552-19-102 Drawings_Volume3.pdf

PDF 9 MB Posted

Attached to
Y1AA--Infrastructure Deficiencies B408 [552-19-102] Dayton VAMC
Solicitation number
36C25025B0036
Issued by

About this file

These are architectural demolition plans for a VA Medical Center infrastructure improvement project in Dayton, Ohio, specifically for Building 408. The documents detail a comprehensive four-phase demolition plan across the basement, first floor, second floor, and roof levels. The project involves renovating mechanical, electrical, plumbing, and technology (MEPTF) systems, abating hazardous materials, and replacing windows and doors throughout the building.

The phased approach includes: Phase 1 involving site investigation, utility research, and basement work; Phase 2 focusing on central building section renovations; Phase 3 targeting the northern wing; and Phase 4 addressing the southern wing. Infection control measures are extensively documented, including temporary barrier construction, access control, signage requirements, and work schedule restrictions. The demolition plans specify detailed removal protocols for ceiling assemblies, walls, doors, windows, and other building components, with an emphasis on minimizing disruption to ongoing facility operations and maintaining strict safety and cleanliness standards.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE

201A

LOUNGE

C-2-1

CHAPLAIN OFFICE

OFFICE

208E

OFFICE

208D

OFFICE

208C

OFFICE

208B

OFFICE

208F

OFFICE

208G

OFFICE

208H

OFFICE

207E

OFFICE

207D

OFFICE

107v

OFFICE

207B

AFCU SUITE

OFFICE

207F

OFFICE

207G

OFFICE

207I

OFFICE

207H

TOILET

OFFICE

202G

OFFICE

202F

OFFICE

202E

OFFICE

202D

OFFICE

202C

OFFICE

202B

OFFICE

202A

202H

C-2-2C-2-5

C-2-3

205l

ELEV.

NO.12

NNU OFFICE

205A

NNU OFFICE

205B

SAFETY OFFICE

205G

SAFETY OFFICE

205F

SAFETY OFFICE

205E

OIT OFFICE

205D

SAFETY OFFICE

205H

NNU OFFICE

205C

OFFICE

203F

SUITE

OFFICE

203D

OFFICE

203C

OFFICE

203B

OFFICE

203A

TOILET

208A

VESTIBULE

207F

CONFERENCE ROOM

203E

PHASE 3

PHASE 2PHASE 4

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

TEMPORARY PLASTIC BARRIER. SEE PLAN

AND PLAN NOTES

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: II

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 3/GI104.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GI104.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN 4 PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR,

NURSING STAFF AND OCCUPANTS BEFORE CONSTRUCTION MAY BEGIN.

PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE

CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE

AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES #

A

B

C

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED DURING REGULAR SHIFTS, 8:00 AM TO 5:00 PM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

PROJECT PHASING

PHASE 1:

CONTRACTOR SHALL MOBILIZE AND RESEARCH / INVESTIGATE

EXISTING CONDITIONS AND ALL UTILITIES (NEW AND ONES TO BE

RELOCATED) AT THE SITE. ALL SUBMITTALS, REVIEWS, AND

APPROVALS SHALL BE COMPLETED DURING PHASE 1 AND PRIOR TO

BEGINNING OF PHASE 2, INCLUDING MEPTF SYSTEMS AND

TECHNOLOGY SUBMITTALS. COMPLETE ALL BASEMENT WORK AND

NEW MEPTF SYSTEMS WORK TO SUPPORT THE SUBSEQUENT

PHASES.

PHASE 2:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE CENTRAL SECTION OF THE BUILDING.

PHASE 3:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE NORTHERN WING OF THE BUILDING.

PHASE 4:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE SOUTHERN WING OF THE BUILDING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:2

P

M

GI106

INFECTION CONTROL/PHASING

PLANGUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022 AO JP

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"GI106

1 SECOND FLOOR INFECTON/CONTROL PAHSING PLAN

N

Revisions: Date:

aogrzewalla Text Box 05/02/2025 aogrzewalla Snapshot

UP

PHASE 4

PHASE 2

PHASE 3

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: II

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 3/GI104.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GI104.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN 4 PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR,

NURSING STAFF AND OCCUPANTS BEFORE CONSTRUCTION MAY BEGIN.

PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE

CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE

AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES #

A

B

C

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED DURING REGULAR SHIFTS, 8:00 AM TO 5:00 PM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

PROJECT PHASING

PHASE 1:

CONTRACTOR SHALL MOBILIZE AND RESEARCH / INVESTIGATE

EXISTING CONDITIONS AND ALL UTILITIES (NEW AND ONES TO BE

RELOCATED) AT THE SITE. ALL SUBMITTALS, REVIEWS, AND

APPROVALS SHALL BE COMPLETED DURING PHASE 1 AND PRIOR TO

BEGINNING OF PHASE 2, INCLUDING MEPTF SYSTEMS AND

TECHNOLOGY SUBMITTALS. COMPLETE ALL BASEMENT WORK AND

NEW MEPTF SYSTEMS WORK TO SUPPORT THE SUBSEQUENT

PHASES.

PHASE 2:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE CENTRAL SECTION OF THE BUILDING.

PHASE 3:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE NORTHERN WING OF THE BUILDING.

PHASE 4:

CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE

HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS

AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS

THROUGH THE SOUTHERN WING OF THE BUILDING.

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

TEMPORARY PLASTIC BARRIER. SEE PLAN

AND PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:2

P

M

GI107

INFECTION CONTROL/PHASING

PLANGUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"GI107

1 ATTIC

Revisions: Date:

aogrzewalla Text Box 05/02/2025

DN

UNEXCAVATED

SPRINKELR SYSTEM

CONTROLS

205J

PIPE SPACE

205K

UNEXCAVATED

UNEXCAVATED UNEXCAVATED UNEXCAVATED

CONCRETE SLAB

PIPE SPACE

STORAGE

ENGINEERING

STORAGE ROOM

ELEV.

NO.12

MACHINE ROOM

LOCKSMITH

C-B-1

C-B-2

AD100

DEMOLITION GENERAL NOTES

COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING

IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS

REQUIRED TO BE REMOVED.

REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

CONSTRUCTION FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE

APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK TO

BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE NEW

CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF

NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK.

CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED

AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR FOLLOWING

ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE REPAIR TO THE

CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED ASSEMBLIES AS

WELL AS THE REPLACEMENT OF DAMAGED CEILING PANELS, WITHIN AND

BEYOND PROJECT LIMITS.

COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE

SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL

BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING

MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.

COORDINATE SCOPE OF HAZARDOUS MATERIAL REMOVAL WITH HAZARDOUS

TESTING REPORT AS SPECIFICATIONS.

REMOVE, LABEL, BUNDLE AND STORE INTERIOR MILLWORK FROM ALL DOORS

AND WINDOWS, PROVIDE DRAWINGS INDICATING DOOR AND WINDOW

INDENTIFICATION.

REFER TO DEMOLITION LEGEND FOR WINDOW DEMOLITION DETAILS

A

B

C

D

E

F

G

H

I

J

K

L

M

N

DEMOLITION PLAN NOTES

5.

REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.

SAW CUT EXISTING CONCRETE SLAB TO ACCOMMODATE NEW PLUMBING

WORK. RE: PLUMBING DRAWINGS FOR NEW WORK.

CUT ROOF OPENING AS INDICATED ON PLAN. PREP OPENING FOR NEW

CONSTRUCTION. REFER TO SHEET AS110 & AS501 FOR MORE INFORMATION.

REMOVE SECTION OF WALL FROM FLOOR TO UNDERSIDE OF DECK FOR NEW

MECHANICAL CHASE.

REMOVE DOOR AND DOOR HARDWARE. REFER TO COR FOR ANY SALVAGE.

A REMOVE WINDOW AND STORM

WINDOW ASSEMBLIES

DEMOLITION LEGEND

TYPE GRAPHIC DESCRIPTION

D REMOVE WINDOW ASSEMBLIES

5' - 6"

4'

5' - 4" 3' - 0"

8' - 4" 4' - 4"

7'

8'

4' - 4"

1'

1' - 6"

1'

1'

1'

3'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:3

P

M

AD100

BASEMENT FLOOR DEMOLITION

PLANGUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022 AO KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AD100

1 BASEMENT DEMOLITION PLAN

N

SCALE: 1/4" = 1'-0"AD100

2 BASEMENT DEMOLITION - FLOOR CUT

Revisions: Date:

aogrzewalla Text Box 05/02/2025

DEMOLITION GENERAL NOTES

COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING

IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS

REQUIRED TO BE REMOVED.

REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

CONSTRUCTION FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE

APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK TO

BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE NEW

CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF

NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK.

CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED

AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR FOLLOWING

ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE REPAIR TO THE

CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED ASSEMBLIES AS

WELL AS THE REPLACEMENT OF DAMAGED CEILING PANELS, WITHIN AND

BEYOND PROJECT LIMITS.

COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE

SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL

BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING

MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.

COORDINATE SCOPE OF HAZARDOUS MATERIAL REMOVAL WITH HAZARDOUS

TESTING REPORT AS SPECIFICATIONS.

REMOVE, LABEL, BUNDLE AND STORE INTERIOR MILLWORK FROM ALL DOORS

AND WINDOWS, PROVIDE DRAWINGS INDICATING DOOR AND WINDOW

INDENTIFICATION.

REFER TO DEMOLITION LEGEND FOR WINDOW DEMOLITION DETAILS

A

B

C

D

E

F

G

H

I

J

K

L

M

N

DEMOLITION PLAN NOTES

5.

REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.

SAW CUT EXISTING CONCRETE SLAB TO ACCOMMODATE NEW PLUMBING

WORK. RE: PLUMBING DRAWINGS FOR NEW WORK.

CUT ROOF OPENING AS INDICATED ON PLAN. PREP OPENING FOR NEW

CONSTRUCTION. REFER TO SHEET AS110 & AS501 FOR MORE INFORMATION.

REMOVE SECTION OF WALL FROM FLOOR TO UNDERSIDE OF DECK FOR NEW

MECHANICAL CHASE.

REMOVE DOOR AND DOOR HARDWARE. REFER TO COR FOR ANY SALVAGE.

CONFERENCE

103C

OFFICE

103D

OFFICE

LOBBY

OFFICE

101C

ACQUISITION

CHAPLAIN

OFFICE

101D

OFFICE

100d

OFFICE

100c

OFFICE

101A

OPEN OFFICE

OFFICE

100h

OFFICE

100k

OFFICE

100l

OFFICE

100j

CORRIDOR

CORRIDOR

OFFICE

106b

OFFICE

106a

STORAGE

106d

COPIER

106c OFFICE

106j

OFFICE

106l

OFFICE

106k

Room

KITCHEN

OFFICE

103A

OFFICE

MENS

COMM.

103B

OFFICE

109C

OFFICE

106h

OFFICE

106g

OFFICE

106e

OFFICE

106f

OFFICE

107a

OFC

107c

OFC

107d

OFC

107b

SUITE

CONFERENCE

107f

OFFICE

107g

OFC

107e

DSS SUITE

CORRIDOR

TELE PHARMACY

WOMENS

OFFICE

100g

OFFICE

100m

OFFICE

100n

1 1

1 1

1' - 11 1/8"

OFFICE LOBBY

109A

A REMOVE WINDOW AND STORM

WINDOW ASSEMBLIES

DEMOLITION LEGEND

TYPE GRAPHIC DESCRIPTION

D REMOVE WINDOW ASSEMBLIES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:3

P

M

AD101

FIRST FLOOR DEMOLITION PLAN

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022 AO KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AD101

1 FIRST FLOOR DEMOLITION PLAN

N

Revisions: Date:

aogrzewalla Text Box 05/02/2025

CHAPLAIN OFFICE

SAFETY

107dd C-2-1

OFFICE

203D

OFFICE

203B

OFFICE

203A

CONFERENCE ROOM

203E

SUITE

OFFICE

203F

OFFICE

203C

C-2-5

OFFICE

202E

OFFICE

202F

OFFICE

202G

C-2-2

TOILET

OIT OFFICE

205D

NNU OFFICE

205C

NNU OFFICE

205B

NNU OFFICE

205A

SAFETY OFFICE

205E

SAFETY OFFICE

205F

SAFETY OFFICE

205G

SAFETY OFFICE

205H

ELEV.

NO.12 205l

TOILET

C-2-3

OFFICE

207F

OFFICE

207G

OFFICE

207I

OFFICE

207B

AFCU SUITE

OFFICE

207E

OFFICE

207D

OFFICE

107v

OFFICE

208F

OFFICE

208G

OFFICE

208H

OFFICE

208E

OFFICE

208C

OFFICE

202A

OFFICE

202B

OFFICE

202C

OFFICE

202D

LOUNGE

OFFICE

207H

OFFICE

201A

VESTIBULE

207F

DEMOLITION GENERAL NOTES

COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING

IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS

REQUIRED TO BE REMOVED.

REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

CONSTRUCTION FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE

APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK TO

BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE NEW

CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF

NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK.

CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED

AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR FOLLOWING

ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE REPAIR TO THE

CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED ASSEMBLIES AS

WELL AS THE REPLACEMENT OF DAMAGED CEILING PANELS, WITHIN AND

BEYOND PROJECT LIMITS.

COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE

SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL

BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING

MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.

COORDINATE SCOPE OF HAZARDOUS MATERIAL REMOVAL WITH HAZARDOUS

TESTING REPORT AS SPECIFICATIONS.

REMOVE, LABEL, BUNDLE AND STORE INTERIOR MILLWORK FROM ALL DOORS

AND WINDOWS, PROVIDE DRAWINGS INDICATING DOOR AND WINDOW

INDENTIFICATION.

REFER TO DEMOLITION LEGEND FOR WINDOW DEMOLITION DETAILS

A

B

C

D

E

F

G

H

I

J

K

L

M

N

DEMOLITION PLAN NOTES

5.

REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.

SAW CUT EXISTING CONCRETE SLAB TO ACCOMMODATE NEW PLUMBING

WORK. RE: PLUMBING DRAWINGS FOR NEW WORK.

CUT ROOF OPENING AS INDICATED ON PLAN. PREP OPENING FOR NEW

CONSTRUCTION. REFER TO SHEET AS110 & AS501 FOR MORE INFORMATION.

REMOVE SECTION OF WALL FROM FLOOR TO UNDERSIDE OF DECK FOR NEW

MECHANICAL CHASE.

REMOVE DOOR AND DOOR HARDWARE. REFER TO COR FOR ANY SALVAGE.

A REMOVE WINDOW AND STORM

WINDOW ASSEMBLIES

DEMOLITION LEGEND

TYPE GRAPHIC DESCRIPTION

D REMOVE WINDOW ASSEMBLIES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:3

P

M

AD102

SECOND FLOOR DEMOLITION

PLANGUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022 AO KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AD102

1 LEVEL 2 DEMO

N

Revisions: Date:

aogrzewalla Text Box 05/02/2025

AS201

AS202

AS201

AS202

AS203

AS203

V

IF

4'

1/ 2"

O P

E N

IN

G

6'

3' - 0"

OPENING

6' - 0"

OPENING

6' - 0" 3' - 0"

O P

E N

IN

G

6'

V

IF

4'

1/ 2"

3' - 0"

OPENING

6' - 0"

V

IF

5'

O P

E N

IN

G

6'

O P

E N

IN

G

6'

3 3

3' - 0"

OPENING

6' - 0"

ROOF DEMOLITION GENERAL NOTES

COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING

IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS

REQUIRED TO BE REMOVED.

REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

CONSTRUCTION FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE

APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK TO

BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE NEW

CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF

NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK.

CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE

SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL

BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING

MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.

COORDINATE SCOPE OF HAZARDOUS MATERIAL REMOVAL WITH HAZARDOUS

TESTING REPORT AS SPECIFICATIONS.

REMOVE, LABEL, BUNDLE AND STORE INTERIOR MILLWORK FROM ALL DOORS

AND WINDOWS, PROVIDE DRAWINGS INDICATING DOOR AND WINDOW

INDENTIFICATION.

A

B

C

D

E

F

G

H

I

J

K

L

DEMOLITION PLAN NOTES

REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.

SAW CUT EXISTING CONCRETE SLAB TO ACCOMMODATE NEW PLUMBING

WORK. RE: PLUMBING DRAWINGS FOR NEW WORK.

CUT ROOF OPENING AS INDICATED ON PLAN. PREP OPENING FOR NEW

CONSTRUCTION. REFER TO SHEET AS110 & AS501 FOR MORE INFORMATION.

REMOVE SECTION OF WALL FROM FLOOR TO UNDERSIDE OF DECK FOR NEW

MECHANICAL CHASE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:3

P

M

AD110

ROOF DEMOLITION PLAN

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022 AO JP

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AD110

1 ROOF DEMO

N

Revisions: Date:

aogrzewalla Text Box 05/02/2025

2018-05164_Div23_Dwgs
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING
M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M401 - ENLARGED PLANS
M501 - DETAILS
M502 - DETAILS
M503 - DETAILS
M504 - HYDRONIC PIPING SCHEMATICS
M505 - STEAM PIPING SCHEMATIC
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
M702 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MH100 - BASEMENT FLOOR PLAN - DUCTWORK
MH101 - FIRST FLOOR PLAN - DUCTWORK
MH102 - SECOND FLOOR PLAN - DUCTWORK
MH103 - ATTIC FLOOR PLAN - DUCTWORK

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .