552-19-102 Drawings_Volume2.pdf

PDF 10 MB Posted

Attached to
Y1AA--Infrastructure Deficiencies B408 [552-19-102] Dayton VAMC
Solicitation number
36C25025B0036
Issued by

About this file

These documents are Life Safety Plan and Infection Control/Phasing drawings for the VA Dayton Medical Center Building 408 Infrastructure Deficiencies Correction project. The drawings detail a comprehensive renovation project spanning four phases, focusing on mechanical, electrical, plumbing, and technology (MEPTF) systems upgrades, hazardous material abatement, and window and door replacements. The project involves a fully sprinklered, Type II-B construction business occupancy building with strict infection control protocols, including temporary barrier walls, construction access doors, and phased work schedules to minimize disruption to ongoing facility operations.

The project's four phases are strategically planned: Phase 1 involves site investigation, utility assessment, and basement work; Phase 2 targets the central building section; Phase 3 focuses on the northern wing; and Phase 4 addresses the southern wing. Key requirements include working primarily during off-hours (5:00 PM to 5:00 AM), maintaining exit access during business hours, minimizing noise and vibration, implementing infection control measures like sticky walk-off mats and hand sanitizers, and ensuring proper debris and hazardous material management. The project is fully compliant with NFPA 101 Life Safety Code and follows VA design manual specifications.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

UNEXCAVATED

SPRINKELR SYSTEM

CONTROLS

205J

PIPE SPACE

205K

UNEXCAVATED

UNEXCAVATED

Room

205N

UNEXCAVATED UNEXCAVATED

CONCRETE SLAB

Room

205R

PIPE SPACE

STORAGE

ENGINEERING

STORAGE ROOM

ELEV.

NO.12

MACHINE ROOM

LOCKSMITH

C-B-1

C-B-2

CODE ANALYSIS - NFPA 101, BUSINESS CHAPTER 38

CODE CRITERIA

GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD

PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.

NOTES:

CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

CODE REVIEW

THE 2021 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.

FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2021 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN

USED.

PROJECT SCOPE

1. THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2021 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE II-B CONSTRUCTION AS FOLLOWS:

2. OCCUPANCY TYPE: B-BUSINESS, IBC CHAPTER 3/LSC CHAPTER 38

3. FIRE RESISTIVE RATINGS TYPE II-B/ II(000) CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:

STRUCTURAL FRAME: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

BEARING WALLS

EXTERIOR: NONCOMBUSTIBLE, 0 -HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

NON-BEARING WALLS AND PARTITIONS

EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE

FLOOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

ROOF: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)

SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)

4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.

5. ALLOWABLE HEIGHT: 75 FT (IBC, TABLE 504.3)

6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: 4 (IBC, TABLE 504.4)

7. ALLOWABLE AREA: BASED UPON B OCCUPANCY, II-B CONSTRUCTION TYPE, AND FULLY SPRINKLED: ALLOWABLE AREA: 69,000 (IBC, TABLE 506.2)

8. BUILDING SEPARATION: BASED ON A >30 FIRE SEPARATION DISTANCE A 0 -HOUR FIRE RESISTANCE WALL RATING IS REQUIRED. (IBC, TABLE 602)

9. MEANS OF EGRESS

• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 44 INCHES.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES

• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.

• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)

• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 300 FEET (LSC 38.2.6.3)

• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 38.2.5.3.1)

• DEAD END CORRIDORS SHALL NOT EXCEED 50 FEET. (LSC 38.2.5.2.1)

• MEANS OF EGRESS SHALL BE ILLUMINATED. (LSC 38.2.8)

• EMERGENCY LIGHTING SHALL BE PROVIDED, BUILDING OVER 3 STORIES. (LSC 38.2.9.1)

• EXIT SIGNAGE SHALL BE PROVIDED. (LSC 38.2.10)

10. PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE SHALL BE PROVIDED BY PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7(3). WHERE HAZARD IS SEVERE PER LSC CHAPTER 38, SOILED HOLDING, PROTECTION IS PROVIDED WITH AN AUTOMATIC EXTINGUISHING SYSTEMS THE SPACE SHALL ALSO BE ENCLOSED WITH SMOKE

PARTITIONS IN ACCORDANCE WITH SECTION 8.4.

11. INTERIOR FINISH

• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 8 OF THE NFPA 101 TO CLASS A, B AND C MATERIALS. INTERIOR WALL

AND CEILING FINISH SHALL BE CLASS A OR CLASS B IN EXITS, CORRIDORS AND LOBBIES; AND CLASS A, CLASS B, OR CLASS C IN ALL OTHER AREAS. (LSC 38.3.3)

• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.

• · CLASS B: FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450.

• · CLASS C: FLAME SPREAD 76-200; SMOKE DEVELOPED 0-450

• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I OR CLASS II IN CORRIDORS AND EXITS.

• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS

SERVING AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD

METHODS OF FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.

• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA

260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590

12. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10. (38.3.5)

13. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.

• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)

• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 38.4.2)(LSC 9.6.2)

• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS. (LSC 38.3.4.3)

• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.

• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM. (LSC 38.3.4.4)

14. FIRE SUPPRESSION:

SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF

VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:

STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:

ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 250 GPM

ALL OTHER AREAS SHALL BE PROTECTED AS:

LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 100 GPM

ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.

15. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS ALONG HEALTHCARE OCCUPANCIES (LSC CHAPTER 18 AND 19) SHALL BE CONSTRUCTED AND

MAINTAINED PER NFPA 241.

CODE ANALYSIS LEGEND

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:1

P

M

GI101

LIFE SAFETY PLAN

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022 AO AO

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/32" = 1'-0"GI101

2 BASEMENT

N

Revisions: Date:

aogrzewalla Text Box 05/02/2025 aogrzewalla Snapshot

CONFERENCE

103C

OFFICE

OFFICE

103D

OFFICE

103A

OFFICE

TELE PHARMACY

MENS

COMM.

103B

LOBBY

OFFICE

101C

ACQUISITION

CHAPLAIN

OFFICE

101D

OFFICE

101A

KITCHEN

OFFICE

106k

OFFICE

106l

OFFICE

106h

OFFICE

106g

DSS SUITE

OFFICE

106e

STORAGE

106d

OFFICE

106a

OFFICE

106j

OFFICE

106f

COPIER

106c

OFFICE

106b

OPEN OFFICE

OFFICE

100d

OFFICE

100c

OFFICE

100h

OFFICE

100k

OFFICE

100j

OFFICE

100l

WOMENS

OFFICE

100n

OFFICE

100g

OFFICE

100m

CONFERENCE

107f

OFFICE

107g

OFFICE

107a

OFC

107c

OFC

107d

OFC

107e

OFC

107b

SUITE

COMM

101B

OFFICE

109C

CODE ANALYSIS LEGEND

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

CODE ANALYSIS - NFPA 101, BUSINESS CHAPTER 38

CODE CRITERIA

GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD

PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.

NOTES:

CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

CODE REVIEW

THE 2021 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.

FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2021 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN

USED.

PROJECT SCOPE

1. THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2021 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE II-B CONSTRUCTION AS FOLLOWS:

2. OCCUPANCY TYPE: B-BUSINESS, IBC CHAPTER 3/LSC CHAPTER 38

3. FIRE RESISTIVE RATINGS TYPE II-B/ II(000) CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:

STRUCTURAL FRAME: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

BEARING WALLS

EXTERIOR: NONCOMBUSTIBLE, 0 -HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

NON-BEARING WALLS AND PARTITIONS

EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE

FLOOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

ROOF: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)

SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)

4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.

5. ALLOWABLE HEIGHT: 75 FT (IBC, TABLE 504.3)

6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: 4 (IBC, TABLE 504.4)

7. ALLOWABLE AREA: BASED UPON B OCCUPANCY, II-B CONSTRUCTION TYPE, AND FULLY SPRINKLED: ALLOWABLE AREA: 69,000 (IBC, TABLE 506.2)

8. BUILDING SEPARATION: BASED ON A >30 FIRE SEPARATION DISTANCE A 0 -HOUR FIRE RESISTANCE WALL RATING IS REQUIRED. (IBC, TABLE 602)

9. MEANS OF EGRESS

• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 44 INCHES.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES

• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.

• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)

• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 300 FEET (LSC 38.2.6.3)

• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 38.2.5.3.1)

• DEAD END CORRIDORS SHALL NOT EXCEED 50 FEET. (LSC 38.2.5.2.1)

• MEANS OF EGRESS SHALL BE ILLUMINATED. (LSC 38.2.8)

• EMERGENCY LIGHTING SHALL BE PROVIDED, BUILDING OVER 3 STORIES. (LSC 38.2.9.1)

• EXIT SIGNAGE SHALL BE PROVIDED. (LSC 38.2.10)

10. PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE SHALL BE PROVIDED BY PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7(3). WHERE HAZARD IS SEVERE PER LSC CHAPTER 38, SOILED HOLDING, PROTECTION IS PROVIDED WITH AN AUTOMATIC EXTINGUISHING SYSTEMS THE SPACE SHALL ALSO BE ENCLOSED WITH SMOKE

PARTITIONS IN ACCORDANCE WITH SECTION 8.4.

11. INTERIOR FINISH

• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 8 OF THE NFPA 101 TO CLASS A, B AND C MATERIALS. INTERIOR WALL

AND CEILING FINISH SHALL BE CLASS A OR CLASS B IN EXITS, CORRIDORS AND LOBBIES; AND CLASS A, CLASS B, OR CLASS C IN ALL OTHER AREAS. (LSC 38.3.3)

• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.

• · CLASS B: FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450.

• · CLASS C: FLAME SPREAD 76-200; SMOKE DEVELOPED 0-450

• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I OR CLASS II IN CORRIDORS AND EXITS.

• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS

SERVING AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD

METHODS OF FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.

• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA

260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590

12. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10. (38.3.5)

13. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.

• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)

• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 38.4.2)(LSC 9.6.2)

• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS. (LSC 38.3.4.3)

• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.

• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM. (LSC 38.3.4.4)

14. FIRE SUPPRESSION:

SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF

VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:

STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:

ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 250 GPM

ALL OTHER AREAS SHALL BE PROTECTED AS:

LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 100 GPM

ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.

15. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS ALONG HEALTHCARE OCCUPANCIES (LSC CHAPTER 18 AND 19) SHALL BE CONSTRUCTED AND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:1

P

M

GI102

LIFE SAFETY PLAN

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022 AO AO

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/32" = 1'-0"GI102

1 LEVEL 1N

Revisions: Date:

aogrzewalla Text Box 05/02/2025

OFFICE

201A

LOUNGE

C-2-1

CHAPLAIN OFFICE

OFFICE

208E

OFFICE

208D

OFFICE

208C

OFFICE

208B

OFFICE

208F

OFFICE

208G

OFFICE

208H

OFFICE

207E

OFFICE

207D

OFFICE

107v

OFFICE

207B

AFCU SUITE

OFFICE

207F

OFFICE

207G

OFFICE

207I

OFFICE

207HTOILET

SAFETY

107dd

OFFICE

202G

OFFICE

202F

OFFICE

202E

OFFICE

202D

OFFICE

202C

OFFICE

202B

OFFICE

202A

202H

C-2-2C-2-5

C-2-3

205l

ELEV.

NO.12

NNU OFFICE

205A

NNU OFFICE

205B

SAFETY OFFICE

205G

SAFETY OFFICE

205F

SAFETY OFFICE

205E

OIT OFFICE

205D

SAFETY OFFICE

205H

NNU OFFICE

205C

OFFICE

203F

SUITE

OFFICE

203D

OFFICE

203C

OFFICE

203B

OFFICE

203A

TOILET

208A

CONFERENCE ROOM

203E

CODE ANALYSIS - NFPA 101, BUSINESS CHAPTER 38

CODE CRITERIA

GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD

PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.

NOTES:

CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

CODE REVIEW

THE 2021 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.

FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2021 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN

USED.

PROJECT SCOPE

1. THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2021 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE II-B CONSTRUCTION AS FOLLOWS:

2. OCCUPANCY TYPE: B-BUSINESS, IBC CHAPTER 3/LSC CHAPTER 38

3. FIRE RESISTIVE RATINGS TYPE II-B/ II(000) CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:

STRUCTURAL FRAME: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

BEARING WALLS

EXTERIOR: NONCOMBUSTIBLE, 0 -HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

NON-BEARING WALLS AND PARTITIONS

EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE

FLOOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

ROOF: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)

SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)

4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.

5. ALLOWABLE HEIGHT: 75 FT (IBC, TABLE 504.3)

6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: 4 (IBC, TABLE 504.4)

7. ALLOWABLE AREA: BASED UPON B OCCUPANCY, II-B CONSTRUCTION TYPE, AND FULLY SPRINKLED: ALLOWABLE AREA: 69,000 (IBC, TABLE 506.2)

8. BUILDING SEPARATION: BASED ON A >30 FIRE SEPARATION DISTANCE A 0 -HOUR FIRE RESISTANCE WALL RATING IS REQUIRED. (IBC, TABLE 602)

9. MEANS OF EGRESS

• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 44 INCHES.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES

• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.

• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)

• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 300 FEET (LSC 38.2.6.3)

• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 38.2.5.3.1)

• DEAD END CORRIDORS SHALL NOT EXCEED 50 FEET. (LSC 38.2.5.2.1)

• MEANS OF EGRESS SHALL BE ILLUMINATED. (LSC 38.2.8)

• EMERGENCY LIGHTING SHALL BE PROVIDED, BUILDING OVER 3 STORIES. (LSC 38.2.9.1)

• EXIT SIGNAGE SHALL BE PROVIDED. (LSC 38.2.10)

10. PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE SHALL BE PROVIDED BY PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7(3). WHERE HAZARD IS SEVERE PER LSC CHAPTER 38, SOILED HOLDING, PROTECTION IS PROVIDED WITH AN AUTOMATIC EXTINGUISHING SYSTEMS THE SPACE SHALL ALSO BE ENCLOSED WITH SMOKE

PARTITIONS IN ACCORDANCE WITH SECTION 8.4.

11. INTERIOR FINISH

• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 8 OF THE NFPA 101 TO CLASS A, B AND C MATERIALS. INTERIOR WALL

AND CEILING FINISH SHALL BE CLASS A OR CLASS B IN EXITS, CORRIDORS AND LOBBIES; AND CLASS A, CLASS B, OR CLASS C IN ALL OTHER AREAS. (LSC 38.3.3)

• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.

• · CLASS B: FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450.

• · CLASS C: FLAME SPREAD 76-200; SMOKE DEVELOPED 0-450

• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I OR CLASS II IN CORRIDORS AND EXITS.

• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS

SERVING AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD

METHODS OF FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.

• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA

260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590

12. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10. (38.3.5)

13. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.

• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)

• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 38.4.2)(LSC 9.6.2)

• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS. (LSC 38.3.4.3)

• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.

• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM. (LSC 38.3.4.4)

14. FIRE SUPPRESSION:

SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF

VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:

STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:

ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 250 GPM

ALL OTHER AREAS SHALL BE PROTECTED AS:

LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 100 GPM

ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.

15. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS ALONG HEALTHCARE OCCUPANCIES (LSC CHAPTER 18 AND 19) SHALL BE CONSTRUCTED AND

CODE ANALYSIS LEGEND

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:1

P

M

GI103

LIFE SAFETY PLAN

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022 AO AO

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/32" = 1'-0"GI103

1 LEVEL 2

N

Revisions: Date:

aogrzewalla Text Box 05/02/2025

DN

TEMPORARY IC BARRIER WALL

CONSTRUCTION (DUST WALL)

5/8" TYPE X GYP BD

3 5/8" STEEL STUDS @ 16"

O.C.

BEAD OF CONT. SEALANT

6-MIL FIRE RETARDANT POLY

INTERIOR SIDE

CEILING

2" DEEP LEG 3 5/8" STEEL SLIP TRACK

3 5/8" STEEL STUD TRACK

6" M

IN

CONTINUOUSLY ADHERE 6-MIL. FIRE

RETARDANT POLY TO DECK WITH TAPE

CONTINUOUSLY ADHERE FIRE RETARDANT

POLY TO FLOOR WITH TAPE

EXISTING DECK

CONSTRUCTION

SIDE

OCCUPIED

SIDE

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, CARD READER,

HARDWARE AND CLOSER

TRIATEK MONITOR

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE

FOR REQUIRED CONDITION TO

STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

UNEXCAVATED

SPRINKELR SYSTEM

CONTROLS

205J

PIPE SPACE

205K

UNEXCAVATED

UNEXCAVATED

Room

205N

UNEXCAVATED UNEXCAVATED

CONCRETE SLAB

Room

205R

PIPE SPACE

STORAGE

ENGINEERING

STORAGE ROOM

ELEV.

NO.12

MACHINE ROOM

LOCKSMITH

C-B-1

C-B-2

CLEAR

6' - 0"

2PHASE 1

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

TEMPORARY PLASTIC BARRIER. SEE PLAN

AND PLAN NOTES

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: II

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 3/GI104.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GI104.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN 4 PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR,

NURSING STAFF AND OCCUPANTS BEFORE CONSTRUCTION MAY BEGIN.

PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE

CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE

AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES #

A

B

C

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED DURING REGULAR SHIFTS, 8:00 AM TO 5:00 PM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

PROJECT PHASING

PHASE 1:

CONTRACTOR SHALL MOBILIZE AND RESEARCH / INVESTIGATE

EXISTING CONDITIONS AND ALL UTILITIES (NEW AND ONES TO BE

RELOCATED) AT THE SITE. ALL SUBMITTALS, REVIEWS, AND

APPROVALS SHALL BE COMPLETED DURING PHASE 1 AND PRIOR TO

BEGINNING OF PHASE 2, INCLUDING MEPTF SYSTEMS AND

TECHNOLOGY SUBMITTALS. COMPLETE ALL BASEMENT WORK AND

NEW MEPTF SYSTEMS WORK TO SUPPORT THE SUBSEQUENT

PHASES.

PHASE 2:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE CENTRAL SECTION OF THE BUILDING.

PHASE 3:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE NORTHERN WING OF THE BUILDING.

PHASE 4:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE SOUTHERN WING OF THE BUILDING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:2

P

M

GI104

INFECTION CONTROL/PHASING

PLANGUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1 1/2" = 1'-0"GI104

2 TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION

SCALE: 1/4" = 1'-0"GI104

3 TEMPORARY WALL CONSTRUCTION ELEVATION

SCALE: 1/8" = 1'-0"GI104

4 BASMENT INFECTON/CONTROL PAHSING PLAN

N

Revisions: Date:

aogrzewalla Text Box 05/02/2025

CONFERENCE

103C

OFFICE

OFFICE

103D

OFFICE

103A

OFFICE

TELE PHARMACY

MENS

OFFICE LOBBY

109A

COMM.

103B

LOBBY

OFFICE

101C

ACQUISITION

CHAPLAIN

101OFFICE

101D

OFFICE

101A

KITCHEN

OFFICE

106k

OFFICE

106l

OFFICE

106h

OFFICE

106g

DSS SUITE

OFFICE

106e

STORAGE

106d

OFFICE

106a

OFFICE

106j

OFFICE

106f

COPIER

106c

OFFICE

106b

OPEN OFFICE

OFFICE

100d

OFFICE

100c

OFFICE

100h

OFFICE

100k

OFFICE

100j

OFFICE

100l

WOMENS

OFFICE

100n

OFFICE

100g

OFFICE

100m

CONFERENCE

107f

OFFICE

107g

OFFICE

107a

OFC

107c

OFC

107d

OFC

107e

OFC

107b

SUITE

COMM

101B

OFFICE

109C

PHASE 2

1' - 11"

4'

3PHASE 4

PHASE 3

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

TEMPORARY PLASTIC BARRIER. SEE PLAN

AND PLAN NOTES

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: II

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 3/GI104.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GI104.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN 4 PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR,

NURSING STAFF AND OCCUPANTS BEFORE CONSTRUCTION MAY BEGIN.

PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE

CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE

AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES #

A

B

C

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED DURING REGULAR SHIFTS, 8:00 AM TO 5:00 PM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

PROJECT PHASING

PHASE 1:

CONTRACTOR SHALL MOBILIZE AND RESEARCH / INVESTIGATE

EXISTING CONDITIONS AND ALL UTILITIES (NEW AND ONES TO BE

RELOCATED) AT THE SITE. ALL SUBMITTALS, REVIEWS, AND

APPROVALS SHALL BE COMPLETED DURING PHASE 1 AND PRIOR TO

BEGINNING OF PHASE 2, INCLUDING MEPTF SYSTEMS AND

TECHNOLOGY SUBMITTALS. COMPLETE ALL BASEMENT WORK AND

NEW MEPTF SYSTEMS WORK TO SUPPORT THE SUBSEQUENT

PHASES.

PHASE 2:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE CENTRAL SECTION OF THE BUILDING.

PHASE 3:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE NORTHERN WING OF THE BUILDING.

PHASE 4:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE SOUTHERN WING OF THE BUILDING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:2

P

M

GI105

INFECTION CONTROL/PHASING

PLANGUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022 AO JP

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"GI105

1 FIRST FLOOR INFECTON/CONTROL PAHSING PLAN

N

Revisions: Date:

aogrzewalla Text Box 05/02/2025

2018-05164_Div23_Dwgs
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .