This document is a detailed basement floor plan drawing for the Michael E. DeBakey VA Medical Center in Houston, Texas, specifically focused on the chilled water distribution system repair and replacement project (Project Number 580-22-100). The drawing depicts a comprehensive mechanical layout for Building 100, Area H, showing proposed chilled water piping routes, pipe diameters, and connection points with various pipe sizes ranging from 1" to 24" in diameter. The drawing includes general notes emphasizing contractor responsibilities such as verifying existing pipe locations, coordinating installation routing, and performing work during specific conditions (e.g., outside ambient temperatures below 55°F). The plan is part of 100% construction documents, with design development stages tracked from 35% schematic design in August 2023 to 100% construction documents in November 2024, indicating a mature design ready for implementation.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G

H

H.5

J

K

L

M

L.8

J.5

G.2

20212223242525.2 24.6 23.524.5 21.5 20.5 20.1

CHWS

CHWR

"ø

"ø

CHWS

CHWR 16"ø

16"ø

8" ø

8" ø

C H

W S

C H

W R

100-FC24

100-FC23

100-AH7

100-AH6

100-FC22

C H

W R C H

W S

8"ø 8"ø

CHWS

CHWR

8"ø8"ø

1" ø

3"ø

8" ø

8" ø

C H

W S

C H

W R

"ø

"ø

"ø

"ø

C H

W S C

H W

R

"ø

"ø

16"ø 16"ø

2M

P1

24"ø

20"ø

20"øCHWS

CHWR

CHW

S

CHW

R

"ø

"ø

102MP100

2" ø

2" ø

GENERAL NOTES

1. DRAWINGS ARE DIAGRAMMATIC IN NATURE. IT IS THE RESPONSIBILITY OF

THE CONTRACTOR(S) TO VERIFY EXISTING PIPE AND EQUIPMENT

LOCATIONS, REPORT ANY DISCREPANCIES BETWEEN PLANS AND SITE

CONDITIONS, AND COORDINATE INSTALLATION ROUTING WITH ALL OTHER

TRADES AND EXISTING CONDITIONS.

2. EXISTING PIPE SIZES SHOWN ARE BEST INTERPRETATION OF AVAILABLE

DATA. CONTRACTOR TO VERIFY PIPE SIZES DURING COURSE OF WORK, AND

REPORT ANY DISCREPANCIES BETWEEN PLANS AND SITE CONDITIONS.

3. REQUIRED CONTROLS WORK SHALL BE A SEAMLESS EXTENSION OF THE

EXISTING CONTROL SYSTEM. COORDINATE WITH OWNER'S EXISTING

CONTROLS VENDOR AND INTEGRATE NEW WORK INTO EXISTING GRAPHICS.

4. EXISTING PIPE TO BE DEMOLISHED AND NEW PIPE THAT IS HUNG FROM THE

STRUCTURE ABOVE SHALL NOT CONTAIN WATER AT THE SAME TIME TO

REDUCE THE LOAD ON THE STRUCTURE.

5. EXISTING PIPING TO BE DEMOLISHED/REPLACED SHALL BE COORDINATED

WITH VA COR TO SCHEDULE DISCONNETION OF PIPE. THIS WORK IS

REQUIRED TO BE COMPLETED DURING OFF-HOURS. OUTSIDE AMBIENT

TEMPERATURE SHALL BE LESS THAN 55°F.

KEYNOTES #

KEYPLAN

AREA H

SHOWN AREA

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseDESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A/E:

321 4 5 6 7 8 9 10

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 92109

619-770-8552

6/ 4/

2:

:3

PM

BI

M

0-

-1

V A

TX

H ou st on C h i ll e d W at er

/ V

AC

W B ld g

M ec h.

rv t

100% CONSTRUCTION

DOCUMENTS

580-22-100

100-H

100MP100

R.S.M.D.

MICHAEL E. DEBAKEY VA MEDICAL CENTER

HOUSTON, TEXAS

REPAIR/REPLACE MAIN CHILLED

WATER DISTRIBUTION SYSTEM

11/05/2024

AREA H - BASEMENT FLOOR PLAN

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

1" = 10'-0"1 BLDG 100 - AREA H BASEMENT

1. POINT OF CONNECTION BETWEEN NEW AND EXISTING PIPING.

2. PROVIDE SHUT OFF VALVE IN THIS LOCATION.

3. NEW CHILLED WATER PIPING PART OF DEDUCTIVE ALTERNATIVE #2.

TYPICAL ALL NEW PIPING SHOWN IN THIS AREA.

TRUE

NORTH

35% SCHEMATIC DESIGN 08/08/2023

70% DESIGN DEVELOPMENT 10/26/2023

95% CONSTRUCTION DOCUMENTS 01/08/2024

100% CONSTRUCTION DOCUMENTS 11/05/2024