580-22-100 DRAWINGS REPAIR REPLACE MAIN CHILLED WATER DISTRO SYSTEM.pdf

PDF 22 MB Posted

Attached to
Y1DA | 580-22-100 | REPAIR REPLACE MAIN CHILLED WATER DISTRIBUTION SYSTEM | AMENDMENT 0005
Solicitation number
36C25625R0062
Issued by

About this file

These are architectural and engineering design drawings for a repair and replacement project of the main chilled water distribution system at the Michael E. DeBakey VA Medical Center in Houston, Texas. The comprehensive set of 66 drawings covers multiple disciplines including architectural, structural, mechanical, and electrical plans, detailing a complex infrastructure upgrade across multiple buildings (Buildings 100, 104, and 105). The project involves replacing chilled water piping, pumps, and associated electrical infrastructure, with work to be performed in various mechanical bays and tunnels while maintaining hospital operations.

The project is a 100% Service-Disabled Veteran-Owned Small Business set-aside with a contract value between $5-10 million and a 365-calendar day performance period. The solicitation (36C25625R0062) is anticipated to be issued electronically on or about May 6, 2025, with a 90-day proposal acceptance period. Contractors must be registered in the SBA VetCert, System for Award Management (SAM), and meet the NAICS code 236220 small business size standard of $45 million in average annual receipts. Key requirements include adhering to JCAHO, NFPA, OSHA, and life safety standards while minimizing disruption to medical center operations.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TUNNEL

BUILDINGS WITHIN THE SCOPE OF THIS PROJECT

104A

102A

65 11

108A

VA REGIONAL OFFICE

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON, TEXAS

GENERAL NOTES

1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &

SPECIFICATIONS.

2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.

BRING TO THE AWARENESS OF AND VERIFY WITH VA COR PRIOR TO PROCEEDING.

3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE

TO VISIT THE SITE.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT

IMMEDIATELY TO THE ATTENTION OF THE COR.

5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.

6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK

THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.

7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE

WITH THE CONTRACT DOCUMENTS.

DESIGN TEAM

MECHANICAL

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

ARCHITECTURAL

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

ELECTRICAL

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

STRUCTURAL

WSP USA, INC.

33301 9TH AVENUE SOUTH

FEDERAL WAY, WA 98003-2600

PHONE: (206) 431-2300

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

COVER SHEET 95% DESIGN

DEVELOPMENT

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

08/14/2023 ED JS

580-22-100

G-001

1" = 200'-0"

FACILITY SITE PLAN

NOT TO SCALE

LOCATION MAP

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON, TEXAS

PROJECT #: 580-22-100

Revisions: Date:

100% CONSTRUCTION

DOCUMENTS

10/31/2024 EM11/05/2024

01 OF 6608/14/202310/31/202411/05/2024

11/5/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

DRAWING INDEX 95% DESIGN

DEVELOPMENT

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

08/14/2023 ED JS

580-22-100

G-002 Revisions: Date:

100% CONSTRUCTION

DOCUMENTS

10/31/2024 EM11/05/2024

DRAWING INDEX

PAGE # SHEET # SHEET NAME

GENERAL

1 0F 66 G-001 COVER SHEET

2 0F 66 G-002 DRAWING INDEX

ARCHITECTURAL

3 0F 66 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS

4 0F 66 AS101 ICRA DETAILS

5 0F 66 100AAS101 BUILDING 100A -LEVEL 1 -ICRA AND PHASING PLAN

6 0F 66 100AA101 LEVEL 1 -MECHANICAL BAY-1 ENLARGED FLOOR PLAN

7 0F 66 100BAS101 BUILDING 100B -LEVEL 1 -ICRA AND PHASING PLAN

8 0F 66 100BA101 LEVEL 1 -MECHANICAL BAY-2 ENLARGED FLOOR PLAN

9 0F 66 100CAS101 BUILDING 100C -LEVEL 1 -ICRA AND PHASING PLAN

10 0F 66 100CA101 LEVEL 1 -MECHANICAL BAY-3 ENLARGED FLOOR PLAN

11 0F 66 100DAS101 BUILDING 100D -LEVEL 1 -ICRA AND PHASING PLAN

12 0F 66 100DA101 LEVEL 1 -MECHANICAL BAY-4 ENLARGED FLOOR PLAN

13 0F 66 100EAS101 BUILDING 100E -LEVEL 5 -ICRA AND PHASING PLAN

14 0F 66 100EA101 LEVEL 5 -MECHANICAL BAY-7 ENLARGED FLOOR PLAN

15 0F 66 101FAS101 BUILDING 100F -LEVEL 6 -ICRA AND PHASING PLAN

16 0F 66 101FA101 LEVEL 6 -MECHANICAL BAY-5 ENLARGED FLOOR PLAN

17 0F 66 100HAS101 BUILDING 100H -LEVEL 4 -ICRA AND PHASING PLAN

18 0F 66 100HA101 LEVEL 4 -MECHANICAL BAY-8 ENLARGED FLOOR PLAN

19 0F 66 100LAS101 BUILDING 100L -LEVEL 3 -ICRA AND PHASING PLAN

20 0F 66 100LA101 LEVEL 3 -MECHANICAL BAY-11 ENLARGED FLOOR PLAN

21 0F 66 A-601 DETAILS

STRUCTURAL

22 0F 66 S-001 STRUCTURAL NOTES

23 0F 66 S-002 STRUCTURAL NOTES AND ABBREVIATIONS

24 0F 66 S-101 TUNNEL FLOOR PLAN

25 0F 66 S-102 PLAN -BASEMENT LEVEL BUILDING 100 AREA H

26 0F 66 S-201 PIPE SUPPORT ELEVATIONS

27 0F 66 S-202 PIPE SUPPORT ELEVATIONS

28 0F 66 S-203 PIPE SUPPORT ELEVATIONS

29 0F 66 S-501 PIPE SUPPORT SECTIONS AND DETAILS

MECHANICAL

30 0F 66 M-001 MECHANICAL COVER SHEET

31 0F 66 100MD100 AREA H -BASEMENT DEMO PLAN

32 0F 66 102MD100 TUNNEL DEMO PLANS AND ELEVATION

33 0F 66 102MP100 TUNNEL FLOOR PLANS AND ELEVATIONS

34 0F 66 104MD100 BUILDING 104 SECONDARY CHILLED WATER DEMO PLAN

35 0F 66 104MD101 LEVEL 1 -DEMO FLOOR PLAN

36 0F 66 104MP100 BUILDING 104 SECONDARY CHILLED WATER FLOOR PLAN

37 0F 66 104MP101 LEVEL 1 -FLOOR PLAN

38 0F 66 100MP301 MECHANICAL BAY-1 -LEVEL 1 -ENLARGED FLOOR PLAN

39 0F 66 100MP302 MECHANICAL BAY-2 -LEVEL 1 -ENLARGED FLOOR PLAN

40 0F 66 100MP303 MECHANICAL BAY-3 ENLARGED FLOOR PLAN

41 0F 66 100MP304 MECHANICAL BAY-4 -LEVEL 1 -ENLARGED FLOOR PLAN

42 0F 66 100MP305 MECHANICAL BAY-7 -LEVEL 5-ENLARGED FLOOR PLAN

43 0F 66 100MP306 MECHANICAL BAY-11-LEVEL 3-ENLARGED FLOOR PLAN

44 0F 66 M-501 MECHANICAL DETAILS

45 0F 66 M-601 MECHANICAL SCHEDULES I

46 0F 66 M-506 MECHANICAL DETAILS

47 0F 66 M-602 MECHANICAL EQUIPMENT SCHEDULES

48 0F 66 M-701 MECHANICAL PIPING RISER DIAGRAMS

49 0F 66 M-702 MECHANICAL PIPING RISER DIAGRAMS

50 0F 66 M-703 MECHANICAL CONTROLS

ELECTRICAL

51 0F 66 E-001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX

52 0F 66 E-002 ELECTRICAL LEGENDS

53 0F 66 100EP401a BLDG 100 -LEVEL 1 -MECHANICAL RM 1B-236 AND 1B-134A -ELECTRICAL P

54 0F 66 100EP401b BLDG 100 -LEVEL 1 -MECHANICAL RM 1C-138A AND 1C-238A -ELECTRICAL

55 0F 66 100EP401c BLDG 100 -LEVEL 3 -MECHANICAL RM 3C-466B -ELECTRICAL PLANS 56 0F 66 100EP401d BLDG 100 -LEVEL 5 -MECHANICAL RM 5B-338A -ELECTRICAL PLANS

57 0F 66 104EP100 BLDG 104 -TUNNEL -ELECTRICAL PLAN

58 0F 66 104ED101 BLDG 104 -LEVEL 1 -ELECTRICAL PLAN -DEMOLITION

59 0F 66 104EP101 BLDG 104 -LEVEL 1 -ELECTRICAL PLAN -REVISED

60 0F 66 105EP101 BLDG 105 -LEVEL 01 -ELECTRICAL PLAN

61 0F 66 E-501 ELECTRICAL DETAILS

62 0F 66 E-601 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -EXISTING -PART 1 OF 2

63 0F 66 E-602 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -EXISTING -PART 2 OF 2

64 0F 66 E-611 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -REVISED -PART 1 OF 2

65 0F 66 E-612 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -REVISED -PART 2 OF 2

66 0F 66 E-701 ELECTRICAL SCHEDULES

31 0F 66 100MD100 AREA H -BASEMENT DEMO PLAN

32 0F 66 102MD100 TUNNEL DEMO PLANS AND ELEVATION

33 0F 66 102MP100 TUNNEL FLOOR PLANS AND ELEVATIONS

34 0F 66 104MD100 BUILDING 104 SECONDARY CHILLED WATER DEMO PLAN

35 0F 66 104MD101 LEVEL 1 -DEMO FLOOR PLAN

36 0F 66 104MP100 BUILDING 104 SECONDARY CHILLED WATER FLOOR PLAN

37 0F 66 104MP101 LEVEL 1 -FLOOR PLAN

38 0F 66 100MP301 MECHANICAL BAY-1 -LEVEL 1 -ENLARGED FLOOR PLAN

39 0F 66 100MP302 MECHANICAL BAY-2 -LEVEL 1 -ENLARGED FLOOR PLAN

40 0F 66 100MP303 MECHANICAL BAY-3 ENLARGED FLOOR PLAN

41 0F 66 100MP304 MECHANICAL BAY-4 -LEVEL 1 -ENLARGED FLOOR PLAN

42 0F 66 100MP305 MECHANICAL BAY-7 -LEVEL 5-ENLARGED FLOOR PLAN

43 0F 66 100MP306 MECHANICAL BAY-11-LEVEL 3-ENLARGED FLOOR PLAN

44 0F 66 M-501 MECHANICAL DETAILS

45 0F 66 M-601 MECHANICAL SCHEDULES I

46 0F 66 M-506 MECHANICAL DETAILS

47 0F 66 M-602 MECHANICAL EQUIPMENT SCHEDULES

48 0F 66 M-701 MECHANICAL PIPING RISER DIAGRAMS

49 0F 66 M-702 MECHANICAL PIPING RISER DIAGRAMS

50 0F 66 M-703 MECHANICAL CONTROLS

ELECTRICAL

51 0F 66 E-001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX

52 0F 66 E-002 ELECTRICAL LEGENDS

53 0F 66 100EP401a BLDG 100 -LEVEL 1 -MECHANICAL RM 1B-236 AND 1B-134A -ELECTRICAL PLANS

54 0F 66 100EP401b BLDG 100 -LEVEL 1 -MECHANICAL RM 1C-138A AND 1C-238A -ELECTRICAL PLANS

55 0F 66 100EP401c BLDG 100 -LEVEL 3 -MECHANICAL RM 3C-466B -ELECTRICAL PLANS 56 0F 66 100EP401d BLDG 100 -LEVEL 5 -MECHANICAL RM 5B-338A -ELECTRICAL PLANS

57 0F 66 104EP100 BLDG 104 -TUNNEL -ELECTRICAL PLAN

58 0F 66 104ED101 BLDG 104 -LEVEL 1 -ELECTRICAL PLAN -DEMOLITION

59 0F 66 104EP101 BLDG 104 -LEVEL 1 -ELECTRICAL PLAN -REVISED

60 0F 66 105EP101 BLDG 105 -LEVEL 01 -ELECTRICAL PLAN

61 0F 66 E-501 ELECTRICAL DETAILS

62 0F 66 E-601 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -EXISTING -PART 1 OF 2

63 0F 66 E-602 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -EXISTING -PART 2 OF 2

64 0F 66 E-611 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -REVISED -PART 1 OF 2

65 0F 66 E-612 PARTIAL ELECTRICAL ONE-LINE DIAGRAM -REVISED -PART 2 OF 2

66 0F 66 E-701 ELECTRICAL SCHEDULES

08/14/202310/31/202411/05/2024

AB

ABA

AC(T)

ACM

ACW

ADA

ADJ

A/E

AF

AFF

AGG

ALT

ALUM

APPROX

ARCH

ASPH

A/V

BARR

BATH

BB

BLDG

BLK

BLKG

BLW

BM

BMTU

BO

BOC

BOS

BRC

BRKT

BRNG

BTM

BTWN

CAB

CC

CD

CJ

CLG

CLR

CMU

CO

COL

COMP

CONC

CONN

CONST

CONT

COORD

COR

CORR

CS

CT

CTR

CV

AND

ANGLE

AT

CENTERLINE

DEGREES

NUMBER

ANCHOR BOLT

ARCHITECTURAL BARRIERS ACT

ACOUSTICAL CEILING (TILE)

ASBESTOS CONTAINING MATERIAL

ACOUSTICAL WALL

AMERICANS W/ DISABILITIES ACT

ADJACENT

ARCHITECT/ENGINEER

ACCESS FLOOR

ABOVE FINISH FLOOR

AGGREGATE

ALTERNATE

ALUMINUM

APPROXIMATELY

ARCHITECT(URAL)

ASPHALT

AUDIO / VIDEO

BARRIER

BATHROOM

BACKER BOARD

BUILDING

BLOCK

BLOCKING

BELOW

BEAM

BONE MARROW TRANSPLANT UNIT

BOTTOM OF

BOTTOM OF CURB

BOTTOM OF SLAB

BRACE, BRACING

BRACKET

BEARING

BOTTOM

BETWEEN

CABINET

CONTRACTOR FURN, CONTRACTOR INST

CONSTRUCTION/CONTRACT DOCUMENTS

CONTROL JOINT

CEILING

CLEAR(ANCE)

CONCRETE MASONRY UNIT

CONTRACTING OFFICER

COLUMN

COMPOSITION

CONCRETE

CONNECTION

CONSTRUCTION

CONTINUOUS

COORDINATE

CONTRACTING OFFICER REPRESENTATIVE

CORRIDOR

CONCRETE SEALER

CERAMIC TILE

CENTER

CONTRACTOR FURNISHED, VA INSTALLED

HDR

HDWE

HM

HORZ

HPDL

HR

HT

HVAC

ICRA

ID

ILSM

INCL

INST

INSUL

INT

JT

KV

LAM

LAV

LCM

LT

MAT

MAX

MDF

MECH

MEP

MFR

MIN

MISC

MOD

MTL

N N/A

NEG

NO.

NOM

NTS

O.C.

OPNG

OPP

OPT

OVHD

P

PCONC

PCRA

PL

PLAM

PLY(WD)

PNL

PR

PRFB

PS

PT

PTN(S)

PVMT

QTY

HEADER

HARDWARE

HOLLOW METAL

HORIZONTAL

HIGH PRESSURE DECORATIVE LAM

HOUR

HEIGHT

HEATING, VENTILATION & AIR CONDITIONING

INFECTIOUS CONTROL RISK ASSESSMENT

INSIDE DIAMETER OR DIM

INTERIM LIFE SAFETY MEASURES

INCLUDE(D,ING)

INSTALL

INSULATION

INTERIOR

JOINT

KILOVOLT

LAMINATE(D)

LAVATORY

LEAD CONTAINING MATERIAL(S)

LIGHT

MATERIAL(S)

MAXIMUM

MEDIUM-DENSITY FIBREBOARD

MECHANIC(AL)

MECHANICAL, ELECTRICAL, PLUMBING

MANUFACTURE(R)

MINIMUM

MISCELLANEOUS

MODIFIED

METAL

NORTH

NOT APPLICABLE

NEGATIVE

NUMBER

NOMINAL

NOT TO SCALE

ON CENTER(S)

OPENING

OPPOSITE

OPTION(AL)

OVERHEAD

PAINT

PRECAST CONCRETE

PRE-CONSTRUCTION RISK ASSESSMENT

PLATE

PLASTIC LAMINATE

PLYWOOD

PANEL

PAIR

PREFABRICATED

PLASTIC

PRESSURE TREATED

PARTITION(S)

PAVEMENT

QUANTITY

RAD

RCP

REF

REINF

REP

REQ(s,(')D)

RESIL

REV

RF

RM

RMV

RO

S

SCHED

SD

SECT

SF

SFRM

SHG

SHT(G)

SIM

SM

SOW

SPEC

SQ

SS

ST

STDG

STL

STOR

STRUCT

SUSP

SV

SYS

TEMP

T&G

THK

THRESH

TOC

TOS

TPH

TRANS

TS

TYP

UON

VA

VAR

VB

VC

VERT

VIF

VV

W W/

WD

WDW

WGHT

W/O

WP

WR

RADIUS

REFLECTED CEILING PLAN

REFERENCE

REINFORCE(D,ING)

REPRESENTATIVE

REQUIRE(D,S,MENT(S))

RESILIENT

REVERSE

RADIO FREQUENCY / ROOF

ROOM

REMOVE

ROUGH OPENING

SOUTH

SCHEDULE

SCHEMATIC DESIGN

SECTION

SQUARE FEET

SPRAY APPLIED FIRE-RESISTIVE MATERIAL

SHINGLES

SHEET (SHEATHING)

SIMILAR

SEAM

SCOPE OF WORK

SPECIFICATION

SQUARE

STAINLESS STEEL

STAIN

STANDING

STEEL

STORAGE

STRUCTURAL

SUSPENDED

SHEET VINYL

SYSTEM

TEMPORARY

TONGUE AND GROOVE

THICK(NESS)

THRESHOLD

TABLE OF CONTENTS

TOP OF SLAB

TOILET PAPER HOLDER

TRANSITION

TUBE STEEL

TYPICAL

UNLESS OTHERWISE NOTED

VETERANS AFFAIRS

VARIES

VAPOR BARRIER

VA FURNISHED, CONTRACTOR INSTALLED

VERTICAL

VERIFY IN FIELD

VA FURNISHED, VA INSTALLED

WEST

WITH

WOOD

WINDOW

WEIGHT

WITHOUT

WATERPROOF(ING)

WATER RESISTANT

DBL

DC

DD

DEMO

DEPT

DG

DIA

DIM

DWN

DR

DTL

DWG

E

EA

EJ

ELEC

ELEV

ENG

EOC

EOP

EPDM

EQ

EQUIP

ES

ETS

EX(IST)

EXP

EXT

FA

FD

FE(C)

FF

FFB

FFL

FIN

FLASH

FLR

FLRSNT

FNDN

FOC

FOF

FOS

FP

FR

FRM

FT

FTG

FUR

FURN

GA

GALV

GE

G(W)B

GC

GL

GLB

GMU

GOV(T)

GYP

DOUBLE

DIRECT CURRENT

DESIGN DEVELOPMENT

DEMOLISH(ION)

DEPARTMENT

DESIGN GUIDE

DIAMETER

DIMENSION

DOWN

DOOR

DETAIL

DRAWING(S)

EAST

EACH

EXPANSION JOINT

ELECTRIC(AL)

ELEVATION OR ELEVATOR

ENGINEER(ING)

EDGE OF CURB

EDGE OF PAVEMENT

ETHYLENE PROPYLENE DIENE TERPOLYMER

EQUAL

EQUIPMENT

EACH SIDE

EXPOSED TO STRUCTURE

EXISTING

EXPANSION

EXTERIOR

FIRE ALARM

FLOOR DRAIN

FIRE EXTINGUISHER (CABINET)

FACTORY FINISH

FINISH FLOOR BREAK

FINISH FLOOR LINE

FINISH(ED)

FLASHING

FLOOR(ING)

FLORESCENT

FOUNDATION

FACE OF CONCRETE

FACE OF FINISH

FACE OF STUDS

FIRE PROOF

FIRE RATED

FRAME

FOOT, FEET

FOOTING

FURRING

FURNISHED

GAGE, GAUGE

GALVANIZED

GENERAL ELECTRIC

GYPSUM (WALL) BOARD

GENERAL CONTRACTOR

GRID LINE

GLUE LAMINATED BEAM

GLASS MASONRY UNIT

GOVERNMENT

GYPSUM BOARD

A101

1 TYP

101.1

A-101

SIM

EXTERIOR ELEVATION

INTERIOR ELEVATION

BUILDING SECTION FLAG

WALL SECTION FLAG

CALLOUT FLAG

VERTICAL GRID LINE

HORIZONTAL GRID LINE

TRUE NORTH ARROW

PROJECT NORTH ARROW

(TRUE NORTH DASHED)

ELEVATION MARKER

KEY NOTE

ROOM TAG (SF OPTIONAL)

CEILING HEIGHT TAG

ROOM NAME

150 SF

A

A-101

SIM

01A

TRUE

NORTH

W1

A-101

PROJECT

NORTH

WALL TAG

FLOOR TAG

ROOF TAG

DOOR TAG

WINDOW TAG

SPECIALTY EQUIPMENT TAG

SIGNAGE TAG

SIGNAGE KEY NOTE

(AW SHEETS ONLY)

SIGNAGE MATERIAL TAG

(AW SHEETS ONLY)

EXISTING TO REMAIN

NEW CONSTRUCTION

TO DEMOLISH

HIDDEN ABOVE OR BELOW

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

SMOKE ZONE

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE RATED WALL

SMOKE & 1 HR FIRE RATED WALL

FIRE EXTINGUISHER CABINET

AREA OF WORK / AREA SHOWN

CONSTRUCTION ZONE, ( - - )

PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

PATH OF TRAVEL

EMERGENCY EGRESS PATHWAY

SEISMIC JOINT

BATT INSULATION

RIGID INSULATION

GYPSUM BOARD, TYPE X

ACOUSTICAL CEILING TILE, 2' x 2'

CONCRETE

STEEL

PLYWOOD, FIRE RATED

EARTH

SUPPLY GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

RETURN GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

LIGHTING PER ELECTRICAL

(SIZE & PROPORTIONS MAY VARY)

NEW LIGHTS (SEE ELECTRICAL

DETAILS)

A-101

A01

D88

A5175SOAP DISH

IN-04.02-01

AFF

ACT 2x2

9' - 0"

FEC

F-1

R-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:2

:3 p m

A u to d e s k D o c s /6

-2

-7

V A

C T

W e s t H a v e n E

H R

M

IU

/V A

W H

G

E N

S H

E E

T S

S

D B

.r v t

A-001

ARCHITECTURAL SYMBOLS &

ABBREVIATIONS

JS JRS

35% SCHEMATIC

DESIGN

03/22/2024

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516-2770

SYMBOLS ABBREVIATIONS

GENERAL NOTES

APPLICABLE PUBLICATIONS

1. ALL WORK DONE BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE PERFORMED WITH

A HIGH LEVEL OF WORKMANSHIP.

2. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE AT ALL TIMES.

3. DO NOT SCALE DRAWINGS.

4. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL

INDUSTRY STANDARD TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS

INDICATED.

5. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE FULL SPACE INDICATED WITHOUT

ENCROACHMENTS.

6. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH THE CONTRACT DOCUMENTS.

7. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR ELEVATION, UON.

APPLICABLE PUBLICATIONS ARCHITECTURAL NOTES

AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS

OF CODE ENFOREMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS,

FEES, ETC). THE VA SHALL FUNCTION AS THE AUTHORITY HAVING JURISTICTION (AHJ).

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD

APPLICATION GUIDE AND OTHER GUIDEANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL).

INTERNATIONAL BUILDING CODE (IBC) 2018.

INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018.

NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES

PRECEDENCE OVER IBC.

NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8.

NATIONAL ELECTRICAL CODE (NEC).

INTERNATIONAL PLUMBING CODE (IPC).

SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAL SOCIETY OF MECHANICAL

ENGINEERS (ASME) A 17.1.

ASME BOILER AND PRESSURE VESSEL CODE.

ASME CODE FOR PRESSURE PIPING.

ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT

BARRIER FREE DESIGN GUIDE (PG-18-3).

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUE

AND COMMENTARY (ACI 318).

MANUAL OF STEEL CONSTRCUTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR

STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).

ENERGY POLICY ACT OF 2005 (EPACT).

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL

AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RESE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433,434 AND 435.

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU).

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND

TRANSPORTATON MANAGEMENT.

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL

REQUIREMENTS SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2004.

SAFETY STANDARD FOR REFRIDERATION SYSTEMS - ASHRAE STANDARD 15 - 2007.

VAMC APPROVED HARDWARE LOCKING STANDARDS.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI).

AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM).

FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND

STANDARDS FOR TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION.

ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA).

INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE).

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND

INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI).

JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),

ENVIRONMENT OF CARE GUIDELINES AND STANDARDS.

FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE

DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES.

THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL

ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS ENCOURAGING

“ENVIRONMENTALLY RESPONSIBLE DESIGN”.

Revisions: Date:

Phase

70% DESIGN

DEVELOPMENT

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

580-22-100

JS

cation

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

EM

95% DESIGN

DEVELOPMENT

8. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.

100% CONSTRUCTION

DOCUMENTS

10/31/2024 EM11/05/2024

03 OF 6608/14/202310/31/202411/05/2024

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER

TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED

SPACE.

INSTALL TEMPORARY PLASTIC FIRE RESISTANT, DUST

BARRIER. MAY ONLY BE DURING NON FUNCTIONAL

MEDICAL CENTER HOURS.

INSTALL FIRE RESISTANT TEMPORARY DOOR AT OPENING

AND MATCH RATING OF ICRA BARRIER, TYPICAL.

PLACE TACKY CONSTRUCTION WALK-OFF MATS AT

ENTRANCE AND EXIT SIDE OF CONSTRUCTION ACTIVITY

AREAS, TYPICAL.

FOR CLASS III, NEGATIVE AIR MACHINE IS REQUIRED AND

SHALL BE LOCATED EITHER AT THE ICRA BARRIER OR AT

AN EXTERIOR WINDOW. COORDINATE WITH VA

INFECTIOUS PREVENTION TEAM AND COR.

1. PROJECT SHALL COMPLY WITH CLASS, I, II, III & IV ICRA

REQUIREMENTS.

2. COMPLY WITH ALL REQUIREMENTS LISTED IN THE

INFECTION CONTROL SECTION OF SPECIFICATION 01 35

26 - SAFETY REQUIREMENTS.

3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING

ALL ICRA REQUIREMENTS. AT ANY TIME, THE COR MAY

HALT WORK UNTIL ALL REQUIREMENTS ARE MET.

4. REMOVE OR ISOLATE (E) HVAC SYSTEMS WITHIN

CONSTRUCTION AREA TO PREVENT DUST

CONTAMINATION.

5. CONTAIN ALL CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS. WHEN

POSSIBLE, REMOVE CONSTRUCTION DEBRIS WHEN AREA

IS IN ACTIVE ISOLATION.

6. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

7. ADHESIVE WALK-OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

8. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

9. SEAL OFF ANY EXISTING, UNUSED DOORS WITH TAPE

DURING CONSTRUCTION, TYPICAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:2

:4 p m

A u to d e s k D o c s /6

-2

-7

V A

C T

W e s t H a v e n E

H R

M

IU

/V A

W H

G

E N

S H

E E

T S

S

D B

.r v t

AS101

ICRA DETAILS

JS ME

35% SCHEMATIC

DESIGN

03/22/2024

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516-2770

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

Revisions: Date:

Phase

70% DESIGN

DEVELOPMENT

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

580-22-100

JS

cation

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

EM

95% DESIGN

DEVELOPMENT

EXISTING SUSPENDED

CEILING TO REMAIN ON

CORRIDOR SIDE

EXISTING

WALLS TO

REMAIN

EXISTING

WALLS TO

REMAIN

EXISTING DOOR BEHIND

VISQUEEN BARRIER

NON-SKID PLATE JACK

SCREWED FROM END OF

POLE TO TOP OF CEILING,

TYPICAL

FIRE RESISTANT PLASTIC

DUST BARRIER

SURROUNDING DOOR,

TYPICAL

EXTENSION POLES, TYPICAL

NON-SKID PLATE JACK

SCREWED FROM END OF

POLE TO BOTTOM OF

FLOOR, TYPICAL

BOTTOM OF CEILING

ZIPPER OPENING, TYPICAL

STICKY TACKY MATT

INFRONT OF VISQUEEN

BARRIER

TAPE TOP OF

CONSTRUCTION BARRIER

TO BOTTOM OF CEILING

CONSTRUCTION BARRIER

SURROUNDING EXIST

DOOR, TYPICAL

TAPE BOTTOM OF

CONSTRUCTION BARRIER TO

FLOOR SURFACE, TYPICAL

STICKY TACKY MATT IN FRONT

OF FIRE RESISTANT PLASTIC

BARRIER, TYPICAL

NEGATIVE AIR MACHINE,

TYPICAL (INSTALL AT ICRA

BARRIER IF EXTERIOR

WINDOW IS NOT AVAILABLE).

TEMPORARY FIRE

RATED DOOR, TYPICAL

PATCH, REPAINT AND PAINT GWB WHERE ICRA

BARRIERS ARE CONSTRUCTED AND REMOVED.

PATCH AND REPAIR CEILINGS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS ARE

CONSTRUCTED AND REMOVED.

PATCH, REPAINT AND PAINT GWB WHERE ICRA

BARRIERS ARE CONSTRUCTED AND REMOVED.

PATCH AND REPAIR CEILINGS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS ARE

CONSTRUCTED AND REMOVED.

ANTE

ROOM

PROJECT AREA

OUTSIDE

PROJECT AREA

1/2" = 1'-0"

ICRA CLASS I DETAIL

1/2" = 1'-0"

ICRA CLASS II DETAIL

1/2" = 1'-0"

ICRA CLASS III DETAIL

1/2" = 1'-0"

TYPICAL ICRA CLASS II BARRIER - PLAN VIEW

1/2" = 1'-0"

TYPICAL ICRA CLASS III DETAIL - PLAN VIEW

1/2" = 1'-0"

TYPICAL ICRA CLASS IV BARRIER - PLAN VIEW

CLASS I ICRA REQUIREMENTS

A. BEFORE CONSTRUCTION WORK:

1. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORKING HOURS.

2. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITON, RENOVATION, OR CONSTRUCTION

ACTIVITIES BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD OR

OTHER APPROVED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. PARTITIONS SHALL

BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS TO THE FLOOR SLAB OR ROOF

DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED. BARRIER MUST BE PRESENTABLE ON

OCCUPIED SIDE.

B. DURING CONSTRUCTION WORK:

1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

3. CEILING TILES: IMMEDIATELY REPLACE A CEILING TILES DISPLACED FOR VISUAL INSPECTION.

C. UPON COMPLETION:

1. CLEAN WORK AREA UPON COMPLETION OF TASK.

2. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

CLASS II ICRA REQUIREMENTS

A. BEFORE CONSTRUCTION WORK:

1. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS. INSTALL

CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF

NORMAL WORKING HOURS.

2. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITON, RENOVATION, OR CONSTRUCTION

ACTIVITIES BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM

BOARD OR OTHER APPROVED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL.

PARTITIONS SHALL BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS TO

THE FLOOR SLAB OR ROOF DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED.

BARRIER MUST BE PRESENTABLE ON OCCUPIED SIDE.

B. DURING CONSTRUCTION WORK:

1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE. SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS WHERE

POSSIBLE.

3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

4. SEAL UNUSED DOORS WITH DUCT TAPE.

5. BLOCK OFF AND SEAL AIR VENTS.

6. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

7. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

C. UPON COMPLETION:

1. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK

AREA.

4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

5. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

CLASS III ICRA REQUIREMENTS

A. BEFORE CONSTRUCTION WORK:

1. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITON, RENOVATION, OR CONSTRUCTION

ACTIVITIES BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD

OR OTHER APPROVED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. PARTITIONS

SHALL BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS TO THE FLOOR SLAB

OR ROOF DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED. BARRIER MUST

BE PRESENTABLE ON OCCUPIED SIDE.

B. DURING CONSTRUCTION WORK:

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA

FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING

PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND

CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORKING HOURS

3. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A

DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON

INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE

CONTRACTOR.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

C. UPON COMPLETION:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED

BY THE SAFETY DEPARTMENT AND INFECTION CONTROL, THOROUGHLY CLEANED BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION OUTSIDE OF NORMAL WORKING HOURS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS AT THE END OF EACH WORKDAY.

5. WET MOP AREA WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CLASS IV ICRA REQUIREMENTS

A. BEFORE CONSTRUCTION WORK:

1. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITON, RENOVATION, OR CONSTRUCTION

ACTIVITIES BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM

BOARD OR OTHER APPROVED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL.

PARTITIONS SHALL BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS TO

THE FLOOR SLAB OR ROOF DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED.

BARRIER MUST BE PRESENTABLE ON OCCUPIED SIDE.

B. DURING CONSTRUCTION WORK:

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION

OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA

FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING

PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND

CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORKING HOURS.

3. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A

DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON

INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE

CONTRACTOR.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO

THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR

THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE

THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE

COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED

BY THE VA'S SAFTEY DEPARTMENT AND INSPECTION CONTROL DEPARTMENT AND

THOROUGHLY CLEANED BY THE VA'S ENVIRONMENTAL SERVICE DEPARTMENT.

C. UPON COMPLETION:

1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION OUTSIDE OF NORMAL WORKING HOURS.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS AT THE END OF EACH WORKDAY.

5. WET MOP AREA WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

100% CONSTRUCTION

DOCUMENTS

10/31/2024 EM11/05/2024

04 OF 6608/14/202310/31/202411/05/2024

1505 SF

MECHANICAL

BAY-1

1B-236

348 SF

ONE BR

1B-240

136 SF

STR B

1B-240A

170 SF

STR STORAGE

1B-234

117 SF

STORAGE

1B-232

478 SF

TWO BR

1B-242

683 SF

FOUR BR

1B-244

185 SF

EXAM/TMT.

1B-248

185 SF

EXAM/TMT.

1B-246

182 SF

EXAM/TMT.

1B-250

291 SF

CORRIDOR

C1B-210

201 SF

WAIT

C1B-211

40 SF

CU

1B-252B

47 SF

SU

1B-252A

71 SF

TOILET

1B-252

106 SF

EXAM/TMT.

1B-258

117 SF

VITALS ROOM

1B-260

85 SF

CHART ROOM

1B-258A

95 SF

STORAGE

1B-256

195 SF

CLERK/RECEPTIONIST

1B-264

154 SF

HC STAFF

1B-266

292 SF

GU LAB

1B-254

166 SF

STAIR

ST-1

208 SF

CORRIDOR

C1B-212

573 SF

CORRIDOR

C1B-209

348 SF

NURSE OFFICE

1B-270C

64 SF

PAT TOILET

1B-270B

79 SF

OP COORD

1B-270A

130 SF

VEST

1B-270

163 SF

BREAK ROOM

1B-270E

210 SF

VEST

C1B-214

458 SF

CORRIDOR

C1B-213A

2404 SF

THERAPY

POOL B

1B-211H

1017 SF

COURT

82 SF

TECH

1B-211E

144 SF

F DRSG SHR & T

F1

1B-211D

70 SF

F STF DRSG

SHR&T

1B-211C

163 SF

M STF DRES,

SHR&T

1B-211B

191 SF

TOWELS & SUITS

1B-211A

304 SF

ATS TERMINAL

1B-204A

390 SF

CORRIDOR

C1B-202A

194 SF

PASSAGE

1B-211

184 SF

CT STORAGE

1B-215B

91 SF

SUPV

1B-206

391 SF

CORRIDOR

C1B-203

474 SF

CORRIDOR

C1B-204

402 SF

CORRIDOR

C1B-205

63 SF

CU

1B-225

65 SF

NOUR STA

1B-227

36 SF

STF

1B-223

151 SF

SU

1B-229

92 SF

MED

1B-231

468 SF

HOPPER

SHOWER

1B-247 69 SF

STORAGE

1B-247A

76 SF

C LIN

1B-245

231 SF

NURSE STATION /

WARD CL DR

CHAR/DICT

C1B-206

382 SF

CORRIDOR

C1B-208

471 SF

CORRIDOR

C1B-204

215 SF

CORRIDOR

C1B-207

71 SF

W/C BATH

1B-230A

313 SF

ONE BR

1B-230

684 SF

FOUR BR

1B-226

683 SF

FOUR BR

1B-224

419 SF

TWO BR

1B-222

421 SF

TWO BR

1B-220

71 SF

W/C BATH

1B-226A

71 SF

W/C BATH

1B-224A

89 SF

W/C BATH

1B-222A

71 SF

W/C BATH

1B-220A191 SF

TRANS EQ

STORAGE

1B-216

38 SF

TC

1B-214

64 SF

LC

1B-212

340 SF

CONF/CL ROOM

1B-210

20 SF

STORAGE

1B-210A

46 SF

MT

1B-208

94 SF

W/C BATH

1B-242A

71 SF

W/L BATH

1B-244A

40 SF

HRC

1B-249

175 SF

HC COORD

1B-276

67 SF

TOILET

1B-278

49 SF

PAT T

1B-280A

30 SF

SU

1B-280B

773 SF

ARM/LEG/LO-BOY

1B-280

28 SF

CU

1B-280C

19 SF

SALT STORAGE

1B-280D

107 SF

EQ STORAGE

1B-282B

181 SF

PT ADM

1B-282A

1484 SF

PT & CT CLINIC

1B-282

125 SF

SOC WK

1B-228

BMS STO

1B-106

113 SF

STAIR

ST-2

143 SF

FT

1B-108

46 SF

VIS LNG

1B-110

340 SF

NEW SEMI-RECESSED FEC,

SEE DET 1/A-601.

FEC

AREA A

SHOWN AREA

ICRA II

ICRA III

ICRA IV

SMOKE BARRIER

HAZARDOUS AREA

1 HOUR FIRE-RESISTIVE BARRIER

2 HOUR FIRE-RESISTIVE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

BUILDING 100A - LEVEL 1 - ICRA

AND PHASING PLAN

100% CONSTRUCTION

DOCUMENTS

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

10/31/2024 EM JS

580-22-100

100-A

100AAS101

Revisions: Date:

1/8" = 1'-0"

LEVEL 1 - FLOOR PLAN ICRA

KEYPLAN

0' 4' 8' 16'

LEGEND

11/05/2024

05 OF 6608/14/202310/31/202411/05/2024

SHOWN AREA

MECHANICAL -1

3.5455.25.5

R

R.8

S

Q.5

1505 SF

MECHANICAL BAY-1

1B-236

348 SF

ONE BR

1B-240

136 SF

STR B

1B-240A

170 SF

STR STORAGE

1B-234

117 SF

STORAGE

1B-232

478 SF

TWO BR

1B-242

683 SF

FOUR BR

1B-244

215 SF

CORRIDOR

C1B-207

71 SF

W/C BATH

1B-230A

313 SF

ONE BR

1B-230

684 SF

FOUR BR

1B-226

ENTRY POINT 1

NEW SEMI-RECESSED FEC,

SEE DET 1/A-601.

POLYETHYLYNE SHEETING

CONSTRUCTION TACKY MATT

HEPA EQUIPPED AIR FILTER

SMOKE BARRIER

HAZARDOUS AREA

1 HOUR FIRE-RESISTIVE BARRIER

2 HOUR FIRE-RESISTIVE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

LEVEL 1 - MECHANICAL BAY-1

ENLARGED FLOOR PLAN

100% CONSTRUCTION

DOCUMENTS

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

10/31/2024 EM JS

580-22-100

100-A

100AA101

Revisions: Date:

KEYPLAN

1/4" = 1'-0"

MECHANICAL BAY-1 ENLARGED FLOOR PLAN

KEYNOTE (THIS SHEET ONLY)

ICRA LEGEND - CLASS II

1 PLACE TACKY MATS AT ENTRANCE AND EXIT OF CONSTRUCTION

AREA, MINIMUM SIZE 24"x36", TYPICAL.

2 INSTALL POLYETHYLENE SHEETING TO ISOLATE CONSTRUCTION

ZONE. TAPE AND SEAL ALONG EDGES, AND ANY AREAS WHERE

POTENTIAL DUST MAY BE EXPOSED OUTSIDE OF CONSTRUCTION

AREA.

3 NEGATIVE AIR MACHINE TO BE CONNECTED TO EXHAUST,

APPLICABLE TO ALL INFECTION CONTROLS INSIDE THE HOSPITAL,

TYPICAL.

GENERAL NOTES

1. CONTRACTOR TO COORDINATE WITH THE STATION FOR THE BEST

OPTION AS IDENTIFIED BY THE CONTRACTOR TO EITHER USE THE

HEPA FILTRATION SYSTEM OR NEGATIVE PRESSURE SYSTEMS.

2. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.

11/05/2024

06 OF 6608/14/202310/31/202411/05/2024

1483 SF

BAY-2

1B-134A

135 SF

VEST

1B-134

136 SF

STR B

1B-130B

232 SF

ISOLATION

1B-130A

143 SF

ANTE

1B-130

478 SF

TWO BR

1B-128

681 SF

FOUR BR

1B-126

94 SF

W/C BATH

1B-128A

71 SF

W/C BATH

1B-126B

71 SF

W/C BATH

1B-124A

683 SF

FOUR BR

1B-124

89 SF

W/C BATH

1B-122A

419 SF

TWO BR

1B-122

71 SF

W/C BATH

1B-120A

422 SF

TWO BR

1B-120

107 SF

HD NUR

1B-116

206 SF

QUIET

1B-114

340 SF

VIS LNG

1B-110

46 SF

FT

1B-108

143 SF

STAIR

ST-2

113 SF

BMS STO

1B-106

391 SF

CORRIDOR

C1B-102

125 SF

RMS SUPV

1B-117C

48 SF

EQ STOR

1B-117B

104 SF

OT SCI ADM

1B-117A

915 SF

OT SCI CLINIC

1B-117

104 SF

FEL/RES

1B-107

106 SF

SCI C LIN SPEC

1B-109

84 SF

UNIT MGR

1B-111

59 SF

C LIN

1B-115

352 SF

CORRIDOR

C1B-103

720 SF

CORRIDOR

C1B-104

45 SF

STOR

1B-119A

321 SF

INTERNET CAFE

1B-119C

2210 SF

DAYROOM / DIN

1B-119

9 SF

STO

1B-119B

53 SF

PAT T

1B-149

60 SF

STOR

1B-147A

470 SF

HOPPER /

SHOWER

1B-147

73 SF

C LIN

1B-145

231 SF

WARD CL DR

CHAR / DICT

C1B-106

92 SF

MED

1B-131

152 SF

SU

1B-129

89 SF

NOUR STA

1B-127

81 SF

CU

1B-125

40 SF

HAC

1B-151

690 SF

SC LAB

1B-178

122 SF

TISSUE CULTURE

1B-178C

122 SF

MICRO

1B-178B

117 SF

CHIEF

1B-178A

170 SF

1B-174B

88 SF

UNAS

1B-174

147 SF

NUR INST STUD

WRKM

1B-172

122 SF

UNAS

1B-170

144 SF

STAIR

ST-3

517 SF

CORRIDOR

C1B-109

149 SF

PHYS

1B-160

148 SF

PHYS

1B-162

177 SF

PHYS

1B-158

118 SF

PSYCHL TRNE

1B-156

306 SF

W/C & SPEC BED

STOR

1B-154

134 SF

NUR SUPV

1B-152

134 SF

SEC Y

1B-150D

133 SF

ASST CH

1B-150C

202 SF

PASSAGE

1B-150

107 SF

SOC WK

1B-148

109 SF

ADM ASST

1B-150A

187 SF

CH SERV

1B-150B

96 SF

PASSAGE

1B-146 46 SF

VEST

1B-146A

136 SF

MT & LKR

1B-146B

26 SF

VEST

1B-146C

219 SF

FT & LKR

1B-146D110 SF

LNG

1B-146E

72 SF

W/C BATH

1B-144A

803 SF

FOUR BR

1B-144

71 SF

W/C BATH

1B-140A

313 SF

ONE BR

1B-140

117 SF

STOR

1B-138

170 SF

STR STOR

1B-136

139 SF

CORRIDOR

C1B-107

798 SF

CORRIDOR

C1B-108

SUPV

1B-206

91 SF

ATS TERMINAL

1B-204A

304 SF

CORRIDOR

C1B-203

391 SF

MT

1B-208

46 SF

CONF/CL ROOM

1B-210

340 SF

CORRIDOR

C1B-111

277 SF

CORRIDOR

C1B-112

219 SF

VEST

1A-590

148 SF

CREDIT UNION

1A-590A

308 SF

CORR

C1C-112

354 SF

MECHANICAL

BAY-5

1A-570

1402 SF

NEW SEMI-RECESSED FEC,

SEE DET 1/A-601.

FEC

AREA B

SHOWN AREA

ICRA II

ICRA III

ICRA IV

SMOKE BARRIER

HAZARDOUS AREA

1 HOUR FIRE-RESISTIVE BARRIER

2 HOUR FIRE-RESISTIVE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

BUILDING 100B - LEVEL 1 - ICRA

AND PHASING PLAN

100% CONSTRUCTION

DOCUMENTS

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

10/31/2024 EM JS

580-22-100

100-B

100BAS101

KEYPLAN

0' 4' 8' 16' 1/8" = 1'-0"

LEVEL 1 - FLOOR PLAN ICRA

Revisions: Date:

LEGEND

11/05/2024

07 OF 6608/14/202310/31/202411/05/2024

9.5101111.5

Q

R

R.8

S

Q.5

1483 SF

MECHANICAL BAY-2

1B-134A

170 SF

STR STOR

1B-136

135 SF

VEST

1B-134

136 SF

STR B

1B-130B

232 SF

ISOLATION

1B-130A

313 SF

ONE BR

1B-140

117 SF

STOR

1B-138

803 SF

FOUR BR

1B-144

71 SF

W/C BATH

1B-140A

139 SF

CORRIDOR

C1B-107

143 SF

ANTE

1B-130

478 SF

TWO BR

1B-128

681 SF

FOUR BR

1B-126

ENTRY POINT

NEW SEMI-RECESSED FEC,

SEE DET 1/A-601.

POLYETHYLYNE SHEETING

CONSTRUCTION TACKY MATT

HEPA EQUIPPED AIR FILTER

SMOKE BARRIER

HAZARDOUS AREA

1 HOUR FIRE-RESISTIVE BARRIER

2 HOUR FIRE-RESISTIVE BARRIER

MECHANICAL BAY-2

SHOWN AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

LEVEL 1 - MECHANICAL BAY-2

ENLARGED FLOOR PLAN

100% CONSTRUCTION

DOCUMENTS

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

10/31/2024 EM JS

580-22-100

100-B

100BA101

KEYPLAN

1/4" = 1'-0"

MECHANICAL BAY-2 ENLARGED FLOOR PLAN

1 PLACE TACKY MATS AT ENTRANCE AND EXIT OF CONSTRUCTION

AREA, MINIMUM SIZE 24"x36", TYPICAL.

2 INSTALL POLYETHYLENE SHEETING TO ISOLATE CONSTRUCTION

ZONE. TAPE AND SEAL ALONG EDGES, AND ANY AREAS WHERE

POTENTIAL DUST MAY BE EXPOSED OUTSIDE OF CONSTRUCTION

AREA.

3 NEGATIVE AIR MACHINE TO BE CONNECTED TO EXHAUST,

APPLICABLE TO ALL INFECTION CONTROLS INSIDE THE HOSPITAL,

TYPICAL.

Revisions: Date:

1. CONTRACTOR TO COORDINATE WITH THE STATION FOR THE BEST

OPTION AS IDENTIFIED BY THE CONTRACTOR TO EITHER USE THE

HEPA FILTRATION SYSTEM OR NEGATIVE PRESSURE SYSTEMS.

2. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.

KEYNOTE (THIS SHEET ONLY)

ICRA LEGEND - CLASS II

GENERAL NOTES

11/05/2024

08 OF 6608/14/202310/31/202411/05/2024

1435 SF

BAY-3

1C-138A

199 SF

NURSING AREA

1C-138131 SF

W/C BATH

1C-136

319 SF

TWO BR

1C-140

54 SF

TOILET

1C-140A

314 SF

TWO BR

1C-142

314 SF

TWO BR

1C-144

54 SF

TOILET

1C-144A

318 SF

TWO BR

1C-146

318 SF

TWO BR

1C-148

54 SF

TOILET

1C-148A

314 SF

TWO BR

1C-150

314 SF

TWO BR

1C-152

54 SF

TOILET

1C-152A

319 SF

TWO BR

1C-154

145 SF

PVA OFF

1B-164A

146 SF

PVA SECY

1B-164

277 SF

CORRIDOR

C1B-111

119 SF

CORRIDOR

C1B-108

219 SF

CORRIDOR

C1B-112

126 SF

SOC WK

1B-168

124 SF

SOC WK

1B-166191 SF

KITCHEN

1C-158A

262 SF

LIV/DIN

1C-158

211 SF

BR

1C-158B

79 SF

BATH

1C-158D

215 SF

CORRIDOR

C1C-108

459 SF

WAITING /

RECEPTIONIST

/WORK AREA

1C-160

174 SF

SUPERVISORS

OFFICE

1C-160C

107 SF

OFFICE

1C-160D

107 SF

OFFICE

1C-160E

157 SF

NURSE EXECUTIVE

1C-160F

68 SF

CORRIDOR

C1C-160

179 SF

CONFERENCE ROOM

1C-160A208 SF

COPY/WORK ROOM

1C-160B

628 SF

CORRIDOR

C1C-105

83 SF

NUR CLIN

1C-125

164 SF

EX/TMT

1C-127

291 SF

BATH FAC

1C-143

47 SF

TOILET

1C-143A

203 SF

NUR STA

C1C-106

904 SF

CORRIDOR

C1C-107

724 SF

CORRIDOR

C1C-104

556 SF

NHC SERVING UNIT

1C-111

40 SF

HAC

1C-111A

122 SF

NON-FOOD STOR

1C-111B

176 SF

CORRIDOR

C1C-102

143 SF

PT EDUCATION

1C-108

145 SF

STAIR

ST-4

595 SF

CORRIDOR

C1C-103

192 SF

CORRIDOR

C1C-102

195 SF

QUIET

1C-110

54 SF

LC

1C-112

37 SF

TC

1C-114

128 SF

EQ STOR

1C-116

323 SF

TWO BR

1C-118

54 SF

TOILET

1C-118A

314 SF

TWO BR

1C-120

314 SF

TWO BR

1C-122

54 SF

TOILET

1C-122A

318 SF

TWO BR

1C-124

318 SF

TWO BR

1C-126

54 SF

TOILET

1C-126A

314 SF

TWO BR

1C-128

230 SF

ONE BR

1C-130

40 SF

HAC

1C-132

43 SF

TOILET

1C-130A

207 SF

ONE BR

1C-134

1799 SF

DIN/RECREATION

1C-111C

79 SF

ELEVATOR

P-12

79 SF

ELEVATOR

P-11

30 SF

STF T

1C-129

PHYS

1B-162

148 SF

PHYS

1B-160

149 SF

STAIR

ST-3

144 SF

NUR INST STUD

WRKM

1B-172

147 SF

UNAS

1B-170

122 SF

UNASSIGNED

1C-109

256 SF 1C-109D

97 SF

1C-109C

154 SF

1C-109A

145 SF

STORAGE

1C-109B

69 SF

CORRIDOR

C1C-102

219 SF

MED

1C-206

62 SF

CORRIDOR

C1C-202

549 SF

HD NUR

1C-208

108 SF

ONE BR

1C-216

299 SF

1C-204

697 SF

NEW SEMI-RECESSED FEC,

SEE DET 1/A-601.

FEC

SHOWN AREA

AREA C

ICRA II

ICRA III

ICRA IV

SMOKE BARRIER

HAZARDOUS AREA

1 HOUR FIRE-RESISTIVE BARRIER

2 HOUR FIRE-RESISTIVE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

BUILDING 100C - LEVEL 1 - ICRA

AND PHASING PLAN

100% CONSTRUCTION

DOCUMENTS

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

10/31/2024 EM JS

580-22-100

100-C

100CAS101

1/8" = 1'-0"

LEVEL 1 - FLOOR PLAN ICRA

KEYPLAN

0' 4' 8' 16'

Revisions: Date:

LEGEND

11/05/2024

09 OF 6608/14/202310/31/202411/05/2024

1617 15.517.5

R

S

R.8

Q.5

1435 SF

MECHANICAL

BAY-3

1C-138A

199 SF

NURSING AREA

1C-138131 SF

W/C BATH

1C-136

319 SF

TWO BR

1C-140

54 SF

TOILET

1C-140A

314 SF

TWO BR

1C-142

314 SF

TWO BR

1C-144

314 SF

TWO BR

1C-128

230 SF

ONE BR

1C-130

40 SF

HAC

1C-132

43 SF

TOILET

1C-130A

207 SF

ONE BR

1C-134

ENTRY POINT

4'

1/

4"

NEW SEMI-RECESSED FEC,

SEE DET 1/A-601.

POLYETHYLYNE SHEETING

CONSTRUCTION TACKY MATT

HEPA EQUIPPED AIR FILTER

SMOKE BARRIER

HAZARDOUS AREA

1 HOUR FIRE-RESISTIVE BARRIER

2 HOUR FIRE-RESISTIVE BARRIER

MECHANICAL BAY - 3

SHOWN AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

LEVEL 1 - MECHANICAL BAY-3

ENLARGED FLOOR PLAN

100% CONSTRUCTION

DOCUMENTS

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

10/31/2024 EM JS

580-22-100

100-C

100CA101

1/4" = 1'-0"

MECHANICAL BAY-3 ENLARGED FLOOR PLAN

KEYPLAN

1 PLACE TACKY MATS AT ENTRANCE AND EXIT OF CONSTRUCTION

AREA, MINIMUM SIZE 24"x36", TYPICAL.

2 INSTALL POLYETHYLENE SHEETING TO ISOLATE CONSTRUCTION

ZONE. TAPE AND SEAL ALONG EDGES, AND ANY AREAS WHERE

POTENTIAL DUST MAY BE EXPOSED OUTSIDE OF CONSTRUCTION

AREA.

3 NEGATIVE AIR MACHINE TO BE CONNECTED TO EXHAUST,

APPLICABLE TO ALL INFECTION CONTROLS INSIDE THE HOSPITAL,

TYPICAL.

Revisions: Date:

1. CONTRACTOR TO COORDINATE WITH THE STATION FOR THE BEST

OPTION AS IDENTIFIED BY THE CONTRACTOR TO EITHER USE THE

HEPA FILTRATION SYSTEM OR NEGATIVE PRESSURE SYSTEMS.

2. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.

KEYNOTE (THIS SHEET ONLY)

ICRA LEGEND - CLASS II

GENERAL NOTES

11/05/2024

10 OF 6608/14/202310/31/202411/05/2024

ICRA II

ICRA III

ICRA IV

SMOKE BARRIER

HAZARDOUS AREA

1 HOUR FIRE-RESISTIVE BARRIER

2 HOUR FIRE-RESISTIVE BARRIER

1434 SF

MECHANICAL

BAY-4

1C-238A

215 SF

F LKR/T

1C-207A

33 SF

VEST

1C-207

33 SF

VEST

1C-205

109 SF

M LKR/T

1C-205A

93 SF

SOC WK

1C-209

96 SF

BMS STOR

1C-213

55 SF

WARD SUP

1C-215

103 SF

DIET

1C-211

127 SF

SU

1C-219

72 SF

C LIN

1C-217

71 SF

NOUR STA

1C-221

251 SF

CORRIDOR

C1C-204

62 SF

MED

1C-206

549 SF

CORRIDOR

C1C-202

1578 SF

CORRIDOR

C1C-205

108 SF

HD NUR

1C-20853 SF

TOILET

1C-216A

299 SF

ONE BR

1C-216

319 SF

TWO BR

1C-218

54 SF

TOILET

1C-218A

314 SF

TWO BR

1C-220

314 SF

TWO BR

1C-222

54 SF

TOILET

1C-222A

318 SF

TWO BR

1C-224

318 SF

TWO BR

1C-226

54 SF

TOILET

1C-226A

314 SF

TWO BR

1C-228

230 SF

ONE BR

1C-23043 SF

TOILET

1C-230A

40 SF

HAC

1C-232

206 SF

ONE BR

1C-234

131 SF

WC BATH

1C-236

199 SF

NURSING AREA

1C-238

267 SF

ONE BR

1C-240

43 SF

TOILET

1C-240A

314 SF

TWO BR

1C-242

52 SF

TOILET

1C-242A

314 SF

TWO BR

1C-244

318 SF

TWO BR

1C-246

54 SF

TOILET

1C-244A

318 SF

TWO BR

1C-248

54 SF

TOILET

1C-248A

314 SF

TWO BR

1C-247

314 SF

TWO BR

1C-252

54 SF

TOILET

1C-252A

318 SF

TWO BR

1C-254

94 SF

UNIT MGR

1C-256

388 SF

NUR

1C-260

166 SF

STAIR

ST-5

43 SF

PAT T

1C-262B

111 SF

EX/TMT

1C-262A

247 SF

SEC Y & REC

1C-262

56 SF

STOR

1C-262F

139 SF

COORD/CONF

1C-262E

56 SF

REHAB

SUPPLIES

1C-262D

131 SF

CH PHYS

1C-262C

206 SF

VEST

C1C-211

201 SF

SEC Y/WAIT

1C-274

139 SF

NHC SUPV

1C-274A

116 SF

OFF/STOR

1C-272D

73 SF

PA HYDRO

1C-272C

99 SF

STERILE SUPPLIES

1C-274B

60 SF

W/CT

1C-272B

1368 SF

PA CLINIC

1C-272

285 SF

CONF ROOM

1C-270

177 SF

PHARM PREP

1C-268

50 SF

STOR

1C-272A

27 SF

STOR

1C-270A

139 SF

SPEECH PATH

1C-266

744 SF

CORRIDOR

C1C-206

628 SF

CORRIDOR

C1C-207

909 SF

CORRIDOR

C1C-209

289 SF

BATH FAC

1C-243

47 SF

TOILET

1C-243A

30 SF

STF T

1C-229

46 SF

WARD SUP

1C-227

84 SF

RES LAUN

1C-225

113 SF

UNAS

1C-223

204 SF

NUR STA

C1C-208

449 SF

CORRIDOR

C1C-210D

CORRIDOR

C1C-103

595 SF

ELEVATOR

P-11

79 SF

ELEVATOR

P-12

79 SF

QUIET

1C-110

195 SF

STAIR

ST-4

145 SF

1C-204

697 SF

ELEVATOR

S-9

85 SF

ELEVATOR

S-10

86 SF

FUT

ELEVATOR

Z1H01

91 SF

UNAS

1C-203

82 SF

NEW SEMI-RECESSED FEC,

SEE DET 1/A-601.

FEC

AREA D

SHOWN AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

BUILDING 100D - LEVEL 1 - ICRA

AND PHASING PLAN

100% CONSTRUCTION

DOCUMENTS

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

10/31/2024 EM JS

580-22-100

100-D

100DAS101

KEYPLAN

0' 4' 8' 16' 1/8" = 1'-0"

LEVEL 1 - FLOOR PLAN ICRA

Revisions: Date:

LEGEND

11/05/2024

11 OF 6608/14/202310/31/202411/05/2024

MECHANICAL-4

21.5222323.5

R

S

R.8

Q.5

1434 SF

MECHANICAL

BAY-4

1C-238A

199 SF

NURSING AREA

1C-238

267 SF

ONE BR

1C-240

131 SF

WC BATH

1C-236

206 SF

ONE BR

1C-234

314 SF

TWO BR

1C-242

43 SF

TOILET

1C-240A

43 SF

TOILET

1C-230A

230 SF

ONE BR

1C-230

909 SF

CORRIDOR

C1C-209

ENTRY POINT

5' - 0"

NEW SEMI-RECESSED FEC,

SEE DET 1/A-601.

SHOWN AREA

TEMPORARY ICRA BARRIER

CONSTRUCTION TACKY MATT

HEPA EQUIPPED AIR FILTER

TEMPORARY ICRA DOOR

SMOKE BARRIER

HAZARDOUS AREA

1 HOUR FIRE-RESISTIVE BARRIER

2 HOUR FIRE-RESISTIVE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

LEVEL 1 - MECHANICAL BAY-4

ENLARGED FLOOR PLAN

100% CONSTRUCTION

DOCUMENTS

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

MICHAEL E. DEBAKEY VA MEDICAL CENTER - HOUSTON,

TEXAS

10/31/2024 EM JS

580-22-100

100-D

100DA101

KEYPLAN

1/4" = 1'-0"

MECHANICAL BAY-4 ENLARGED FLOOR PLAN

1 PLACE TACKY MATS AT ENTRANCE AND EXIT OF CONSTRUCTION

AREA, MINIMUM SIZE 24"x36", TYPICAL.

2 INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER TO

SEPARATE CONSTRUCTION AREA FROM OCCUPIED SPACE.

3 INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR, SOLID

CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING AND MATCH

RATING OF ICRA BARRIER, TYPICAL.

4 NEGATIVE AIR MACHINE TO BE CONNECTED TO EXHAUST,

APPLICABLE TO ALL INFECTION CONTROLS INSIDE THE HOSPITAL,

TYPICAL.

Revisions: Date:

1. CONTRACTOR TO COORDINATE WITH THE STATION FOR THE BEST

OPTION AS IDENTIFIED BY THE CONTRACTOR TO EITHER USE THE

HEPA FILTRATION SYSTEM OR NEGATIVE PRESSURE SYSTEMS.

2. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.

KEYNOTE (THIS SHEET ONLY)

ICRA LEGEND - CLASS III

GENERAL NOTES

11/05/2024

12 OF 6608/14/202310/31/202411/05/2024

ICRA III

ICRA IV

SMOKE BARRIER

HAZARDOUS AREA

1 HOUR FIRE-RESISTIVE BARRIER

2 HOUR FIRE-RESISTIVE BARRIER

AREA E

90 SF

STOR

5B-325

292 SF

TWO BR

5B-342

292 SF

TWO BR

5B-344

64 SF

W/C BATH

5B-340A

64 SF

W/C BATH

5B-344A

283 SF

TWO BR

5B-346

283 SF

TWO BR

5B-348

64 SF

W/C BATH

5B-348A

291 SF

TWO BR

5B-350

291 SF

TWO BR

5B-352

64 SF

W/C BATH

5B-352A

283 SF

TWO BR

5B-354

140 SF

CU

5B-349

66 SF

MED

5B-383

61 SF

C LIN

5B-381

72 SF

NOUR STA

5B-351

132 SF

SU

5B-327

31 SF

STFT

5B-329

187 SF

ONE BR

5B-398

66 SF

W/C BATH

5B-398A

196 SF

ONE BR

5B-396

62 SF

W/C BATH

5B-396A

192 SF

ONE BR

5B-394

62 SF

W/C BATH

5B-394A

186 SF

ONE BR

5B-392

69 SF

W/C BATH

5B-390A

189 SF

ONE BR

5B-390

184 SF

ONE BR

5B-388

69 SF

W/C BATH

5B-386A

194 SF

ONE BR

5B-386

66 SF

W/C BATH

5B-384B 66 SF

ANTE

5B-384

66 SF

ANTE

5B-382

66 SF

W/C BATH

5B-382B

41 SF

HAC

5B-380

139 SF

ISOL

5B-384A

134 SF

ISOL

5B-382A

179 SF

STF LNG

5B-378

102 SF

HD NUR

5B-331

230 SF

HS OFF/WKRM

5B-395

110 SF

SOC WK

5B-312

66 SF

W/C BATH

5B-320A

64 SF

W/C BATH

5B-322A

291 SF

TWO BR

5B-322

293 SF

DAY ROOM

5B-310

246 SF

ONE BR

5B-320

291 SF

TWO BR

5B-324

64 SF

W/C BATH

5B-324A

283 SF

TWO BR

5B-326

283 SF

TWO BR

5B-328

64 SF

W/C BATH

5B-328A

292 SF

TWO BR

5B-330

292 SF

TWO BR

5B-332

64 SF

W/C BATH

5B-332A

272 SF

TWO BR

5B-334

90 SF

VEST

5B-336

144 SF

EQ STOR

5B-338

272 SF

TWO BR

5B-340

102 SF

HS

5B-335

108 SF

PHYS

5B-337

102 SF

EX/TMT

5B-341

419 SF

CONFERENCE RM

5B-385

1011 SF

CORRIDOR

C5B-302

209 SF

CHART

C5B-305

367 SF

NUR STA / WARD CL

C5B-304

209 SF

CHAR DICT

C5B-306

705 SF

CORRIDOR

C5B-308

882 SF

CORRIDOR

C5B-303

328 SF

CORRIDOR

C5B-414

148 SF

CORR

C5B-307

159 SF

FIRE STAIR

ST-6

366 SF

BATH FAC

5B-358

171 SF

CORRIDOR

C5B-301

1287 SF

MECHANICAL

BAY - 7

5B-338A

96 SF

BMS STOR

5B-201

ELEVATOR

S-1

ELEVATOR

S-2

ELEVATOR

S-3

ELEVATOR

S-4

ELEVATOR

S-5

FUT

SERV ELEV LOBBY

C5B-200

297 SF

CORR

C5A-200E

204 SF

CORR

C5B-201E

444 SF

CORR

C5B-214

239 SF

ATS TERMINAL

5B-204E

56 SF

ELEVATOR

T-2

56 SF

ELEVATOR

T-1

149 SF

STAIR

Z5E06

NEW SEMI-RECESSED FEC,

SEE DET 1/A-601.

FEC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .