552-19-102 Drawings_Volume8.pdf

PDF 10 MB Posted

Attached to
Y1AA--Infrastructure Deficiencies B408 [552-19-102] Dayton VAMC
Solicitation number
36C25025B0036
Issued by

About this file

These detailed engineering drawings depict HVAC and piping system plans for the renovation of Building 408 at the Dayton VA Medical Center. The drawings, prepared by Heapy Engineering and Guidon Design, cover multiple floors including basement, first floor, second floor, and attic, with comprehensive diagrams showing ductwork, piping, fan coil units, and mechanical system configurations. The plans include detailed technical specifications for air handling, mechanical connections, duct transitions, and piping routing, with notations for different construction phases (Phase 1, Phase 2, Phase 3, Phase 4) and specific technical details like pipe diameters, airflow volumes, and equipment placement. The drawings are part of a federal infrastructure improvement project aimed at correcting deficiencies in the existing mechanical systems of the facility.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T

T

T

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

FCU

FCU

FCU

F C

U

FCU

PHASE 2PHASE 2

PHASE 3PHASE 4

10 15

10 15

10 15

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:3

:2

P

M

MD101

FIRST FLOOR PLAN - REMOVALS CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MD101

1 FIRST FLOOR-HVAC-REMOVALS

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

1. EXISTING LOUVER TO REMAIN.

2. REMOVE EXISTING DUCTWORK AND ASSOCIATED ACCESSORIES, SUPPORTS,

ETC.

3. REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK, SUPPORTS, ETC.

4. REMOVE EXISTING THERMOSTAT AND ASSOCIATED TUBING, WIRING, CONDUIT,

ETC.

5. REMOVE EXISTING STEAM CONVECTOR AND ASSOCIATED PIPING, VALVES,

CONTROLS, ETC. FOR REPLACEMENT WITH HOT WATER FIN TUBE IN NEW

WORK.

6. REMOVE EXISTING AIR HANDLING UNIT AND ASSOCIATED DUCTWORK, PIPING,

CONTROLS, AIR DEVICES, ETC.

7. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED DUCTWORK, PIPING,

VALVES, CONTROLS, ETC.

8. REMOVE EXISTING WINDOW AIR CONDITIONING UNIT.

9. REMOVE EXISTING AIR CONDITIONING UNIT AND ASSOCIATED PIPING,

CONTROLS, ETC.

10. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONCRETE PAD,

CONTROLS, PIPING, ETC.

11. PROVIDE 2" DOUBLE WALL INSULATED SHEET METAL PANEL BEHIND LOUVER.

SEAL AIR TIGHT.

12. FLOOR REGISTER TO REMAIN.

13. REMOVE EXISTING CHILLER AND ASSOCIATED CONCRETE PAD, PIPING,

CONTROLS, ETC.

14. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED PIPING, VALVES,

CONTROLS, ETC. PATCH FLOOR TO MATCH EXISTING.

15. PATCH GRADE TO MATCH EXISTING.

16. REMOVE EXTERIOR HVAC EQUIPMENT IN PHASE COORESPONDING TO

INTERIOR WORK.

17. EXISTING 2.5" MPS, 2" MPC PIPING UP/DN TO REMAIN.

N

Revisions: Date:

T T

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

1 1

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

6 6

TYP.

TYP.

F C

U

F C

U

10TYP.

TYP.

PHASE 2

PHASE 3PHASE 4

CAP

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:3

:2

P

M

MD102

SECOND FLOOR PLAN -

REMOVALS

CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MD102

1 SECOND FLOOR-HVAC-REMOVALS

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

1. EXISTING DUCTWORK TO REMAIN.

2. REMOVE EXISTING DUCTWORK AS SHOWN.

3. REMOVE EXISTING STEAM CONVECTOR AND ASSOCIATED PIPING, VALVES,

CONTROLS, ETC. FOR REPLACEMENT WITH HOT WATER FIN TUBE IN NEW WORK.

4. EXISTING AIR DEVICE AND RUNOUT DUCT FROM ATTIC TO REMAIN.

5. REMOVE EXISTING AIR CONDITIONING UNIT.

6. REMOVE EXISTING THERMOSTAT AND ASSOCIATED TUBING, WIRING, CONDUIT,

ETC.

7. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED DUCTWORK, PIPING,

VALVES, CONTROLS, ETC.

8. REMOVE EXISTING DUCTWORK AND ASSOCIATED ACCESSORIES, SUPPORTS,

ETC.

9. REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK, SUPPORTS, ETC.

10. EXISTING 2.5" MPS, 2" MPC PIPING UP/DN TO REMAIN.

14/14

/1 420/14

D

D

14/14

CHR

32/16 20/14

CH

10/14

8/10

2"

8/10

D D

12/12

D

36/14

18/14

10/10

32/16

12"D

12/10

20/14

CHR

CH

18/18

D

26/18 14/14

D

16/14

16/14

12"D

12"D

12"D

28/14

LPR

1"

1"0.75"

1.25"

2"

2.5"

LPR

1.25"

1.5"

L

P R

1"

1.25"

1"

LPR

1"

10"D

8"D

8"D

10"D

6"D

12"D

10"D

12/10

36/18

36/14

LPR

5 1 1 1

GIV -5

GIV -

- GIV

2GIV -

66666

6 6

PHASE 2

PHASE 3PHASE 4

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:3

:2

P

M

MD103

ATTIC FLOOR PLAN - REMOVALS CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

1. REMOVE EXISTING DUCTWORK AND ASSOCIATED ACCESSORIES, SUPPORTS,

ETC.

2. REMOVE EXISTING GRAVITY INTAKE VENT AND ASSOCIATED DUCTWORK ETC.

PATCH ROOF TO MATCH EXISTING.

3. REMOVE EXISTING PIPING AND ASSOCIATED ACCESSORIES, SUPPORTS, ETC.

4. REMOVE EXISTING STEAM HEATING COIL AND ASSOCIATED PIPING, SUPPORTS,

ETC.

5. REMOVE EXISTING FAN COIL/AIR HANDLING UNIT AND ASSOCIATED SUPPORTS,

DUCTWORK, PIPING, VALVES, CONTROLS, ETC.

6. REMOVE EXISTING DUCTWORK TO FLOOR PENETRATION FOR RECONNECTION

IN NEW WORK.

7. EXISTING STEAM PIPING DOWN THRU BUILDING TO REMAIN.

SCALE: 1/8" = 1'-0"MD103

1 ATTIC-HVAC-REMOVALS

DN

T

T

T

T

T

T

T

T

SIGN

SHOP

ENGINEERING

STORAGE

ROOM

MECHANICAL

ROOM

C-B-1

10ø

CD1

360 CFM

10ø

CD1

365 CFM

6ø

CD1

30 CFM

8ø

CD1

300 CFM

PHASE 1

FCU-71

24x12

300 CFM

CG1

24x12

30 CFM

CG1

24x12

365 CFM

CR1

24x12

150 CFM

CR1

FCU-72

FCU-73

ø ø x1 x1

16x10 x1

10ø

14x12

24x12

360 CFM

CG1

24x12

365 CFM

CG1

109B

CRAWLSPACE

109C

CRAWLSPACE

205K-2

PIPE

SPACE-2

109E

CRAWLSPACE

109F

CRAWLSPACE

109G

CRAWLSPACE

109H

CRAWLSPACE

109I

CRAWLSPACE

109J

CRAWLSPACE

109K

CRAWLSPACE 109L

CRAWLSPACE

408-UH1

408-UH2

408-UH3

408-UH3

408-UH1

408-UH2

14x12 SA UP

10x16

EA UP

TYP.

ELEV

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:3

:0

P

M

MH100

BASEMENT FLOOR PLAN -

DUCTWORK

CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

1. FISH WIRING THRU EXISTING WALL.

2. PROVIDE STATIC TYPE 'B' FIRE DAMPER AT FLOOR PENETRATION.

SCALE: 1/8" = 1'-0"MH100

1 BASEMENT-HVAC-DUCTWORK

T T

T

TT

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

TT

T

T

T

T

T

T

408-BT1

100m

OFFICE

100g

OFFICE

100n

OFFICE

OPEN

OFFICE

100h

OFFICE

103C

CONFERENCE

OFFICE

103D

OFFICE

103A

OFFICE

OFFICE

TELE

PHARMACY

MENS

109A

OFFICE

LOBBY

103B

COMM.

Room

CORRIDOR

LOBBY

CORRIDOR

101C

OFFICE

ACQUISITION

CHAPLAIN

101D

OFFICE

101A

OFFICE

KITCHEN

106k

OFFICE

106l

OFFICE

106h

OFFICE

106g

OFFICE

DSS SUITE

106e

OFFICE

106d

STORAGE

106a

OFFICE

106j

OFFICE

106f

OFFICE

106c

COPIER

106b

OFFICE

100d

OFFICE

100c

OFFICE

100k

OFFICE

100j

OFFICE

100l

OFFICE

WOMENS

CORRIDOR

107f

CONFERENCE

107g

OFFICE

107a

OFFICE

107c

OFC

107d

OFC

107e

OFC

107b

OFC

SUITE

101B

COMM

109C

OFFICE

10ø

CD1

305 CFM

12x12

FCU-28

10ø

(2) CD1

335 CFM

12ø

CD1

485 CFM

10ø

(2) CD1

330 CFM

8ø

CD1

160 CFM

8ø

CD1

160 CFM

8ø

CD1

160 CFM

8ø

CD1

160 CFM

12ø

CD1

440 CFM

14ø

CD1

520 CFM

12ø

CD1

450 CFM

10ø

CD1

330 CFM 8ø

CD1

210 CFM

6ø

CD1

70 CFM

6ø

CD1

70 CFM

6ø

CD1

125 CFM

8x8

195 CFM

TR1

10ø

CD1

370 CFM 10ø

CD1

305 CFM

10ø

CD1

305 CFM

10ø

CD1

325 CFM 10ø

CD1

330 CFM

10ø

CD1

325 CFM

12ø

CD1

575 CFM

8ø

CD1

145 CFM 6ø

CD1

70 CFM

6ø

CD1

135 CFM

6ø

CD1

70 CFM

8ø

CD1

125 CFM

6ø

CD1

75 CFM

6ø

CD1

70 CFM

8ø

CD1

130 CFM

8ø

CD1

205 CFM

8ø

CD1

140 CFM

10ø

CD1

260 CFM

8ø

CD1

145 CFM

8ø

CD1

180 CFM

8ø

CD1

175 CFM

10ø

CD1

375 CFM

6ø

CD1

70 CFM

8ø

CD1

205 CFM

14ø

CD1

535 CFM

6ø

CD1

120 CFM

10ø

CD1

265 CFM

10ø

CD1

265 CFM

6ø

CD1

80 CFM

8ø

CD1

155 CFM

8ø

CD1

155 CFM

8ø

CD1

155 CFM

8ø

CD1

165 CFM

10ø

CD1

355 CFM

10ø

CD1

345 CFM

12ø

CD1

430 CFM

12ø

CD1

435 CFM

8ø

CD1

210 CFM 10ø

CD1

300 CFM

10ø

CD1

300 CFM

10ø

CD1

300 CFM

10ø

CD1

355 CFM

10ø

CD1

360 CFM

10ø

CD1

355 CFM

10ø

CD1

360 CFM

10ø

CD1

260 CFM

10ø

CD1

260 CFM

12ø

CD1

490 CFM

12x12

12x12

10x10

14x14

12x12 x1 x1 x1

8x x1 x1

12x12 10x10 x1

12x12

8x

12x12

12x12 x1 x1

10x12

18x18

18x18

14x14

10x10

10x10

FCU-27

FCU-29

FCU-30

FCU-31

10ø

CD1

255 CFM

24x12

400 CFM

CR1

FCU-16

24x12

275 CFM

CR1

24x24

425 CFM

CR1

14x14

135 CFM

TR1

14x14

135 CFM

TR1

14x14

10x10

FCU-24

FCU-25

FCU-26

FCU-18

FCU-13

FCU-10A

F C

U -7

F C

U -2

F C

U -1

A

FCU-6

FCU-3

FCU-15

FCU-14

FCU-22

FCU-21

FCU-20

FCU-19

FCU-17

FCU-12

FCU-11

FCU-10FCU-9FCU-8

FCU-4

FCU-5

FT-5'-0"

FT-8'-6"

FT-8'-6"

FT-5'-0"

FT-4'-0" FT-5'-0" FT-4'-0"

FT-5'-0"

FT-5'-0" FT-5'-0"

FT-5'-0" FT-4'-0"

FT-4'-0"

FCU-23A FCU-23B

FT-4'-0"

FT-4'-0" FT-5'-0" FT-5'-0"

FT-5'-0" FT-5'-0"

FT-4'-0" FT-5'-0" FT-4'-0"

FT-5'-0"

FT-5'-0"

FT-4'-0"FT-4'-0"

FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"

FT-3'-0"

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-5'-6"

FT-5'-6"

FT-4'-0"

FT-6'-0"

FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"

FT-6'-0"

FT-5'-6"

FT-5'-6"

FT-4'-0"

12x6

215 CFM

TG1TR1

12x6

215 CFM

TR1

x1

10x8

8x6

130 CFM

TR1

24x12

25 CFM

CG1

24x12

380 CFM

CG1

24x12

565 CFM

CG1

24x12

560 CFM

CG1

24x12

370 CFM

CG1

24x12

440 CFM

CG1 24x24

435 CFM

CG1

24x12

315 CFM

CG1

24x12

190 CFM

CG1

24x24

480 CFM

CG1

24x12

275 CFM

CG1

24x12

405 CFM

CG1

24x12

140 CFM

CG1

24x12

300 CFM

CG1 24x12

295 CFM

CG1

24x12

340 CFM

CG1

24x12

415 CFM

CG1

24x12

315 CFM

CG1

24x12

145 CFM

CG1

24x12

135 CFM

CG1

24x12

90 CFM

CG1

24x12

50 CFM

CG1

24x24

165 CFM

CG1

24x12

180 CFM

CG1

24x12

275 CFM

CG1

24x12

175 CFM

CG1

24x12

115 CFM

CG1

24x24

545 CFM

CG1

24x12

130 CFM

CG1

24x12

40 CFM

CG1

24x12

50 CFM

CG1

24x12

50 CFM

CG1

24x12

450 CFM

CG1

24x12

90 CFM

CG1

24x24

530 CFM

CG1

24x12

805 CFM

CG1

FCU-27A FCU-27B

FCU-23C FCU-23D

FCU-5A FCU-5B

FT-4'-0"

24x24

655 CFM

CG1

24x24

625 CFM

CR1

12x12

195 CFM

TR2

10ø 12ø

8ø ø ø

8ø

8ø ø ø

12ø

8ø6ø

8ø ø

8ø

14ø

10ø

8ø

8x6

10ø

8ø

8ø

10ø

8ø ø

10x6

8x8

8ø

6ø ø

16x14 10x10

24x12

370 CFM

CR1

24x24

425 CFM

CR1

24x12

375 CFM

CR1

26x12 x1

18x12

24x12

260 CFM

CR1

24x12

260 CFM

CR1

24x12

260 CFM

CR1

14x14 12x14

24x12

400 CFM

CR1

24x12

315 CFM

CG1

24x48

1190 CFM

CG1

14x10

12ø

8ø

FCU-23

24x12

25 CFM

CG1

24x12

25 CFM

CG1

24x12

400 CFM

CR1

14ø x1

16x10

12x12

195 CFM

TR2

8x8

195 CFM

TR1

408-ACCH2 408-ACCH1

24x12

100 CFM

CR1

FCU-14A

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

8ø

CD1

260 CFM

12ø

CD1

485 CFM

FCU-1B

FT-9'-6"

FT-10'-0"

FT-8'-0"

FT-9'-6"

FT-10'-0"

FT-10'-0"

24x18 SA UP 20x18 EA UP

24x18 SA UP

18x18 EA UP

26x10 SA UP 14x12 SA DN

16x10 EA DN 18x10 EA UP

AC-2

AC-1

CU-1

CU-2

CU-3

PHASE 2

PHASE 3PHASE 4

14x10

10x14

12x12

12x10

24x16

20x10

10x6

24x16 x1

UP

DN

8x8

100 CFM

TR2

UP

ELEV

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:3

:0

P

M

MH101

FIRST FLOOR PLAN - DUCTWORK CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MH101

1 FIRST FLOOR PLAN - NEW WORK

GENERAL NOTES

PLAN NOTES

1. PROVIDE SINGLE PLENUM BOX ABOVE AIR DEVICES.

2. FISH WIRING THRU EXISTING WALL.

3. PROVIDE STATIC TYPE 'B' FIRE DAMPER AT FLOOR PENETRATION.

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

T T

T

T

T

T

T

T

T T T

T

T

T

T

T

T

T

T

T T

T T

T

T

TT

T

T

T

T

T

T

1 1

1 1

1 1

1 1 1

203E

CONFERENCE

ROOM

201A

OFFICE

LOUNGE

C-2-1 206

CHAPLAIN

OFFICE

208E

OFFICE

208D

OFFICE 208C

OFFICE

208B

OFFICE

208F

OFFICE

208G

OFFICE

208H

OFFICE

207E

OFFICE

207D OFFICE 107v

OFFICE

207B

OFFICE

AFCU

SUITE

207F

OFFICE

207G

OFFICE

207I

OFFICE

207H

OFFICE

TOILET

107dd

SAFETY

202G

OFFICE

202F

OFFICE202E

OFFICE

202D

OFFICE

202C

OFFICE

202B

OFFICE

202A

OFFICE

202H

C-2-2C-2-5 C-2-3

205l

205A

NNU

OFFICE

205B

NNU

OFFICE

205G

SAFETY

OFFICE

205F

SAFETY

OFFICE

205E

SAFETY

OFFICE205D

OIT OFFICE

205H

SAFETY

OFFICE

205C

NNU

OFFICE

203F

OFFICE

SUITE

203D

OFFICE

203C

OFFICE

203B

OFFICE

203A

OFFICE

TOILET

208A

207F

VESTIBULEC-B-3

Room

24x12

305 CFM

CR1

24x12

380 CFM

CR1

FT-4'-0"

FT-5'-0"

FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-4'-0"

FT-3'-0"

FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"

FT-5'-0"

FT-5'-0"

FT-4'-0"FT-5'-0"FT-4'-0"

FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-4'-0"

FT-4'-0"

FT-5'-0"FT-5'-0"

FT-4'-0"

FT-4'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"

FT-4'-0"FT-5'-0"FT-4'-0"

FT-5'-0"

FT-27'-0"

FT-4'-0"

FCU-63

FCU-62

FCU-61

FCU-57

FCU-64

FCU-60

FCU-58

FCU-59

FCU-55FCU-54

FCU-53

FCU-56

FCU-70

FCU-44

FCU-43

FCU-46

FCU-45

FCU-47

FCU-50

FCU-48

FCU-52

FCU-49

FCU-51

FCU-32

FCU-38

FCU-33

FCU-34

FCU-37

FCU-35

FCU-36 FCU-41 FCU-42

FCU-40FCU-39

24x12

165 CFM

CG1

FCU-142

AC-3

24x12

140 CFM

CG1

F C

U -6

F C

U -6

18x16 16x10 ø

24x12

400 CFM

CR1

24x24

675 CFM

CG1

x1 x1

12x10

12x10

24x24

510 CFM

CG1

24x24

515 CFM

CG1

24x24

510 CFM

CG1

x1

24x12

400 CFM

CG1

24x12

235 CFM

CG1

24x12

105 CFM

CG1

24x12

55 CFM

CG1

24x12

405 CFM

CG1

24x12

270 CFM

CG1

24x12

50 CFM

CG1

24x12

40 CFM

CG1

24x12

175 CFM

CG1

24x12

210 CFM

CG1 24x12

305 CFM

CG1

24x12

45 CFM

CG1

24x12

45 CFM

CG1

24x12

45 CFM

CG1

24x12

40 CFM

CG1

24x12

295 CFM

CG1

24x12

290 CFM

CG1

24x12

245 CFM

CG124x12

305 CFM

CG1

24x12

300 CFM

CG1

24x12

300 CFM

CG1

24x12

470 CFM

CG1

24x12

175 CFM

CG1

24x12

45 CFM

CG1

24x12

40 CFM

CG1

24x12

45 CFM

CG1

24x12

335 CFM

CG124x12

230 CFM

CG1

24x12

160 CFM

CG1

24x12

90 CFM

CG124x12

510 CFM

CG124x12

285 CFM

CG1

24x12

50 CFM

CG1

24x12

45 CFM

CG1

24x12

35 CFM

CG1

24x12

285 CFM

CG1

24x12

30 CFM

CG1

24x12

150 CFM

CG1

24x12

40 CFM

CG1

24x12

35 CFM

CG1

24x12

520 CFM

CG1

24x12

380 CFM

CG1

24x12

65 CFM

CG1

24x12

120 CFM

CG1

24x12

165 CFM

CG1

280 275

340 340 340

290 335 335

265 200

310305

135 130

35 70

320 500 500

150125

130300

TYP.

TYP.

TYP.

20x18 EA UP/DN

24x18 RA UP/DN

TYP.

TYP.

24x12

400 CFM

CR1

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

FT-10'-0"

FT-27'-0"

FT-10'-0"

FT-10'-0"

FT-10'-0"

24x18 SA UP/DN

20x18 EA UP 18x18 EA DN

26x10 SA UP/DN

18x10 EA UP/DN

PHASE 2

PHASE 3PHASE 4

S-B

S-B

S-B

S-B S-B

UP

UP DN

DN

DN

DN

DN

DN

ELEV

10ø

CD1

455 CFM

10ø

CD1

450 CFM

10ø

CD1

450 CFM

10ø

CD1

455 CFM

6ø

CD1

70 CFM

6ø

CD1

70 CFM

8ø

CD1

165 CFM

8ø

CD1

165 CFM

8ø

CD1

265 CFM

8ø

CD1

265 CFM

8ø

CD1

265 CFM

12x14

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:3

:0

P

M

MH102

SECOND FLOOR PLAN -

DUCTWORK

CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MH102

1 SECOND FLOOR-HVAC-DUCTWORK

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

1. BALANCE EXISTING AIR DEVICE TO INDICATED CFM.

2. EXTEND DUCT UP THRU ATTIC FLOOR. PROVIDE RADIATION TYPE FIRE DAMPER

AT PENETRATION.

3. FISH WIRING THROUGH EXISTING WALL.

4. ROUTE DUCTWORK THRU EXISTING CEILINGS. TAKE PHOTOGRAPHS PRIOR TO

CONSTRUCTION. RETURN CEILINGS TO PRE-CONSTRUCTION CONDITION.

FCU-70

FCU-56

FCU-53

FCU-54

FCU-55

14x14

10x10

10x10

8x8

8x8

12x12

12x12

8x8

8x

8x x1 x1 x1

10x10

12x12

10x10

10x10

12x12 12x12

8x8 12x12 x1 x1

8x8

10x12

8x

8x12

12x12

12x12

FCU-57

FCU-62

FCU-63

FCU-64

FCU-33

FCU-35 FCU-43

FCU-58

FCU-59

FCU-63

FCU-61

FCU-60

FCU-51

FCU-49

FCU-48

FCU-52

FCU-38

FCU-32

FCU-37

FCU-34

FCU-36

FCU-41

FCU-40

FCU-42

FCU-45

FCU-46

FCU-47

FCU-50

14x10

F C

U -3

F C

U -6

18x20 x2 x1

20x20

TYP.

FCU-67

FCU-44

20x18 EA DN

24x18 SA DN

24x18 SA DN

18x20 EA DN

26x10 SA DN

18x10 EA DN

20x20

18x18 EA UP THRU ROOF

20x20 EA UP

THRU ROOF

18x18 EA UP

THRU ROOF

408-H3

408-H2

408-H1

20x20 SA UP

THRU ROOF

20x20 SA UP

THRU ROOF

20x20 SA UP

THRU ROOF

18x20

DSD

DSD

DSD

PHASE 2

PHASE 3PHASE 4

TYP.

TYP.

TYP.

TYP.

TYP.

12x12

8ø

10ø

24x18

8ø

8x8

12x12

14x10 10x10

10x10

12x10 x1 x1 ø

8ø

10ø x2

8x8

ELEVATOR

MACHINE

ROOM

408-ERV1

408-ERV2

DSD

20x20

16x24

18x18

16x24

20x20

DSD

THERE IS A SOLID

FLOOR ON THIS

SIDE OF ATTIC

THERE IS NO FLOOR ON THIS SIDE OF ATTIC. WALKING PATHS

AND EQUIPMENT PLATFORMS ON TOP OF JOISTS ONLY

WALL SEPARATING ATTIC WITH AND WITHOUT FLOOR

x1

20x20 x2

0DSD

THERE IS NO FLOOR ON THIS

SIDE OF ATTIC. WALKING PATHS

AND EQUIPMENT PLATFORMS

ON TOP OF JOISTS ONLY

THERE IS NO FLOOR

ON THIS SIDE OF ATTIC.

WALKING PATHS AND

EQUIPMENT

PLATFORMS ON TOP

OF JOISTS ONLY

408-ERV3

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:3

:1

P

M

MH103

ATTIC FLOOR PLAN - DUCTWORK CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

GENERAL NOTES

PLAN NOTES

A. REFER TO CFM REQUIREMENTS ON SECOND FLOOR AND DUCT CONNECTION

DETAILS FOR RUNOUT DUCT SIZES.

B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

1. CONNECT TO EXISTING DUCTWORK AT FLOOR.

2. PROVIDE 0.75" THICK PLYWOOD WALKING PATH.

3. PATCH DUCT PENETRATION THROUGH NEW MECHANICAL CHIMNEY STACK WALL.

4. PROVIDE STATIC TYPE 'B' FIRE DAMPER AT FLOOR PENETRATION.

5. PROVIDE RADIATION TYPE FIRE DAMPER AT PENETRATION.

SCALE: 1/8" = 1'-0"MH103

1 ATTIC-HVAC-DUCTWORK

DN

T

T

T

T

T

T

T

T

M P

S

CHS

CHR

HWR

CHS

HWS

CHR

HWR

CHS

HWS

H W

S

C H

S H

W R

C H

R

3"

M P

S 4" 4"4" 4"3"

M P

S 4"

H W

S

5" 5"

4"

5" CHR

HWR

M401

PHASE 1

1" 1"1"

1"

1.25"

1" 1"

1.

" 1.

1.5" 1.5"

.75" UP

.75" UP .75" UP

1" 1"

4" UP

1" UP

1"

1"

1.25" 1.25"

1.

5"

1.

5"4"

4" 4" 4"

2" 2"

1" 1"

1"1.5" 1.5"

1" 1"

1.

5"

1" 1"

2" 2"

2" 2"

1.5" 1.5"

1"

1"

1" 1"

1" 1"

1" UP

1.25"

1.25"

1.

5"

1.

5"

4"

4" 4"

4"

4" UP

1" 1"

1" CHS/CHR UP

1" UP 1" UP

0.75" HWS/HWR

UP (TYP.)

0.75"

0.75"

1"

1"

0.75"

1.25"

LOCKSMITH

ENGINEERING

STORAGE

ROOM

1"

1" 408-CWP1

408-HWP1

408-UH3

408-UH1

408-UH2

408-UH3

408-UH3

408-UH1

408-UH2

4"

FCU-73

FCU-71

FCU-72

0.75"

HWS/HWR UP

(TYP.)

0.75" HWS/HWR

UP (TYP.)

0.75"

HWS/HWR UP

(TYP.)

H W

S H

W R

H W

R H W

S

207N Space

207O Space

207Q Space

109B

CRAWLSPACE

109C

CRAWLSPACE

205K-2

PIPE

SPACE-2

109E

CRAWLSPACE

109F

CRAWLSPACE

109G

CRAWLSPACE

109H

CRAWLSPACE

109I

CRAWLSPACE

109J

CRAWLSPACE

109K

CRAWLSPACE

109L

CRAWLSPACE 205R

Room

C H

R C

H S

0.75" 0.75"

0.75" 0.75"

1.

5"

1.

5"

1.

5"

408-C3

408-C2

408-C1

2"2.

5"

M P

S M

P C

0.75"

HWS/HWR UP

(TYP.)

H W

S

C H

S

HWR

CHR

H W

S H

W R

H W

S H

W R

C H

S C

H R

1.25" - D

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:3

:2

P

M

MP100

BASEMENT FLOOR PLAN - PIPING CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MP100

1 BASEMENT-HVAC-PIPING

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL

UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.

1. PROVIDE DIRECT BURIED PREINSULATED CHILLED WATER PIPING PER

SPECIFICATION SECTION 23 21 13.

N

Revisions: Date:

PROVIDE BASEMENT PIPING IN

PHASE 1 TO THE EXTENT POSSIBLE

WITHOUT DISRUPTING FUTURE

PHASES ON OTHER FLOOR.

T T

T

TT

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

TT

T

T

T

T

T

T

408-BT1

FCU-28

FCU-27

FCU-29

FCU-30

FCU-31

FCU-16

F C

U -2

FCU-25 FCU-26

FCU-18

FCU-13

FCU-10A

F C

U -7

F C

U -2

F C

U -1

A

F C

U -6

F C

U -3

FCU-15

FCU-14

FCU-22

FCU-21

FCU-20 FCU-19

FCU-17

FCU-12

FCU-11

FCU-10FCU-9FCU-8

FCU-4

FCU-5

FCU-23A FCU-23B

FCU-23C FCU-23D

FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"

FCU-5A FCU-5B

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-4'-0"

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-4'-0"

FT-3'-0"

FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"

FT-5'-0"

FT-4'-0"

FT-5'-6"

FT-5'-6"

FT-5'-6"

FT-6'-0"

FT-6'-0"

FT-4'-0"

FT-5'-0"

FT-5'-0"

FT-4'-0"

FT-5'-0"

FT-4'-0"

FT-5'-0"

FT-5'-0"

FT-4'-0"FT-4'-0"FT-4'-0"

FT-4'-0"FT-5'-0"

FT-5'-0"FT-5'-0"

FT-5'-0"

FT-4'-0"FT-5'-0"FT-4'-0"

FT-5'-0"

FT-8'-6"

FT-8'-6"

FT-5'-0"

FT-4'-0"

FCU-27A FCU-27B

CHR

HWR

CHS

HWS

FT-5'-0" FT-5'-0"

1.5" 1.5" 1.5" 1.5"

2"2"2" 2"

408-ACCH2 408-ACCH1408-ACCH2 408-ACCH1408-ACCH2

CHR4"4"

4"

4" 4"

0.75" DN

0.75" UP

0.75" UP

0.75" DN

0.75" UP

0.75" UP

FT-10'-0"

FT-10'-0"

FT-8'-0"

FT-10'-0"

FT-9'-6"

FT-9'-6"

F C

U -2

1"

1.

1.

1.5"1.5"

1" 1"

2"2"

1" 1"

1.25" 1.25"

1.

1.

1.5" 1.5"

1" 1"

1" 1"

1" 1"

1.

5"

1.

5"

1" 1"

1.5"1.5"

1.

1.

1.25"1.25"

1" 1"

2" 2"

1.

" 1.

1" 1"

1" 1"

1.25" 1.25" 1" 1"

1.

1.

2"2" 1.5" 1.5" 1" 1"

1" 1"

1.5" 1.5"1" 1"

1"1"

1" DN

1"1"

1" DN

1" 1"

1" 1"

1" 1"

1.

1.

1" 1"

1.25" 1.25" 1" 1"

2" 2"

2" 2"

1" 1"

1" 1"

1" 1"

1.

1.

1.5" 1.5" 1.5"

1.5"

1" 1" 1.

" 1.

1.

2" 2"

3" UP, 4" DN

ALL PIPING

SYSTEMS

1" 1"

H W

R H

W S

1.

1.

1" 1"

1"

0.

0.

0.75" UP (TYP.)

107d

OFC

107e OFC 107f

CONFERENCE

107b

OFC

107c

OFC

107g

OFFICE

107a

OFFICE

106f

OFFICE

106e

OFFICE

106g OFFICE 106h

OFFICE

106d

STORAGE

106c

COPIER

106j

OFFICE

DSS SUITE

106k

OFFICE

106l

OFFICE

106b

OFFICE

106a

OFFICE

KITCHEN

Room

103B

COMM.

MENS

TELE

PHARMACY

103C

CONFERENCE

103D

OFFICE104

OFFICE

103A

OFFICE

101C

OFFICE

101A

OFFICE

101A

OFFICE

ACQUISITION

CHAPLAIN

101D

OFFICE

100c OFFICE100d

OFFICE

Space

100m

OFFICE

100g

OFFICE

100n

OFFICE

100k

OFFICE

100h

OFFICE

100l

OFFICE

100j

OFFICE

WOMENS

101B

COMM

109A

BREAK

ROOM

109C

OFFICE

2"

0.75"

HWS/HWR UP

(TYP.)

0.75"

HWS/HWR UP

(TYP.)

0.75"

HWS/HWR UP

(TYP.)

1"CHS/CHR

1" CHS/CHR

1"CHS/CHR

1"CHS/CHR

0.75"

HWS/HWR UP

(TYP.)

1"CHS/CHR

3" UP, 4" DN

ALL PIPING

SYSTEMS

3" UP, 4" DN

ALL PIPING

SYSTEMS

0.75"

HWS/HWR UP

(TYP.)

FT-4'-0"

0.75"

HWS/HWR UP

(TYP.)

1" 1"

FCU-1B

1"

D

1.25" - D

1" - D

1" - D

1.25" - D

1.25" - D 1" - D

1.25" - D

1" - D

1.

D

1.5" - D

1.

D

1" - D

1.5" - D

AC-1AC-2

CU-3

CU-2

CU-1

PHASE 2

PHASE 3PHASE 4

UP

DN

UP

ELEV

1.5" - D

1.5" - D

1 .

5 "

D

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:4

:3

P

M

MP101

FIRST FLOOR PLAN - PIPING CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

GENERAL NOTES

PLAN NOTES

SCALE: 1/8" = 1'-0"MP101

1 FIRST FLOOR PLAN - NEW WORK

N

A. FIELD VERIFY LOCATIONS FOR ALL EXTERIOR EQUIPMENT AND CONCRETE

PADS WITH COR.

B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL

UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.

C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

1. EXISTING 2.5" MPS, 2" MPC PIPING UP/DN TO REMAIN.

2. EXTEND 2" DRAIN DOWN TO MOP BASIN. INDIRECT DRAIN WITH 45° CHAMFER.

3. EXTEND REFRIGERANT PIPING AND DRAIN FROM AC-3 ON SECOND FLOOR.

REFER TO SHEET MP102 FOR CONTINUATION.

4. PROVIDE REFRIGERANT PIPING AND SPECIALTIES PER MANUFACTURERS

RECOMMENDATIONS. APPROXIMATE ROUTE SHOWN.

5. PROVIDE CONCRETE PAD. MAINTAIN MANUFACTURERS RECOMMENDED

CLEARANCES.

6. PROVIDE PVC PIPE ENCLOSURE TO CONCEAL VERTICAL PIPING. MATCH

BUILDING COLOR.

T T

T

T

T

T

T

T

T T T

T

T

T

T

T

T

T

T

T T

T T

T

T

TT

T

T

T

T

T

T

FT-4'-0"

FT-5'-0"

FT-27'-0"

FT-5'-0"

FT-4'-0" FT-5'-0" FT-4'-0"

FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-4'-0"

FT-4'-0"

FT-5'-0" FT-5'-0"

FT-4'-0"

FT-4'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"

FT-4'-0" FT-5'-0" FT-4'-0"

FT-5'-0"

FT-5'-0"

FCU-142

FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"

FT-3'-0"

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-4'-0"

AC-3

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-4'-0"

FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"

CHR

CHS

HWR

HWS

3" 3" 3" 3"

FT-10'-0"

FT-10'-0"

FT-27'-0"

FT-10'-0"

FT-10'-0"

1.

5"

1.

5"

1.

5"

1.

5"C

H R

C H

S H

W S

H W

R

UP & DN

CHR

CHS

HWR

HWS

3" 3" 3" 3"

UP & DN

UP & DN

UP & DN

UP & DN

DOWN

UP

TOILET

207H

OFFICE

207G

OFFICE

207I

OFFICE

207F

OFFICE

207E

OFFICE 207D

OFFICE

107v

OFFICE

208B

OFFICE

208C

OFFICE

208D

OFFICE

208E

OFFICE

CHAPLAIN

OFFICE

208F

OFFICE

208G

OFFICE

208H

OFFICE

205H

SAFETY

OFFICE

205G

SAFETY

OFFICE

205F

SAFETY

OFFICE

205E

SAFETY

OFFICE205D

OIT OFFICE

205C

NNU

OFFICE

205B

NNU

OFFICE

205A

NNU

OFFICE

202G

OFFICE

202F

OFFICE202E

OFFICE

202D

OFFICE

202C

OFFICE

202B

OFFICE

202A

OFFICE

203B

OFFICE

203C

OFFICE

SUITE

203D

OFFICE

203E

CONFERENCE

ROOM

203F

OFFICE

TOILET

109A

BREAK

ROOM

205l

LOUNGE

201A

OFFICE

207B

OFFICE

AFCU

SUITE

208A

202H

FCU-65FCU-66

0.75" - D0.75" - D

PHASE 2

PHASE 3PHASE 4

UP

UP DN

DN

DN

DN

DN

DN

ELEV

1.5" D UP

1.5" D UP

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:4

:1

P

M

MP102

SECOND FLOOR PLAN - PIPING CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

GENERAL NOTES

PLAN NOTES

SCALE: 1/8" = 1'-0"MP102

1 SECOND FLOOR-HVAC-PIPING

N

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL

UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL

UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.

1. EXISTING 2.5" MPS, 2" MPC PIPING UP/DN TO REMAIN.

2. EXTEND 2" DRAIN DOWN TO MOP BASIN. INDIRECT DRAIN WITH 45° CHAMFER.

FCU-70

FCU-56

FCU-53

FCU-54

FCU-55

FCU-57

FCU-62

FCU-63

FCU-64

FCU-33

FCU-35 FCU-43

FCU-44

FCU-58

FCU-59

FCU-63

FCU-61

FCU-60

FCU-51

FCU-49

FCU-48

FCU-52

FCU-38

FCU-32

FCU-37

FCU-34

F C

U -3

FCU-41

FCU-40

FCU-42 FCU-45

FCU-46

FCU-47

FCU-50

HWS

CHS

HWR

CHR

1.5" - HWR

1.5" - HWS

1.5" - CHR

1.5"1.5"

1.25"1.25"

1.25"1.25"

1.25"1.25"

1" 1"

FCU-69FCU-39

1.25"1.25"

1.5"1.5"

3" DN

3" DN

3" DN

ALL SYSTEMS

FCU-67

1.5" - CHS

1" - HWR

1" - HWS

1" - CHS

1" - CHR

1" - CHR

1" - CHS

1" - HWS

1" - HWR

1.25" - CHR

1.25" - CHS

1.25" - HWR

1.25" - HWS

0.75"0.75"

1"1"

1"1"

CHR

CHS

HWR

HWS

H W

S H

W R

C H

S C

H R

1.25"1.25"

1"1"

1.5"1.5"

1.25"

1.25"1.25"

1"1"

CHR

CHS HWR

HWS

1"1"

1.25"1.25"

1"1"

0.75"0.75" 0.75"0.75"

1"1"

1"1" 0.75"0.75"

1" - MPS 1" - MPC

1.25" - MPS 1" - MPC

1.25"

1"

408-H2

408-H3

408-H1

1.25" - D

1.5" - D

1" - D

1.

5"

D

1"

D

1.

D

1.25" - D1.25" - D

1.

D

PHASE 2

PHASE 3PHASE 4

1.5" D DN 1.5" D DN1.

D

408-ERV1

1"1" 0.75"0.75"

408-ERV2

408-ERV3

1.5" - CHR

1.5" - CHS

1.5" - HWS

1.5" - HWR

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:3

:3

P

M

MP103

ATTIC FLOOR PLAN - PIPING CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

GENERAL NOTES

PLAN NOTES

SCALE: 1/8" = 1'-0"

ATTIC-HVAC-PIPING

1N

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL

UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL

UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.

1. EX. 2.5" MPS, 2" MPC PIPING DN.

408-C1

408-C2

408-C3

408-HWP1

408-HWP2

408-HWAS1

408-CWAS1

408-CWP1

408-CWP2

14x12 ø x1

4" - HWR

4"

H W

S

4"

H W

R

4"

M P

S

2.5" - MPS

5" - CHS

3"

H W

R

3"

H W

S

4" - CHR

3" - C H

S

4"

C H

S

4" - HWS

5"

C H

R

408-PRV1

3"

M P

S

4"

H W

S

4"

H W

R

4"

C H

S

4"

C H

R

2"

P C

408-CP1

408-FT1

FCU-72

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:3

:0

P

M

M401

ENLARGED PLANS CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

GENERAL NOTES

PLAN NOTES

1. PROVIDE INDIVIDUAL SADDLE SUPPORTS AND ANGLE FRAME TO SUPPORT

HEAT EXCHANGER OFF FLOOR. HEAT EXCHANGER SHALL BE INSTALLED HIGH

ENOUGH TO ALLOW GRAVITY DRAINAGE OF CONDENSATE TO FLASH TANK.

A. REFER TO PIPING SCHEMATICS AND DETAILS FOR SPECIFIC REQUIREMENTS.

B. MAINTAIN ALL SERVICE CLEARANCES.

C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

SCALE: 1/2" = 1'-0"

BASEMENT-HVAC-PIPING - ENLARGED PLAN

1N

FLEXIBLE DUCT CONNECTIONS

RETURN OR EXHAUST GRILLE/REGISTER CONNECTION

EXHAUST OR RETURN BRANCH

DUCTWORK

SUPPLY DUCTWORK TAKE-OFFS

FLEXIBLE AIR DUCT CONNECTOR

ALTERNATE SUPPLY DUCT TAKEOFF -

FAN COIL UNIT OUTSIDE AIR

DUCTWORK TRANSITIONS

DUCTWORK SQUARE VANE ELBOWS

DUCTWORK RADIUS ELBOWS

DUCT CONNECTIONS-FAN COIL UNITS

SUPPLY DUCT TAKEOFF -

FAN COIL UNIT OUTSIDE AIR

VANE

VANE

FROM STRUCTURE

SAME AS DIFFUSER

INLET: 5'-0" MAX

FLEXIBLE DUCT SIZE

LENGTH.

12"

CEILING

SUPPORT SADDLE

VOLUME DAMPER W/

LOCKING QUADSADDLE

SHEET METAL

CONICAL OUTLET

BRANCH DUCT

FOR CHANGE OF

DIRECTION GREATER

USE RIGID ELBOWS

THAN 45°

THERMAL INSULATION

SEE SPECIFICATIONS

BRANCH DUCT

MAIN EXHAUST OR RETURN

PLAN VIEW

45 DEG.

DAMPER WHERE

TURNING VANES

STRAP HANGER

251 CFM TO 400 CFM - 10" DIA.

401 CFM TO 700 CFM - 12" DIA.

101 CFM TO 250 CFM - 8" DIA.

100 CFM AND LESS - 6" DIA.

ARE TO BE SIZED AS FOLLOWS:

BRANCH DUCT SIZES, UNLESS NOTED ON PLANS

BRANCH DUCT TAKE-OFF WITH MANUAL DAMPER.1

STRAP HANGER

SPIN-IN TAP

FITTING

6" MIN

RETURN/

EXHAUST DUCT

CEILING

CEILING DEVICE

RECTANGULAR

DUCT, NOTE 1

MANUAL

DAMPER

STRAP HANGER

SCHEDULED

SHEETMETAL PLENUM

SAME SIZE AS AIR DEVICE

ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLEXIBLE MATERIAL

AS SPECIFIED

WASHER

FLANGED

CONNECTION ON

FAN SIDE

1-1/2" MIN. TO 3" MAX. INSTALLED. 6"

NOMINAL WITH MATERIAL TAUT

1-1/2" 1/2" 1/2"

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

DUCT

1-1/2" POCKET

SLIP

ALTERNATE

POSITION

OF BOLT

1" FLANGE & HEM

BOLT ON 4" CENTERS

1"x1/8" BAND IRON

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

RIVET ON 4"

CENTERS

SHEET METAL SCREWS ON

12" CENTERS

DUCT

5/16" FLANGE

BOLT ON 4" CENTERS

1"x1/8" BAND IRON

1"x1/8" DRAW BAND

FLEXIBLE

MATERIAL AS

SPECIFIED

1-1/2" MIN. TO 3" MAX. INSTALLED. 6"

NOMINAL WITH MATERIAL TAUT

WASHER

FLANGED CONNECTION

ON FAN SIDE

ROUND DUCT - NOTE 2

FLEXIBLE AIR DUCT

CONNECTOR. SEE DETAIL

ON THIS SHEET

NOTES:

SPIN-IN BRANCH TAP FITTING WITH

MANUAL DAMPER

BRANCH DUCT

1/4W OR 4" MIN.

PROVIDE VOLUME DAMPER

AT EACH BRANCH DUCT

W

AIR FLOW

AIR

FLOW

SQUARE ELBOW SHOWN.

PROVIDE ROUND ELBOW

WHEN SHOWN ON PLANS

A

IR

F L

O W

W

MAIN SUPPLY

DUCT

AIR

FLOW

1/4 W OR 4"

MIN.

AIR

FLOW

AIR

FLOW

VOLUME EXTRACTOR; ADJUSTABLE FROM

FULLY CLOSED POSITION TO CFM NOTED

ON FLOOR PLANS

MAIN

SUPPLY

DUCT

TOP REGISTER

ADJUSTABLE

METAL ROD

OR LINKAGE

PROVIDE VOLUME

DAMPER

PROVIDE VOLUME

DAMPER

SEE FLOOR PLAN FOR

SPLIT DIMENSION

MAIN

SUPPLY

DUCT

TURNING VANES

SUPPLY REGISTER

OR BRANCH DUCT

A

IR

F L

O W

AIR

FLOW

AIR

FLOW

SUPPLY REGISTER TAKE-OFF

PLAN VIEW

BRANCH DUCT TAKE-OFF PLAN VIEW

AIR SPLIT DUCT TAKE-OFF PLAN

VIEW

THERMAL INSULATION

SEE SPECIFICATIONS

TYPICAL

DIFFUSER OR

REGISTER IN

LAY-IN CLG.

SEE SPECIFICATIONS FOR CLAMPS

AND SEALANT (TYP.)

RIGID DUCT TO AIR TERMINAL UNIT. REFER TO

AIR TERMINAL UNIT DUCT CONNECTION DETAIL

FOR CONTINUATION.

F L

O W

FLOW

PLAN VIEW

MAIN SUPPLY

SMACNA FIGURE 4-6.

45° LEED IN

PLAN VIEW

°M

A X

"D

MAIN SUPPLY

ROUND SHEET METAL DUCT.

RIGID DUCT TO AIR TERMINAL UNIT. REFER

TO AIR TERMINAL UNIT DUCT CONNECTION

DETAIL FOR CONTINUATION

M A

X

M A

X

M A

X

M A

X.

TYPICAL DUCTWORK TRANSITION WITH

EQUIPMENT MOUNTED IN DUCT

PLAN OR SIDE VIEW

TYPICAL DUCTWORK TRANSITION

PLAN OR SIDE VIEW

AIR

FLOW

AIR

FLOW

E Q

U

IP

M E

N T

M A

X

M A X.30

NOTE:

UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.

R

1/6W

/3

W 1/2W

WW

SHORT RADIUS ELBOW

WITH TWO VANES

SHORT RADIUS ELBOW

WITH ONE VANE

STANDARD RADIUS OR

LONG RADIUS ELBOW

R SHALL

EQUAL OR

BE

GREATER

THAN

1/6W.

/3

W

2/3W

R

R

W

R SHALL

EQUAL OR

BE

GREATER

THAN

1/3W.

R SHALL

EQUAL OR

BE

GREATER

THAN W.

THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.

ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL

SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED, SUPPORTED

AND FASTENED AS RECOMMENDED BY SMACNA.

NOTES:

1.

2.

W1

W

ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.

WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE

REGARDLESS OF W DIMENSION.

ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1 1/2" MAXIMUM SPACE BETWEEN

VANES AND A 3/4" TRAILING EDGE.

WHEN W EQUALS W2 AND W1 IS GREATER THAN 20", VANES SHALL BE DOUBLE VANE TYPE.

NOTES:

1.

2.

3.

4.

NOTES:

1.

2.

3.

FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM FAN COIL UNIT

SUPPLY AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0". USE

RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER THAN 45°.

COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE

INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.

DUCT RUNOUT TO DIFFUSERS SHALL BE SAME SIZE AS THE DIFFUSER

NECK SIZE UNLESS OTHERWISE NOTED.

4-PIPE

HEATING COIL

FLEXIBLE AIR DUCT

CONNECTOR. SEE

DIFFUSER (TYP.)

SEE NOTE 2

S E

E N

O T

E

NOTE 3

(TYP.)

MAIN SUPPLY DUCT

REFER TO OUTSIDE AIR

DUCT TAKEOFF DETAIL

DETAIL ON THIS SHEET

4. PROVIDE 10" DEEP PLENUM BOX AT RETURN INLET OF FAN COIL UNIT

5. RETURN AIR DUCT TO ROOM GRILLE/REGISTER. REFER TO DETAIL ON

THIS SHEET.

6. OUTSIDE AIR MANUAL BALANCE DAMPER. SEE SCHEDULE FOR AIR FLOW.

7. PROVIDE FLEXIBLE DUCT CONNECTION AT INLET AND OUTLET OF

FAN COIL UNIT, PER DETAIL ON THIS SHEET.

COOLING COIL

FAN COIL UNIT

SEE NOTE 6

SEE NOTE 5

SEE NOTE 4

SEE NOTE 7

SEE NOTE 7

251 CFM TO 400 CFM - 10" DIA.

401 CFM TO 700 CFM - 12x12" RECT

101 CFM TO 250 CFM - 8" DIA.

100 CFM AND LESS - 6" DIA.

ARE TO BE SIZED AS FOLLOWS:

BRANCH DUCT SIZES, UNLESS NOTED ON PLANS8.

SEE NOTE 8

FULL SIZE OF UNIT OPENING.

4-PIPE

FAN COIL UNIT

SEE NOTE 5

SEE NOTE 4

ALTERNATE FOR RETURN AIR OVER 400 CFM

x

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/3

/2

:3

:1

P

M

M501

DETAILS CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

2018-05164_Div23_Dwgs
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .