This document is a cover sheet for 100% Construction Documents for the Dayton Veterans Affairs Medical Center infrastructure improvement project for Building 408. The project, identified by number 552-19-102, involves correcting infrastructure deficiencies and is fully sprinklered. The construction documents are prepared by Guidon Design Inc. (architect) with Heapy Engineering (mechanical, electrical, plumbing engineering), located in Indianapolis, IN and Dayton, OH respectively. The project contact is Phil West, Contracting Officer Representative (COR) at the Dayton VA Medical Center, with the project located at 4100 W. Third Street, Dayton, OH 45428. The cover sheet includes a location map, building elevation rendering, and a comprehensive sheet list covering general, architectural, plumbing, fire protection, mechanical, and electrical drawings, indicating a comprehensive renovation of the facility's infrastructure systems.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
N
PROJECT LOCATION
BUILDING 408
AREA MAP
N
PROJECT LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
P
.1
V
A D a y to n
I D
IQ
\T
O
C o rr e c t In fr a s tr u c ti o n
D e fe c ie n c ie s B ld g
G D
I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.0
B L
D G v
.r v t
/2
/2
:3
:1
P
M
GI000
COVER SHEET
GUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET, SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
ADAM OGRZEWALLA
HEAPY ENGINEERING
1400 W DOROTHY LANE
DAYTON, OH 45409
317-800-6388
MATT GRAHAM
CORRECT INFRASTRUCTURE
DEFICIENCIES, B408
DAYTON, OH 45428
552-19-102
PHIL WEST, COR
08/15/2022 JG KJW
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
DAYTON VETERANS AFFAIRS MEDICAL CENTER
DAYTON, OH 45428
100% CONSTRUCTION DOCUMENTS
CORRECT INFRASTRUCTURE
DEFICIENCIES, B408
552-19-102
SHEET LIST
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 LIFE SAFETY PLAN
GI102 LIFE SAFETY PLAN
GI103 LIFE SAFETY PLAN
GI104 INFECTION CONTROL/PHASING PLAN
GI105 INFECTION CONTROL/PHASING PLAN
GI106 INFECTION CONTROL/PHASING PLAN
ARCHITECTURAL
AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AD100 BASEMENT FLOOR DEMOLITION PLAN
AD101 FIRST FLOOR DEMOLITION PLAN
AD102 SECOND FLOOR DEMOLITION PLAN
AD110 ROOF DEMOLITION PLAN
AS101 BASEMENT FLOOR PLAN
AS112 SECOND FLOOR REFLECTED CEILING PLAN
AS110 ROOF PLAN
AS111 FIRST FLOOR REFLECTED CEILING PLAN
AS102 FIRST FLOOR PLAN
AS103 SECOND FLOOR PLAN
AS602 DOOR AND WINDOW SCHEDULE
PLUMBING
P001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
PD100 PLUMBING PLANS - REMOVALS
P100 BASEMENT FLOOR PLAN - NEW WORK
P101 FIRST FLOOR PLAN - NEW WORK
P102 SECOND FLOOR PLAN - NEW WORK
P501 DETAILS AND SCHEDULES
FIRE PROTECTION
FX001 LEGEND, ADDREVIATIONS, & INDEX OF DRAWINGS
FX100 FIRE SUPPRESSION PLANS
MECHANICAL
M001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
MD100 BASEMENT FLOOR PLAN - REMOVALS
MD101 FIRST FLOOR PLAN - REMOVALS
MD102 SECOND FLOOR PLAN - REMOVALS
MD103 ATTIC FLOOR PLAN - REMOVALS
MH100 BASEMENT FLOOR PLAN - DUCTWORK
MH101 FIRST FLOOR PLAN - DUCTWORK
MH102 SECOND FLOOR PLAN - DUCTWORK
MH103 ATTIC FLOOR PLAN - DUCTWORK
MP100 BASEMENT FLOOR PLAN - PIPING
MP101 FIRST FLOOR PLAN - PIPING
MP102 SECOND FLOOR PLAN - PIPING
MP103 ATTIC FLOOR PLAN - PIPING
M401 ENLARGED PLANS
M501 DETAILS
M502 DETAILS
M503 DETAILS
M504 HYDRONIC PIPING SCHEMATICS
M505 STEAM PIPING SCHEMATIC
M601 SCHEDULES
M602 SCHEDULES
M603 SCHEDULES
M701 CONTROLS AND AUTOMATION
M702 CONTROLS AND AUTOMATION
ELECTRICAL
E001 LEGEND, ABBREVIATIONS & DRAWINGS
E501 DETAILS AND SCHEDULES
E502 LIGHTING FIXTURES DESCRIPTIONS
E601 BLDG 408 - SINGLE LINE DIAGRAM
ED100 BASEMENT FLOOR PLAN - ELECTRICAL - REMOVALS
ED101 FIRST FLOOR PLAN - ELECTRICAL - REMOVALS
ED102 SECOND FLOOR PLAN - ELECTRICAL - REMOVALS
ED103 ATTIC FLOOR PLAN - ELECTRICAL - REMOVALS
EL101 FIRST FLOOR PLAN - LIGHTING - NEW WORK
EL102 SECOND FLOOR PLAN - LIGHTING - NEW WORK
EL103 ATTIC FLOOR PLAN - LIGHTING - NEW WORK
EP100 BASEMENT FLOOR PLAN - POWER & SYSTEMS - NEW WORK
EP101 FIRST FLOOR PLAN - POWER & SYSTEMS - NEW WORK
EP102 SECOND FLOOR PLAN - POWER & SYSTEMS - NEW WORK
EP103 ATTIC FLOOR PLAN - POWER & SYSTEMS - NEW WORK
ES110 ROOF PLAN
Contact:Contact: Contact:
HEAPY ENGINEERING
Matthew Graham, P.E., LEED AP BD+C
MEPTF Project Manager
MECHANICAL,
ELECTRICAL &
PLUMBING
DAYTON VA MEDICAL CENTER
Phil West, COR
Project Engineer
4100 W. Third Street Dayton, OH 45428 p: 937.268.6511 x 2305 e: phillip.west@va.gov
OWNER
GUIDON DESIGN INC.
Adam Ogrzewalla, AIA
A/E Project Manager
1221 N. Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 103 e: aogrzewalla@guidondesign.com
ARCHITECT, CIVIL,
STRUCTURAL ENGINEERING
1400 West Dorothy Lane Dayton OH 45409 p: 937.224.0861 e: MSGraham@heapy.com
Revisions: Date:
aogrzewalla Text Box 05/02/2025 aogrzewalla Snapshot
| 2018-05164_Div23_Dwgs |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
| M001 - LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS |
| M401 - ENLARGED PLANS |
| M501 - DETAILS |
| M502 - DETAILS |
| M503 - DETAILS |
| M504 - HYDRONIC PIPING SCHEMATICS |
| M505 - STEAM PIPING SCHEMATIC |
| M601 - SCHEDULES |
| M602 - SCHEDULES |
| M603 - SCHEDULES |
| M701 - CONTROLS AND AUTOMATION |
| M702 - CONTROLS AND AUTOMATION |
| MD100 - BASEMENT FLOOR PLAN - REMOVALS |
| MD101 - FIRST FLOOR PLAN - REMOVALS |
| MD102 - SECOND FLOOR PLAN - REMOVALS |
| MD103 - ATTIC FLOOR PLAN - REMOVALS |
| MH100 - BASEMENT FLOOR PLAN - DUCTWORK |
| MH101 - FIRST FLOOR PLAN - DUCTWORK |
| MH102 - SECOND FLOOR PLAN - DUCTWORK |
| MH103 - ATTIC FLOOR PLAN - DUCTWORK |
| MP100 - BASEMENT FLOOR PLAN - PIPING |
| MP101 - FIRST FLOOR PLAN - PIPING |
| MP102 - SECOND FLOOR PLAN - PIPING |
| MP103 - ATTIC FLOOR PLAN - PIPING |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .