- 23 Sheets.pdf PDF
Appendix 2- Contractor Certification Regarding Safety and Environmental- 589-22-885 03.docx DOCX document
589-22-885 Expand SPS Combined Drawing Set Vol 5 - Fire Protection- 7 Sheets.pdf PDF
589-22-885 Expand SPS Combined Drawing Set Vol 3 - Structural -12 Sheets.pdf PDF
Appendix 3- VAAR 852.219-75 VA Limitations on Subcontracting- Certificate of Compliance for Services and Construction 02.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

589-22-885 | EXPAND SPS - KCVAMC

KANSAS CITY VA MEDICAL CENTER

100% IFB CONSTRUCTION DRAWINGS

VOLUME 1 OF 9 - GENERAL

PAGES 1-17 OF 155, 17 SHEETS

LOCATION

PLAN

AREA

PLAN

PROJECT LOCATION

BUILDING 26

NN

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing #

U.S. DEPARTMENT OF VETERANS AFFAIRS

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MISSOURI ARCHITECTURAL COA EXP. 12/31/2024

MISSOURI ENGINEERING COA EXP. 12/31/2024

STRUCTURAL / CIVIL ENGR

H2B

1225 N. LOOP WEST, STE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB ENGR

SPUR DESIGN

2519 MADISON AVE

KANSAS CITY, MO 64108

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FIRE PROTECTION ENGR

POOLE FIRE PROTECTION

19910 WEST 161ST ST.

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

11140 S. TOWNE SQ., STE 100

ST. LOUIS, MO 63123

(713) 864-2900

TELECOMMUNICATION

ASPEN ENGINEERING & CONTRACTING

7 KIJI-DAVA CIRCLE, STE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

HEALTHCARE PLANNER

THE INNOVA GROUP

9442 N. CAPITAL OF TX HWY

AUSTIN, TX 78759

(512) 346-8700

/1

/2

:1

:2

A

M

COVER SHEET

KJW 01 OF 155AJS

100% ISSUED FOR BID

EXPAND SPS - KCVAMC

VA PROJECT NUMBER: 589-22-885

EXPAND SPS - KCVAMC

04/17/2024

589-22-885

KANSAS CITY VA MEDICAL CENTER

4801 LINWOOD BLVD

KANSAS CITY, MO 64128

KANSAS CITY VA MEDICAL CENTER

4801 LINWOOD BLVD

KANSAS CITY, MO 64128

100% ISSUED FOR BID

GI000

SPUR #: 2205

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

[06] MECHANICAL

102 M-000 MECHANICAL LEGEND AND ABBREVIATIONS

103 M-100 EXISTING HVAC REFERENCE PLAN - LEVEL 2

104 MDH100 MECHANICAL HVAC DUCT DEMOLITION PLAN - LEVEL 3

105 MDH101 MECHANICAL HVAC DUCT DEMOLITION PLAN - LEVEL 4

106 MDH102 MECHANICAL HVAC DUCT DEMOLITION PLAN - ROOF

107 MDP100 MECHANICAL HVAC PIPING DEMOLITION PLAN - LEVEL 3

108 MDP101 MECHANICAL HVAC PIPING DEMOLITION PLAN - LEVEL 4 & ROOF

109 MH100 MECHANICAL HVAC DUCT PLAN - LEVEL 3

110 MH101 MECHANICAL HVAC DUCT PLAN - LEVEL 4

111 MP100 MECHANICAL HVAC PIPING PLAN - LEVEL 3

112 MP101 MECHANICAL HVAC PIPING PLAN - LEVEL 4

113 M-201 MECHANICAL AIRFLOW PLAN

114 M-501 MECHANICAL DETAILS

115 M-502 MECHANICAL DETAILS

116 M-503 MECHANICAL DETAILS

117 M-504 MECHANICAL DETAILS

118 M-601 MECHANICAL SCHEDULES

119 M-701 MECHANICAL CONTROLS

120 M-702 MECHANICAL CONTROLS

121 M-703 MECHANICAL CONTROLS

122 M-704 MECHANICAL CONTROLS

123 M-705 MECHANICAL CONTROLS

[07] ELECTRICAL

124 E-001 ELECTRICAL SYMBOLS & ABBREVIATIONS

125 ED101 ELECTRICAL DEMOLITION PLAN - BASEMENT

126 ED102A ELECTRICAL POWER DEMOLITION PLAN - LEVEL 2

127 ED102B ELECTRICAL LIGHTING DEMOLITION PLAN - LEVEL 2

128 ED103A ELECTRICAL POWER DEMOLITION PLAN - LEVEL 3

129 ED103B ELECTRICAL LIGHTING DEMOLITION PLAN - LEVEL 3

130 ED104 ELECTRICAL DEMOLITION PLAN - LEVEL 4

131 ED105 ELECTRICAL DEMOLITION PLANS - LEVEL 5

132 ED106 ELECTRICAL DEMOLITION PLAN - ROOF

133 E-101 ELECTRICAL PLAN - BASEMENT

134 EP102 ELECTRICAL POWER PLAN - LEVEL 2

135 EL102 ELECTRICAL LIGHTING PLANS - LEVEL 2

136 EP103 ELECTRICAL POWER PLAN - LEVEL 3

137 EL103 ELECTRICAL LIGHTING PLAN - LEVEL 3

138 EP104 ELECTRICAL POWER PLAN - LEVEL 4

139 EP105 ELECTRICAL POWER AND LIGHTING PLANS - LEVEL 5

140 E-401 ELECTRICAL ENLARGED PLANS

141 E-402 ELECTRICAL ENLARGED PLANS

142 E-403 ELECTRICAL ENLARGED PLANS

143 E-501 ELECTRICAL DETAILS

144 E-601 ELECTRICAL ONE-LINE DIAGRAM

145 E-602 ELECTRICAL PANEL SCHEDULES

146 E-603 ELECTRICAL SCHEDULES

[08] TELECOMMUNICATION

147 T-100 TELECOMMUNICATION FLOOR PLAN

[09] SECURITY

148 TY001 SECURITY LEGENDS AND SYMBOLS

149 TD101 SECURITY DEMOLITION PLAN - LEVEL 3

150 TY101 SECURITY FLOOR PLAN - BASEMENT

151 TY102 SECURITY FLOOR PLAN - LEVEL 3

152 TY103 SECURITY FLOOR PLAN - LEVEL 4

153 TY104 SECURITY FLOOR PLAN - LEVEL 5

154 TY501 SECURITY DETAILS

155 TY601 SECURITY RISERS AND DIAGRAMS

TOTAL SHEETS: 155

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

51 AE105 DIMENSION PLAN - LEVEL 3

52 AE106 REFERENCE AND DIMENSION PLAN - LEVEL 4

53 AE107 REFERENCE, DIMENSION, AND REFLECTED CEILING PLAN - LEVEL 5

54 AE108 ROOF PLAN

55 AC131 REFLECTED CEILING PLAN - LEVEL 2

56 AC132 REFLECTED CEILING PLAN - LEVEL 3

57 AE311 WALL SECTIONS

58 AE400 OVERALL EQUIPMENT PLAN - LEVEL 3

59 AE401 ENLARGED PLANS & ELEVATIONS

60 AE402 ENLARGED PLANS & ELEVATIONS

61 AE403 ENLARGED PLANS & ELEVATIONS

62 AE404 ENLARGED PLANS & ELEVATIONS

63 AE405 ENLARGED PLANS & ELEVATIONS

64 AE406 ENLARGED PLANS & ELEVATIONS

65 AE407 ENLARGED PLANS & ELEVATIONS

66 AE501 SECTION DETAILS

67 AE511 PLAN DETAILS

68 AE601 DOOR SCHEDULE

69 AF701 FINISH FLOOR PLANS

70 AF711 FINISH SCHEDULE & DETAILS

71 AF712 INTERIOR DETAILS

72 AF721 SIGNAGE PLAN

[04] FIRE PROTECTION

73 FA001 FIRE ALARMS GENERAL NOTES, LEGEND, AND DIAGRAMS

74 FA101 FIRE ALARM AUDIBILITY PLAN

75 FA102 FIRE ALARM PLAN

76 FA103 FIRE ALARM PLAN

77 FX001 FIRE SUPRESSION GENERAL NOTES

78 FX101 FIRE SUPRRESSION PLAN - LEVEL 2

79 FX102 FIRE SUPPRESSION HAZARD CLASSIFICATION PLAN

[05] PLUMBING

80 P-000 PLUMBING LEGEND

81 P-100 EXISTING PLUMBING REFERENCE PLAN - LEVEL 2

82 PLD101 PLUMBING SANITARY DEMOLITION PLAN - LEVEL 2

83 PLD102 PLUMBING SANITARY DEMOLITION PLAN - LEVEL 3

84 PPD101 PLUMBING DOMESTIC WATER DEMOLITION PLAN - LEVEL 2

85 PPD102 PLUMBING DOMESTIC WATER DEMOLITION PLAN - LEVEL 3

86 PGD102 PLUMBING MEDICAL GAS DEMOLITION PLAN - LEVEL 3

87 PL100 PLUMBING SANITARY PLAN - BASEMENT

88 PL101 PLUMBING SANITARY PLAN - LEVEL 2

89 PL102 PLUMBING SANITARY PLAN - LEVEL 3

90 PP100 PLUMBING DOMESTIC WATER PLAN - BASEMENT

91 PP101 PLUMBING DOMESTIC WATER PLAN - LEVEL 2

92 PP102 PLUMBING DOMESTIC WATER PLAN - LEVEL 3

93 PG102 PLUMBING MEDICAL GAS SUPPLY PLAN - LEVEL 3

94 P-301 ISOMETRIC VIEW

95 P-302 ISOMETRIC VIEW

96 P-303 ISOMETRIC VIEW

97 P-304 ISOMETRIC VIEW

98 P-401 PLUMBING ENLARGED PLANS

99 P-501 PLUMBING DETAILS

100 P-502 PLUMBING DETAILS

101 P-601 PLUMBING SCHEDULES

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

[00] GENERAL

01 GI000 COVER SHEET

02 GI001 GENERAL INFORMATION

03 GI002 ICRA CONSTRUCTION DETAILS

04 GI010 PHASING PLAN - BASEMENT

05 GI011 PHASING PLAN - LEVEL 1

06 GI012 PHASING PLAN - LEVEL 2 - REFLECTED CEILING PLAN

07 GI013 PHASING PLAN - LEVEL 2 - PHASE 1

08 GI014 PHASING PLAN - LEVEL 2 - PHASE 2

09 GI015 PHASING PLAN - LEVEL 2 - PHASE 3

10 GI016 PHASING PLAN - LEVEL 2 - PHASE 4

11 GI017 PHASING PLAN - LEVEL 2 - PHASE 5 & 6

12 GI018 PHASING PLAN - LEVEL 3

13 GI019 PHASING PLAN - LEVEL 3

14 GI020 PHASING PLAN - LEVEL 4

15 GI021 PHASING PLAN - LEVEL 5

16 GI022 PHASING PLAN - ROOF

17 GI023 LIFE SAFETY PLANS

[01] HAZARDOUS MATERIALS

18 HA000 BASEMENT - ENVIRONMENTAL HAZARDS

19 HA100 FLOOR 1 - ENVIRONMENTAL HAZARD

20 HA200 FLOOR 2 - ENVIRONMENTAL HAZARDS

21 HA300 FLOOR 3 - ENVIRONMENTAL HAZARDS

22 HA400 FLOOR 4 - ENVIRONMENTAL HAZARDS

23 HA500 FLOOR 5 - ENVIRONMENTAL HAZARDS

24 HA600 ROOF - ENVIRONMENTAL HAZARDS

[02] STRUCTURAL

25 SA001 STRUCTURAL GENERAL NOTES

26 SA010 STRUCTURAL SPECIAL INSPECTIONS

27 SA011 STRUCTURAL SPECIAL INSPECTIONS

28 SF101 EXISTING SECOND FLOOR FRAMING PLAN

29 SF102 EXISTING THIRD FLOOR FRAMING PLAN

30 SF103 EXISTING FOURTH FLOOR FRAMING PLAN

31 SF104 EXISTING FIFTH FLOOR FRAMING PLAN

32 SF105 ENLARGED ROOF AND PENTHOUSE FRAMING PLAN

33 SF401 FRP SECTIONS

34 SF402 FRP SECTIONS

35 SF501 FRAMING DETAILS

36 SF502 FRAMING DETAILS

[03] ARCHITECTURAL

37 AS001 ARCHITECTURAL SITE PLAN

38 AD001 DEMOLITION REFLECTED CEILING PLAN - LEVEL 1

39 AD002 DEMOLITION PLANS - LEVEL 2

40 AD003 DEMOLITION REFLECTED CEILING PLAN - LEVEL 2

41 AD004 DEMOLITION PLAN - LEVEL 3

42 AD005 DEMOLITION REFLECTED CEILING PLAN - LEVEL 3

43 AD006 DEMOLITION PLANS - LEVEL 4 AND 5

44 AD007 DEMOLITION PLANS - ROOF

45 AE001 PARTITION TYPES

46 AE100 REFERENCE PLAN - BASEMENT

47 AE101 REFERENCE PLAN AND REFLECTED CEILING PLAN - LEVEL 1

48 AE102 REFERENCE PLAN - LEVEL 2

49 AE103 DIMENSION PLAN - LEVEL 2

50 AE104 REFERENCE PLAN - LEVEL 3

No. REVISION DESCRIPTION DATE

ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS

4' -0

M

A X

4' -0

M

A X

2' -1

0" M

A X

2' -3

M

IN

1'-6" MIN

1. GENERAL CONTRACTOR TO PROVIDE FIRE TREATED WOOD

SUPPORT BLOCKING FOR ALL WALL MOUNTED

ACCESSORIES, FIXTURES, AND EQUIPMENT.

2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN

COUNTERTOPS @ 36"-48" MAX ON CENTER.

3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER

FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.

4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL

FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR

FIXTURE TYPES USED IN THIS PROJECT.

5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,

BACKING TO BE PROVIDED AS SHIM FOR FLUSH

APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.

6" MAX

9" M

IN

SHOWER

VA TOILET ROOM

TURNING RADIUS

DRINKING

FOUNTAIN

PAPER TOWEL

DISPENSER

SANITARY

NAPKIN

DISPENSER

4' -0

"M A

X

WASTE

RECEPTACLE

LAVATORY

WITH MIRROR

ON CENTER

WALL

4' -0

M

A X

SOAP

DISPENSER

2' -1

0" M

A X

T O

B .O

. R E

F

LE

C T

IV

E

S U

R F

A C

E

3' -4

"M A

X

17 MIN

2' -3

M

IN

3' -0

M

A X

1'-6" MIN

WALL

2' -9

4' -0

EQ EQ

8" MIN

WALL

LAVATORY

WITH APRON

1' -5

M

A X

1'-6" MIN

URINAL

WALL

1'-5" - 1'-7" (AMBULATORY)

1'-4" - 1'-6" (WHEELCHAIR)

CLEAR FLOOR

5'-6"

CLEAR FLOOR

6'-0"

3'-0" MIN

2' -9

3' -0

1'-0" MIN

3'-6" MIN 1'-0"MAX

4'-6" MIN

1' -5

'-7

1' -6

M

IN

A N

S I I

C C

A

7.

1)

1' -3

M

IN

A D

A /A

B A

WALL

WALL

4' -0

M

A X

WALL HOOK

7' -0

CLOCK

WALL

FINISHED FLOOR

FIRE EXTINGUISHER

CABINET

WEIGHT > 40LBS

FIRE EXTINGUISHER

CABINET

WEIGHT < 40LBS

4' -0

"M A

X

4' -0

M

A X

TOILET SEAT

COVER

DISPENSER

BABY

CHANGING

STATION

CLEAR FLOOR SPACE

@ WATER CLOSET

5'-6"

2'-6"

4' -0

2'-6"

4' -0

HANDRAILS AND

BUMPERGUARDS

FIXTURE MOUNTING HEIGHTS AND CLEARANCES

18" MIN

M

IN

FRONT APPROACH,

PULL SIDE

36" MIN

M

IN

HINGE APPROACH,

PULL SIDE

HINGE APPROACH,

PULL SIDE

*12" MIN48

M

IN

FRONT APPROACH,

PUSH SIDE

M

IN

HINGE APPROACH,

PUSH SIDE

22" MIN 24" MIN

*4 8"

M

IN

LATCH APPROACH,

PULL SIDE

24" MIN*4

2"

M

IN

LATCH APPROACH,

PUSH SIDE

*IF BOTH CLOSER

AND LATCH ARE

PROVIDED

*54" MIN IF CLOSER

IS PROVIDED

*48" IF CLOSER IS

PROVIDED

FRONT APPROACH,

PUSH SIDE

M

IN

42" MIN

DOOR AND FIXTURE CLEARANCES

MATERIALS LEGEND

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN

VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS

SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)

• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)

• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)

• 2021 NATIONAL FIRE CODES (NFPA)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• 2022 VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2021 INTERNATIONAL MECHANICAL CODE

• 2023 NATIONAL ELECTRICAL CODE (NEC), NFPA 70

• 2021 INTERNATIONAL PLUMBING CODE (IPC)

• 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)

• 2017 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES

• 2022 FGI GUIDELINES

• 2019 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)

• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND

NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS

• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1

• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT

NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.

DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES

EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

ASHRAE 90.1 - 2019 EDITION

BUILDING LOCATION: KANSAS CITY, MO

CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4A

INTERIOR DESIGN CONDITIONS:

THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM

AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.

BUILDING ENVELOPE REQUIREMENTS (5.5 )

BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)

ROOFS REQUIRED DESIGNED

INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls EXISTING

ATTIC AND OTHER: R-49 EXISTING

WALLS, ABOVE GRADE

MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 EXISTING

WALL, BELOW GRADE

BELOW-GRADE WALL: R-7.5 c.i. EXISTING

FLOORS

MASS: R-14.6 c.i. EXISTING

STEEL-FRAMED: R-30 EXISTING

WOOD-FRAMED AND OTHER: R-30 EXISTING

SLAB-ON-GRADE FLOORS

UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING

OPAQUE DOORS

SWINGING: U-0.370 EXISTING

NONSWINGING: U-0.310 EXISTING

FENESTRATION (TABLE 5.5-4):

VERTICAL FENESTRATION, U-FACTOR

FIXED: U-0.36 EXISTING

OPERABLE: U-0.45 EXISTING

ENTRANCE DOOR: U-0.63 EXISTING

DEFINITIONS

c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM

NR = NO (INSULATION) REQUIREMENT

ENERGY REQUIREMENTS

N

1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL

CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE

ENTIRE DOCUMENT SET.

2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY

WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY

DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY

ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.

3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT

CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.

4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE

CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK

AREAS FROM THE EXISTING FACILITIES.

5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.

6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN

PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND

REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.

7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED

OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE

OWNER.

8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT

PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.

9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE

ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.

10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER

DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A

WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE

AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND

ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,

BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL

DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE

OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION

DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND

OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND

SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL

SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE

DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO

THE GOVERNMENT.

11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH

SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 5 WORKING DAYS IN

ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE,

EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR

INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60

CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS

DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER

MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE

THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS

REQUESTED IN WRITING AND APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED,

IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME

SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF

THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY

OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE

INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN

ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY

AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING

THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.

12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR

DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING

BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE

DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION

DOCUMENTS.

13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.

14. CONTRACTOR TO COORDINATE WITH VA POINT OF CONTACT FOR REQUIREMENTS OF

PRE-CONSTRUCTION RISK ASSESSMENT (PCRA). CONTRACTOR TO PROVIDE PRE-

CONSTRUCTION RISK ASSESSMENT PROCESS IN PLACE PRIOR TO CONSTRUCTION AND

DURING CONSTRUCTION. CONTRACTOR TO COORDINATE WITH VA POINT OF CONTACT

THROUGHOUT CONSTRUCTION FOR PCRA REQUIREMENTS. CONTRACTOR TO REVEIW

ANY KC VA PCRA TRAINING REQUIREMENTS PRIOR TO COMMENCEMENT OF

CONSTRUCTION.

GENERAL NOTES

AREA NAME

150 SF

A101

A101

SIM

A

00.0

A101

1 1

A101

LEVEL NAME

00'-00"

00'-00" 4B

3A

FIBERGLASS BATT

INSULATION

RIGID INSULATION

CONCRETE / PRECAST

CONCRETE

EARTH / SOIL

SAND, EIFS FINISH, OR

PLASTER FINISH

GYPSUM BOARD FINISH

BRICK

CONCRETE MASONRY

UNIT

STONE / CAST STONE

GYPSUM BOARD SECTION

EXTERIOR SHEATHING

BOARD SECTION

PLYWOOD SECTION

CLEAN UTILITY

000A

150 SF

/1 A101

X0000

6"2' -1

0"

'-2

ROOM TAG

AREA TAG

SPECIALTY EQUIPMENT TAG

DOOR TAG

KEYED NOTE TAG

WALL TAG

WINDOW TAG

A101

SIM

A101

SIM__________

A

ACB ACOUSTIC CEILING BAFFLE

ACP ACOUSTIC CEILING PANEL

ACST ACOUSTIC

ADA AMERICANS WITH DISABILITIES ACT

ACT ACOUSTICAL CEILING TILE

ADDL ADDITIONAL

ADDN ADDITION

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

AE ARCHITECT/ENGINEER

AF ACCESS FLOORING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINIUM (TRIM)

AMT AMOUNT

APPROX APPROXIMATE

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

AT ACOUSTIC CEILING TILE

AVG AVERAGE

B

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BOS BOTTOM OF STEEL

BOT BOTTOM

BRKT BRACKET

BTWN BETWEEN

C

CAB CABINET

CAV CAVITY

CBB CONCRETE BACKER BOARD

CD CONSTRUCTION DOCUMENTS

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CH BD CHALK BOARD

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CP CONTRACTOR PROVIDED

CP/CI CONTRACTOR PROVIDED /

CONTRACTOR INSTALLED

CPT CARPET/CARPET TILE

CS CONCRETE SEALED

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTER

CU FT CUBIC FEET

D

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

DWG DRAWING

DWP DIMENSIONAL WALL PANEL

E

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPY EPOXY FLOORING

EQ EQUAL

ETR EXISTING TO REMAIN

EX EXISTING

EXP EXPOSED

EXT EXTERIOR

F

FAB FABRIC

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FP FIRE PROTECTION

FR FIRE RESISTANT

FT FEET

FTG FOOTING

FV FIELD VERIFY

FWC FABRIC WALL COVERING

G

GDR GUARDRAIL

GL GLASS/GLAZING

GRAN GRANITE

GR FL GROUND FLOOR

GT GROUT

GSM GALVANIZED SHEET METAL

GYP BD GYPSUM BOARD

H

HDW HARDWARE

HEPA HIGH EFFICIENCY

PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

HVT HOMOGENOUS VINYL TILE

I

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J

J-BOX JUNCTION BOX

L

LAV LAVATORY

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIN LINEAR

LN LINOLEUM

LOC LOCATION

LT LIGHT

LVR LOUVER

LVT LUXURY VINYL TILE

M

MAT CARPET MAT / WALK-OFF MAT

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MOD MODIFY

MTG MOUNTING

MTL METAL

MVBL MOVABLE

N

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P

P PAINT

PA PUBLIC ADDRESS

PBD PARTICLE BOARD

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PNL PANEL

PR PAIR

PRB PROFILE BASE

PRKG PARKING

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PORCELAIN TILE

PWR POWER

Q

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QTY QUANTITY

REFERENCE SYMBOLS IDENTIFICATION TAGS

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.

GRID HEAD AND

LINE

LEVEL INDICATOR

MATCH LINE AND

VIEW REFERENCE

NORTH ARROW W/

PROJECT NORTH

SPOT ELEVATION

DETAIL

SECTION

**48" MIN IF BOTH CLOSER

AND LATCH PROVIDED

WALL

SECTION

BUILDING

SECTION

DETAIL

ELEVATION

INTERIOR

ELEVATION

BUILDING

ELEVATION

1 1

6'- 0"

5'- 6"

BARIATRIC TOILET ROOM

TURNING RADIUS

CLEAR FLOOR SPACE

@ ADA LAVATORY

CLEAR FLOOR SPACE @ ADA

DRINKING FOUNTAIN

6"

3"

6" 1'

-6

6" MAX

7" - 9" 11" MIN

17" - 25"

M

IN

6' -0

(ANSI ICC A117.1)

39"- 41"

(A N

S I I

C C

A

7.

1)

M

IN

(A N

S I I

C C

A

7.

1)

1"

3' -6

M

A X

5' -0

M

A X

R

RAF RESILIENT ATHETIC FLOORING

RB RUBBER BASE/RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RES-W RESINOUS / EPOXY WALL / CEILING

RF RUBBER FLOORING

RFG ROOFING

RM ROOM

RO ROUGH OPENING

RP RESIN PANEL

RSF RESILIENT SHEET FLOORING

RV ROOF VENT

RWC RIGID VINYL WALLCOVERING

S

SC SPECIALTY COATING

SD STATIC DISSIPATIVE FLOORING/TILE

SCHED SCHEDULE

SECT SECTION

SF SQUARE FOOT (FEET)

SGL SINGLE

SIM SIMILAR

SJ SCORED JOINT

SLNT SEALANT

SM SHEET METAL

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SOLID SURFACE

ST STONE

STD STANDARD

STOR STORAGE

SV SHEET VINYL (ROLLED OR TILE)

SWC STAINLESS STEEL WALLCOVERING

T

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZO

TOF TOP OF FOOTING/ FOUNDATION

TOM TOP OF MASONRY

TOS TOP OF SLAB/ STEEL

U

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VAR VARIES

VC VA PROVIDED / CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION TILE

VFAT VINYL FACED ACOUSTICLAL TILE

VP VENEERED PLASTER

VT VINYL TILE

VV VA PROVIDED / VA INSTALLED

VWC VINYL WALLCOVERING

VWF VINYL WALL FABRIC

W

W/ WITH

W/O WITHOUT

W/C WATER CLOSET

WC WHEELCHAIR

WD WOOD

WFAB WALL FABRIC

WPM WATERPROOF MEMBRANE

WSF WELDED SHEET FLOOR

X

X BRACE CROSS BRACE

2' -9

3' -0

M

IN

FRONT APPROACH

M

IN

SIDE APPROACH

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MISSOURI ARCHITECTURAL COA EXP. 12/31/2024

MISSOURI ENGINEERING COA EXP. 12/31/2024

STRUCTURAL / CIVIL ENGR

H2B

1225 N. LOOP WEST, STE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB ENGR

SPUR DESIGN

2519 MADISON AVE

KANSAS CITY, MO 64108

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FIRE PROTECTION ENGR

POOLE FIRE PROTECTION

19910 WEST 161ST ST.

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

11140 S. TOWNE SQ., STE 100

ST. LOUIS, MO 63123

(713) 864-2900

TELECOMMUNICATION

ASPEN ENGINEERING & CONTRACTING

7 KIJI-DAVA CIRCLE, STE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

HEALTHCARE PLANNER

THE INNOVA GROUP

9442 N. CAPITAL OF TX HWY

AUSTIN, TX 78759

(512) 346-8700

/1

/2

:1

:3

A

M

GENERAL INFORMATION

CAB 02 OF 155AJS

100% ISSUED FOR BID

EXPAND SPS - KCVAMC

04/17/2024

589-22-885

KANSAS CITY VA MEDICAL CENTER

4801 LINWOOD BLVD

KANSAS CITY, MO 64128

GI001

SPUR #: 2205

CONTROLS DEFINED BELOW FOR THE LEVEL OF PRECAUTIONS IDENTIFIED FOR THE ACTIVITY MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS AND MAINTAINED UNTIL WORK IS COMPLETED AND THE AREA IS ACTIVATED. CONTROL MEASURES FOR EACH PRECAUTION LEVEL MUST ALSO INCLUDE THE CONTROL MEASURES IN THE PRECEDING LEVEL(S). AS THE ACTIVITY PROGRESSES, A FULL RE-EVALUATION OF REMAINING ACTIVITY TYPE AND PATIENT RISK IS REQUIRED PRIOR TO DOWNGRADING THE LEVEL OF

PRECAUTIONS.

LEVEL I:

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION OF

WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF

CONTAMINANTS AND LOOSE MATERIAL.

LEVEL II:

ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED AREAS

AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT CART OR

SOME OTHER SYSTEM).

2. IF WORK SITE CONTAINED, MUST BE NEUTRAL OR NEGATIVELY PRESSURIZED.

3. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK

AREA.

4. REMOVE/ISOLATE/TAPE OFF AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC

SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER

ISOLATION.

5. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING STAGNATION

DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED FROM THE

MAIN SYSTEM.

6. SEAL/CLOSE DOORS TO PREVENT DUST MIGRATION. MAY PUT ZIPPER PLASTIC BARRIER OVER

DOOR.

7. CONSIDER HEPA CART USE.

8. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND DISPOSAL

OF TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.

9. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN SEALED

CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE AREA.

10. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO

TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST BE

DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED

WORK AREA.

11. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA BASED ON

FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.

12. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR HEPA

VACUUMING SURFACES AT LEAST DAILY.

LEVEL III:

ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS. BARRIERS

MUST EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A MANNER

THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO FLOOR

AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING, USING

APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE

BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A WORK SPECIFIC

WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING); THIS MUST BE

MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. EXHAUST DISCHARGED

DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED. EXHAUSTING DISCHARGED AIR INTO SHARED

OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G., BATHROOM

EXHAUST) IS PROHIBITED.

6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR

DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR AND

DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE

NOT ACCEPTABLE.

LEVEL IV:

ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM

MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND

CLEANING.

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST

BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF

COVER SUITS IS ACCEPTABLE.

4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM.

SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED SPACE

(NON-WORK AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.

GENERAL ICRA NOTES - LEVEL OF PRECAUTIONS & CONTROL MEASURES

CONTROLS DEFINED BELOW SHALL BE COMPLETED UPON COMPLETION OF THE ACTIVITY AND INSPECTED

PRIOR TO TERMINATING MEASURES DEFINED IN TABLE 5.

LEVELS I -II:

CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

HVAC SYSTEMS:

1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. VERIFY

THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN

SPECIFICATIONS.

WATER SYSTEMS:

1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT

LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

LEVELS III - IV:

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND ENGINEERING

REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL ACTIVITY/PROJECT CLOSE

OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL MEASURES.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES

AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES

AS WELL AS AIR DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING MAY BE

NEEDED AFTER REMOVAL OF BARRIER.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD

BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE WORK

AREA.

2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT) MUST

REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION OF DUST

CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL

OF CRITICAL BARRIERS.

3. IF NEGATIVE AIR PRESSURE DROPS OUT OF RANGE, THE CONTRACTOR IS REQUIRED TO BRING

THE SPACE BACK WITHIN RANGE.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE

WORK IS BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR

EXCHANGE DESIGN SPECIFICATIONS.

WATER SYSTEMS:

UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST

TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

MINIMUM INFECTION PREVENTION AND CONTROL MEASURES REQUIRED

UPON COMPLETION OF THE ACTIVITY

OUTSIDE OF

BUILDING

WEEKLY CHANGED HEPA FILTER

HEPA NEGATIVE AIR UNIT

WEEKLY CHANGED (OR MORE AS

NEEDED) PRE FILTER

FIRE RATED

PLYWOOD OR

SHEET METAL

FLEX DUCT

SUPPLY DUCTS EITHER KEEP

RUNNING OR COVER WHEN

RUNNING TO KEEP DUST OUT.

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

A O V

FIRE EXTINGUISHER ON PORTABLE

FLOOR BRACKET (ILSM MAY REQUIRE

MORE THAN ONE)

SUSPENDED PLASTIC

ZIPPER WALL CURTAIN

BARRIER

6 MIL PLASTIC

TEMPORARY DIGITAL MANOMETER FOR NEGATIVE

PRESSURE MONITORING OUTSIDE OF ICRA BARRIER

FOR VA'S INSPECTION. INDICATOR SHALL BE AT -0.03

OR GREATER (VERIFY DAILY). IF NOT, VERIFY ALL

OPENINGS, SUCH AS DOOR CLOSED, AND/OR CHANGE

OUT NEGATIVE AIR PRE-FILTER.

PROVIDE STICKY MAT, DRY MAT, WET MAT

(CHANGED END OF SHIFT OR MORE IF

NECESSARY TO MAINTAIN CLEANLINESS)

PROVIDE WIPES AND SPRAY FOR WET MAT

POST ICRA ILSM FIRE

INSPECTION SHEETS

CONTAINER VISIBLE TO

PUBLIC

COVER ALL SUPPLY AND

RETURNS AT THE

GRATE/DIFFUSERS

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES AND

THE DIFFUSERS)

E

DOOR

OPENING

VENT TO OUTSIDE

ROUTE TO BE

APPROVED BY COR.

FIRE PULL STATION WITH AUDIO/

VISUAL

ILSM SIGNAGE

ICRA BARRIER, SEE PLANS

FOR TYPE AND LOCATION

GI002

GI002

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO LOCKING

BRAKES

MOBILE CART

A D

JU

S

T A

B

LE

H E

IG

H

T

HEPA NEGATIVE AIR

UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

HEATED DETECTOR CUT-OFF

BASIS OF DESIGN: HEPA NEGATIVE AIR UNIT

INTEGRAL WITH EDGEGUARD BARRIER SYSTEM.

FIRE RATED PLYWOOD OR

SHEET METAL (TEMP. REMOVE

GLASS PANEL)

EXISTING WINDOW FRAME

TYPE B, D, OR E ICRA

BARRIER, SEE PLANS FOR

TYPE AND LOCATION

TYPE C OR E ICRA BARRIER,

SEE PLANS FOR TYPE AND

LOCATION

EXISTING CEILING

EXISTING CONCRETE SLAB FLOOR OR

ROOF ASSEMBLY

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING

REPLACED MUST BE PROTECTED.

COVER WITH ROSIN PAPER/ FIRE

RATED PLYWOOD.

WHEN WORKING ABOVE CEILING WITH

BARRIERS THAT TERMINATE AT CEILING,

PROVIDE PLASTIC ENCLOSURE IN

PLENUM SPACE.

PROVIDE TEMPORARY EXHAUST DUCTS TO

EXTERIOR OF BUILDING. DUCTS TO HANG FROM

DECK ABOVE CEILING. PROVIDE FIRE/SMOKE

DAMPERS WHERE DUCT WORK PENETRATES A

FIRE/SMOKE WALL. COORDINATE PATH WITH VA.

3 5/8" INSULATED WALL WITH 16

GAUGE METAL STUDS @ 16" O.C.

WALL TO EXTEND TO UNDERSIDE

OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH EXISTING

AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

4 7/8"

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING

CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF

EXISTING DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

4 7/8"

3 5/8" 16 GAUGE METAL STUDS

@ 16" O.C. WALL TO EXTEND

TO UNDERSIDE OF DECK

DC

FIRE RESISTANT SEALANT, BOTH

SIDES

FIRE RESISTANT SEALANT, BOTH

SIDES

1-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U404

SMOKE RATED

A

PLASTIC SHEET BARRIER

NON RATED

PLASTIC SHEET

BARRIER

EXISTING WALL

ASSEMBLY

EXISTING CEILING

BOTTOM SEALING

RUNNER

TOP SEALING RUNNER

SUPPORT POLES,

QUANTITY PER

MANUF.

RECOMMENDATIONS

REQU.

AS

3 5/8" INSULATED WALL WITH 16

GAUGE METAL STUDS @ 16" O.C.

(2) LAYERS 5/8" GYPSUM BOARD

EACH SIDE. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH EXISTING

AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

6 1/8"

E

FIRE RESISTANT SEALANT, BOTH

SIDES

2-HR RATED AND SMOKE

RATED

U.L. DESIGN NO. U404B

REUSABLE BARRIER

ALUMINUM FRAME

CEILING GRID

ATTACHMENT

OPTION

DUAL BOTTOM

GASKETS

GALVANIZED

STEEL BACK

URETHANE FOAM

CORE

LIGHTWEIGHT

ALUMINUM FRONT

360 DEGREE

T-SLOT

ATTACHMENT

SYSTEM

DUAL SLOTS &

FLANGED

STUD

CONCEALED

HEIGHT

LOCKS

TOP GASKET

INSPECTIONS AND NON-INVASTIVE ACTIVITES

MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION

CATEGORY A

INCLUDES BUT NOT LIMITED TO:

• WORK CAN BE COMPLETED IN A SINGLE SHIFT, NOT TO EXCEED 10 HOURS.

• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.

• WORK THAT DOES NOT CREATE DUST OR DEBRIS.

• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR

VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET WITH LIMITED

EXPOSURE TIME (NOT TO EXCEED AN HOUR FOR EACH TILE) WITHIN THE SHIFT.

• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY

WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO

NOT CREATE DUST OR DEBRIS.

• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS PLUMBING ON POTABLE SYSTEMS

LIMITED TO FAUCET REPLACEMENT ETC. AND ELECTRICAL WORK SUCH AS

REPLACEMENT OF BULBS, RECEPTACLES, OR SWITCHES.

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATES MINIMAL DUSTCATEGORY B

INCLUDES BUT NOT LIMITED TO:

• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT

BUT NOT EXCEEDING A WEEK.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS

COMPLETED.

• WORK THAT CREATES MINIMAL DUST AND DEBRIS.

• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS

REPAIR OF FIREWALLS AND BARRIERS, AND NEW FLOORING THAT PRODUCES MINIMAL

DUST AND DEBRIS. CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRY SANDING)

THAT PRODUCE MINIMAL DUST AND DEBRIS.

• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR

PIPING FOR A SINGLE FIXTURE. ANY WORK ON SANITARY PLUMBING INCLUDING

SNAKING OF DRAINS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A

SINGLE DEVICE, INSTALLATION OF NEW DEVICE SUCH AS A LIGHT FIXTURE THAT

PRODUCES MINIMAL DUST AND DEBRIS.

• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS

REPLACEMENT OF A SINGLE DIFFUSER, SINGLE TERMINAL UNIT OR A SINGLE DEVICE

THAT PRODUCES MINIMAL DUST AND DEBRIS.

INFECTION CONTROL RISK ASSESSMENT (ICRA)

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES

DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

CATEGORY C

INCLUDES BUT NOT LIMITED TO:

• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.

• DEMOLITION/REMOVAL OF PREEXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER

ARCHITECTURAL ELEMENTS.

• DEMOLITION/REMOVAL OF MORE THAN 32 FT2 OF DRYWALL/FRAMING, HARD CEILINGS, AND DOORS/FRAMING AND

MINIMAL INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS AND BRANCH PIPING.

• INSTALLATION OF NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL/PLASTER AND ASSOCIATED

WORK.

• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS AND TOILETS AND ASSOCIATED

PLUMBING.

• SHUT DOWN OF SECTIONS OF POTABLE WATER SYSTEMS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES

FOR AN AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS

ETC.

• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS.

• MECHANICAL WORK SUCH AS THE INSTALLATION OF DUCTWORK, DIFFUSERS, AND TERMINAL UNITS FOR AN AREA.

MAJOR DEMOLITION AND CONSTRUCTION PROJECTSCATEGORY D

INCLUDES BUT NOT LIMITED TO:

• WORK EXCEEDING 6 MONTHS IN DURATION.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.

• LARGE-SCALE DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTURE INCLUDING REMOVAL OF

MULTIPLE DOORS, WALLS, FRAMING, CEILINGS, FLOORING, PIPING, ELECTRICAL AND HVAC.

• THE INSTALLATION BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL AND ASSOCIATED PLASTER WORK.

• PLUMBING WORK SUCH AS THE INSTALLATION OF:

• NEW MEDICAL GAS SYSTEMS,

• STEAM/HEATING HOT WATER, CONDENSATE SYSTEMS,

• MULTIPLE SINKS, SHOWERS AND TOILETS INCLUDING ASSOCIATED PLUMBING.

• SHUTDOWN OF POTABLE WATER, STEAM/HEATING HOT WATER, CONDENSATE, AND MEDICAL GAS SYSTEMS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION PANELS, CONDUIT AND WIRE

FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW

DEVICES SUCH AS TERMINAL UNITS, FANS ETC.

• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS.

• ELECTRICAL SHUTDOWN OF MULTIPLE PANELS.

• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT, ASSOCIATED DUCTWORK, DIFFUSERS, HEAT EXCHANGERS, TERMINAL UNITS AND CONTROLS.

LOW RISK

PATEINT RISK GROUPS

MEDIUM RISK HIGH RISK HIGHEST RISK

• PUBLIC HALLWAYS AND

GATHERING AREAS NOT

IN CLINICAL AREAS

• OFFICE AREAS NOT IN

CLINICAL AREAS

• BREAKROOMS NOT IN

CLINICAL AREAS

• BATHROOMS OR LOCKER

ROOMS NOT IN CLINICAL

AREAS

• MECHANICAL/ELECTRICAL

ROOMS NOT IN CLINICAL

AREAS

• EMS CLOSETS NOT ON

CLINICAL UNITS

• WAITING AREAS

• CLINICAL

ENGINEERING

(BIOMEDICAL/

STORAGE CLOSETS

FOR ITEMS USED ON

A CLINICAL UNIT.)

• MATERIALS

MANAGEMENT/LOGIST

ICS/TSS

• STERILE PROCESSING

DEPARTMENT – DIRTY

SIDE

• KITCHEN, CAFETERIA,

GIFT SHOP, COFFEE

SHOP, AND FOOD

KIOSKS

• PATIENT CARE ROOMS AND

AREAS

• ALL ACUTE CARE UNITS,

INCLUDING MENTAL

HEALTH

• ALL OUTPATIENT UNITS

AND CLINICS

• EMERGENCY DEPARTMENT

• DOMICILIARIES AND

TRANSITIONAL

RESIDENCES

• EMPLOYEE HEALTH

• PHARMACY – GENERAL

WORK ZONE

• MEDICATION ROOMS AND

CLEAN UTILITY ROOMS

• IMAGING SUITES –

DIAGNOSTIC IMAGING

• LABORATORY

• ALL TRANSPLANT UNITS

• ALL INTENSIVE CARE UNITS

• ALL ONCOLOGY UNITS AND

CHEMOTHERAPY/INFUSION

CENTERS

• OR THEATERS AND

RESTRICTED AREAS

• HEMODIALYSIS UNITS

• PROCEDURAL ROOMS*

• PHARMACY COMPOUNDING

AREA

• STERILE PROCESSING

DEPARTMENT – CLEAN SIDE

• TRANSFUSION SERVICES

• IMAGING SUITES –

INTERVENTIONAL IMAGING

• DEDICATED ISOLATION

WARDS/UNITS FOR

INFECTIOUS DISEASES

RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

I

I

I

II

II

II

II

III

II

III

IV

IV

III

IV

IV

IV

IC MATRIX - CLASS OF PRECAUTIONS:

CONSTRUCTION PROJECT BY PATIENT RISK

CONSTRUCTION PROJECT TYPE

NOTE: AN INFECTION PREVENTION AND CONTROL PERMIT IS REQUIRED FOR LEVEL III AND LEVEL IV.

CONSULT WITH INFECTION PREVENTION AND CONTROL FOR LEVEL I AND LEVEL II.

NON-PATIENT CARE AREAS

SUCH AS:

PATIENT CARE SUPPORT

AREAS SUCH AS:

PATIENT CARE AREAS SUCH

AS:

PROCEDURAL, INVASIVE,

STERILE SUPPORT AND HIGHLY

COMPROMISED PATIENT CARE

AREAS SUCH AS:

XXXXXX

XXXXXX

XXXXXX

A .F

.F

4' -0

THIS IS A RESTRICTED AREA

AREA UNDER CONSTRUCTION

PERSONNEL ENTERING MUST HAVE: HARD HAT,

SAFETY SHOES, SAFETY GLASSES AND PROPER I.D.

COMING SOON!!

--DESCRIPTION ON NEWLY PROPOSED OCCUPANCY--

ICRA, ISLM, WATCH,

MISC. FORMS

PAPER CADDY

INDICATOR

(REFER TO

PLAN AND

ELEVATION)

FRAMED PICTURE

OF C.O.R. WITH

CONTACT

INFORMATION

CONSTRUCTION

SUPERVISOR

NAME AND CELL NUMBER

XXXXX

BOILER/CHILLER PLANT AFTER

HOURS CONTACT PHONE XXXXX

FIRE EMERGENCY DIAL 911

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MISSOURI ARCHITECTURAL COA EXP. 12/31/2024

MISSOURI ENGINEERING COA EXP. 12/31/2024

STRUCTURAL / CIVIL ENGR

H2B

1225 N. LOOP WEST, STE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB ENGR

SPUR DESIGN

2519 MADISON AVE

KANSAS CITY, MO 64108

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FIRE PROTECTION ENGR

POOLE FIRE PROTECTION

19910 WEST 161ST ST.

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

11140 S. TOWNE SQ., STE 100

ST. LOUIS, MO 63123

(713) 864-2900

TELECOMMUNICATION

ASPEN ENGINEERING & CONTRACTING

7 KIJI-DAVA CIRCLE, STE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

HEALTHCARE PLANNER

THE INNOVA GROUP

9442 N. CAPITAL OF TX HWY

AUSTIN, TX 78759

(512) 346-8700

/1

/2

:1

:4

A

M

ICRA CONSTRUCTION DETAILS

KJW 03 OF 155AJS

100% ISSUED FOR BID

EXPAND SPS - KCVAMC

04/17/2024

589-22-885

KANSAS CITY VA MEDICAL CENTER

4801 LINWOOD BLVD

KANSAS CITY, MO 64128

GI002

SPUR #: 2205

1/2" = 1'-0"

GENERAL ICRA CONSTRUCTION PLAN LAYOUT3 3/8" = 1'-0"

ICRA MOBILE CONTAINMENT CART2 3/8" = 1'-0"

SECTION AT ICRA CONSTRUCTION PLAN1

3/4" = 1'-0"

ICRA BARRIER WALL TYPES5

3/8" = 1'-0"

ICRA ELEVATION4

1 2 3 4 5 6 7

A

B

C

D

E

F

G

H

OFFICE

VB-610

OFFICE

VB-611

OFFICE

VB-612

OFFICE

VB-614

OFFICE

VB-615

OFFICE

VB-616

EXAM

VB-617

CHECK-IN

VB-618

WEIGHT

ROOM

VB-630

CLOSET

VB-631

EXAM

VB-624

EXAM

VB-622

EXAM

VB-620

WAITING

VB-619

TLT, MALE

VB-612

EXAM

VB-621

CLOSET

VB-622A EXAM

VB-623

TLT, FEMALE

VB-634

EXAM

VB-625

CORRIDOR

CB-61

TOILET

VB-627

TLT,

FEMALE

VB-636

MECHANICAL

ROOM

VB-722

UPS

VB-725

ELECTRICAL

VB-723

MECHANICAL

ROOM

VB-724

STAIR 18

S18

STORAGE

VB-712

CLOSET

VB-719

COOLER

VB-710 BREAK ROOM

VB-711

CORRIDOR

CB-63

MECHANICAL

ROOM

VB-720

STORAGE

VB-748

VB-749STORAGE

VB-747

OFFICE

VB-755

OFFICE

VB-738

OFFICE

VB-745

OFFICE

VB-735A

OFFICE

VB-736

OFFICE

VB-736A

OFFICE

VB-746

CORRIDOR

CB-60

OT KITCHEN

VB-642

RETAIL

STORE

VB-715

OFFICE

VB-713

OFFICE

VB-715B

OFFICE

VB-727

IT CLOSET

VB-715A

VB-700

CLOSET

VB-701

CORRIDOR

CB-62

CORRIDOR

CB-60

EXAM

VB-626

EXAM

VB-627

OFFICE

VB-632A

OFFICE

VB-638

OFFICE

VB-632

OFFICE

VB-640 OFFICE

VB-636

LOUNGE

VB-643

STORAGE

VB-643B

STORAGE

VB-644

OFFICE

VB-643AOFFICE

VB-650

MECHANICAL

VB-644A

STORAGE

VB-651B

OFFICE

VB-651A

STAIR 17

S17

MECHANICAL

ROOM

VB-721

STAIR 16

S16

VB-600

ELEVATOR

E22

ELEVATOR

E12

ELEVATOR

E11

ELEVATOR

LOBBY

EB-V

192'-0"

32'-0" 32'-0" 32'-0" 32'-0" 32'-0" 32'-0"

8'

-0

'-0

'-0

'-0

'-0

'-0

'-0

'-0

OFFICE

VB-714

OFFICE

VB-716

PHASE 1

PHASE 1

2.36

2.36

2.36

2.36

2.36

2.36

2.36

1.08

1.05

1.05

1.11

TEMPORARY 3'-0" x 7'-0" ICRA BARRIER DOOR WITH FRAME SYSTEM.

SEAL DOOR AND PROVIDE LOCKING HARDWARE.

ICRA LEGEND

A

PROVIDE WALK-OFF MATS THIS AREA

E

B

D

NOTE: ALL SYMBOLS MAY NOT BE USED.

PROPOSED CONTRACT ACCESS PATH

WALL TYPE 'A', PLASTIC SHEET BARRIER.

REFER TO ICRA CONSTRUCTION DETAILS (1/GI002)

WALL TYPE 'C', TEMPORARY SMOKE BARRIER AT THIS LOCATION.

CONTRACTOR TO COORDINATE WITH VA COR AND VA SAFETY OFFICER FOR

EXTENTS OF BARRIER. REFER TO ICRA CONSTRUCTION DETAILS (1/GI002)

C

WALL TYPE 'D', TEMPORARY 1-HR RATED AND SMOKE BARRIER AT THIS

LOCATION. CONTRACTOR TO COORDINATE WITH VA COR AND VA SAFETY

OFFICER FOR EXTENTS OF BARRIER. REFER TO ICRA CONSTRUCTION DETAILS

(1/GI002)

WALL TYPE 'E', TEMPORARY 2-HR RATED AND SMOKE BARRIER AT THIS

LOCATION. CONTRACTOR TO COORDINATE WITH VA COR AND VA SAFETY

OFFICER FOR EXTENTS OF BARRIER. REFER TO ICRA CONSTRUCTION DETAILS

(1/GI002)

WALL TYPE 'B', REUSABLE BARRIER AT THIS LOCATION. CONTRACTOR TO

COORDINATE WITH VA COR AND VA SAFETY OFFICER FOR EXTENTS OF

BARRIER. REFER TO ICRA CONSTRUCTION DETAILS (1/GI002)

NOT IN SCOPE

PHASING PLAN LEGEND

OVERALL

PROJECT SCOPE

PHASE 1

PHASE 2

PHASE 3

PHASE 4

PHASE 5

PHASE 6

PHASE 7

PHASE 8

PHASE 9

PHASE 10

PHASE 11

1. ALL CONSTRUCTION PHASING TO BE COORDINATED WITH THE KANSAS CITY VA COR FOR WORK

RELATED TIMES FOR DAY, NIGHT, AND WEEKEND WORK.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .