552-19-102 Drawings_Volume8.pdf
PDF 10 MB Posted
- Solicitation number
- 36C25025B0036
About this file
These detailed engineering drawings depict HVAC and piping system plans for the renovation of Building 408 at the Dayton VA Medical Center. The drawings, prepared by Heapy Engineering and Guidon Design, cover multiple floors including basement, first floor, second floor, and attic, with comprehensive diagrams showing ductwork, piping, fan coil units, and mechanical system configurations. The plans include detailed technical specifications for air handling, mechanical connections, duct transitions, and piping routing, with notations for different construction phases (Phase 1, Phase 2, Phase 3, Phase 4) and specific technical details like pipe diameters, airflow volumes, and equipment placement. The drawings are part of a federal infrastructure improvement project aimed at correcting deficiencies in the existing mechanical systems of the facility.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T
T
T
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
FCU
FCU
FCU
F C
U
FCU
PHASE 2PHASE 2
PHASE 3PHASE 4
10 15
10 15
10 15
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:3
:2
P
M
MD101
FIRST FLOOR PLAN - REMOVALS CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"MD101
1 FIRST FLOOR-HVAC-REMOVALS
GENERAL NOTES
PLAN NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
1. EXISTING LOUVER TO REMAIN.
2. REMOVE EXISTING DUCTWORK AND ASSOCIATED ACCESSORIES, SUPPORTS,
ETC.
3. REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK, SUPPORTS, ETC.
4. REMOVE EXISTING THERMOSTAT AND ASSOCIATED TUBING, WIRING, CONDUIT,
ETC.
5. REMOVE EXISTING STEAM CONVECTOR AND ASSOCIATED PIPING, VALVES,
CONTROLS, ETC. FOR REPLACEMENT WITH HOT WATER FIN TUBE IN NEW
WORK.
6. REMOVE EXISTING AIR HANDLING UNIT AND ASSOCIATED DUCTWORK, PIPING,
CONTROLS, AIR DEVICES, ETC.
7. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED DUCTWORK, PIPING,
VALVES, CONTROLS, ETC.
8. REMOVE EXISTING WINDOW AIR CONDITIONING UNIT.
9. REMOVE EXISTING AIR CONDITIONING UNIT AND ASSOCIATED PIPING,
CONTROLS, ETC.
10. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONCRETE PAD,
CONTROLS, PIPING, ETC.
11. PROVIDE 2" DOUBLE WALL INSULATED SHEET METAL PANEL BEHIND LOUVER.
SEAL AIR TIGHT.
12. FLOOR REGISTER TO REMAIN.
13. REMOVE EXISTING CHILLER AND ASSOCIATED CONCRETE PAD, PIPING,
CONTROLS, ETC.
14. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED PIPING, VALVES,
CONTROLS, ETC. PATCH FLOOR TO MATCH EXISTING.
15. PATCH GRADE TO MATCH EXISTING.
16. REMOVE EXTERIOR HVAC EQUIPMENT IN PHASE COORESPONDING TO
INTERIOR WORK.
17. EXISTING 2.5" MPS, 2" MPC PIPING UP/DN TO REMAIN.
N
Revisions: Date:
T T
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
1 1
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
6 6
TYP.
TYP.
F C
U
F C
U
10TYP.
TYP.
PHASE 2
PHASE 3PHASE 4
CAP
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:3
:2
P
M
MD102
SECOND FLOOR PLAN -
REMOVALS
CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"MD102
1 SECOND FLOOR-HVAC-REMOVALS
GENERAL NOTES
PLAN NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
1. EXISTING DUCTWORK TO REMAIN.
2. REMOVE EXISTING DUCTWORK AS SHOWN.
3. REMOVE EXISTING STEAM CONVECTOR AND ASSOCIATED PIPING, VALVES,
CONTROLS, ETC. FOR REPLACEMENT WITH HOT WATER FIN TUBE IN NEW WORK.
4. EXISTING AIR DEVICE AND RUNOUT DUCT FROM ATTIC TO REMAIN.
5. REMOVE EXISTING AIR CONDITIONING UNIT.
6. REMOVE EXISTING THERMOSTAT AND ASSOCIATED TUBING, WIRING, CONDUIT,
ETC.
7. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED DUCTWORK, PIPING,
VALVES, CONTROLS, ETC.
8. REMOVE EXISTING DUCTWORK AND ASSOCIATED ACCESSORIES, SUPPORTS,
ETC.
9. REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK, SUPPORTS, ETC.
10. EXISTING 2.5" MPS, 2" MPC PIPING UP/DN TO REMAIN.
14/14
/1 420/14
D
D
14/14
CHR
32/16 20/14
CH
10/14
8/10
2"
8/10
D D
12/12
D
36/14
18/14
10/10
32/16
12"D
12/10
20/14
CHR
CH
18/18
D
26/18 14/14
D
16/14
16/14
12"D
12"D
12"D
28/14
LPR
1"
1"0.75"
1.25"
2"
2.5"
LPR
1.25"
1.5"
L
P R
1"
1.25"
1"
LPR
1"
10"D
8"D
8"D
10"D
6"D
12"D
10"D
12/10
36/18
36/14
LPR
5 1 1 1
GIV -5
GIV -
- GIV
2GIV -
66666
6 6
PHASE 2
PHASE 3PHASE 4
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:3
:2
P
M
MD103
ATTIC FLOOR PLAN - REMOVALS CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
GENERAL NOTES
PLAN NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
1. REMOVE EXISTING DUCTWORK AND ASSOCIATED ACCESSORIES, SUPPORTS,
ETC.
2. REMOVE EXISTING GRAVITY INTAKE VENT AND ASSOCIATED DUCTWORK ETC.
PATCH ROOF TO MATCH EXISTING.
3. REMOVE EXISTING PIPING AND ASSOCIATED ACCESSORIES, SUPPORTS, ETC.
4. REMOVE EXISTING STEAM HEATING COIL AND ASSOCIATED PIPING, SUPPORTS,
ETC.
5. REMOVE EXISTING FAN COIL/AIR HANDLING UNIT AND ASSOCIATED SUPPORTS,
DUCTWORK, PIPING, VALVES, CONTROLS, ETC.
6. REMOVE EXISTING DUCTWORK TO FLOOR PENETRATION FOR RECONNECTION
IN NEW WORK.
7. EXISTING STEAM PIPING DOWN THRU BUILDING TO REMAIN.
SCALE: 1/8" = 1'-0"MD103
1 ATTIC-HVAC-REMOVALS
DN
T
T
T
T
T
T
T
T
SIGN
SHOP
ENGINEERING
STORAGE
ROOM
MECHANICAL
ROOM
C-B-1
10ø
CD1
360 CFM
10ø
CD1
365 CFM
6ø
CD1
30 CFM
8ø
CD1
300 CFM
PHASE 1
FCU-71
24x12
300 CFM
CG1
24x12
30 CFM
CG1
24x12
365 CFM
CR1
24x12
150 CFM
CR1
FCU-72
FCU-73
ø ø x1 x1
16x10 x1
10ø
14x12
24x12
360 CFM
CG1
24x12
365 CFM
CG1
109B
CRAWLSPACE
109C
CRAWLSPACE
205K-2
PIPE
SPACE-2
109E
CRAWLSPACE
109F
CRAWLSPACE
109G
CRAWLSPACE
109H
CRAWLSPACE
109I
CRAWLSPACE
109J
CRAWLSPACE
109K
CRAWLSPACE 109L
CRAWLSPACE
408-UH1
408-UH2
408-UH3
408-UH3
408-UH1
408-UH2
14x12 SA UP
10x16
EA UP
TYP.
ELEV
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:3
:0
P
M
MH100
BASEMENT FLOOR PLAN -
DUCTWORK
CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
GENERAL NOTES
PLAN NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
1. FISH WIRING THRU EXISTING WALL.
2. PROVIDE STATIC TYPE 'B' FIRE DAMPER AT FLOOR PENETRATION.
SCALE: 1/8" = 1'-0"MH100
1 BASEMENT-HVAC-DUCTWORK
T T
T
TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TT
T
T
T
T
T
T
408-BT1
100m
OFFICE
100g
OFFICE
100n
OFFICE
OPEN
OFFICE
100h
OFFICE
103C
CONFERENCE
OFFICE
103D
OFFICE
103A
OFFICE
OFFICE
TELE
PHARMACY
MENS
109A
OFFICE
LOBBY
103B
COMM.
Room
CORRIDOR
LOBBY
CORRIDOR
101C
OFFICE
ACQUISITION
CHAPLAIN
101D
OFFICE
101A
OFFICE
KITCHEN
106k
OFFICE
106l
OFFICE
106h
OFFICE
106g
OFFICE
DSS SUITE
106e
OFFICE
106d
STORAGE
106a
OFFICE
106j
OFFICE
106f
OFFICE
106c
COPIER
106b
OFFICE
100d
OFFICE
100c
OFFICE
100k
OFFICE
100j
OFFICE
100l
OFFICE
WOMENS
CORRIDOR
107f
CONFERENCE
107g
OFFICE
107a
OFFICE
107c
OFC
107d
OFC
107e
OFC
107b
OFC
SUITE
101B
COMM
109C
OFFICE
10ø
CD1
305 CFM
12x12
FCU-28
10ø
(2) CD1
335 CFM
12ø
CD1
485 CFM
10ø
(2) CD1
330 CFM
8ø
CD1
160 CFM
8ø
CD1
160 CFM
8ø
CD1
160 CFM
8ø
CD1
160 CFM
12ø
CD1
440 CFM
14ø
CD1
520 CFM
12ø
CD1
450 CFM
10ø
CD1
330 CFM 8ø
CD1
210 CFM
6ø
CD1
70 CFM
6ø
CD1
70 CFM
6ø
CD1
125 CFM
8x8
195 CFM
TR1
10ø
CD1
370 CFM 10ø
CD1
305 CFM
10ø
CD1
305 CFM
10ø
CD1
325 CFM 10ø
CD1
330 CFM
10ø
CD1
325 CFM
12ø
CD1
575 CFM
8ø
CD1
145 CFM 6ø
CD1
70 CFM
6ø
CD1
135 CFM
6ø
CD1
70 CFM
8ø
CD1
125 CFM
6ø
CD1
75 CFM
6ø
CD1
70 CFM
8ø
CD1
130 CFM
8ø
CD1
205 CFM
8ø
CD1
140 CFM
10ø
CD1
260 CFM
8ø
CD1
145 CFM
8ø
CD1
180 CFM
8ø
CD1
175 CFM
10ø
CD1
375 CFM
6ø
CD1
70 CFM
8ø
CD1
205 CFM
14ø
CD1
535 CFM
6ø
CD1
120 CFM
10ø
CD1
265 CFM
10ø
CD1
265 CFM
6ø
CD1
80 CFM
8ø
CD1
155 CFM
8ø
CD1
155 CFM
8ø
CD1
155 CFM
8ø
CD1
165 CFM
10ø
CD1
355 CFM
10ø
CD1
345 CFM
12ø
CD1
430 CFM
12ø
CD1
435 CFM
8ø
CD1
210 CFM 10ø
CD1
300 CFM
10ø
CD1
300 CFM
10ø
CD1
300 CFM
10ø
CD1
355 CFM
10ø
CD1
360 CFM
10ø
CD1
355 CFM
10ø
CD1
360 CFM
10ø
CD1
260 CFM
10ø
CD1
260 CFM
12ø
CD1
490 CFM
12x12
12x12
10x10
14x14
12x12 x1 x1 x1
8x x1 x1
12x12 10x10 x1
12x12
8x
12x12
12x12 x1 x1
10x12
18x18
18x18
14x14
10x10
10x10
FCU-27
FCU-29
FCU-30
FCU-31
10ø
CD1
255 CFM
24x12
400 CFM
CR1
FCU-16
24x12
275 CFM
CR1
24x24
425 CFM
CR1
14x14
135 CFM
TR1
14x14
135 CFM
TR1
14x14
10x10
FCU-24
FCU-25
FCU-26
FCU-18
FCU-13
FCU-10A
F C
U -7
F C
U -2
F C
U -1
A
FCU-6
FCU-3
FCU-15
FCU-14
FCU-22
FCU-21
FCU-20
FCU-19
FCU-17
FCU-12
FCU-11
FCU-10FCU-9FCU-8
FCU-4
FCU-5
FT-5'-0"
FT-8'-6"
FT-8'-6"
FT-5'-0"
FT-4'-0" FT-5'-0" FT-4'-0"
FT-5'-0"
FT-5'-0" FT-5'-0"
FT-5'-0" FT-4'-0"
FT-4'-0"
FCU-23A FCU-23B
FT-4'-0"
FT-4'-0" FT-5'-0" FT-5'-0"
FT-5'-0" FT-5'-0"
FT-4'-0" FT-5'-0" FT-4'-0"
FT-5'-0"
FT-5'-0"
FT-4'-0"FT-4'-0"
FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"
FT-3'-0"
FT-4'-0"
FT-6'-0"
FT-6'-0"
FT-4'-0"
FT-6'-0"
FT-6'-0"
FT-5'-6"
FT-5'-6"
FT-4'-0"
FT-6'-0"
FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"
FT-6'-0"
FT-5'-6"
FT-5'-6"
FT-4'-0"
12x6
215 CFM
TG1TR1
12x6
215 CFM
TR1
x1
10x8
8x6
130 CFM
TR1
24x12
25 CFM
CG1
24x12
380 CFM
CG1
24x12
565 CFM
CG1
24x12
560 CFM
CG1
24x12
370 CFM
CG1
24x12
440 CFM
CG1 24x24
435 CFM
CG1
24x12
315 CFM
CG1
24x12
190 CFM
CG1
24x24
480 CFM
CG1
24x12
275 CFM
CG1
24x12
405 CFM
CG1
24x12
140 CFM
CG1
24x12
300 CFM
CG1 24x12
295 CFM
CG1
24x12
340 CFM
CG1
24x12
415 CFM
CG1
24x12
315 CFM
CG1
24x12
145 CFM
CG1
24x12
135 CFM
CG1
24x12
90 CFM
CG1
24x12
50 CFM
CG1
24x24
165 CFM
CG1
24x12
180 CFM
CG1
24x12
275 CFM
CG1
24x12
175 CFM
CG1
24x12
115 CFM
CG1
24x24
545 CFM
CG1
24x12
130 CFM
CG1
24x12
40 CFM
CG1
24x12
50 CFM
CG1
24x12
50 CFM
CG1
24x12
450 CFM
CG1
24x12
90 CFM
CG1
24x24
530 CFM
CG1
24x12
805 CFM
CG1
FCU-27A FCU-27B
FCU-23C FCU-23D
FCU-5A FCU-5B
FT-4'-0"
24x24
655 CFM
CG1
24x24
625 CFM
CR1
12x12
195 CFM
TR2
10ø 12ø
8ø ø ø
8ø
8ø ø ø
12ø
8ø6ø
8ø ø
8ø
14ø
10ø
8ø
8x6
10ø
8ø
8ø
10ø
8ø ø
10x6
8x8
8ø
6ø ø
16x14 10x10
24x12
370 CFM
CR1
24x24
425 CFM
CR1
24x12
375 CFM
CR1
26x12 x1
18x12
24x12
260 CFM
CR1
24x12
260 CFM
CR1
24x12
260 CFM
CR1
14x14 12x14
24x12
400 CFM
CR1
24x12
315 CFM
CG1
24x48
1190 CFM
CG1
14x10
12ø
8ø
FCU-23
24x12
25 CFM
CG1
24x12
25 CFM
CG1
24x12
400 CFM
CR1
14ø x1
16x10
12x12
195 CFM
TR2
8x8
195 CFM
TR1
408-ACCH2 408-ACCH1
24x12
100 CFM
CR1
FCU-14A
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
8ø
CD1
260 CFM
12ø
CD1
485 CFM
FCU-1B
FT-9'-6"
FT-10'-0"
FT-8'-0"
FT-9'-6"
FT-10'-0"
FT-10'-0"
24x18 SA UP 20x18 EA UP
24x18 SA UP
18x18 EA UP
26x10 SA UP 14x12 SA DN
16x10 EA DN 18x10 EA UP
AC-2
AC-1
CU-1
CU-2
CU-3
PHASE 2
PHASE 3PHASE 4
14x10
10x14
12x12
12x10
24x16
20x10
10x6
24x16 x1
UP
DN
8x8
100 CFM
TR2
UP
ELEV
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:3
:0
P
M
MH101
FIRST FLOOR PLAN - DUCTWORK CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"MH101
1 FIRST FLOOR PLAN - NEW WORK
GENERAL NOTES
PLAN NOTES
1. PROVIDE SINGLE PLENUM BOX ABOVE AIR DEVICES.
2. FISH WIRING THRU EXISTING WALL.
3. PROVIDE STATIC TYPE 'B' FIRE DAMPER AT FLOOR PENETRATION.
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
T T
T
T
T
T
T
T
T T T
T
T
T
T
T
T
T
T
T T
T T
T
T
TT
T
T
T
T
T
T
1 1
1 1
1 1
1 1 1
203E
CONFERENCE
ROOM
201A
OFFICE
LOUNGE
C-2-1 206
CHAPLAIN
OFFICE
208E
OFFICE
208D
OFFICE 208C
OFFICE
208B
OFFICE
208F
OFFICE
208G
OFFICE
208H
OFFICE
207E
OFFICE
207D OFFICE 107v
OFFICE
207B
OFFICE
AFCU
SUITE
207F
OFFICE
207G
OFFICE
207I
OFFICE
207H
OFFICE
TOILET
107dd
SAFETY
202G
OFFICE
202F
OFFICE202E
OFFICE
202D
OFFICE
202C
OFFICE
202B
OFFICE
202A
OFFICE
202H
C-2-2C-2-5 C-2-3
205l
205A
NNU
OFFICE
205B
NNU
OFFICE
205G
SAFETY
OFFICE
205F
SAFETY
OFFICE
205E
SAFETY
OFFICE205D
OIT OFFICE
205H
SAFETY
OFFICE
205C
NNU
OFFICE
203F
OFFICE
SUITE
203D
OFFICE
203C
OFFICE
203B
OFFICE
203A
OFFICE
TOILET
208A
207F
VESTIBULEC-B-3
Room
24x12
305 CFM
CR1
24x12
380 CFM
CR1
FT-4'-0"
FT-5'-0"
FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"
FT-4'-0"
FT-6'-0"
FT-6'-0"
FT-4'-0"
FT-6'-0"
FT-6'-0"
FT-4'-0"
FT-3'-0"
FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"
FT-5'-0"
FT-5'-0"
FT-4'-0"FT-5'-0"FT-4'-0"
FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-4'-0"
FT-4'-0"
FT-5'-0"FT-5'-0"
FT-4'-0"
FT-4'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"
FT-4'-0"FT-5'-0"FT-4'-0"
FT-5'-0"
FT-27'-0"
FT-4'-0"
FCU-63
FCU-62
FCU-61
FCU-57
FCU-64
FCU-60
FCU-58
FCU-59
FCU-55FCU-54
FCU-53
FCU-56
FCU-70
FCU-44
FCU-43
FCU-46
FCU-45
FCU-47
FCU-50
FCU-48
FCU-52
FCU-49
FCU-51
FCU-32
FCU-38
FCU-33
FCU-34
FCU-37
FCU-35
FCU-36 FCU-41 FCU-42
FCU-40FCU-39
24x12
165 CFM
CG1
FCU-142
AC-3
24x12
140 CFM
CG1
F C
U -6
F C
U -6
18x16 16x10 ø
24x12
400 CFM
CR1
24x24
675 CFM
CG1
x1 x1
12x10
12x10
24x24
510 CFM
CG1
24x24
515 CFM
CG1
24x24
510 CFM
CG1
x1
24x12
400 CFM
CG1
24x12
235 CFM
CG1
24x12
105 CFM
CG1
24x12
55 CFM
CG1
24x12
405 CFM
CG1
24x12
270 CFM
CG1
24x12
50 CFM
CG1
24x12
40 CFM
CG1
24x12
175 CFM
CG1
24x12
210 CFM
CG1 24x12
305 CFM
CG1
24x12
45 CFM
CG1
24x12
45 CFM
CG1
24x12
45 CFM
CG1
24x12
40 CFM
CG1
24x12
295 CFM
CG1
24x12
290 CFM
CG1
24x12
245 CFM
CG124x12
305 CFM
CG1
24x12
300 CFM
CG1
24x12
300 CFM
CG1
24x12
470 CFM
CG1
24x12
175 CFM
CG1
24x12
45 CFM
CG1
24x12
40 CFM
CG1
24x12
45 CFM
CG1
24x12
335 CFM
CG124x12
230 CFM
CG1
24x12
160 CFM
CG1
24x12
90 CFM
CG124x12
510 CFM
CG124x12
285 CFM
CG1
24x12
50 CFM
CG1
24x12
45 CFM
CG1
24x12
35 CFM
CG1
24x12
285 CFM
CG1
24x12
30 CFM
CG1
24x12
150 CFM
CG1
24x12
40 CFM
CG1
24x12
35 CFM
CG1
24x12
520 CFM
CG1
24x12
380 CFM
CG1
24x12
65 CFM
CG1
24x12
120 CFM
CG1
24x12
165 CFM
CG1
280 275
340 340 340
290 335 335
265 200
310305
135 130
35 70
320 500 500
150125
130300
TYP.
TYP.
TYP.
20x18 EA UP/DN
24x18 RA UP/DN
TYP.
TYP.
24x12
400 CFM
CR1
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
FT-10'-0"
FT-27'-0"
FT-10'-0"
FT-10'-0"
FT-10'-0"
24x18 SA UP/DN
20x18 EA UP 18x18 EA DN
26x10 SA UP/DN
18x10 EA UP/DN
PHASE 2
PHASE 3PHASE 4
S-B
S-B
S-B
S-B S-B
UP
UP DN
DN
DN
DN
DN
DN
ELEV
10ø
CD1
455 CFM
10ø
CD1
450 CFM
10ø
CD1
450 CFM
10ø
CD1
455 CFM
6ø
CD1
70 CFM
6ø
CD1
70 CFM
8ø
CD1
165 CFM
8ø
CD1
165 CFM
8ø
CD1
265 CFM
8ø
CD1
265 CFM
8ø
CD1
265 CFM
12x14
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:3
:0
P
M
MH102
SECOND FLOOR PLAN -
DUCTWORK
CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"MH102
1 SECOND FLOOR-HVAC-DUCTWORK
GENERAL NOTES
PLAN NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
1. BALANCE EXISTING AIR DEVICE TO INDICATED CFM.
2. EXTEND DUCT UP THRU ATTIC FLOOR. PROVIDE RADIATION TYPE FIRE DAMPER
AT PENETRATION.
3. FISH WIRING THROUGH EXISTING WALL.
4. ROUTE DUCTWORK THRU EXISTING CEILINGS. TAKE PHOTOGRAPHS PRIOR TO
CONSTRUCTION. RETURN CEILINGS TO PRE-CONSTRUCTION CONDITION.
FCU-70
FCU-56
FCU-53
FCU-54
FCU-55
14x14
10x10
10x10
8x8
8x8
12x12
12x12
8x8
8x
8x x1 x1 x1
10x10
12x12
10x10
10x10
12x12 12x12
8x8 12x12 x1 x1
8x8
10x12
8x
8x12
12x12
12x12
FCU-57
FCU-62
FCU-63
FCU-64
FCU-33
FCU-35 FCU-43
FCU-58
FCU-59
FCU-63
FCU-61
FCU-60
FCU-51
FCU-49
FCU-48
FCU-52
FCU-38
FCU-32
FCU-37
FCU-34
FCU-36
FCU-41
FCU-40
FCU-42
FCU-45
FCU-46
FCU-47
FCU-50
14x10
F C
U -3
F C
U -6
18x20 x2 x1
20x20
TYP.
FCU-67
FCU-44
20x18 EA DN
24x18 SA DN
24x18 SA DN
18x20 EA DN
26x10 SA DN
18x10 EA DN
20x20
18x18 EA UP THRU ROOF
20x20 EA UP
THRU ROOF
18x18 EA UP
THRU ROOF
408-H3
408-H2
408-H1
20x20 SA UP
THRU ROOF
20x20 SA UP
THRU ROOF
20x20 SA UP
THRU ROOF
18x20
DSD
DSD
DSD
PHASE 2
PHASE 3PHASE 4
TYP.
TYP.
TYP.
TYP.
TYP.
12x12
8ø
10ø
24x18
8ø
8x8
12x12
14x10 10x10
10x10
12x10 x1 x1 ø
8ø
10ø x2
8x8
ELEVATOR
MACHINE
ROOM
408-ERV1
408-ERV2
DSD
20x20
16x24
18x18
16x24
20x20
DSD
THERE IS A SOLID
FLOOR ON THIS
SIDE OF ATTIC
THERE IS NO FLOOR ON THIS SIDE OF ATTIC. WALKING PATHS
AND EQUIPMENT PLATFORMS ON TOP OF JOISTS ONLY
WALL SEPARATING ATTIC WITH AND WITHOUT FLOOR
x1
20x20 x2
0DSD
THERE IS NO FLOOR ON THIS
SIDE OF ATTIC. WALKING PATHS
AND EQUIPMENT PLATFORMS
ON TOP OF JOISTS ONLY
THERE IS NO FLOOR
ON THIS SIDE OF ATTIC.
WALKING PATHS AND
EQUIPMENT
PLATFORMS ON TOP
OF JOISTS ONLY
408-ERV3
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:3
:1
P
M
MH103
ATTIC FLOOR PLAN - DUCTWORK CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
GENERAL NOTES
PLAN NOTES
A. REFER TO CFM REQUIREMENTS ON SECOND FLOOR AND DUCT CONNECTION
DETAILS FOR RUNOUT DUCT SIZES.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
1. CONNECT TO EXISTING DUCTWORK AT FLOOR.
2. PROVIDE 0.75" THICK PLYWOOD WALKING PATH.
3. PATCH DUCT PENETRATION THROUGH NEW MECHANICAL CHIMNEY STACK WALL.
4. PROVIDE STATIC TYPE 'B' FIRE DAMPER AT FLOOR PENETRATION.
5. PROVIDE RADIATION TYPE FIRE DAMPER AT PENETRATION.
SCALE: 1/8" = 1'-0"MH103
1 ATTIC-HVAC-DUCTWORK
DN
T
T
T
T
T
T
T
T
M P
S
CHS
CHR
HWR
CHS
HWS
CHR
HWR
CHS
HWS
H W
S
C H
S H
W R
C H
R
3"
M P
S 4" 4"4" 4"3"
M P
S 4"
H W
S
5" 5"
4"
5" CHR
HWR
M401
PHASE 1
1" 1"1"
1"
1.25"
1" 1"
1.
" 1.
1.5" 1.5"
.75" UP
.75" UP .75" UP
1" 1"
4" UP
1" UP
1"
1"
1.25" 1.25"
1.
5"
1.
5"4"
4" 4" 4"
2" 2"
1" 1"
1"1.5" 1.5"
1" 1"
1.
5"
1" 1"
2" 2"
2" 2"
1.5" 1.5"
1"
1"
1" 1"
1" 1"
1" UP
1.25"
1.25"
1.
5"
1.
5"
4"
4" 4"
4"
4" UP
1" 1"
1" CHS/CHR UP
1" UP 1" UP
0.75" HWS/HWR
UP (TYP.)
0.75"
0.75"
1"
1"
0.75"
1.25"
LOCKSMITH
ENGINEERING
STORAGE
ROOM
1"
1" 408-CWP1
408-HWP1
408-UH3
408-UH1
408-UH2
408-UH3
408-UH3
408-UH1
408-UH2
4"
FCU-73
FCU-71
FCU-72
0.75"
HWS/HWR UP
(TYP.)
0.75" HWS/HWR
UP (TYP.)
0.75"
HWS/HWR UP
(TYP.)
H W
S H
W R
H W
R H W
S
207N Space
207O Space
207Q Space
109B
CRAWLSPACE
109C
CRAWLSPACE
205K-2
PIPE
SPACE-2
109E
CRAWLSPACE
109F
CRAWLSPACE
109G
CRAWLSPACE
109H
CRAWLSPACE
109I
CRAWLSPACE
109J
CRAWLSPACE
109K
CRAWLSPACE
109L
CRAWLSPACE 205R
Room
C H
R C
H S
0.75" 0.75"
0.75" 0.75"
1.
5"
1.
5"
1.
5"
408-C3
408-C2
408-C1
2"2.
5"
M P
S M
P C
0.75"
HWS/HWR UP
(TYP.)
H W
S
C H
S
HWR
CHR
H W
S H
W R
H W
S H
W R
C H
S C
H R
1.25" - D
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:3
:2
P
M
MP100
BASEMENT FLOOR PLAN - PIPING CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"MP100
1 BASEMENT-HVAC-PIPING
GENERAL NOTES
PLAN NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL
UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.
1. PROVIDE DIRECT BURIED PREINSULATED CHILLED WATER PIPING PER
SPECIFICATION SECTION 23 21 13.
N
Revisions: Date:
PROVIDE BASEMENT PIPING IN
PHASE 1 TO THE EXTENT POSSIBLE
WITHOUT DISRUPTING FUTURE
PHASES ON OTHER FLOOR.
T T
T
TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TT
T
T
T
T
T
T
408-BT1
FCU-28
FCU-27
FCU-29
FCU-30
FCU-31
FCU-16
F C
U -2
FCU-25 FCU-26
FCU-18
FCU-13
FCU-10A
F C
U -7
F C
U -2
F C
U -1
A
F C
U -6
F C
U -3
FCU-15
FCU-14
FCU-22
FCU-21
FCU-20 FCU-19
FCU-17
FCU-12
FCU-11
FCU-10FCU-9FCU-8
FCU-4
FCU-5
FCU-23A FCU-23B
FCU-23C FCU-23D
FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"
FCU-5A FCU-5B
FT-4'-0"
FT-6'-0"
FT-6'-0"
FT-4'-0"
FT-4'-0"
FT-6'-0"
FT-6'-0"
FT-4'-0"
FT-3'-0"
FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"
FT-5'-0"
FT-4'-0"
FT-5'-6"
FT-5'-6"
FT-5'-6"
FT-6'-0"
FT-6'-0"
FT-4'-0"
FT-5'-0"
FT-5'-0"
FT-4'-0"
FT-5'-0"
FT-4'-0"
FT-5'-0"
FT-5'-0"
FT-4'-0"FT-4'-0"FT-4'-0"
FT-4'-0"FT-5'-0"
FT-5'-0"FT-5'-0"
FT-5'-0"
FT-4'-0"FT-5'-0"FT-4'-0"
FT-5'-0"
FT-8'-6"
FT-8'-6"
FT-5'-0"
FT-4'-0"
FCU-27A FCU-27B
CHR
HWR
CHS
HWS
FT-5'-0" FT-5'-0"
1.5" 1.5" 1.5" 1.5"
2"2"2" 2"
408-ACCH2 408-ACCH1408-ACCH2 408-ACCH1408-ACCH2
CHR4"4"
4"
4" 4"
0.75" DN
0.75" UP
0.75" UP
0.75" DN
0.75" UP
0.75" UP
FT-10'-0"
FT-10'-0"
FT-8'-0"
FT-10'-0"
FT-9'-6"
FT-9'-6"
F C
U -2
1"
1.
1.
1.5"1.5"
1" 1"
2"2"
1" 1"
1.25" 1.25"
1.
1.
1.5" 1.5"
1" 1"
1" 1"
1" 1"
1.
5"
1.
5"
1" 1"
1.5"1.5"
1.
1.
1.25"1.25"
1" 1"
2" 2"
1.
" 1.
1" 1"
1" 1"
1.25" 1.25" 1" 1"
1.
1.
2"2" 1.5" 1.5" 1" 1"
1" 1"
1.5" 1.5"1" 1"
1"1"
1" DN
1"1"
1" DN
1" 1"
1" 1"
1" 1"
1.
1.
1" 1"
1.25" 1.25" 1" 1"
2" 2"
2" 2"
1" 1"
1" 1"
1" 1"
1.
1.
1.5" 1.5" 1.5"
1.5"
1" 1" 1.
" 1.
1.
2" 2"
3" UP, 4" DN
ALL PIPING
SYSTEMS
1" 1"
H W
R H
W S
1.
1.
1" 1"
1"
0.
0.
0.75" UP (TYP.)
107d
OFC
107e OFC 107f
CONFERENCE
107b
OFC
107c
OFC
107g
OFFICE
107a
OFFICE
106f
OFFICE
106e
OFFICE
106g OFFICE 106h
OFFICE
106d
STORAGE
106c
COPIER
106j
OFFICE
DSS SUITE
106k
OFFICE
106l
OFFICE
106b
OFFICE
106a
OFFICE
KITCHEN
Room
103B
COMM.
MENS
TELE
PHARMACY
103C
CONFERENCE
103D
OFFICE104
OFFICE
103A
OFFICE
101C
OFFICE
101A
OFFICE
101A
OFFICE
ACQUISITION
CHAPLAIN
101D
OFFICE
100c OFFICE100d
OFFICE
Space
100m
OFFICE
100g
OFFICE
100n
OFFICE
100k
OFFICE
100h
OFFICE
100l
OFFICE
100j
OFFICE
WOMENS
101B
COMM
109A
BREAK
ROOM
109C
OFFICE
2"
0.75"
HWS/HWR UP
(TYP.)
0.75"
HWS/HWR UP
(TYP.)
0.75"
HWS/HWR UP
(TYP.)
1"CHS/CHR
1" CHS/CHR
1"CHS/CHR
1"CHS/CHR
0.75"
HWS/HWR UP
(TYP.)
1"CHS/CHR
3" UP, 4" DN
ALL PIPING
SYSTEMS
3" UP, 4" DN
ALL PIPING
SYSTEMS
0.75"
HWS/HWR UP
(TYP.)
FT-4'-0"
0.75"
HWS/HWR UP
(TYP.)
1" 1"
FCU-1B
1"
D
1.25" - D
1" - D
1" - D
1.25" - D
1.25" - D 1" - D
1.25" - D
1" - D
1.
D
1.5" - D
1.
D
1" - D
1.5" - D
AC-1AC-2
CU-3
CU-2
CU-1
PHASE 2
PHASE 3PHASE 4
UP
DN
UP
ELEV
1.5" - D
1.5" - D
1 .
5 "
D
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:4
:3
P
M
MP101
FIRST FLOOR PLAN - PIPING CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
GENERAL NOTES
PLAN NOTES
SCALE: 1/8" = 1'-0"MP101
1 FIRST FLOOR PLAN - NEW WORK
N
A. FIELD VERIFY LOCATIONS FOR ALL EXTERIOR EQUIPMENT AND CONCRETE
PADS WITH COR.
B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL
UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
1. EXISTING 2.5" MPS, 2" MPC PIPING UP/DN TO REMAIN.
2. EXTEND 2" DRAIN DOWN TO MOP BASIN. INDIRECT DRAIN WITH 45° CHAMFER.
3. EXTEND REFRIGERANT PIPING AND DRAIN FROM AC-3 ON SECOND FLOOR.
REFER TO SHEET MP102 FOR CONTINUATION.
4. PROVIDE REFRIGERANT PIPING AND SPECIALTIES PER MANUFACTURERS
RECOMMENDATIONS. APPROXIMATE ROUTE SHOWN.
5. PROVIDE CONCRETE PAD. MAINTAIN MANUFACTURERS RECOMMENDED
CLEARANCES.
6. PROVIDE PVC PIPE ENCLOSURE TO CONCEAL VERTICAL PIPING. MATCH
BUILDING COLOR.
T T
T
T
T
T
T
T
T T T
T
T
T
T
T
T
T
T
T T
T T
T
T
TT
T
T
T
T
T
T
FT-4'-0"
FT-5'-0"
FT-27'-0"
FT-5'-0"
FT-4'-0" FT-5'-0" FT-4'-0"
FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-4'-0"
FT-4'-0"
FT-5'-0" FT-5'-0"
FT-4'-0"
FT-4'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"
FT-4'-0" FT-5'-0" FT-4'-0"
FT-5'-0"
FT-5'-0"
FCU-142
FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"
FT-3'-0"
FT-4'-0"
FT-6'-0"
FT-6'-0"
FT-4'-0"
AC-3
FT-4'-0"
FT-6'-0"
FT-6'-0"
FT-4'-0"
FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"
CHR
CHS
HWR
HWS
3" 3" 3" 3"
FT-10'-0"
FT-10'-0"
FT-27'-0"
FT-10'-0"
FT-10'-0"
1.
5"
1.
5"
1.
5"
1.
5"C
H R
C H
S H
W S
H W
R
UP & DN
CHR
CHS
HWR
HWS
3" 3" 3" 3"
UP & DN
UP & DN
UP & DN
UP & DN
DOWN
UP
TOILET
207H
OFFICE
207G
OFFICE
207I
OFFICE
207F
OFFICE
207E
OFFICE 207D
OFFICE
107v
OFFICE
208B
OFFICE
208C
OFFICE
208D
OFFICE
208E
OFFICE
CHAPLAIN
OFFICE
208F
OFFICE
208G
OFFICE
208H
OFFICE
205H
SAFETY
OFFICE
205G
SAFETY
OFFICE
205F
SAFETY
OFFICE
205E
SAFETY
OFFICE205D
OIT OFFICE
205C
NNU
OFFICE
205B
NNU
OFFICE
205A
NNU
OFFICE
202G
OFFICE
202F
OFFICE202E
OFFICE
202D
OFFICE
202C
OFFICE
202B
OFFICE
202A
OFFICE
203B
OFFICE
203C
OFFICE
SUITE
203D
OFFICE
203E
CONFERENCE
ROOM
203F
OFFICE
TOILET
109A
BREAK
ROOM
205l
LOUNGE
201A
OFFICE
207B
OFFICE
AFCU
SUITE
208A
202H
FCU-65FCU-66
0.75" - D0.75" - D
PHASE 2
PHASE 3PHASE 4
UP
UP DN
DN
DN
DN
DN
DN
ELEV
1.5" D UP
1.5" D UP
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:4
:1
P
M
MP102
SECOND FLOOR PLAN - PIPING CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
GENERAL NOTES
PLAN NOTES
SCALE: 1/8" = 1'-0"MP102
1 SECOND FLOOR-HVAC-PIPING
N
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL
UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL
UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.
1. EXISTING 2.5" MPS, 2" MPC PIPING UP/DN TO REMAIN.
2. EXTEND 2" DRAIN DOWN TO MOP BASIN. INDIRECT DRAIN WITH 45° CHAMFER.
FCU-70
FCU-56
FCU-53
FCU-54
FCU-55
FCU-57
FCU-62
FCU-63
FCU-64
FCU-33
FCU-35 FCU-43
FCU-44
FCU-58
FCU-59
FCU-63
FCU-61
FCU-60
FCU-51
FCU-49
FCU-48
FCU-52
FCU-38
FCU-32
FCU-37
FCU-34
F C
U -3
FCU-41
FCU-40
FCU-42 FCU-45
FCU-46
FCU-47
FCU-50
HWS
CHS
HWR
CHR
1.5" - HWR
1.5" - HWS
1.5" - CHR
1.5"1.5"
1.25"1.25"
1.25"1.25"
1.25"1.25"
1" 1"
FCU-69FCU-39
1.25"1.25"
1.5"1.5"
3" DN
3" DN
3" DN
ALL SYSTEMS
FCU-67
1.5" - CHS
1" - HWR
1" - HWS
1" - CHS
1" - CHR
1" - CHR
1" - CHS
1" - HWS
1" - HWR
1.25" - CHR
1.25" - CHS
1.25" - HWR
1.25" - HWS
0.75"0.75"
1"1"
1"1"
CHR
CHS
HWR
HWS
H W
S H
W R
C H
S C
H R
1.25"1.25"
1"1"
1.5"1.5"
1.25"
1.25"1.25"
1"1"
CHR
CHS HWR
HWS
1"1"
1.25"1.25"
1"1"
0.75"0.75" 0.75"0.75"
1"1"
1"1" 0.75"0.75"
1" - MPS 1" - MPC
1.25" - MPS 1" - MPC
1.25"
1"
408-H2
408-H3
408-H1
1.25" - D
1.5" - D
1" - D
1.
5"
D
1"
D
1.
D
1.25" - D1.25" - D
1.
D
PHASE 2
PHASE 3PHASE 4
1.5" D DN 1.5" D DN1.
D
408-ERV1
1"1" 0.75"0.75"
408-ERV2
408-ERV3
1.5" - CHR
1.5" - CHS
1.5" - HWS
1.5" - HWR
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:3
:3
P
M
MP103
ATTIC FLOOR PLAN - PIPING CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
GENERAL NOTES
PLAN NOTES
SCALE: 1/8" = 1'-0"
ATTIC-HVAC-PIPING
1N
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL
UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL
UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.
1. EX. 2.5" MPS, 2" MPC PIPING DN.
408-C1
408-C2
408-C3
408-HWP1
408-HWP2
408-HWAS1
408-CWAS1
408-CWP1
408-CWP2
14x12 ø x1
4" - HWR
4"
H W
S
4"
H W
R
4"
M P
S
2.5" - MPS
5" - CHS
3"
H W
R
3"
H W
S
4" - CHR
3" - C H
S
4"
C H
S
4" - HWS
5"
C H
R
408-PRV1
3"
M P
S
4"
H W
S
4"
H W
R
4"
C H
S
4"
C H
R
2"
P C
408-CP1
408-FT1
FCU-72
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:3
:0
P
M
M401
ENLARGED PLANS CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
GENERAL NOTES
PLAN NOTES
1. PROVIDE INDIVIDUAL SADDLE SUPPORTS AND ANGLE FRAME TO SUPPORT
HEAT EXCHANGER OFF FLOOR. HEAT EXCHANGER SHALL BE INSTALLED HIGH
ENOUGH TO ALLOW GRAVITY DRAINAGE OF CONDENSATE TO FLASH TANK.
A. REFER TO PIPING SCHEMATICS AND DETAILS FOR SPECIFIC REQUIREMENTS.
B. MAINTAIN ALL SERVICE CLEARANCES.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,
AND ADDITIONAL GENERAL NOTES.
SCALE: 1/2" = 1'-0"
BASEMENT-HVAC-PIPING - ENLARGED PLAN
1N
FLEXIBLE DUCT CONNECTIONS
RETURN OR EXHAUST GRILLE/REGISTER CONNECTION
EXHAUST OR RETURN BRANCH
DUCTWORK
SUPPLY DUCTWORK TAKE-OFFS
FLEXIBLE AIR DUCT CONNECTOR
ALTERNATE SUPPLY DUCT TAKEOFF -
FAN COIL UNIT OUTSIDE AIR
DUCTWORK TRANSITIONS
DUCTWORK SQUARE VANE ELBOWS
DUCTWORK RADIUS ELBOWS
DUCT CONNECTIONS-FAN COIL UNITS
SUPPLY DUCT TAKEOFF -
FAN COIL UNIT OUTSIDE AIR
VANE
VANE
FROM STRUCTURE
SAME AS DIFFUSER
INLET: 5'-0" MAX
FLEXIBLE DUCT SIZE
LENGTH.
12"
CEILING
SUPPORT SADDLE
VOLUME DAMPER W/
LOCKING QUADSADDLE
SHEET METAL
CONICAL OUTLET
BRANCH DUCT
FOR CHANGE OF
DIRECTION GREATER
USE RIGID ELBOWS
THAN 45°
THERMAL INSULATION
SEE SPECIFICATIONS
BRANCH DUCT
MAIN EXHAUST OR RETURN
PLAN VIEW
45 DEG.
DAMPER WHERE
TURNING VANES
STRAP HANGER
251 CFM TO 400 CFM - 10" DIA.
401 CFM TO 700 CFM - 12" DIA.
101 CFM TO 250 CFM - 8" DIA.
100 CFM AND LESS - 6" DIA.
ARE TO BE SIZED AS FOLLOWS:
BRANCH DUCT SIZES, UNLESS NOTED ON PLANS
BRANCH DUCT TAKE-OFF WITH MANUAL DAMPER.1
STRAP HANGER
SPIN-IN TAP
FITTING
6" MIN
RETURN/
EXHAUST DUCT
CEILING
CEILING DEVICE
RECTANGULAR
DUCT, NOTE 1
MANUAL
DAMPER
STRAP HANGER
SCHEDULED
SHEETMETAL PLENUM
SAME SIZE AS AIR DEVICE
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLEXIBLE MATERIAL
AS SPECIFIED
WASHER
FLANGED
CONNECTION ON
FAN SIDE
1-1/2" MIN. TO 3" MAX. INSTALLED. 6"
NOMINAL WITH MATERIAL TAUT
1-1/2" 1/2" 1/2"
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
DUCT
1-1/2" POCKET
SLIP
ALTERNATE
POSITION
OF BOLT
1" FLANGE & HEM
BOLT ON 4" CENTERS
1"x1/8" BAND IRON
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
RIVET ON 4"
CENTERS
SHEET METAL SCREWS ON
12" CENTERS
DUCT
5/16" FLANGE
BOLT ON 4" CENTERS
1"x1/8" BAND IRON
1"x1/8" DRAW BAND
FLEXIBLE
MATERIAL AS
SPECIFIED
1-1/2" MIN. TO 3" MAX. INSTALLED. 6"
NOMINAL WITH MATERIAL TAUT
WASHER
FLANGED CONNECTION
ON FAN SIDE
ROUND DUCT - NOTE 2
FLEXIBLE AIR DUCT
CONNECTOR. SEE DETAIL
ON THIS SHEET
NOTES:
SPIN-IN BRANCH TAP FITTING WITH
MANUAL DAMPER
BRANCH DUCT
1/4W OR 4" MIN.
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
W
AIR FLOW
AIR
FLOW
SQUARE ELBOW SHOWN.
PROVIDE ROUND ELBOW
WHEN SHOWN ON PLANS
A
IR
F L
O W
W
MAIN SUPPLY
DUCT
AIR
FLOW
1/4 W OR 4"
MIN.
AIR
FLOW
AIR
FLOW
VOLUME EXTRACTOR; ADJUSTABLE FROM
FULLY CLOSED POSITION TO CFM NOTED
ON FLOOR PLANS
MAIN
SUPPLY
DUCT
TOP REGISTER
ADJUSTABLE
METAL ROD
OR LINKAGE
PROVIDE VOLUME
DAMPER
PROVIDE VOLUME
DAMPER
SEE FLOOR PLAN FOR
SPLIT DIMENSION
MAIN
SUPPLY
DUCT
TURNING VANES
SUPPLY REGISTER
OR BRANCH DUCT
A
IR
F L
O W
AIR
FLOW
AIR
FLOW
SUPPLY REGISTER TAKE-OFF
PLAN VIEW
BRANCH DUCT TAKE-OFF PLAN VIEW
AIR SPLIT DUCT TAKE-OFF PLAN
VIEW
THERMAL INSULATION
SEE SPECIFICATIONS
TYPICAL
DIFFUSER OR
REGISTER IN
LAY-IN CLG.
SEE SPECIFICATIONS FOR CLAMPS
AND SEALANT (TYP.)
RIGID DUCT TO AIR TERMINAL UNIT. REFER TO
AIR TERMINAL UNIT DUCT CONNECTION DETAIL
FOR CONTINUATION.
F L
O W
FLOW
PLAN VIEW
MAIN SUPPLY
SMACNA FIGURE 4-6.
45° LEED IN
PLAN VIEW
°M
A X
"D
MAIN SUPPLY
ROUND SHEET METAL DUCT.
RIGID DUCT TO AIR TERMINAL UNIT. REFER
TO AIR TERMINAL UNIT DUCT CONNECTION
DETAIL FOR CONTINUATION
M A
X
M A
X
M A
X
M A
X.
TYPICAL DUCTWORK TRANSITION WITH
EQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEW
AIR
FLOW
AIR
FLOW
E Q
U
IP
M E
N T
M A
X
M A X.30
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
R
1/6W
/3
W 1/2W
WW
SHORT RADIUS ELBOW
WITH TWO VANES
SHORT RADIUS ELBOW
WITH ONE VANE
STANDARD RADIUS OR
LONG RADIUS ELBOW
R SHALL
EQUAL OR
BE
GREATER
THAN
1/6W.
/3
W
2/3W
R
R
W
R SHALL
EQUAL OR
BE
GREATER
THAN
1/3W.
R SHALL
EQUAL OR
BE
GREATER
THAN W.
THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL
SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED, SUPPORTED
AND FASTENED AS RECOMMENDED BY SMACNA.
NOTES:
1.
2.
W1
W
ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1 1/2" MAXIMUM SPACE BETWEEN
VANES AND A 3/4" TRAILING EDGE.
WHEN W EQUALS W2 AND W1 IS GREATER THAN 20", VANES SHALL BE DOUBLE VANE TYPE.
NOTES:
1.
2.
3.
4.
NOTES:
1.
2.
3.
FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM FAN COIL UNIT
SUPPLY AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0". USE
RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER THAN 45°.
COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE
INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.
DUCT RUNOUT TO DIFFUSERS SHALL BE SAME SIZE AS THE DIFFUSER
NECK SIZE UNLESS OTHERWISE NOTED.
4-PIPE
HEATING COIL
FLEXIBLE AIR DUCT
CONNECTOR. SEE
DIFFUSER (TYP.)
SEE NOTE 2
S E
E N
O T
E
NOTE 3
(TYP.)
MAIN SUPPLY DUCT
REFER TO OUTSIDE AIR
DUCT TAKEOFF DETAIL
DETAIL ON THIS SHEET
4. PROVIDE 10" DEEP PLENUM BOX AT RETURN INLET OF FAN COIL UNIT
5. RETURN AIR DUCT TO ROOM GRILLE/REGISTER. REFER TO DETAIL ON
THIS SHEET.
6. OUTSIDE AIR MANUAL BALANCE DAMPER. SEE SCHEDULE FOR AIR FLOW.
7. PROVIDE FLEXIBLE DUCT CONNECTION AT INLET AND OUTLET OF
FAN COIL UNIT, PER DETAIL ON THIS SHEET.
COOLING COIL
FAN COIL UNIT
SEE NOTE 6
SEE NOTE 5
SEE NOTE 4
SEE NOTE 7
SEE NOTE 7
251 CFM TO 400 CFM - 10" DIA.
401 CFM TO 700 CFM - 12x12" RECT
101 CFM TO 250 CFM - 8" DIA.
100 CFM AND LESS - 6" DIA.
ARE TO BE SIZED AS FOLLOWS:
BRANCH DUCT SIZES, UNLESS NOTED ON PLANS8.
SEE NOTE 8
FULL SIZE OF UNIT OPENING.
4-PIPE
FAN COIL UNIT
SEE NOTE 5
SEE NOTE 4
ALTERNATE FOR RETURN AIR OVER 400 CFM
x
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
PROJECT NO. STATE COA FIRM NO.2018-05164 01528
/3
/2
:3
:1
P
M
M501
DETAILS CORRECT
INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OHIO 45428
552-19-102
PHIL WEST, COR
May 2nd, 2025 GSE WJS
BID DOCUMENTS
FULLY SPRINKLERED
| 2018-05164_Div23_Dwgs |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .