Project 538-23-102: Renovate B26 Mental Health
This is a Statement of Work describing a partial renovation project of approximately 19,000 square feet of the existing Sustained Behavioral Treatment Unit (SBTU) located on the first floor of Building 26. The project will address deficiencies identified in the Mental Health Environment of Care Checklist (MHEOCC) and will be executed in multiple phases to maintain uninterrupted operations of the facility.
The scope of work includes partial demolition and reconstruction of the SBTU with installation of hard ceilings, floor modifications in patient shower areas, and upgraded Nurse Call systems. The project requires installation of anti-ligature hardware and modification of existing window ledges to comply with MHEOCC standards. Additional work includes construction of two new sally-ports to divide the first floor into three separate SBTU treatment wings, complete renovation of two patient rooms to accommodate bariatric patients, and installation of a concrete basement floor to address environmental concerns in the space housing the new Air Handling Unit (AHU) that will serve the first-floor treatment space. The multiphase approach is essential to allow the facility to continue operations throughout the construction period.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
538-23-102 Renovate B26 Mental Health
Description of Work
This project will partially renovate approximately 19,000 sf of the existing Sustained Behavioral
Treatment Unit (SBTU) located on the first floor of Building 26. This renovation will slightly modify the unit and will also address the MHEOCC (Mental Health Environment of Care Checklist) items that were previously identified by the local MHEOCC group. In addition, this project will also provide a basement floor on the ground level of B26 that houses the new AHU (Air Handling Unit) that serves the treatment space on the first floor.
Specific new work tasks include, but are not necessarily limited to the following:
• Partial renovation in a multiphase project to allow uninterrupted operations.
• Partial demo of existing SBTU area.
• Partial new construction of the SBTU to include hard ceilings, modify floors in the patient showers, upgraded Nurse Call systems, modify existing window ledge to address MHEOCC deficiencies. In additional Anti-ligature hardware will be used.
• Two new sally-ports to facilitate the 1st floor into three separate SBTU treatment wings.
• Concrete basement floor to improve environmental concerns in the basement space that houses the AHU.
• Completely renovate two patient rooms to provide for two bariatric rooms.