552-19-102 Drawings_Volume3.pdf
PDF 9 MB Posted
- Solicitation number
- 36C25025B0036
About this file
These are architectural demolition plans for a VA Medical Center infrastructure improvement project in Dayton, Ohio, specifically for Building 408. The documents detail a comprehensive four-phase demolition plan across the basement, first floor, second floor, and roof levels. The project involves renovating mechanical, electrical, plumbing, and technology (MEPTF) systems, abating hazardous materials, and replacing windows and doors throughout the building.
The phased approach includes: Phase 1 involving site investigation, utility research, and basement work; Phase 2 focusing on central building section renovations; Phase 3 targeting the northern wing; and Phase 4 addressing the southern wing. Infection control measures are extensively documented, including temporary barrier construction, access control, signage requirements, and work schedule restrictions. The demolition plans specify detailed removal protocols for ceiling assemblies, walls, doors, windows, and other building components, with an emphasis on minimizing disruption to ongoing facility operations and maintaining strict safety and cleanliness standards.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFICE
201A
LOUNGE
C-2-1
CHAPLAIN OFFICE
OFFICE
208E
OFFICE
208D
OFFICE
208C
OFFICE
208B
OFFICE
208F
OFFICE
208G
OFFICE
208H
OFFICE
207E
OFFICE
207D
OFFICE
107v
OFFICE
207B
AFCU SUITE
OFFICE
207F
OFFICE
207G
OFFICE
207I
OFFICE
207H
TOILET
OFFICE
202G
OFFICE
202F
OFFICE
202E
OFFICE
202D
OFFICE
202C
OFFICE
202B
OFFICE
202A
202H
C-2-2C-2-5
C-2-3
205l
ELEV.
NO.12
NNU OFFICE
205A
NNU OFFICE
205B
SAFETY OFFICE
205G
SAFETY OFFICE
205F
SAFETY OFFICE
205E
OIT OFFICE
205D
SAFETY OFFICE
205H
NNU OFFICE
205C
OFFICE
203F
SUITE
OFFICE
203D
OFFICE
203C
OFFICE
203B
OFFICE
203A
TOILET
208A
VESTIBULE
207F
CONFERENCE ROOM
203E
PHASE 3
PHASE 2PHASE 4
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
REFERENCE AREA FOR ABOVE
CEILING WORK ON FLOOR BELOW.
REFER TO ENGINEERING DRAWINGS
FOR FULL SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
TEMPORARY PLASTIC BARRIER. SEE PLAN
AND PLAN NOTES
INFECTION CONTROL PLAN NOTES #
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 3/GI104.
PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 2/GI104.
PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
PROJECT SHALL BE COMPLETED IN 4 PHASES.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR,
NURSING STAFF AND OCCUPANTS BEFORE CONSTRUCTION MAY BEGIN.
PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE
CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE
AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN
A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
INFECTION CONTROL GENERAL NOTES
PHASING GENERAL NOTES #
A
B
C
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS
SHALL BE COMPLETED DURING REGULAR SHIFTS, 8:00 AM TO 5:00 PM.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
PROJECT PHASING
PHASE 1:
CONTRACTOR SHALL MOBILIZE AND RESEARCH / INVESTIGATE
EXISTING CONDITIONS AND ALL UTILITIES (NEW AND ONES TO BE
RELOCATED) AT THE SITE. ALL SUBMITTALS, REVIEWS, AND
APPROVALS SHALL BE COMPLETED DURING PHASE 1 AND PRIOR TO
BEGINNING OF PHASE 2, INCLUDING MEPTF SYSTEMS AND
TECHNOLOGY SUBMITTALS. COMPLETE ALL BASEMENT WORK AND
NEW MEPTF SYSTEMS WORK TO SUPPORT THE SUBSEQUENT
PHASES.
PHASE 2:
CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE
HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS
AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS
THROUGH THE CENTRAL SECTION OF THE BUILDING.
PHASE 3:
CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE
HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS
AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS
THROUGH THE NORTHERN WING OF THE BUILDING.
PHASE 4:
CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE
HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS
AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS
THROUGH THE SOUTHERN WING OF THE BUILDING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
P
.1
V
A D a y to n
I D
IQ
\T
O
C o rr e c t In fr a s tr u c ti o n
D e fe c ie n c ie s B ld g
G D
I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.0
B L
D G v
.r v t
/2
/2
:3
:2
P
M
GI106
INFECTION CONTROL/PHASING
PLANGUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET, SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
ADAM OGRZEWALLA
HEAPY ENGINEERING
1400 W DOROTHY LANE
DAYTON, OH 45409
317-800-6388
MATT GRAHAM
CORRECT INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OH 45428
552-19-102
PHIL WEST, COR
08/15/2022 AO JP
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"GI106
1 SECOND FLOOR INFECTON/CONTROL PAHSING PLAN
N
Revisions: Date:
aogrzewalla Text Box 05/02/2025 aogrzewalla Snapshot
UP
PHASE 4
PHASE 2
PHASE 3
INFECTION CONTROL PLAN NOTES #
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 3/GI104.
PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 2/GI104.
PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
PROJECT SHALL BE COMPLETED IN 4 PHASES.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR,
NURSING STAFF AND OCCUPANTS BEFORE CONSTRUCTION MAY BEGIN.
PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE
CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE
AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN
A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
INFECTION CONTROL GENERAL NOTES
PHASING GENERAL NOTES #
A
B
C
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS
SHALL BE COMPLETED DURING REGULAR SHIFTS, 8:00 AM TO 5:00 PM.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
PROJECT PHASING
PHASE 1:
CONTRACTOR SHALL MOBILIZE AND RESEARCH / INVESTIGATE
EXISTING CONDITIONS AND ALL UTILITIES (NEW AND ONES TO BE
RELOCATED) AT THE SITE. ALL SUBMITTALS, REVIEWS, AND
APPROVALS SHALL BE COMPLETED DURING PHASE 1 AND PRIOR TO
BEGINNING OF PHASE 2, INCLUDING MEPTF SYSTEMS AND
TECHNOLOGY SUBMITTALS. COMPLETE ALL BASEMENT WORK AND
NEW MEPTF SYSTEMS WORK TO SUPPORT THE SUBSEQUENT
PHASES.
PHASE 2:
CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE
HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS
AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS
THROUGH THE CENTRAL SECTION OF THE BUILDING.
PHASE 3:
CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE
HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS
AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS
THROUGH THE NORTHERN WING OF THE BUILDING.
PHASE 4:
CONSISTS OF ALL WORK TO RENOVATE THE MEPTF SYSTEMS, ABATE
HAZARDOUS MATERIALS, AND THE REPLACEMENT OF THE WINDOWS
AND DOORS THROUGHOUT THE AREA IDENTIFIED IN THE DRAWINGS
THROUGH THE SOUTHERN WING OF THE BUILDING.
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
REFERENCE AREA FOR ABOVE
CEILING WORK ON FLOOR BELOW.
REFER TO ENGINEERING DRAWINGS
FOR FULL SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
TEMPORARY PLASTIC BARRIER. SEE PLAN
AND PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
P
.1
V
A D a y to n
I D
IQ
\T
O
C o rr e c t In fr a s tr u c ti o n
D e fe c ie n c ie s B ld g
G D
I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.0
B L
D G v
.r v t
/2
/2
:3
:2
P
M
GI107
INFECTION CONTROL/PHASING
PLANGUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET, SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
ADAM OGRZEWALLA
HEAPY ENGINEERING
1400 W DOROTHY LANE
DAYTON, OH 45409
317-800-6388
MATT GRAHAM
CORRECT INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OH 45428
552-19-102
PHIL WEST, COR
08/15/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"GI107
1 ATTIC
Revisions: Date:
aogrzewalla Text Box 05/02/2025
DN
UNEXCAVATED
SPRINKELR SYSTEM
CONTROLS
205J
PIPE SPACE
205K
UNEXCAVATED
UNEXCAVATED UNEXCAVATED UNEXCAVATED
CONCRETE SLAB
PIPE SPACE
STORAGE
ENGINEERING
STORAGE ROOM
ELEV.
NO.12
MACHINE ROOM
LOCKSMITH
C-B-1
C-B-2
AD100
DEMOLITION GENERAL NOTES
COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS
REQUIRED TO BE REMOVED.
REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
CONSTRUCTION FLOOR PLANS AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE
APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK TO
BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE NEW
CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF
NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK.
CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR FOLLOWING
ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE REPAIR TO THE
CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED ASSEMBLIES AS
WELL AS THE REPLACEMENT OF DAMAGED CEILING PANELS, WITHIN AND
BEYOND PROJECT LIMITS.
COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE
SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL
BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING
MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.
COORDINATE SCOPE OF HAZARDOUS MATERIAL REMOVAL WITH HAZARDOUS
TESTING REPORT AS SPECIFICATIONS.
REMOVE, LABEL, BUNDLE AND STORE INTERIOR MILLWORK FROM ALL DOORS
AND WINDOWS, PROVIDE DRAWINGS INDICATING DOOR AND WINDOW
INDENTIFICATION.
REFER TO DEMOLITION LEGEND FOR WINDOW DEMOLITION DETAILS
A
B
C
D
E
F
G
H
I
J
K
L
M
N
DEMOLITION PLAN NOTES
5.
REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.
SAW CUT EXISTING CONCRETE SLAB TO ACCOMMODATE NEW PLUMBING
WORK. RE: PLUMBING DRAWINGS FOR NEW WORK.
CUT ROOF OPENING AS INDICATED ON PLAN. PREP OPENING FOR NEW
CONSTRUCTION. REFER TO SHEET AS110 & AS501 FOR MORE INFORMATION.
REMOVE SECTION OF WALL FROM FLOOR TO UNDERSIDE OF DECK FOR NEW
MECHANICAL CHASE.
REMOVE DOOR AND DOOR HARDWARE. REFER TO COR FOR ANY SALVAGE.
A REMOVE WINDOW AND STORM
WINDOW ASSEMBLIES
DEMOLITION LEGEND
TYPE GRAPHIC DESCRIPTION
D REMOVE WINDOW ASSEMBLIES
5' - 6"
4'
5' - 4" 3' - 0"
8' - 4" 4' - 4"
7'
8'
4' - 4"
1'
1' - 6"
1'
1'
1'
3'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
P
.1
V
A D a y to n
I D
IQ
\T
O
C o rr e c t In fr a s tr u c ti o n
D e fe c ie n c ie s B ld g
G D
I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.0
B L
D G v
.r v t
/2
/2
:3
:3
P
M
AD100
BASEMENT FLOOR DEMOLITION
PLANGUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET, SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
ADAM OGRZEWALLA
HEAPY ENGINEERING
1400 W DOROTHY LANE
DAYTON, OH 45409
317-800-6388
MATT GRAHAM
CORRECT INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OH 45428
552-19-102
PHIL WEST, COR
08/15/2022 AO KH
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AD100
1 BASEMENT DEMOLITION PLAN
N
SCALE: 1/4" = 1'-0"AD100
2 BASEMENT DEMOLITION - FLOOR CUT
Revisions: Date:
aogrzewalla Text Box 05/02/2025
DEMOLITION GENERAL NOTES
COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS
REQUIRED TO BE REMOVED.
REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
CONSTRUCTION FLOOR PLANS AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE
APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK TO
BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE NEW
CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF
NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK.
CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR FOLLOWING
ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE REPAIR TO THE
CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED ASSEMBLIES AS
WELL AS THE REPLACEMENT OF DAMAGED CEILING PANELS, WITHIN AND
BEYOND PROJECT LIMITS.
COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE
SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL
BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING
MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.
COORDINATE SCOPE OF HAZARDOUS MATERIAL REMOVAL WITH HAZARDOUS
TESTING REPORT AS SPECIFICATIONS.
REMOVE, LABEL, BUNDLE AND STORE INTERIOR MILLWORK FROM ALL DOORS
AND WINDOWS, PROVIDE DRAWINGS INDICATING DOOR AND WINDOW
INDENTIFICATION.
REFER TO DEMOLITION LEGEND FOR WINDOW DEMOLITION DETAILS
A
B
C
D
E
F
G
H
I
J
K
L
M
N
DEMOLITION PLAN NOTES
5.
REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.
SAW CUT EXISTING CONCRETE SLAB TO ACCOMMODATE NEW PLUMBING
WORK. RE: PLUMBING DRAWINGS FOR NEW WORK.
CUT ROOF OPENING AS INDICATED ON PLAN. PREP OPENING FOR NEW
CONSTRUCTION. REFER TO SHEET AS110 & AS501 FOR MORE INFORMATION.
REMOVE SECTION OF WALL FROM FLOOR TO UNDERSIDE OF DECK FOR NEW
MECHANICAL CHASE.
REMOVE DOOR AND DOOR HARDWARE. REFER TO COR FOR ANY SALVAGE.
CONFERENCE
103C
OFFICE
103D
OFFICE
LOBBY
OFFICE
101C
ACQUISITION
CHAPLAIN
OFFICE
101D
OFFICE
100d
OFFICE
100c
OFFICE
101A
OPEN OFFICE
OFFICE
100h
OFFICE
100k
OFFICE
100l
OFFICE
100j
CORRIDOR
CORRIDOR
OFFICE
106b
OFFICE
106a
STORAGE
106d
COPIER
106c OFFICE
106j
OFFICE
106l
OFFICE
106k
Room
KITCHEN
OFFICE
103A
OFFICE
MENS
COMM.
103B
OFFICE
109C
OFFICE
106h
OFFICE
106g
OFFICE
106e
OFFICE
106f
OFFICE
107a
OFC
107c
OFC
107d
OFC
107b
SUITE
CONFERENCE
107f
OFFICE
107g
OFC
107e
DSS SUITE
CORRIDOR
TELE PHARMACY
WOMENS
OFFICE
100g
OFFICE
100m
OFFICE
100n
1 1
1 1
1' - 11 1/8"
OFFICE LOBBY
109A
A REMOVE WINDOW AND STORM
WINDOW ASSEMBLIES
DEMOLITION LEGEND
TYPE GRAPHIC DESCRIPTION
D REMOVE WINDOW ASSEMBLIES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
P
.1
V
A D a y to n
I D
IQ
\T
O
C o rr e c t In fr a s tr u c ti o n
D e fe c ie n c ie s B ld g
G D
I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.0
B L
D G v
.r v t
/2
/2
:3
:3
P
M
AD101
FIRST FLOOR DEMOLITION PLAN
GUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET, SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
ADAM OGRZEWALLA
HEAPY ENGINEERING
1400 W DOROTHY LANE
DAYTON, OH 45409
317-800-6388
MATT GRAHAM
CORRECT INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OH 45428
552-19-102
PHIL WEST, COR
08/15/2022 AO KH
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AD101
1 FIRST FLOOR DEMOLITION PLAN
N
Revisions: Date:
aogrzewalla Text Box 05/02/2025
CHAPLAIN OFFICE
SAFETY
107dd C-2-1
OFFICE
203D
OFFICE
203B
OFFICE
203A
CONFERENCE ROOM
203E
SUITE
OFFICE
203F
OFFICE
203C
C-2-5
OFFICE
202E
OFFICE
202F
OFFICE
202G
C-2-2
TOILET
OIT OFFICE
205D
NNU OFFICE
205C
NNU OFFICE
205B
NNU OFFICE
205A
SAFETY OFFICE
205E
SAFETY OFFICE
205F
SAFETY OFFICE
205G
SAFETY OFFICE
205H
ELEV.
NO.12 205l
TOILET
C-2-3
OFFICE
207F
OFFICE
207G
OFFICE
207I
OFFICE
207B
AFCU SUITE
OFFICE
207E
OFFICE
207D
OFFICE
107v
OFFICE
208F
OFFICE
208G
OFFICE
208H
OFFICE
208E
OFFICE
208C
OFFICE
202A
OFFICE
202B
OFFICE
202C
OFFICE
202D
LOUNGE
OFFICE
207H
OFFICE
201A
VESTIBULE
207F
DEMOLITION GENERAL NOTES
COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS
REQUIRED TO BE REMOVED.
REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
CONSTRUCTION FLOOR PLANS AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE
APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK TO
BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE NEW
CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF
NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK.
CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR FOLLOWING
ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE REPAIR TO THE
CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED ASSEMBLIES AS
WELL AS THE REPLACEMENT OF DAMAGED CEILING PANELS, WITHIN AND
BEYOND PROJECT LIMITS.
COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE
SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL
BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING
MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.
COORDINATE SCOPE OF HAZARDOUS MATERIAL REMOVAL WITH HAZARDOUS
TESTING REPORT AS SPECIFICATIONS.
REMOVE, LABEL, BUNDLE AND STORE INTERIOR MILLWORK FROM ALL DOORS
AND WINDOWS, PROVIDE DRAWINGS INDICATING DOOR AND WINDOW
INDENTIFICATION.
REFER TO DEMOLITION LEGEND FOR WINDOW DEMOLITION DETAILS
A
B
C
D
E
F
G
H
I
J
K
L
M
N
DEMOLITION PLAN NOTES
5.
REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.
SAW CUT EXISTING CONCRETE SLAB TO ACCOMMODATE NEW PLUMBING
WORK. RE: PLUMBING DRAWINGS FOR NEW WORK.
CUT ROOF OPENING AS INDICATED ON PLAN. PREP OPENING FOR NEW
CONSTRUCTION. REFER TO SHEET AS110 & AS501 FOR MORE INFORMATION.
REMOVE SECTION OF WALL FROM FLOOR TO UNDERSIDE OF DECK FOR NEW
MECHANICAL CHASE.
REMOVE DOOR AND DOOR HARDWARE. REFER TO COR FOR ANY SALVAGE.
A REMOVE WINDOW AND STORM
WINDOW ASSEMBLIES
DEMOLITION LEGEND
TYPE GRAPHIC DESCRIPTION
D REMOVE WINDOW ASSEMBLIES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
P
.1
V
A D a y to n
I D
IQ
\T
O
C o rr e c t In fr a s tr u c ti o n
D e fe c ie n c ie s B ld g
G D
I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.0
B L
D G v
.r v t
/2
/2
:3
:3
P
M
AD102
SECOND FLOOR DEMOLITION
PLANGUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET, SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
ADAM OGRZEWALLA
HEAPY ENGINEERING
1400 W DOROTHY LANE
DAYTON, OH 45409
317-800-6388
MATT GRAHAM
CORRECT INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OH 45428
552-19-102
PHIL WEST, COR
08/15/2022 AO KH
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AD102
1 LEVEL 2 DEMO
N
Revisions: Date:
aogrzewalla Text Box 05/02/2025
AS201
AS202
AS201
AS202
AS203
AS203
V
IF
4'
1/ 2"
O P
E N
IN
G
6'
3' - 0"
OPENING
6' - 0"
OPENING
6' - 0" 3' - 0"
O P
E N
IN
G
6'
V
IF
4'
1/ 2"
3' - 0"
OPENING
6' - 0"
V
IF
5'
O P
E N
IN
G
6'
O P
E N
IN
G
6'
3 3
3' - 0"
OPENING
6' - 0"
ROOF DEMOLITION GENERAL NOTES
COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS
REQUIRED TO BE REMOVED.
REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
CONSTRUCTION FLOOR PLANS AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE
APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK TO
BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE NEW
CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF
NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK.
CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE
SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL
BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING
MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.
COORDINATE SCOPE OF HAZARDOUS MATERIAL REMOVAL WITH HAZARDOUS
TESTING REPORT AS SPECIFICATIONS.
REMOVE, LABEL, BUNDLE AND STORE INTERIOR MILLWORK FROM ALL DOORS
AND WINDOWS, PROVIDE DRAWINGS INDICATING DOOR AND WINDOW
INDENTIFICATION.
A
B
C
D
E
F
G
H
I
J
K
L
DEMOLITION PLAN NOTES
REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.
SAW CUT EXISTING CONCRETE SLAB TO ACCOMMODATE NEW PLUMBING
WORK. RE: PLUMBING DRAWINGS FOR NEW WORK.
CUT ROOF OPENING AS INDICATED ON PLAN. PREP OPENING FOR NEW
CONSTRUCTION. REFER TO SHEET AS110 & AS501 FOR MORE INFORMATION.
REMOVE SECTION OF WALL FROM FLOOR TO UNDERSIDE OF DECK FOR NEW
MECHANICAL CHASE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
P
.1
V
A D a y to n
I D
IQ
\T
O
C o rr e c t In fr a s tr u c ti o n
D e fe c ie n c ie s B ld g
G D
I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.0
B L
D G v
.r v t
/2
/2
:3
:3
P
M
AD110
ROOF DEMOLITION PLAN
GUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET, SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
ADAM OGRZEWALLA
HEAPY ENGINEERING
1400 W DOROTHY LANE
DAYTON, OH 45409
317-800-6388
MATT GRAHAM
CORRECT INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OH 45428
552-19-102
PHIL WEST, COR
08/15/2022 AO JP
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AD110
1 ROOF DEMO
N
Revisions: Date:
aogrzewalla Text Box 05/02/2025
| 2018-05164_Div23_Dwgs |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .