580-22-100 DRAWINGS REPAIR REPLACE MAIN CHILLED WATER DISTRO SYSTEM.pdf
PDF 22 MB Posted
- Attached to
- Y1DA | 580-22-100 | REPAIR REPLACE MAIN CHILLED WATER DISTRIBUTION SYSTEM | AMENDMENT 0005
- Solicitation number
- 36C25625R0062
About this file
These are architectural and engineering design drawings for a repair and replacement project of the main chilled water distribution system at the Michael E. DeBakey VA Medical Center in Houston, Texas. The comprehensive set of 66 drawings covers multiple disciplines including architectural, structural, mechanical, and electrical plans, detailing a complex infrastructure upgrade across multiple buildings (Buildings 100, 104, and 105). The project involves replacing chilled water piping, pumps, and associated electrical infrastructure, with work to be performed in various mechanical bays and tunnels while maintaining hospital operations.
The project is a 100% Service-Disabled Veteran-Owned Small Business set-aside with a contract value between $5-10 million and a 365-calendar day performance period. The solicitation (36C25625R0062) is anticipated to be issued electronically on or about May 6, 2025, with a 90-day proposal acceptance period. Contractors must be registered in the SBA VetCert, System for Award Management (SAM), and meet the NAICS code 236220 small business size standard of $45 million in average annual receipts. Key requirements include adhering to JCAHO, NFPA, OSHA, and life safety standards while minimizing disruption to medical center operations.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TUNNEL
BUILDINGS WITHIN THE SCOPE OF THIS PROJECT
104A
102A
65 11
108A
VA REGIONAL OFFICE
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON, TEXAS
GENERAL NOTES
1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &
SPECIFICATIONS.
2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.
BRING TO THE AWARENESS OF AND VERIFY WITH VA COR PRIOR TO PROCEEDING.
3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE
TO VISIT THE SITE.
4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT
IMMEDIATELY TO THE ATTENTION OF THE COR.
5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.
6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK
THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.
7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
DESIGN TEAM
MECHANICAL
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
ARCHITECTURAL
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
ELECTRICAL
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
STRUCTURAL
WSP USA, INC.
33301 9TH AVENUE SOUTH
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
COVER SHEET 95% DESIGN
DEVELOPMENT
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
08/14/2023 ED JS
580-22-100
G-001
1" = 200'-0"
FACILITY SITE PLAN
NOT TO SCALE
LOCATION MAP
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON, TEXAS
PROJECT #: 580-22-100
Revisions: Date:
100% CONSTRUCTION
DOCUMENTS
10/31/2024 EM11/05/2024
01 OF 6608/14/202310/31/202411/05/2024
11/5/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
DRAWING INDEX 95% DESIGN
DEVELOPMENT
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
08/14/2023 ED JS
580-22-100
G-002 Revisions: Date:
100% CONSTRUCTION
DOCUMENTS
10/31/2024 EM11/05/2024
DRAWING INDEX
PAGE # SHEET # SHEET NAME
GENERAL
1 0F 66 G-001 COVER SHEET
2 0F 66 G-002 DRAWING INDEX
ARCHITECTURAL
3 0F 66 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS
4 0F 66 AS101 ICRA DETAILS
5 0F 66 100AAS101 BUILDING 100A -LEVEL 1 -ICRA AND PHASING PLAN
6 0F 66 100AA101 LEVEL 1 -MECHANICAL BAY-1 ENLARGED FLOOR PLAN
7 0F 66 100BAS101 BUILDING 100B -LEVEL 1 -ICRA AND PHASING PLAN
8 0F 66 100BA101 LEVEL 1 -MECHANICAL BAY-2 ENLARGED FLOOR PLAN
9 0F 66 100CAS101 BUILDING 100C -LEVEL 1 -ICRA AND PHASING PLAN
10 0F 66 100CA101 LEVEL 1 -MECHANICAL BAY-3 ENLARGED FLOOR PLAN
11 0F 66 100DAS101 BUILDING 100D -LEVEL 1 -ICRA AND PHASING PLAN
12 0F 66 100DA101 LEVEL 1 -MECHANICAL BAY-4 ENLARGED FLOOR PLAN
13 0F 66 100EAS101 BUILDING 100E -LEVEL 5 -ICRA AND PHASING PLAN
14 0F 66 100EA101 LEVEL 5 -MECHANICAL BAY-7 ENLARGED FLOOR PLAN
15 0F 66 101FAS101 BUILDING 100F -LEVEL 6 -ICRA AND PHASING PLAN
16 0F 66 101FA101 LEVEL 6 -MECHANICAL BAY-5 ENLARGED FLOOR PLAN
17 0F 66 100HAS101 BUILDING 100H -LEVEL 4 -ICRA AND PHASING PLAN
18 0F 66 100HA101 LEVEL 4 -MECHANICAL BAY-8 ENLARGED FLOOR PLAN
19 0F 66 100LAS101 BUILDING 100L -LEVEL 3 -ICRA AND PHASING PLAN
20 0F 66 100LA101 LEVEL 3 -MECHANICAL BAY-11 ENLARGED FLOOR PLAN
21 0F 66 A-601 DETAILS
STRUCTURAL
22 0F 66 S-001 STRUCTURAL NOTES
23 0F 66 S-002 STRUCTURAL NOTES AND ABBREVIATIONS
24 0F 66 S-101 TUNNEL FLOOR PLAN
25 0F 66 S-102 PLAN -BASEMENT LEVEL BUILDING 100 AREA H
26 0F 66 S-201 PIPE SUPPORT ELEVATIONS
27 0F 66 S-202 PIPE SUPPORT ELEVATIONS
28 0F 66 S-203 PIPE SUPPORT ELEVATIONS
29 0F 66 S-501 PIPE SUPPORT SECTIONS AND DETAILS
MECHANICAL
30 0F 66 M-001 MECHANICAL COVER SHEET
31 0F 66 100MD100 AREA H -BASEMENT DEMO PLAN
32 0F 66 102MD100 TUNNEL DEMO PLANS AND ELEVATION
33 0F 66 102MP100 TUNNEL FLOOR PLANS AND ELEVATIONS
34 0F 66 104MD100 BUILDING 104 SECONDARY CHILLED WATER DEMO PLAN
35 0F 66 104MD101 LEVEL 1 -DEMO FLOOR PLAN
36 0F 66 104MP100 BUILDING 104 SECONDARY CHILLED WATER FLOOR PLAN
37 0F 66 104MP101 LEVEL 1 -FLOOR PLAN
38 0F 66 100MP301 MECHANICAL BAY-1 -LEVEL 1 -ENLARGED FLOOR PLAN
39 0F 66 100MP302 MECHANICAL BAY-2 -LEVEL 1 -ENLARGED FLOOR PLAN
40 0F 66 100MP303 MECHANICAL BAY-3 ENLARGED FLOOR PLAN
41 0F 66 100MP304 MECHANICAL BAY-4 -LEVEL 1 -ENLARGED FLOOR PLAN
42 0F 66 100MP305 MECHANICAL BAY-7 -LEVEL 5-ENLARGED FLOOR PLAN
43 0F 66 100MP306 MECHANICAL BAY-11-LEVEL 3-ENLARGED FLOOR PLAN
44 0F 66 M-501 MECHANICAL DETAILS
45 0F 66 M-601 MECHANICAL SCHEDULES I
46 0F 66 M-506 MECHANICAL DETAILS
47 0F 66 M-602 MECHANICAL EQUIPMENT SCHEDULES
48 0F 66 M-701 MECHANICAL PIPING RISER DIAGRAMS
49 0F 66 M-702 MECHANICAL PIPING RISER DIAGRAMS
50 0F 66 M-703 MECHANICAL CONTROLS
ELECTRICAL
51 0F 66 E-001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
52 0F 66 E-002 ELECTRICAL LEGENDS
53 0F 66 100EP401a BLDG 100 -LEVEL 1 -MECHANICAL RM 1B-236 AND 1B-134A -ELECTRICAL P
54 0F 66 100EP401b BLDG 100 -LEVEL 1 -MECHANICAL RM 1C-138A AND 1C-238A -ELECTRICAL
55 0F 66 100EP401c BLDG 100 -LEVEL 3 -MECHANICAL RM 3C-466B -ELECTRICAL PLANS 56 0F 66 100EP401d BLDG 100 -LEVEL 5 -MECHANICAL RM 5B-338A -ELECTRICAL PLANS
57 0F 66 104EP100 BLDG 104 -TUNNEL -ELECTRICAL PLAN
58 0F 66 104ED101 BLDG 104 -LEVEL 1 -ELECTRICAL PLAN -DEMOLITION
59 0F 66 104EP101 BLDG 104 -LEVEL 1 -ELECTRICAL PLAN -REVISED
60 0F 66 105EP101 BLDG 105 -LEVEL 01 -ELECTRICAL PLAN
61 0F 66 E-501 ELECTRICAL DETAILS
62 0F 66 E-601 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -EXISTING -PART 1 OF 2
63 0F 66 E-602 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -EXISTING -PART 2 OF 2
64 0F 66 E-611 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -REVISED -PART 1 OF 2
65 0F 66 E-612 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -REVISED -PART 2 OF 2
66 0F 66 E-701 ELECTRICAL SCHEDULES
31 0F 66 100MD100 AREA H -BASEMENT DEMO PLAN
32 0F 66 102MD100 TUNNEL DEMO PLANS AND ELEVATION
33 0F 66 102MP100 TUNNEL FLOOR PLANS AND ELEVATIONS
34 0F 66 104MD100 BUILDING 104 SECONDARY CHILLED WATER DEMO PLAN
35 0F 66 104MD101 LEVEL 1 -DEMO FLOOR PLAN
36 0F 66 104MP100 BUILDING 104 SECONDARY CHILLED WATER FLOOR PLAN
37 0F 66 104MP101 LEVEL 1 -FLOOR PLAN
38 0F 66 100MP301 MECHANICAL BAY-1 -LEVEL 1 -ENLARGED FLOOR PLAN
39 0F 66 100MP302 MECHANICAL BAY-2 -LEVEL 1 -ENLARGED FLOOR PLAN
40 0F 66 100MP303 MECHANICAL BAY-3 ENLARGED FLOOR PLAN
41 0F 66 100MP304 MECHANICAL BAY-4 -LEVEL 1 -ENLARGED FLOOR PLAN
42 0F 66 100MP305 MECHANICAL BAY-7 -LEVEL 5-ENLARGED FLOOR PLAN
43 0F 66 100MP306 MECHANICAL BAY-11-LEVEL 3-ENLARGED FLOOR PLAN
44 0F 66 M-501 MECHANICAL DETAILS
45 0F 66 M-601 MECHANICAL SCHEDULES I
46 0F 66 M-506 MECHANICAL DETAILS
47 0F 66 M-602 MECHANICAL EQUIPMENT SCHEDULES
48 0F 66 M-701 MECHANICAL PIPING RISER DIAGRAMS
49 0F 66 M-702 MECHANICAL PIPING RISER DIAGRAMS
50 0F 66 M-703 MECHANICAL CONTROLS
ELECTRICAL
51 0F 66 E-001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
52 0F 66 E-002 ELECTRICAL LEGENDS
53 0F 66 100EP401a BLDG 100 -LEVEL 1 -MECHANICAL RM 1B-236 AND 1B-134A -ELECTRICAL PLANS
54 0F 66 100EP401b BLDG 100 -LEVEL 1 -MECHANICAL RM 1C-138A AND 1C-238A -ELECTRICAL PLANS
55 0F 66 100EP401c BLDG 100 -LEVEL 3 -MECHANICAL RM 3C-466B -ELECTRICAL PLANS 56 0F 66 100EP401d BLDG 100 -LEVEL 5 -MECHANICAL RM 5B-338A -ELECTRICAL PLANS
57 0F 66 104EP100 BLDG 104 -TUNNEL -ELECTRICAL PLAN
58 0F 66 104ED101 BLDG 104 -LEVEL 1 -ELECTRICAL PLAN -DEMOLITION
59 0F 66 104EP101 BLDG 104 -LEVEL 1 -ELECTRICAL PLAN -REVISED
60 0F 66 105EP101 BLDG 105 -LEVEL 01 -ELECTRICAL PLAN
61 0F 66 E-501 ELECTRICAL DETAILS
62 0F 66 E-601 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -EXISTING -PART 1 OF 2
63 0F 66 E-602 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -EXISTING -PART 2 OF 2
64 0F 66 E-611 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -REVISED -PART 1 OF 2
65 0F 66 E-612 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -REVISED -PART 2 OF 2
66 0F 66 E-701 ELECTRICAL SCHEDULES
08/14/202310/31/202411/05/2024
AB
ABA
AC(T)
ACM
ACW
ADA
ADJ
A/E
AF
AFF
AGG
ALT
ALUM
APPROX
ARCH
ASPH
A/V
BARR
BATH
BB
BLDG
BLK
BLKG
BLW
BM
BMTU
BO
BOC
BOS
BRC
BRKT
BRNG
BTM
BTWN
CAB
CC
CD
CJ
CLG
CLR
CMU
CO
COL
COMP
CONC
CONN
CONST
CONT
COORD
COR
CORR
CS
CT
CTR
CV
AND
ANGLE
AT
CENTERLINE
DEGREES
NUMBER
ANCHOR BOLT
ARCHITECTURAL BARRIERS ACT
ACOUSTICAL CEILING (TILE)
ASBESTOS CONTAINING MATERIAL
ACOUSTICAL WALL
AMERICANS W/ DISABILITIES ACT
ADJACENT
ARCHITECT/ENGINEER
ACCESS FLOOR
ABOVE FINISH FLOOR
AGGREGATE
ALTERNATE
ALUMINUM
APPROXIMATELY
ARCHITECT(URAL)
ASPHALT
AUDIO / VIDEO
BARRIER
BATHROOM
BACKER BOARD
BUILDING
BLOCK
BLOCKING
BELOW
BEAM
BONE MARROW TRANSPLANT UNIT
BOTTOM OF
BOTTOM OF CURB
BOTTOM OF SLAB
BRACE, BRACING
BRACKET
BEARING
BOTTOM
BETWEEN
CABINET
CONTRACTOR FURN, CONTRACTOR INST
CONSTRUCTION/CONTRACT DOCUMENTS
CONTROL JOINT
CEILING
CLEAR(ANCE)
CONCRETE MASONRY UNIT
CONTRACTING OFFICER
COLUMN
COMPOSITION
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS
COORDINATE
CONTRACTING OFFICER REPRESENTATIVE
CORRIDOR
CONCRETE SEALER
CERAMIC TILE
CENTER
CONTRACTOR FURNISHED, VA INSTALLED
HDR
HDWE
HM
HORZ
HPDL
HR
HT
HVAC
ICRA
ID
ILSM
INCL
INST
INSUL
INT
JT
KV
LAM
LAV
LCM
LT
MAT
MAX
MDF
MECH
MEP
MFR
MIN
MISC
MOD
MTL
N N/A
NEG
NO.
NOM
NTS
O.C.
OPNG
OPP
OPT
OVHD
P
PCONC
PCRA
PL
PLAM
PLY(WD)
PNL
PR
PRFB
PS
PT
PTN(S)
PVMT
QTY
HEADER
HARDWARE
HOLLOW METAL
HORIZONTAL
HIGH PRESSURE DECORATIVE LAM
HOUR
HEIGHT
HEATING, VENTILATION & AIR CONDITIONING
INFECTIOUS CONTROL RISK ASSESSMENT
INSIDE DIAMETER OR DIM
INTERIM LIFE SAFETY MEASURES
INCLUDE(D,ING)
INSTALL
INSULATION
INTERIOR
JOINT
KILOVOLT
LAMINATE(D)
LAVATORY
LEAD CONTAINING MATERIAL(S)
LIGHT
MATERIAL(S)
MAXIMUM
MEDIUM-DENSITY FIBREBOARD
MECHANIC(AL)
MECHANICAL, ELECTRICAL, PLUMBING
MANUFACTURE(R)
MINIMUM
MISCELLANEOUS
MODIFIED
METAL
NORTH
NOT APPLICABLE
NEGATIVE
NUMBER
NOMINAL
NOT TO SCALE
ON CENTER(S)
OPENING
OPPOSITE
OPTION(AL)
OVERHEAD
PAINT
PRECAST CONCRETE
PRE-CONSTRUCTION RISK ASSESSMENT
PLATE
PLASTIC LAMINATE
PLYWOOD
PANEL
PAIR
PREFABRICATED
PLASTIC
PRESSURE TREATED
PARTITION(S)
PAVEMENT
QUANTITY
RAD
RCP
REF
REINF
REP
REQ(s,(')D)
RESIL
REV
RF
RM
RMV
RO
S
SCHED
SD
SECT
SF
SFRM
SHG
SHT(G)
SIM
SM
SOW
SPEC
SQ
SS
ST
STDG
STL
STOR
STRUCT
SUSP
SV
SYS
TEMP
T&G
THK
THRESH
TOC
TOS
TPH
TRANS
TS
TYP
UON
VA
VAR
VB
VC
VERT
VIF
VV
W W/
WD
WDW
WGHT
W/O
WP
WR
RADIUS
REFLECTED CEILING PLAN
REFERENCE
REINFORCE(D,ING)
REPRESENTATIVE
REQUIRE(D,S,MENT(S))
RESILIENT
REVERSE
RADIO FREQUENCY / ROOF
ROOM
REMOVE
ROUGH OPENING
SOUTH
SCHEDULE
SCHEMATIC DESIGN
SECTION
SQUARE FEET
SPRAY APPLIED FIRE-RESISTIVE MATERIAL
SHINGLES
SHEET (SHEATHING)
SIMILAR
SEAM
SCOPE OF WORK
SPECIFICATION
SQUARE
STAINLESS STEEL
STAIN
STANDING
STEEL
STORAGE
STRUCTURAL
SUSPENDED
SHEET VINYL
SYSTEM
TEMPORARY
TONGUE AND GROOVE
THICK(NESS)
THRESHOLD
TABLE OF CONTENTS
TOP OF SLAB
TOILET PAPER HOLDER
TRANSITION
TUBE STEEL
TYPICAL
UNLESS OTHERWISE NOTED
VETERANS AFFAIRS
VARIES
VAPOR BARRIER
VA FURNISHED, CONTRACTOR INSTALLED
VERTICAL
VERIFY IN FIELD
VA FURNISHED, VA INSTALLED
WEST
WITH
WOOD
WINDOW
WEIGHT
WITHOUT
WATERPROOF(ING)
WATER RESISTANT
DBL
DC
DD
DEMO
DEPT
DG
DIA
DIM
DWN
DR
DTL
DWG
E
EA
EJ
ELEC
ELEV
ENG
EOC
EOP
EPDM
EQ
EQUIP
ES
ETS
EX(IST)
EXP
EXT
FA
FD
FE(C)
FF
FFB
FFL
FIN
FLASH
FLR
FLRSNT
FNDN
FOC
FOF
FOS
FP
FR
FRM
FT
FTG
FUR
FURN
GA
GALV
GE
G(W)B
GC
GL
GLB
GMU
GOV(T)
GYP
DOUBLE
DIRECT CURRENT
DESIGN DEVELOPMENT
DEMOLISH(ION)
DEPARTMENT
DESIGN GUIDE
DIAMETER
DIMENSION
DOWN
DOOR
DETAIL
DRAWING(S)
EAST
EACH
EXPANSION JOINT
ELECTRIC(AL)
ELEVATION OR ELEVATOR
ENGINEER(ING)
EDGE OF CURB
EDGE OF PAVEMENT
ETHYLENE PROPYLENE DIENE TERPOLYMER
EQUAL
EQUIPMENT
EACH SIDE
EXPOSED TO STRUCTURE
EXISTING
EXPANSION
EXTERIOR
FIRE ALARM
FLOOR DRAIN
FIRE EXTINGUISHER (CABINET)
FACTORY FINISH
FINISH FLOOR BREAK
FINISH FLOOR LINE
FINISH(ED)
FLASHING
FLOOR(ING)
FLORESCENT
FOUNDATION
FACE OF CONCRETE
FACE OF FINISH
FACE OF STUDS
FIRE PROOF
FIRE RATED
FRAME
FOOT, FEET
FOOTING
FURRING
FURNISHED
GAGE, GAUGE
GALVANIZED
GENERAL ELECTRIC
GYPSUM (WALL) BOARD
GENERAL CONTRACTOR
GRID LINE
GLUE LAMINATED BEAM
GLASS MASONRY UNIT
GOVERNMENT
GYPSUM BOARD
A101
1 TYP
101.1
A-101
SIM
EXTERIOR ELEVATION
INTERIOR ELEVATION
BUILDING SECTION FLAG
WALL SECTION FLAG
CALLOUT FLAG
VERTICAL GRID LINE
HORIZONTAL GRID LINE
TRUE NORTH ARROW
PROJECT NORTH ARROW
(TRUE NORTH DASHED)
ELEVATION MARKER
KEY NOTE
ROOM TAG (SF OPTIONAL)
CEILING HEIGHT TAG
ROOM NAME
150 SF
A
A-101
SIM
01A
TRUE
NORTH
W1
A-101
PROJECT
NORTH
WALL TAG
FLOOR TAG
ROOF TAG
DOOR TAG
WINDOW TAG
SPECIALTY EQUIPMENT TAG
SIGNAGE TAG
SIGNAGE KEY NOTE
(AW SHEETS ONLY)
SIGNAGE MATERIAL TAG
(AW SHEETS ONLY)
EXISTING TO REMAIN
NEW CONSTRUCTION
TO DEMOLISH
HIDDEN ABOVE OR BELOW
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
SMOKE ZONE
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
SMOKE RATED WALL
SMOKE & 1 HR FIRE RATED WALL
FIRE EXTINGUISHER CABINET
AREA OF WORK / AREA SHOWN
CONSTRUCTION ZONE, ( - - )
PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
PATH OF TRAVEL
EMERGENCY EGRESS PATHWAY
SEISMIC JOINT
BATT INSULATION
RIGID INSULATION
GYPSUM BOARD, TYPE X
ACOUSTICAL CEILING TILE, 2' x 2'
CONCRETE
STEEL
PLYWOOD, FIRE RATED
EARTH
SUPPLY GRILLE PER MECHANICAL
(SIZE & PROPORTIONS MAY VARY)
RETURN GRILLE PER MECHANICAL
(SIZE & PROPORTIONS MAY VARY)
LIGHTING PER ELECTRICAL
(SIZE & PROPORTIONS MAY VARY)
NEW LIGHTS (SEE ELECTRICAL
DETAILS)
A-101
A01
D88
A5175SOAP DISH
IN-04.02-01
AFF
ACT 2x2
9' - 0"
FEC
F-1
R-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:2
:3 p m
A u to d e s k D o c s /6
-2
-7
V A
C T
W e s t H a v e n E
H R
M
IU
/V A
W H
G
E N
S H
E E
T S
S
D B
.r v t
A-001
ARCHITECTURAL SYMBOLS &
ABBREVIATIONS
JS JRS
35% SCHEMATIC
DESIGN
03/22/2024
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516-2770
SYMBOLS ABBREVIATIONS
GENERAL NOTES
APPLICABLE PUBLICATIONS
1. ALL WORK DONE BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE PERFORMED WITH
A HIGH LEVEL OF WORKMANSHIP.
2. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE AT ALL TIMES.
3. DO NOT SCALE DRAWINGS.
4. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL
INDUSTRY STANDARD TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS
INDICATED.
5. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE FULL SPACE INDICATED WITHOUT
ENCROACHMENTS.
6. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH THE CONTRACT DOCUMENTS.
7. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR ELEVATION, UON.
APPLICABLE PUBLICATIONS ARCHITECTURAL NOTES
AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS
OF CODE ENFOREMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS,
FEES, ETC). THE VA SHALL FUNCTION AS THE AUTHORITY HAVING JURISTICTION (AHJ).
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD
APPLICATION GUIDE AND OTHER GUIDEANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL).
INTERNATIONAL BUILDING CODE (IBC) 2018.
INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018.
NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES
PRECEDENCE OVER IBC.
NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8.
NATIONAL ELECTRICAL CODE (NEC).
INTERNATIONAL PLUMBING CODE (IPC).
SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAL SOCIETY OF MECHANICAL
ENGINEERS (ASME) A 17.1.
ASME BOILER AND PRESSURE VESSEL CODE.
ASME CODE FOR PRESSURE PIPING.
ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT
BARRIER FREE DESIGN GUIDE (PG-18-3).
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUE
AND COMMENTARY (ACI 318).
MANUAL OF STEEL CONSTRCUTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).
ENERGY POLICY ACT OF 2005 (EPACT).
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL
AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RESE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435.
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU).
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND
TRANSPORTATON MANAGEMENT.
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL
REQUIREMENTS SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2004.
SAFETY STANDARD FOR REFRIDERATION SYSTEMS - ASHRAE STANDARD 15 - 2007.
VAMC APPROVED HARDWARE LOCKING STANDARDS.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI).
AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM).
FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND
STANDARDS FOR TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION.
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA).
INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE).
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND
INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI).
JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),
ENVIRONMENT OF CARE GUIDELINES AND STANDARDS.
FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE
DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES.
THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL
ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS ENCOURAGING
“ENVIRONMENTALLY RESPONSIBLE DESIGN”.
Revisions: Date:
Phase
70% DESIGN
DEVELOPMENT
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
580-22-100
JS
cation
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
EM
95% DESIGN
DEVELOPMENT
8. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.
100% CONSTRUCTION
DOCUMENTS
10/31/2024 EM11/05/2024
03 OF 6608/14/202310/31/202411/05/2024
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER
TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
INSTALL TEMPORARY PLASTIC FIRE RESISTANT, DUST
BARRIER. MAY ONLY BE DURING NON FUNCTIONAL
MEDICAL CENTER HOURS.
INSTALL FIRE RESISTANT TEMPORARY DOOR AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
PLACE TACKY CONSTRUCTION WALK-OFF MATS AT
ENTRANCE AND EXIT SIDE OF CONSTRUCTION ACTIVITY
AREAS, TYPICAL.
FOR CLASS III, NEGATIVE AIR MACHINE IS REQUIRED AND
SHALL BE LOCATED EITHER AT THE ICRA BARRIER OR AT
AN EXTERIOR WINDOW. COORDINATE WITH VA
INFECTIOUS PREVENTION TEAM AND COR.
1. PROJECT SHALL COMPLY WITH CLASS, I, II, III & IV ICRA
REQUIREMENTS.
2. COMPLY WITH ALL REQUIREMENTS LISTED IN THE
INFECTION CONTROL SECTION OF SPECIFICATION 01 35
26 - SAFETY REQUIREMENTS.
3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
ALL ICRA REQUIREMENTS. AT ANY TIME, THE COR MAY
HALT WORK UNTIL ALL REQUIREMENTS ARE MET.
4. REMOVE OR ISOLATE (E) HVAC SYSTEMS WITHIN
CONSTRUCTION AREA TO PREVENT DUST
CONTAMINATION.
5. CONTAIN ALL CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS. WHEN
POSSIBLE, REMOVE CONSTRUCTION DEBRIS WHEN AREA
IS IN ACTIVE ISOLATION.
6. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE
LOCKED AT ALL TIMES UNLESS IN USE BY THE
CONTRACTOR. WHEN IN USE, ACCESS WILL BE
CONTROLLED AND MONITORED BY THE CONTRACTOR.
7. ADHESIVE WALK-OFF CONSTRUCTION MATS TO BE USED
AT ALL CONSTRUCTION ZONE AND ANTE ROOM
ENTRANCES AND EXITS.
8. TEMPORARY BARRIERS AND DOORS MAY ONLY BE
DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA
COR.
9. SEAL OFF ANY EXISTING, UNUSED DOORS WITH TAPE
DURING CONSTRUCTION, TYPICAL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:2
:4 p m
A u to d e s k D o c s /6
-2
-7
V A
C T
W e s t H a v e n E
H R
M
IU
/V A
W H
G
E N
S H
E E
T S
S
D B
.r v t
AS101
ICRA DETAILS
JS ME
35% SCHEMATIC
DESIGN
03/22/2024
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516-2770
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
Revisions: Date:
Phase
70% DESIGN
DEVELOPMENT
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
580-22-100
JS
cation
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
EM
95% DESIGN
DEVELOPMENT
EXISTING SUSPENDED
CEILING TO REMAIN ON
CORRIDOR SIDE
EXISTING
WALLS TO
REMAIN
EXISTING
WALLS TO
REMAIN
EXISTING DOOR BEHIND
VISQUEEN BARRIER
NON-SKID PLATE JACK
SCREWED FROM END OF
POLE TO TOP OF CEILING,
TYPICAL
FIRE RESISTANT PLASTIC
DUST BARRIER
SURROUNDING DOOR,
TYPICAL
EXTENSION POLES, TYPICAL
NON-SKID PLATE JACK
SCREWED FROM END OF
POLE TO BOTTOM OF
FLOOR, TYPICAL
BOTTOM OF CEILING
ZIPPER OPENING, TYPICAL
STICKY TACKY MATT
INFRONT OF VISQUEEN
BARRIER
TAPE TOP OF
CONSTRUCTION BARRIER
TO BOTTOM OF CEILING
CONSTRUCTION BARRIER
SURROUNDING EXIST
DOOR, TYPICAL
TAPE BOTTOM OF
CONSTRUCTION BARRIER TO
FLOOR SURFACE, TYPICAL
STICKY TACKY MATT IN FRONT
OF FIRE RESISTANT PLASTIC
BARRIER, TYPICAL
NEGATIVE AIR MACHINE,
TYPICAL (INSTALL AT ICRA
BARRIER IF EXTERIOR
WINDOW IS NOT AVAILABLE).
TEMPORARY FIRE
RATED DOOR, TYPICAL
PATCH, REPAINT AND PAINT GWB WHERE ICRA
BARRIERS ARE CONSTRUCTED AND REMOVED.
PATCH AND REPAIR CEILINGS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS ARE
CONSTRUCTED AND REMOVED.
PATCH, REPAINT AND PAINT GWB WHERE ICRA
BARRIERS ARE CONSTRUCTED AND REMOVED.
PATCH AND REPAIR CEILINGS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS ARE
CONSTRUCTED AND REMOVED.
ANTE
ROOM
PROJECT AREA
OUTSIDE
PROJECT AREA
1/2" = 1'-0"
ICRA CLASS I DETAIL
1/2" = 1'-0"
ICRA CLASS II DETAIL
1/2" = 1'-0"
ICRA CLASS III DETAIL
1/2" = 1'-0"
TYPICAL ICRA CLASS II BARRIER - PLAN VIEW
1/2" = 1'-0"
TYPICAL ICRA CLASS III DETAIL - PLAN VIEW
1/2" = 1'-0"
TYPICAL ICRA CLASS IV BARRIER - PLAN VIEW
CLASS I ICRA REQUIREMENTS
A. BEFORE CONSTRUCTION WORK:
1. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORKING HOURS.
2. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITON, RENOVATION, OR CONSTRUCTION
ACTIVITIES BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD OR
OTHER APPROVED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. PARTITIONS SHALL
BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS TO THE FLOOR SLAB OR ROOF
DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED. BARRIER MUST BE PRESENTABLE ON
OCCUPIED SIDE.
B. DURING CONSTRUCTION WORK:
1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
3. CEILING TILES: IMMEDIATELY REPLACE A CEILING TILES DISPLACED FOR VISUAL INSPECTION.
C. UPON COMPLETION:
1. CLEAN WORK AREA UPON COMPLETION OF TASK.
2. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
CLASS II ICRA REQUIREMENTS
A. BEFORE CONSTRUCTION WORK:
1. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS. INSTALL
CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF
NORMAL WORKING HOURS.
2. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITON, RENOVATION, OR CONSTRUCTION
ACTIVITIES BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM
BOARD OR OTHER APPROVED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL.
PARTITIONS SHALL BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS TO
THE FLOOR SLAB OR ROOF DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED.
BARRIER MUST BE PRESENTABLE ON OCCUPIED SIDE.
B. DURING CONSTRUCTION WORK:
1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE. SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS WHERE
POSSIBLE.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
7. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
C. UPON COMPLETION:
1. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK
AREA.
4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
5. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
CLASS III ICRA REQUIREMENTS
A. BEFORE CONSTRUCTION WORK:
1. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITON, RENOVATION, OR CONSTRUCTION
ACTIVITIES BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD
OR OTHER APPROVED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. PARTITIONS
SHALL BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS TO THE FLOOR SLAB
OR ROOF DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED. BARRIER MUST
BE PRESENTABLE ON OCCUPIED SIDE.
B. DURING CONSTRUCTION WORK:
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND
CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORKING HOURS
3. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A
DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON
INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE
CONTRACTOR.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
C. UPON COMPLETION:
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED
BY THE SAFETY DEPARTMENT AND INFECTION CONTROL, THOROUGHLY CLEANED BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION OUTSIDE OF NORMAL WORKING HOURS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS AT THE END OF EACH WORKDAY.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
CLASS IV ICRA REQUIREMENTS
A. BEFORE CONSTRUCTION WORK:
1. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITON, RENOVATION, OR CONSTRUCTION
ACTIVITIES BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM
BOARD OR OTHER APPROVED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL.
PARTITIONS SHALL BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS TO
THE FLOOR SLAB OR ROOF DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED.
BARRIER MUST BE PRESENTABLE ON OCCUPIED SIDE.
B. DURING CONSTRUCTION WORK:
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND
CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORKING HOURS.
3. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A
DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON
INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE
CONTRACTOR.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR
THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE
COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED
BY THE VA'S SAFTEY DEPARTMENT AND INSPECTION CONTROL DEPARTMENT AND
THOROUGHLY CLEANED BY THE VA'S ENVIRONMENTAL SERVICE DEPARTMENT.
C. UPON COMPLETION:
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION OUTSIDE OF NORMAL WORKING HOURS.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS AT THE END OF EACH WORKDAY.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
100% CONSTRUCTION
DOCUMENTS
10/31/2024 EM11/05/2024
04 OF 6608/14/202310/31/202411/05/2024
1505 SF
MECHANICAL
BAY-1
1B-236
348 SF
ONE BR
1B-240
136 SF
STR B
1B-240A
170 SF
STR STORAGE
1B-234
117 SF
STORAGE
1B-232
478 SF
TWO BR
1B-242
683 SF
FOUR BR
1B-244
185 SF
EXAM/TMT.
1B-248
185 SF
EXAM/TMT.
1B-246
182 SF
EXAM/TMT.
1B-250
291 SF
CORRIDOR
C1B-210
201 SF
WAIT
C1B-211
40 SF
CU
1B-252B
47 SF
SU
1B-252A
71 SF
TOILET
1B-252
106 SF
EXAM/TMT.
1B-258
117 SF
VITALS ROOM
1B-260
85 SF
CHART ROOM
1B-258A
95 SF
STORAGE
1B-256
195 SF
CLERK/RECEPTIONIST
1B-264
154 SF
HC STAFF
1B-266
292 SF
GU LAB
1B-254
166 SF
STAIR
ST-1
208 SF
CORRIDOR
C1B-212
573 SF
CORRIDOR
C1B-209
348 SF
NURSE OFFICE
1B-270C
64 SF
PAT TOILET
1B-270B
79 SF
OP COORD
1B-270A
130 SF
VEST
1B-270
163 SF
BREAK ROOM
1B-270E
210 SF
VEST
C1B-214
458 SF
CORRIDOR
C1B-213A
2404 SF
THERAPY
POOL B
1B-211H
1017 SF
COURT
82 SF
TECH
1B-211E
144 SF
F DRSG SHR & T
F1
1B-211D
70 SF
F STF DRSG
SHR&T
1B-211C
163 SF
M STF DRES,
SHR&T
1B-211B
191 SF
TOWELS & SUITS
1B-211A
304 SF
ATS TERMINAL
1B-204A
390 SF
CORRIDOR
C1B-202A
194 SF
PASSAGE
1B-211
184 SF
CT STORAGE
1B-215B
91 SF
SUPV
1B-206
391 SF
CORRIDOR
C1B-203
474 SF
CORRIDOR
C1B-204
402 SF
CORRIDOR
C1B-205
63 SF
CU
1B-225
65 SF
NOUR STA
1B-227
36 SF
STF
1B-223
151 SF
SU
1B-229
92 SF
MED
1B-231
468 SF
HOPPER
SHOWER
1B-247 69 SF
STORAGE
1B-247A
76 SF
C LIN
1B-245
231 SF
NURSE STATION /
WARD CL DR
CHAR/DICT
C1B-206
382 SF
CORRIDOR
C1B-208
471 SF
CORRIDOR
C1B-204
215 SF
CORRIDOR
C1B-207
71 SF
W/C BATH
1B-230A
313 SF
ONE BR
1B-230
684 SF
FOUR BR
1B-226
683 SF
FOUR BR
1B-224
419 SF
TWO BR
1B-222
421 SF
TWO BR
1B-220
71 SF
W/C BATH
1B-226A
71 SF
W/C BATH
1B-224A
89 SF
W/C BATH
1B-222A
71 SF
W/C BATH
1B-220A191 SF
TRANS EQ
STORAGE
1B-216
38 SF
TC
1B-214
64 SF
LC
1B-212
340 SF
CONF/CL ROOM
1B-210
20 SF
STORAGE
1B-210A
46 SF
MT
1B-208
94 SF
W/C BATH
1B-242A
71 SF
W/L BATH
1B-244A
40 SF
HRC
1B-249
175 SF
HC COORD
1B-276
67 SF
TOILET
1B-278
49 SF
PAT T
1B-280A
30 SF
SU
1B-280B
773 SF
ARM/LEG/LO-BOY
1B-280
28 SF
CU
1B-280C
19 SF
SALT STORAGE
1B-280D
107 SF
EQ STORAGE
1B-282B
181 SF
PT ADM
1B-282A
1484 SF
PT & CT CLINIC
1B-282
125 SF
SOC WK
1B-228
BMS STO
1B-106
113 SF
STAIR
ST-2
143 SF
FT
1B-108
46 SF
VIS LNG
1B-110
340 SF
NEW SEMI-RECESSED FEC,
SEE DET 1/A-601.
FEC
AREA A
SHOWN AREA
ICRA II
ICRA III
ICRA IV
SMOKE BARRIER
HAZARDOUS AREA
1 HOUR FIRE-RESISTIVE BARRIER
2 HOUR FIRE-RESISTIVE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
BUILDING 100A - LEVEL 1 - ICRA
AND PHASING PLAN
100% CONSTRUCTION
DOCUMENTS
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
10/31/2024 EM JS
580-22-100
100-A
100AAS101
Revisions: Date:
1/8" = 1'-0"
LEVEL 1 - FLOOR PLAN ICRA
KEYPLAN
0' 4' 8' 16'
LEGEND
11/05/2024
05 OF 6608/14/202310/31/202411/05/2024
SHOWN AREA
MECHANICAL -1
3.5455.25.5
R
R.8
S
Q.5
1505 SF
MECHANICAL BAY-1
1B-236
348 SF
ONE BR
1B-240
136 SF
STR B
1B-240A
170 SF
STR STORAGE
1B-234
117 SF
STORAGE
1B-232
478 SF
TWO BR
1B-242
683 SF
FOUR BR
1B-244
215 SF
CORRIDOR
C1B-207
71 SF
W/C BATH
1B-230A
313 SF
ONE BR
1B-230
684 SF
FOUR BR
1B-226
ENTRY POINT 1
NEW SEMI-RECESSED FEC,
SEE DET 1/A-601.
POLYETHYLYNE SHEETING
CONSTRUCTION TACKY MATT
HEPA EQUIPPED AIR FILTER
SMOKE BARRIER
HAZARDOUS AREA
1 HOUR FIRE-RESISTIVE BARRIER
2 HOUR FIRE-RESISTIVE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
LEVEL 1 - MECHANICAL BAY-1
ENLARGED FLOOR PLAN
100% CONSTRUCTION
DOCUMENTS
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
10/31/2024 EM JS
580-22-100
100-A
100AA101
Revisions: Date:
KEYPLAN
1/4" = 1'-0"
MECHANICAL BAY-1 ENLARGED FLOOR PLAN
KEYNOTE (THIS SHEET ONLY)
ICRA LEGEND - CLASS II
1 PLACE TACKY MATS AT ENTRANCE AND EXIT OF CONSTRUCTION
AREA, MINIMUM SIZE 24"x36", TYPICAL.
2 INSTALL POLYETHYLENE SHEETING TO ISOLATE CONSTRUCTION
ZONE. TAPE AND SEAL ALONG EDGES, AND ANY AREAS WHERE
POTENTIAL DUST MAY BE EXPOSED OUTSIDE OF CONSTRUCTION
AREA.
3 NEGATIVE AIR MACHINE TO BE CONNECTED TO EXHAUST,
APPLICABLE TO ALL INFECTION CONTROLS INSIDE THE HOSPITAL,
TYPICAL.
GENERAL NOTES
1. CONTRACTOR TO COORDINATE WITH THE STATION FOR THE BEST
OPTION AS IDENTIFIED BY THE CONTRACTOR TO EITHER USE THE
HEPA FILTRATION SYSTEM OR NEGATIVE PRESSURE SYSTEMS.
2. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.
11/05/2024
06 OF 6608/14/202310/31/202411/05/2024
1483 SF
BAY-2
1B-134A
135 SF
VEST
1B-134
136 SF
STR B
1B-130B
232 SF
ISOLATION
1B-130A
143 SF
ANTE
1B-130
478 SF
TWO BR
1B-128
681 SF
FOUR BR
1B-126
94 SF
W/C BATH
1B-128A
71 SF
W/C BATH
1B-126B
71 SF
W/C BATH
1B-124A
683 SF
FOUR BR
1B-124
89 SF
W/C BATH
1B-122A
419 SF
TWO BR
1B-122
71 SF
W/C BATH
1B-120A
422 SF
TWO BR
1B-120
107 SF
HD NUR
1B-116
206 SF
QUIET
1B-114
340 SF
VIS LNG
1B-110
46 SF
FT
1B-108
143 SF
STAIR
ST-2
113 SF
BMS STO
1B-106
391 SF
CORRIDOR
C1B-102
125 SF
RMS SUPV
1B-117C
48 SF
EQ STOR
1B-117B
104 SF
OT SCI ADM
1B-117A
915 SF
OT SCI CLINIC
1B-117
104 SF
FEL/RES
1B-107
106 SF
SCI C LIN SPEC
1B-109
84 SF
UNIT MGR
1B-111
59 SF
C LIN
1B-115
352 SF
CORRIDOR
C1B-103
720 SF
CORRIDOR
C1B-104
45 SF
STOR
1B-119A
321 SF
INTERNET CAFE
1B-119C
2210 SF
DAYROOM / DIN
1B-119
9 SF
STO
1B-119B
53 SF
PAT T
1B-149
60 SF
STOR
1B-147A
470 SF
HOPPER /
SHOWER
1B-147
73 SF
C LIN
1B-145
231 SF
WARD CL DR
CHAR / DICT
C1B-106
92 SF
MED
1B-131
152 SF
SU
1B-129
89 SF
NOUR STA
1B-127
81 SF
CU
1B-125
40 SF
HAC
1B-151
690 SF
SC LAB
1B-178
122 SF
TISSUE CULTURE
1B-178C
122 SF
MICRO
1B-178B
117 SF
CHIEF
1B-178A
170 SF
1B-174B
88 SF
UNAS
1B-174
147 SF
NUR INST STUD
WRKM
1B-172
122 SF
UNAS
1B-170
144 SF
STAIR
ST-3
517 SF
CORRIDOR
C1B-109
149 SF
PHYS
1B-160
148 SF
PHYS
1B-162
177 SF
PHYS
1B-158
118 SF
PSYCHL TRNE
1B-156
306 SF
W/C & SPEC BED
STOR
1B-154
134 SF
NUR SUPV
1B-152
134 SF
SEC Y
1B-150D
133 SF
ASST CH
1B-150C
202 SF
PASSAGE
1B-150
107 SF
SOC WK
1B-148
109 SF
ADM ASST
1B-150A
187 SF
CH SERV
1B-150B
96 SF
PASSAGE
1B-146 46 SF
VEST
1B-146A
136 SF
MT & LKR
1B-146B
26 SF
VEST
1B-146C
219 SF
FT & LKR
1B-146D110 SF
LNG
1B-146E
72 SF
W/C BATH
1B-144A
803 SF
FOUR BR
1B-144
71 SF
W/C BATH
1B-140A
313 SF
ONE BR
1B-140
117 SF
STOR
1B-138
170 SF
STR STOR
1B-136
139 SF
CORRIDOR
C1B-107
798 SF
CORRIDOR
C1B-108
SUPV
1B-206
91 SF
ATS TERMINAL
1B-204A
304 SF
CORRIDOR
C1B-203
391 SF
MT
1B-208
46 SF
CONF/CL ROOM
1B-210
340 SF
CORRIDOR
C1B-111
277 SF
CORRIDOR
C1B-112
219 SF
VEST
1A-590
148 SF
CREDIT UNION
1A-590A
308 SF
CORR
C1C-112
354 SF
MECHANICAL
BAY-5
1A-570
1402 SF
NEW SEMI-RECESSED FEC,
SEE DET 1/A-601.
FEC
AREA B
SHOWN AREA
ICRA II
ICRA III
ICRA IV
SMOKE BARRIER
HAZARDOUS AREA
1 HOUR FIRE-RESISTIVE BARRIER
2 HOUR FIRE-RESISTIVE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
BUILDING 100B - LEVEL 1 - ICRA
AND PHASING PLAN
100% CONSTRUCTION
DOCUMENTS
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
10/31/2024 EM JS
580-22-100
100-B
100BAS101
KEYPLAN
0' 4' 8' 16' 1/8" = 1'-0"
LEVEL 1 - FLOOR PLAN ICRA
Revisions: Date:
LEGEND
11/05/2024
07 OF 6608/14/202310/31/202411/05/2024
9.5101111.5
Q
R
R.8
S
Q.5
1483 SF
MECHANICAL BAY-2
1B-134A
170 SF
STR STOR
1B-136
135 SF
VEST
1B-134
136 SF
STR B
1B-130B
232 SF
ISOLATION
1B-130A
313 SF
ONE BR
1B-140
117 SF
STOR
1B-138
803 SF
FOUR BR
1B-144
71 SF
W/C BATH
1B-140A
139 SF
CORRIDOR
C1B-107
143 SF
ANTE
1B-130
478 SF
TWO BR
1B-128
681 SF
FOUR BR
1B-126
ENTRY POINT
NEW SEMI-RECESSED FEC,
SEE DET 1/A-601.
POLYETHYLYNE SHEETING
CONSTRUCTION TACKY MATT
HEPA EQUIPPED AIR FILTER
SMOKE BARRIER
HAZARDOUS AREA
1 HOUR FIRE-RESISTIVE BARRIER
2 HOUR FIRE-RESISTIVE BARRIER
MECHANICAL BAY-2
SHOWN AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
LEVEL 1 - MECHANICAL BAY-2
ENLARGED FLOOR PLAN
100% CONSTRUCTION
DOCUMENTS
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
10/31/2024 EM JS
580-22-100
100-B
100BA101
KEYPLAN
1/4" = 1'-0"
MECHANICAL BAY-2 ENLARGED FLOOR PLAN
1 PLACE TACKY MATS AT ENTRANCE AND EXIT OF CONSTRUCTION
AREA, MINIMUM SIZE 24"x36", TYPICAL.
2 INSTALL POLYETHYLENE SHEETING TO ISOLATE CONSTRUCTION
ZONE. TAPE AND SEAL ALONG EDGES, AND ANY AREAS WHERE
POTENTIAL DUST MAY BE EXPOSED OUTSIDE OF CONSTRUCTION
AREA.
3 NEGATIVE AIR MACHINE TO BE CONNECTED TO EXHAUST,
APPLICABLE TO ALL INFECTION CONTROLS INSIDE THE HOSPITAL,
TYPICAL.
Revisions: Date:
1. CONTRACTOR TO COORDINATE WITH THE STATION FOR THE BEST
OPTION AS IDENTIFIED BY THE CONTRACTOR TO EITHER USE THE
HEPA FILTRATION SYSTEM OR NEGATIVE PRESSURE SYSTEMS.
2. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.
KEYNOTE (THIS SHEET ONLY)
ICRA LEGEND - CLASS II
GENERAL NOTES
11/05/2024
08 OF 6608/14/202310/31/202411/05/2024
1435 SF
BAY-3
1C-138A
199 SF
NURSING AREA
1C-138131 SF
W/C BATH
1C-136
319 SF
TWO BR
1C-140
54 SF
TOILET
1C-140A
314 SF
TWO BR
1C-142
314 SF
TWO BR
1C-144
54 SF
TOILET
1C-144A
318 SF
TWO BR
1C-146
318 SF
TWO BR
1C-148
54 SF
TOILET
1C-148A
314 SF
TWO BR
1C-150
314 SF
TWO BR
1C-152
54 SF
TOILET
1C-152A
319 SF
TWO BR
1C-154
145 SF
PVA OFF
1B-164A
146 SF
PVA SECY
1B-164
277 SF
CORRIDOR
C1B-111
119 SF
CORRIDOR
C1B-108
219 SF
CORRIDOR
C1B-112
126 SF
SOC WK
1B-168
124 SF
SOC WK
1B-166191 SF
KITCHEN
1C-158A
262 SF
LIV/DIN
1C-158
211 SF
BR
1C-158B
79 SF
BATH
1C-158D
215 SF
CORRIDOR
C1C-108
459 SF
WAITING /
RECEPTIONIST
/WORK AREA
1C-160
174 SF
SUPERVISORS
OFFICE
1C-160C
107 SF
OFFICE
1C-160D
107 SF
OFFICE
1C-160E
157 SF
NURSE EXECUTIVE
1C-160F
68 SF
CORRIDOR
C1C-160
179 SF
CONFERENCE ROOM
1C-160A208 SF
COPY/WORK ROOM
1C-160B
628 SF
CORRIDOR
C1C-105
83 SF
NUR CLIN
1C-125
164 SF
EX/TMT
1C-127
291 SF
BATH FAC
1C-143
47 SF
TOILET
1C-143A
203 SF
NUR STA
C1C-106
904 SF
CORRIDOR
C1C-107
724 SF
CORRIDOR
C1C-104
556 SF
NHC SERVING UNIT
1C-111
40 SF
HAC
1C-111A
122 SF
NON-FOOD STOR
1C-111B
176 SF
CORRIDOR
C1C-102
143 SF
PT EDUCATION
1C-108
145 SF
STAIR
ST-4
595 SF
CORRIDOR
C1C-103
192 SF
CORRIDOR
C1C-102
195 SF
QUIET
1C-110
54 SF
LC
1C-112
37 SF
TC
1C-114
128 SF
EQ STOR
1C-116
323 SF
TWO BR
1C-118
54 SF
TOILET
1C-118A
314 SF
TWO BR
1C-120
314 SF
TWO BR
1C-122
54 SF
TOILET
1C-122A
318 SF
TWO BR
1C-124
318 SF
TWO BR
1C-126
54 SF
TOILET
1C-126A
314 SF
TWO BR
1C-128
230 SF
ONE BR
1C-130
40 SF
HAC
1C-132
43 SF
TOILET
1C-130A
207 SF
ONE BR
1C-134
1799 SF
DIN/RECREATION
1C-111C
79 SF
ELEVATOR
P-12
79 SF
ELEVATOR
P-11
30 SF
STF T
1C-129
PHYS
1B-162
148 SF
PHYS
1B-160
149 SF
STAIR
ST-3
144 SF
NUR INST STUD
WRKM
1B-172
147 SF
UNAS
1B-170
122 SF
UNASSIGNED
1C-109
256 SF 1C-109D
97 SF
1C-109C
154 SF
1C-109A
145 SF
STORAGE
1C-109B
69 SF
CORRIDOR
C1C-102
219 SF
MED
1C-206
62 SF
CORRIDOR
C1C-202
549 SF
HD NUR
1C-208
108 SF
ONE BR
1C-216
299 SF
1C-204
697 SF
NEW SEMI-RECESSED FEC,
SEE DET 1/A-601.
FEC
SHOWN AREA
AREA C
ICRA II
ICRA III
ICRA IV
SMOKE BARRIER
HAZARDOUS AREA
1 HOUR FIRE-RESISTIVE BARRIER
2 HOUR FIRE-RESISTIVE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
BUILDING 100C - LEVEL 1 - ICRA
AND PHASING PLAN
100% CONSTRUCTION
DOCUMENTS
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
10/31/2024 EM JS
580-22-100
100-C
100CAS101
1/8" = 1'-0"
LEVEL 1 - FLOOR PLAN ICRA
KEYPLAN
0' 4' 8' 16'
Revisions: Date:
LEGEND
11/05/2024
09 OF 6608/14/202310/31/202411/05/2024
1617 15.517.5
R
S
R.8
Q.5
1435 SF
MECHANICAL
BAY-3
1C-138A
199 SF
NURSING AREA
1C-138131 SF
W/C BATH
1C-136
319 SF
TWO BR
1C-140
54 SF
TOILET
1C-140A
314 SF
TWO BR
1C-142
314 SF
TWO BR
1C-144
314 SF
TWO BR
1C-128
230 SF
ONE BR
1C-130
40 SF
HAC
1C-132
43 SF
TOILET
1C-130A
207 SF
ONE BR
1C-134
ENTRY POINT
4'
1/
4"
NEW SEMI-RECESSED FEC,
SEE DET 1/A-601.
POLYETHYLYNE SHEETING
CONSTRUCTION TACKY MATT
HEPA EQUIPPED AIR FILTER
SMOKE BARRIER
HAZARDOUS AREA
1 HOUR FIRE-RESISTIVE BARRIER
2 HOUR FIRE-RESISTIVE BARRIER
MECHANICAL BAY - 3
SHOWN AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
LEVEL 1 - MECHANICAL BAY-3
ENLARGED FLOOR PLAN
100% CONSTRUCTION
DOCUMENTS
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
10/31/2024 EM JS
580-22-100
100-C
100CA101
1/4" = 1'-0"
MECHANICAL BAY-3 ENLARGED FLOOR PLAN
KEYPLAN
1 PLACE TACKY MATS AT ENTRANCE AND EXIT OF CONSTRUCTION
AREA, MINIMUM SIZE 24"x36", TYPICAL.
2 INSTALL POLYETHYLENE SHEETING TO ISOLATE CONSTRUCTION
ZONE. TAPE AND SEAL ALONG EDGES, AND ANY AREAS WHERE
POTENTIAL DUST MAY BE EXPOSED OUTSIDE OF CONSTRUCTION
AREA.
3 NEGATIVE AIR MACHINE TO BE CONNECTED TO EXHAUST,
APPLICABLE TO ALL INFECTION CONTROLS INSIDE THE HOSPITAL,
TYPICAL.
Revisions: Date:
1. CONTRACTOR TO COORDINATE WITH THE STATION FOR THE BEST
OPTION AS IDENTIFIED BY THE CONTRACTOR TO EITHER USE THE
HEPA FILTRATION SYSTEM OR NEGATIVE PRESSURE SYSTEMS.
2. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.
KEYNOTE (THIS SHEET ONLY)
ICRA LEGEND - CLASS II
GENERAL NOTES
11/05/2024
10 OF 6608/14/202310/31/202411/05/2024
ICRA II
ICRA III
ICRA IV
SMOKE BARRIER
HAZARDOUS AREA
1 HOUR FIRE-RESISTIVE BARRIER
2 HOUR FIRE-RESISTIVE BARRIER
1434 SF
MECHANICAL
BAY-4
1C-238A
215 SF
F LKR/T
1C-207A
33 SF
VEST
1C-207
33 SF
VEST
1C-205
109 SF
M LKR/T
1C-205A
93 SF
SOC WK
1C-209
96 SF
BMS STOR
1C-213
55 SF
WARD SUP
1C-215
103 SF
DIET
1C-211
127 SF
SU
1C-219
72 SF
C LIN
1C-217
71 SF
NOUR STA
1C-221
251 SF
CORRIDOR
C1C-204
62 SF
MED
1C-206
549 SF
CORRIDOR
C1C-202
1578 SF
CORRIDOR
C1C-205
108 SF
HD NUR
1C-20853 SF
TOILET
1C-216A
299 SF
ONE BR
1C-216
319 SF
TWO BR
1C-218
54 SF
TOILET
1C-218A
314 SF
TWO BR
1C-220
314 SF
TWO BR
1C-222
54 SF
TOILET
1C-222A
318 SF
TWO BR
1C-224
318 SF
TWO BR
1C-226
54 SF
TOILET
1C-226A
314 SF
TWO BR
1C-228
230 SF
ONE BR
1C-23043 SF
TOILET
1C-230A
40 SF
HAC
1C-232
206 SF
ONE BR
1C-234
131 SF
WC BATH
1C-236
199 SF
NURSING AREA
1C-238
267 SF
ONE BR
1C-240
43 SF
TOILET
1C-240A
314 SF
TWO BR
1C-242
52 SF
TOILET
1C-242A
314 SF
TWO BR
1C-244
318 SF
TWO BR
1C-246
54 SF
TOILET
1C-244A
318 SF
TWO BR
1C-248
54 SF
TOILET
1C-248A
314 SF
TWO BR
1C-247
314 SF
TWO BR
1C-252
54 SF
TOILET
1C-252A
318 SF
TWO BR
1C-254
94 SF
UNIT MGR
1C-256
388 SF
NUR
1C-260
166 SF
STAIR
ST-5
43 SF
PAT T
1C-262B
111 SF
EX/TMT
1C-262A
247 SF
SEC Y & REC
1C-262
56 SF
STOR
1C-262F
139 SF
COORD/CONF
1C-262E
56 SF
REHAB
SUPPLIES
1C-262D
131 SF
CH PHYS
1C-262C
206 SF
VEST
C1C-211
201 SF
SEC Y/WAIT
1C-274
139 SF
NHC SUPV
1C-274A
116 SF
OFF/STOR
1C-272D
73 SF
PA HYDRO
1C-272C
99 SF
STERILE SUPPLIES
1C-274B
60 SF
W/CT
1C-272B
1368 SF
PA CLINIC
1C-272
285 SF
CONF ROOM
1C-270
177 SF
PHARM PREP
1C-268
50 SF
STOR
1C-272A
27 SF
STOR
1C-270A
139 SF
SPEECH PATH
1C-266
744 SF
CORRIDOR
C1C-206
628 SF
CORRIDOR
C1C-207
909 SF
CORRIDOR
C1C-209
289 SF
BATH FAC
1C-243
47 SF
TOILET
1C-243A
30 SF
STF T
1C-229
46 SF
WARD SUP
1C-227
84 SF
RES LAUN
1C-225
113 SF
UNAS
1C-223
204 SF
NUR STA
C1C-208
449 SF
CORRIDOR
C1C-210D
CORRIDOR
C1C-103
595 SF
ELEVATOR
P-11
79 SF
ELEVATOR
P-12
79 SF
QUIET
1C-110
195 SF
STAIR
ST-4
145 SF
1C-204
697 SF
ELEVATOR
S-9
85 SF
ELEVATOR
S-10
86 SF
FUT
ELEVATOR
Z1H01
91 SF
UNAS
1C-203
82 SF
NEW SEMI-RECESSED FEC,
SEE DET 1/A-601.
FEC
AREA D
SHOWN AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
BUILDING 100D - LEVEL 1 - ICRA
AND PHASING PLAN
100% CONSTRUCTION
DOCUMENTS
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
10/31/2024 EM JS
580-22-100
100-D
100DAS101
KEYPLAN
0' 4' 8' 16' 1/8" = 1'-0"
LEVEL 1 - FLOOR PLAN ICRA
Revisions: Date:
LEGEND
11/05/2024
11 OF 6608/14/202310/31/202411/05/2024
MECHANICAL-4
21.5222323.5
R
S
R.8
Q.5
1434 SF
MECHANICAL
BAY-4
1C-238A
199 SF
NURSING AREA
1C-238
267 SF
ONE BR
1C-240
131 SF
WC BATH
1C-236
206 SF
ONE BR
1C-234
314 SF
TWO BR
1C-242
43 SF
TOILET
1C-240A
43 SF
TOILET
1C-230A
230 SF
ONE BR
1C-230
909 SF
CORRIDOR
C1C-209
ENTRY POINT
5' - 0"
NEW SEMI-RECESSED FEC,
SEE DET 1/A-601.
SHOWN AREA
TEMPORARY ICRA BARRIER
CONSTRUCTION TACKY MATT
HEPA EQUIPPED AIR FILTER
TEMPORARY ICRA DOOR
SMOKE BARRIER
HAZARDOUS AREA
1 HOUR FIRE-RESISTIVE BARRIER
2 HOUR FIRE-RESISTIVE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
LEVEL 1 - MECHANICAL BAY-4
ENLARGED FLOOR PLAN
100% CONSTRUCTION
DOCUMENTS
REPAIR/REPLACE MAIN CHILLED
WATER DISTRIBUTION SYSTEM
MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,
TEXAS
10/31/2024 EM JS
580-22-100
100-D
100DA101
KEYPLAN
1/4" = 1'-0"
MECHANICAL BAY-4 ENLARGED FLOOR PLAN
1 PLACE TACKY MATS AT ENTRANCE AND EXIT OF CONSTRUCTION
AREA, MINIMUM SIZE 24"x36", TYPICAL.
2 INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER TO
SEPARATE CONSTRUCTION AREA FROM OCCUPIED SPACE.
3 INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR, SOLID
CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING AND MATCH
RATING OF ICRA BARRIER, TYPICAL.
4 NEGATIVE AIR MACHINE TO BE CONNECTED TO EXHAUST,
APPLICABLE TO ALL INFECTION CONTROLS INSIDE THE HOSPITAL,
TYPICAL.
Revisions: Date:
1. CONTRACTOR TO COORDINATE WITH THE STATION FOR THE BEST
OPTION AS IDENTIFIED BY THE CONTRACTOR TO EITHER USE THE
HEPA FILTRATION SYSTEM OR NEGATIVE PRESSURE SYSTEMS.
2. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.
KEYNOTE (THIS SHEET ONLY)
ICRA LEGEND - CLASS III
GENERAL NOTES
11/05/2024
12 OF 6608/14/202310/31/202411/05/2024
ICRA III
ICRA IV
SMOKE BARRIER
HAZARDOUS AREA
1 HOUR FIRE-RESISTIVE BARRIER
2 HOUR FIRE-RESISTIVE BARRIER
AREA E
90 SF
STOR
5B-325
292 SF
TWO BR
5B-342
292 SF
TWO BR
5B-344
64 SF
W/C BATH
5B-340A
64 SF
W/C BATH
5B-344A
283 SF
TWO BR
5B-346
283 SF
TWO BR
5B-348
64 SF
W/C BATH
5B-348A
291 SF
TWO BR
5B-350
291 SF
TWO BR
5B-352
64 SF
W/C BATH
5B-352A
283 SF
TWO BR
5B-354
140 SF
CU
5B-349
66 SF
MED
5B-383
61 SF
C LIN
5B-381
72 SF
NOUR STA
5B-351
132 SF
SU
5B-327
31 SF
STFT
5B-329
187 SF
ONE BR
5B-398
66 SF
W/C BATH
5B-398A
196 SF
ONE BR
5B-396
62 SF
W/C BATH
5B-396A
192 SF
ONE BR
5B-394
62 SF
W/C BATH
5B-394A
186 SF
ONE BR
5B-392
69 SF
W/C BATH
5B-390A
189 SF
ONE BR
5B-390
184 SF
ONE BR
5B-388
69 SF
W/C BATH
5B-386A
194 SF
ONE BR
5B-386
66 SF
W/C BATH
5B-384B 66 SF
ANTE
5B-384
66 SF
ANTE
5B-382
66 SF
W/C BATH
5B-382B
41 SF
HAC
5B-380
139 SF
ISOL
5B-384A
134 SF
ISOL
5B-382A
179 SF
STF LNG
5B-378
102 SF
HD NUR
5B-331
230 SF
HS OFF/WKRM
5B-395
110 SF
SOC WK
5B-312
66 SF
W/C BATH
5B-320A
64 SF
W/C BATH
5B-322A
291 SF
TWO BR
5B-322
293 SF
DAY ROOM
5B-310
246 SF
ONE BR
5B-320
291 SF
TWO BR
5B-324
64 SF
W/C BATH
5B-324A
283 SF
TWO BR
5B-326
283 SF
TWO BR
5B-328
64 SF
W/C BATH
5B-328A
292 SF
TWO BR
5B-330
292 SF
TWO BR
5B-332
64 SF
W/C BATH
5B-332A
272 SF
TWO BR
5B-334
90 SF
VEST
5B-336
144 SF
EQ STOR
5B-338
272 SF
TWO BR
5B-340
102 SF
HS
5B-335
108 SF
PHYS
5B-337
102 SF
EX/TMT
5B-341
419 SF
CONFERENCE RM
5B-385
1011 SF
CORRIDOR
C5B-302
209 SF
CHART
C5B-305
367 SF
NUR STA / WARD CL
C5B-304
209 SF
CHAR DICT
C5B-306
705 SF
CORRIDOR
C5B-308
882 SF
CORRIDOR
C5B-303
328 SF
CORRIDOR
C5B-414
148 SF
CORR
C5B-307
159 SF
FIRE STAIR
ST-6
366 SF
BATH FAC
5B-358
171 SF
CORRIDOR
C5B-301
1287 SF
MECHANICAL
BAY - 7
5B-338A
96 SF
BMS STOR
5B-201
ELEVATOR
S-1
ELEVATOR
S-2
ELEVATOR
S-3
ELEVATOR
S-4
ELEVATOR
S-5
FUT
SERV ELEV LOBBY
C5B-200
297 SF
CORR
C5A-200E
204 SF
CORR
C5B-201E
444 SF
CORR
C5B-214
239 SF
ATS TERMINAL
5B-204E
56 SF
ELEVATOR
T-2
56 SF
ELEVATOR
T-1
149 SF
STAIR
Z5E06
NEW SEMI-RECESSED FEC,
SEE DET 1/A-601.
FEC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .