This is a comprehensive set of construction document final drawings for the renovation of Building 26 (Mental Health Unit) at the Chillicothe VA Medical Center in Ohio. The project, identified as 538-23-102, involves modifications to the first floor Acute Mental Health Unit and basement mechanical space totaling approximately 23,067 square feet.
The renovation scope encompasses demolition and new construction of patient rooms, bathrooms, corridors, and support spaces with compliance to 2024 NFPA 101 Life Safety Code and 2021 International Building Code standards. Key construction elements include new wall partitions (primarily Type S1.0 gypsum board construction), flooring systems with resinous overlays in patient bathrooms and utility areas, new electrical and mechanical systems, fire suppression modifications, plumbing infrastructure updates including domestic water backfeed piping, HVAC ductwork and controls, lighting fixtures with emergency circuitry, and comprehensive security/technology systems integration. The project requires coordination with phasing operations to maintain facility functionality, with specific provisions for negative air pressure maintenance, temporary partitioning during construction, and protection of existing systems serving undisturbed areas. Detailed specifications address ligature-resistant design elements for mental health settings, including anti-ligature hardware, grab bars, and tamper-proof fasteners throughout patient care areas. The contractor is responsible for field verification of all existing conditions, coordination of multiple trade disciplines, management of domestic water system outages with maximum four-hour shutdowns, and compliance with behavioral health facility security requirements including card access systems and door locking arrangements.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X
X
XX.X-X
XX
X
1/A101
X
A101
XX
TOILET ACCESSORY TAGX SIGNAGE TAG
A101
SIM
X
U S 35
US 35
US 35
SR 104
EXIT
S R
N . H
IG
H
S T
R E
E T
C R
SCIO
TO R
IVER
S R
N
B
R
ID
G E
S T
R E
E T
Department of Veterans Affairs Medical Campus
T A
F T
D R
IV
E
G R
IF
F
IN
D
R
TAFT CIRCLE T
A
F T
C
IR
C L E
S T
A T
E R
O U
T E
HINES BLVD.
HINES BLVD.
BURMA RD.
H
IN
E S B
L V D
CLEVELAND AVE.
BOTTS RD.
HINES BLVD.
H
IN
E S
B L V
D
C L E V E L A N
D A
V E
C L E
V E
L A
N D
A V
E
HINES BLVD.
S A
N D
U S
K Y
B L V
D
D O
B S
O N
C
IR
C L E
D O
B S
O N
C
IR
C L E
T A
F T
D R
IV
E
G R
IF
F
IN
D
R
B26
P: 937-224-0861 www.heapy.com J A S O N
H
R O S S
IO
H O
F O
E T A T
S
R EG
IS
E T
R E D
R A
C H
TI
E
CT
VA Project No.
RDC/JPA Project No.
Department of Veterans Affairs Medical Center
HEAPY ENGINEERING
MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY
1400 WEST DOROTHY LANE
DAYTON, OH 45409
937.224.0861 P
937.224.5777 F
ARCHITECTURE PLANNING INTERIOR DESIGN
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
RDC / JPA ARCHITECTURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SCHAEFER
STRUCTURAL ENGINEERING
537 EAST PETE ROSE WAY, SUITE 400
CINCINNATI, OH 45202
513.542.3300 P
513.542.5540 F
FORCE PROTECT
SECURITY CONSULTANTS
10901 FRONT BEACH ROAD, SUITE 1415
PANAMA CITY, FLORIDA 32407
502.836.4232 P
PROJECT
NO.
/2
/2
:1
:4
A
M
RENOVATE B26 MENTAL
HEALTH
6/13/2025
COVER SHEET
G001
VRSO
538-23-102
CHILLICOTHE, OHIO
RENOVATE B26 MENTAL HEALTH
17273 STATE ROUTE 104 CHILLICOTHE, OHIO 45601 PROJECT #: 538-23-102
STATION
RYAN JETER
CONSTRUCTION
DOCUMENTS
23067.00
G001 COVER SHEET
G100 CODE DATA
G101 PHASING PLAN
AD101 DEMOLITION PLAN - FIRST FLOOR
AD121 DEMOLITION PLAN - FIRST FLOOR RCP
AE100 BASEMENT PLAN - NEW WORK
AE101 FIRST FLOOR PLAN - NEW WORK
AE110 WALL TYPES, PLAN DETAILS, & SECTIONS
AE111 PLAN DETAILS & SECTIONS
AE112 ENLARGED PLANS & ELEVATIONS
AE113 ENLARGED PLANS & ELEVATIONS
AE120 BASEMENT - REFLECTED CEILING PLAN
AE121 FIRST FLOOR - REFLECTED CEILING PLAN
AE122 REFLECTED CEILING DETAILS
AE511 CASEWORK SECTIONS & DETAILS
AE601 DOOR SCHEDULE & DETAILS
AF101-F FLOOR FINISH PLAN
AF101-W WALL FINISH PLAN
AF102-F BASEMENT FLOOR FINISH PLAN
AF601 FINISH LEGEND & FINISH DETAILS
QF100 EQUIPMENT & FURNITURE PLAN
S001 GENERAL NOTES AND SPECIAL INSPECTIONS
S101 FOUNDATION PLAN
S201 TYPICAL FOUNDATION DETAILS & SECTIONS
F001 ABBREVIATIONS, SYMBOLS & DESIGN NOTES
FX101 FIRST FLOOR PLAN - FIRE SUPPRESSION
P001 ABBREVIATIONS, SYMBOLS & GENERAL NOTES
PC100 BASEMENT PLAN - DISTRIBUTION - PRE-CONSTRUCTION
PD200 DEMOLITION PLAN - BASEMENT FLOOR
PD201 DEMOLITION PLAN - FIRST FLOOR
PL200 BASEMENT PLAN - DRAINAGE
PL201 FIRST FLOOR PLAN - DRAINAGE
PP200 BASEMENT PLAN - DISTRIBUTION
PP201 FIRST FLOOR PLAN - DISTRIBUTION
P601 SCHEDULES & DETAILS
P901 ISOMETRIC - DISTRIBUTION
P902 ISOMETRIC - DRAINAGE
M001 ABBREVIATIONS, SYMBOLS & GENERAL NOTES
MD101 DEMOLITION PLAN - FIRST FLOOR
M101 FIRST FLOOR PLAN
M500 DETAILS
M600 SCHEDULES
M700 DIAGRAM - CONTROLS
E001 ABBREVIATIONS, SYMBOLS & GENERAL NOTES
ED101 DEMOLITION PLAN - FIRST FLOOR LIGHTING
ED102 DEMOLITION PLAN - FIRST FLOOR POWER & FIRE ALARM
EL101 FIRST FLOOR PLAN - LIGHTING
EP101 FIRST FLOOR PLAN - POWER
EF101 FIRST FLOOR PLAN - FIRE ALARM
E501 DETAILS
E601 SCHEDULES
E701 DIAGRAM - SINGLE-LINE
T001 ABBREVIATIONS, SYMBOLS & GENERAL NOTES
TD101 DEMOLITION PLAN - FIRST FLOOR PLAN
TN101 FIRST FLOOR PLAN - DATA NETWORKS
T401 ENLARGED FIRST FLOOR TECHNOLOGY ROOM
T501 DETAILS AND SCHEDULE
T503 DETAILS AND SCHEDULE
T502 DETAILS
GENERAL CONSTRUCTION NOTES
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,
INTERNATIONAL BUILDING CODE, AND OTHER COES AS IDENTIFIED IN VHA
PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE
ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND
DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13
WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT
EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH
ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT
ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF
NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO
REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT
SURFACES TO REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW
MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO
BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE
SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT
THROUGH FINISHED OPENINGS.
DRAWING INDEXVICINITY MAP
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,
HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS
AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT
DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL
WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS
SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A
PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS
INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL
SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE
THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR
SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED
WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF
THE WALL.
12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO
AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER
RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS
RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS
IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY
FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
13. ALL WORK MUST BE IN COMPLIANCE WITH PCRA/ICRA PERMIT.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
N N.T.S.Scale:
CAMPUS PLAN
Revisions Date
CONSTRUCTION DOCUMENTS 06/13/2025
0-HR Smoke Partition - NFPA 101-8.4
1-HR Smoke Barrier - NFPA 101-8.5
1-HR Fire Barrier - NFPA 101-8.3
2-HR Fire Barrier - NFPA 101-8.3
Means of Egress
Existing Wall to Remain
New Wall
CODE LEGEND
STORAGE
NURSE
STATION
STAFF TOILET
SALLYPORT
C112
VEST.
120B
CORRIDOR
C103
SHARED
WORKSPACE
PRIVATE
PATIENT
ROOM
CORRIDOR
C105
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
126A
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
128A
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
127A
PATIENT
BATHROOM
125A
PRIVATE
PATIENT
ROOM
MED ROOM
CORRIDOR
C102
PRIVATE
PATIENT
ROOM
EXISTING
STAIR
S1-1
PATIENT
BATHROOM
114A
CORRIDOR
C104
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
124A
PATIENT
BATHROOM
122A
PATIENT
BATHROOM
121A
PATIENT
BATHROOM
111A
PATIENT
BATHROOM
109A
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
CONSULT
ROOM
TUB ROOM
MD/DO/APP
105A
COURTYARD
EXISTING
STAIR
S2-1
ELEC.
LINEN CHUTE
130A
LINEN
VESTIBULE
HAC
EXAM ROOM
STORAGE
VEST.
C104A
PRIVATE
PATIENT
ROOM
STAFF /
VISITOR
TOILET
PATIENT
BATHROOM
164A
MED ROOM
100A
ELEC.
ELEC.
CORRIDOR
C107
RECREATION
CONFERENCE
ROOM
DAY ROOM
175B
CORRIDOR
C100
NURSE
STATION
CORRIDOR
C102
CORRIDOR
C111
PRIVATE
PATIENT
ROOM
QUIET ROOM
PATIENT
BATHROOM
167A
PATIENT
BATHROOM
168A
PATIENT
BATHROOM
169A
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
170A
SHARED
WORK ROOM
EXISTING
STAIR
S5-1
IT / DATA
ROOM
COURTYARD
DINING
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
SERVERY &
NUTRITION
175A
NURSE
STATION
NUTRITION
EXISTING
STAIR
S4-1
STAFF TOILET
CLEAN
UTILITY/MED
SUPPLY
SOILED
UTILITY
VISITOR
ROOM
NURSE
MANAGER
SHARED
WORKSPACE
STORAGE
STAFF
LOCKER
144A
SHARED
WORKSPACE
SALLY PORT
C108
WARD CLERK
PATIENT
BATHROOM
107A
PATIENT
BATHROOM
108A
PRIVATE
PATIENT
ROOM
SALLY PORT
C101
DAY ROOM
GROUP ROOM
BARIATRIC
PRIVATE
PATIENT
ROOM
BARIATRIC
PATIENT
BATHROOM
148A
EXISTING
STAIR
S3-1
HAC
BARIATRIC
PRIVATE
PATIENT
ROOM
BARIATRIC
PATIENT
BATHROOM
147A
CORRIDOR
C108
CORRIDOR
C110
CORRIDOR
C110A
STORAGE
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
151A
PATIENT
BATHROOM
153A
PRIVATE
PATIENT
ROOM
153 CORRIDOR
C109
PATIENT
BATHROOM
150A
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
152A
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
154A
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
157A
MEDROOM
159VEST
158A
PATIENT
BATHROOM
156A
STORAGE
CLOSET
102A
CORRIDOR
C106
CONSULT
ROOM
STORAGE
133A
STORAGE
136A
WAITING
VESTIBULE
STAFF
LOUNGE
30' (max. limit) Dead End: 5' - 3 7/8"
30' (max. limit) Dead End: 5' - 2 1/8"
LAUNDRY
160Travel Distance to Smoke Barrier 107' 200' (max. limit)
Common Path: 60' 100' (max. limit)D
E L
D E
" Travel Distance to Smoke Barrier 189'
200' (max. limit)
Travel Distance to Exit: 82' 200' (max. limit)
FE
FE
FE
FEFE
FE
FE
Travel Distance to Exit: 54' 200' (max. limit)
Common Path: 51' 100' (max. limit)
S m o k e C o m p a rt m e n t
,7
S
F S m o k e C o m p a rt m e n t
,9
S
F
Common Path: 43' 100' (max. limit)
Smoke Compartment #2
17,790 SF
Smoke Compartment #1
7,930SF
P: 937-224-0861 www.heapy.com J A S O N
H
R O S S
IO
H O
F O
E T A T
S
R EG
IS
E T
R E D
R A
C H
TI
E
CT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT
NO.
/2
/2
:1
:5
A
M
RENOVATE B26 MENTAL
HEALTH
6/13/2025
CODE DATA
G100
VRSO
538-23-102
CHILLICOTHE, OHIO
STATION
RYAN JETER
CONSTRUCTION
DOCUMENTS
23067.00
N Scale: 1/8" = 1'-0"
Code Plan
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
Project Name: VA Chillicothe, Renovate Building 26 Mental Health
Project Number: VA# 538-23-102 / RDCJPA# 23067.00
Project Address: 17237 State Route 104, Chillicothe, Ohio 45601
Project Description:
This project will involve making modifications to the 1st floor Acute Mental Health Unit and the Basement mechanical space.
Applicable Codes:
• VA Directives, Design Manuals, Master Specifications, VA National CAD Standard
Application Guide, and other Guidance on the Technical Information Library (TIL) (www.cfm.va.gov/til/)
• 2024 NFPA 101, Life Safety Code (LSC) Chapter 20, et al
• NFPA National Fire Codes, with the exception of NFPA 5000 and NFPA 900
• 2021 International Building Code (IBC), only when specifically referenced in VA Design
Documents
• Occupational, Safety and Health Administration (OSHA) Standards.\VA Seismic
Design Requirements, H-18-8
• Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13), rev. 02/01/2024
2024 NFPA 101, LIFE SAFETY CODE SUMMARY:
Chapter 6, Classification of Occupancy and Hazard Contents
6.1.5. Health Care, Chapters 18 and 19
Chapter 7, Means of Egress Table 7.3.1.2, Occupant Load Factor: Health Care Use Inpatient treatment departments: 1,448 s.f. ÷ 240 s.f./person = 6 occupants Sleeping departments: 6,628 s.f. ÷ 120 s.f./person = 55 occupants
Table A.7.6, Common Path, Dead End, and Travel Distance Limits: Health Care Use, Sprinklered
Common path limit: 100 feet (18.2.5.2) Dead end limit: 30 feet (18.2.5.3) Travel distance limit: 200 feet (18.2.6.2.1)
Chapter 8, Features of Fire Protection Table A.8.2.1.2, Fire Resistance Ratings for Type II (222) Construction:
Exterior bearing walls, supporting more than one floor, columns or other bearing walls: 2 hour
Supporting one floor only: 2 hour Supporting Roof only: 1 hour
Interior bearing walls, supporting more than one floor, columns or other bearing walls: 2 hour
Supporting one floor only: 2 hour Supporting Roof only: 1 hour
Columns, supporting more than one floor, columns or other bearing walls: 2 hour
Supporting one floor only: 2 hour Supporting Roof only: 1 hour
Beams, Girders, Trusses, and Arches, supporting more than one floor, columns or other bearing walls: 2 hour
Supporting one floor only: 2 hour Supporting Roof only: 1 hour
Floor/Ceiling assemblies: 2 hour Roof Ceiling assemblies: 1 hour Interior nonbearing walls: 0 hour Exterior nonbearing walls: 0 hour
Chapter 9, Building Service and Fire Protection Equipment The building is equipped with a fire alarm system in accordance with 2021 NFPA 101 LSC, Sections 9.6 / 18.3.4.1.
The building is sprinklered throughout by an approved, supervised automatic sprinkler system in accordance with 2021 NFPA 101 LSC, Sections 9.7 / 18.3.5.
The building is supplied with portable fire extinguishers in accordance with 2021 NFPA 101 LSC, Sections 9.9 / 18.3.5.12
Chapter 10, Interior Finish, Contents, and Furnishings Table A.10.2.2, Interior Finish Classification Limitations:
Health Care Use Exits: Class A Exit access corridors: Class A (Class B on lower portion of corridor) Other spaces: Class A (Class B in small individual rooms) New interior finishes on walls and ceilings are limited to Class A materials, except for small rooms (see 18.3.3.2.1) and lower portion of corridor walls (see 18.3.3.2.2).
Chapter 18, New Health Care Occupancies Table 18.1.6.1, Construction Type Limitations Construction Type II (222) / IB International Building Code Equivalent, Sprinklered More than 4 stories allowed (basements shall not be considered a story) Unlimited Area (International Building Code)
18.2.2.2.5.1. Door-locking arrangements shall be permitted where the clinical needs of patients require specialized security measures or where patients pose a security threat, provided that staff can readily unlock door at all times in accordance with18.2.2.2.6.
18.2.2.2.6. Doors that are located in the means of egress and are permitted to be locked under other provisions of 18.2.2.2.5 shall be comply with both of the following.
1. Provisions shall be made of rapid removal of occupants by means of one of the following:
a. Remote control locks from within the locked smoke compartment
b. Keying of all locks carried by staff at all times.
c. Other such reliable means available to the staff at all times.
2. Only one locking device shall be permitted on each door.
18.2.3.5. Aisle, corridor, and ramp required for exit access in a limited care facility or hospital for psychiatric care shall not be less than 6 feet in clear, unobstructed width, unless otherwise permitted by one of the following (see the code book).
18.2.4.3 Not less than two separate exits shall be accessible from every part of every story, except where rooms are not required to have a door leading directly to the exit access corridor, as permitted by 18.2.5.6.3.
18.3.7.1 Buildings containing health care facilities shall be subdivided by smoke barriers (see 18.2.4.3), unless otherwise permitted by 18.3.7.2 and 18.2.7.3)
(1) To divide every story used by inpatients for sleeping or treatment into not less than two smoke compartments.
(2) To divide every story having an occupant load of 50 or more persons, regardless of use, into not less than two smoke compartments.
(3) To limit the size of each smoke compartment required by 18.3.7.1 (1) and
18.3.7.1 (2) to an area not exceeding (see code book).
(4) To separate atriums is accordance with 18.3.7.3, in which case no limitation in the atrium size is required.
(5) To limit the travel distance from any point to reach a door in the required smoke barrier to a distance not exceeding 200 feet.
Chapter 43, Building Rehabilitation This project is a modification in accordance with 43.2.2.1.3.
Door required for egress from Phase 1 to Stair S-4. Contractor to maintain clear path for egress.
Complete rooms 135 and 140 before starting work in room
105A and 105. Coordinate with COR office/staff logistics.
Double egress doors and window infill installed at completion of phase 1 prior to phase 2 starting.
Coordinate with COR.
Contractor must keep corridor C106 clear for daily staff activities and access.
Dining room will be occupied throughout the project. Install temporary wall before phase 2 begins.
Construct temporary wall in one day to limit patient access disruption.
Coordinate with COR.
UNIT A
UNIT B
S4-1
105A
Preconstruction Legionella Work in basement prior phase 1. See plumbing drawings for additional information.
Basement slab work to be in Phase 1.
Existing area not in Scope
PHASE 1:
PHASE 2:
Temporary Wall Partition Provide minimum level 4 finish gypsum board finish, p-1, and rubber base at patient access areas.
LEGEND
P: 937-224-0861 www.heapy.com J A S O N
H
R O S S
IO
H O
F O
E T A T
S
R EG
IS
E T
R E D
R A
C H
TI
E
CT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT
NO.
/2
/2
:1
:5
A
M
RENOVATE B26 MENTAL
HEALTH
6/13/2025
PHASING PLAN
G101
VRSO
538-23-102
CHILLICOTHE, OHIO
STATION
RYAN JETER
CONSTRUCTION
DOCUMENTS
23067.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
N.T.S.Scale:
FIRST FLOOR PHASING
N.T.S.Scale:
BASEMENT PHASING PLAN
GENERAL PHASING NOTES
A. For temporay partition locations see Demolition Plans. Temporary partitions are suggested locations. Coordinate final location in field with C.O.R.
B. Verify all conditions in the field prior to fabrication, erection and construction.
C. All asbestos containing material (ACM) must be abated per the direction of the C.O.R. and project specification 017419 and local state and federal regulations. Abatement if required is to be scheduled in appropriate sequence with demolition, new construction and project phasing.
D. Coordinate phase completion and start-up with requirements as set forth by the C.O.R. to maintain daily operations to near as normal as possible.
E. Coordinate location of job dumpster with the C.O.R. so as to disrupt daily operations as little as possible.
F. Coordinate access to all phases of construction, deliveries, and debris removal with the C.O.R. See General Requirements.
G. Temporary door locations and sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with the C.O.R.
H. Existing HVAC, medical gases, sprinklers and water supply to be maintained throughout as required during each phase of construction.Coordinate phasing with Mechanical and Plumbing contractor. Support and protect all lines during each phase of construction. See MEP Drawings.
J. Provide and maintain negative air pressure at all construction.
Coordinate with HVAC contractor. See HVAC plans for temporary venting requirements and duct locations.
K. Temporary partition to structural deck above. See A601 for temporary partition type.
L. Existing power must be maintained throughout as required during each phase of construction.Coordinate phasing with Electrical Contractor. Coordinate power turnover with requirements as dictated by the C.O.R. See Electrical Drawings.
M. Coordinate sequence construction with C.O.R. so that only one side of any corridor in use is obstructed at any one time.
N. Coordinate all work involving the generation of excessive noise so as to occur during non-peak operating hours, 1000 to 1600 daily.
Activities to occur during this time include, but are not limited to saw cutting, jack hammering, hammer drilling and core drilling. If there is any question as to whether an operation should occur during this time the Contractor will contact the C.O.R.
P. Unit A will be occupied during construction of Phase 1. Unit B will be occupied during construction of Phase 2. Contractor is required to coordinate work activites and temporary barriers in a way that allows for adquate operation of those occupied units.
DN
STORAGE
CLEAN
UTILITY
2.14
2.14
2.14
2.14
ALCOVE
CORRIDOR
C106
SERVERY
175A
TOILET
STORAGE
120A
MED ROOM
SHARED
WORKROOM
STORAGE
VISITOR
ROOM
ELEVATOR
INTAKE
ROOM
VESTIBULE
VISITOR
ROOM
WAITING
PATIENT
BATHROOM
138A
STORAGE
STAFF
LOUNGE/LOCKERS
ALCOVE
BARIATRIC
PRIVATE
PATIENT
ROOM
ISOLATION
ROOM
110A
ANTE
ROOM
2.69
STORAGE
BARIATRIC
PRIVATE
PATIENT
ROOM
BARIATRIC
PATIENT
BATHROOM
147A
HAC
BARIATRIC
PATIENT
BATHROOM
148A
CORRIDOR
C108
LOCKERS
144A
2.69
PATIENT
TOILET
110B
ALCOVEALCOVE
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
128A
PATIENT
BATHROOM
126A
DIRTY
LINEN
C105A
PATIENT
BATHROOM
125A
PATIENT
BATHROOM
127A
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
124A
PATIENT
BATHROOM
122A PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
NURSE
STATION
PATIENT
BATHROOM
121A
STORAGE
STORAGE
ELECTRICAL
CORRIDOR
C103
VESTIBULE
120B
MED GAS
HAC
LINEN
VESTIBULE
STORAGE
133A
SHARED
WORKROOM
EXAM
ROOM
CORRIDOR
C107
TOILET
CONFERENCE
ROOM
IT / DATA
ROOM
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
150A
PATIENT
BATHROOM
151A
PATIENT
BATHROOM
153A
PATIENT
BATHROOM
152A
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
NURSE
STATION
VESTIBULE
158B
PATIENT
BATHROOM
157A
STORAGE
158A
MED ROOM
PATIENT
LAUNDRY
TREATMENT
TEAM
ROOM
CORRIDOR
TOILET
PATIENT
BATHROOM
164A
PRIVATE
PATIENT
ROOM
QUIET
ROOM
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
167A
PATIENT
BATHROOM
168A
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
169A
PATIENT
BATHROOM
170A
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
CONSULT
ROOM
CONSULT
ROOM
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
111A
PATIENT
BATHROOM
109A
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
108A
PATIENT
BATHROOM
107A
PRIVATE
PATIENT
ROOM
RECREATIONAL
173DAY ROOM
DINING
COURTYARD
NUTRITION
CORRIDOR
C111
NURSE
STATION
MED ROOM
100A
SOILED
UTILITY
GROUP
ROOM
SHARED
WORKROOM
COURTYARD
CORRIDOR
C102
PATIENT
BATHROOM
114A
STAFF
TOILET
PATIENT
BATHROOM
154A
PATIENT
BATHROOM
156A
CORRIDOR
C105
EXISTING
STAIR
S2-1
LINEN
CHUTE
130A
STORAGE
136A
CORRIDOR
C109
ELECTRICAL
DAY ROOM
CORRIDOR
C112
CORRIDOR
C101
2.69
2.69
2.69
2.692.682.682.682.682.682.682.68
2.69
2.69
2.60
2.60
2.60
2.60
2.60
2.60
2.60
2.60
2.60
2.60
2.60
2.60 2.60
2.60
2.60
2.60
2.60
2.602.60
2.56
2.12
2.56
2.56
2.56
2.14
2.57
2.57
2.14
2.61
2.65
2.65
2.12
2.65
2.65
2.12
2.12
2.65
2.12
2.14
2.56
2.12
2.14
2.14
2.14 2.082.14
2.17
2.17
2.15
2.07
2.57
2.67 2.56 2.56
2.72
2.73
Typ.
2.74
2.73
Typ.
2.73
Typ.
2.73
Typ.
2.73
Typ.
2.73 Typ.
2.69
2.69
2.25
2.26
2.25 2.26
2.26
2.61
2.61
2.27
2.272.27
2.5722.01
2.69
2.69 2.27
2.26
2.81
AE111
Sim
CLR.
5'-0" MIN.
T1.0
2.29
C L
R
M
IN
CLR.
4'-0" MIN.
2.26
2.69 2.27
T1.0
T1.0
2.30
2.14
T1.0
2.13
2.20
2.85
2.84
2.75
1.03
2.41
2.41
2.42
2.40
2.40
2.40
2.40
2.40
2.402.40
2.40
2.40
2.40
2.402.402.402.402.40
2.162.16
2.16
2.16
2.43 2.43 2.43
2.40 2.402.40 2.40 2.40 2.40
2.40
2.40
2.40
2.40
2.40
2.40 2.40 2.40 2.40
AE111
Sim
2.302.30
2.87
2.87
2.87
2.87
2.87
2.872.87
2.87 2.87
2.87
2.87
2.87
2.87
2.87
2.87
2.87
2.35
2.56
2.30
T1.0
T1.0
2.30
2.89
2.89
2.89 2.89
2.89
2.89
2.89
2.89
2.89
2.89
2.89
2.89
2.89
2.89
2.89
2.89
2.89
2.37
DEMOLITION LEGEND
Wall to be Demolished
Existing Wall to Remain
Door and Frame to be Demolished
Existing to Remain
ACT/Light Fixture to be Demolished
Area of Floor Prep for New Flooring
P: 937-224-0861 www.heapy.com J A S O N
H
R O S S
IO
H O
F O
E T A T
S
R EG
IS
E T
R E D
R A
C H
TI
E
CT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT
NO.
/2
/2
:1
:0
A
M
RENOVATE B26 MENTAL
HEALTH
6/13/2025
DEMOLITION PLAN - FIRST FLOOR
AD101
VRSO
538-23-102
CHILLICOTHE, OHIO
STATION
RYAN JETER
CONSTRUCTION
DOCUMENTS
23067.00
N Scale: 1/8" = 1'-0"
Demolition Plan
1.03 DEDUCT ALTERNATE 01: West Sally Port
2.07 Salvage existing sink, casework, and related accessories for new construction. See Plumbing Drawings.
2.08 Salvage existing toilet & related accessories for new
construction.
2.12 Existing handrail to remain. Protect in place.
2.13 Existing window to remain. Protect in place.
2.14 Remove existing linoleum tile flooring and wall base.
2.15 Existing fire extinguisher to remain. Protect in place.
2.16 Existing window sill to remain. Protect in place.
2.17 Remove a section of the existing drywall partition, window, sill, and masonry wall construction for the new door opening. Refer to Detail 1/AE111.
2.20 Existing column enclosure to remain. Protect in place.
2.25 Remove existing door leaf. Existing frame to remain, protect in place.
2.26 Remove existing door and frame. Prepare opening for new
construction.
2.27 Remove existing handrails where new window sill is installed.
Patch and repair finish to match existing.
2.29 Existing sink/countertop to remain. Protect in place.
2.30 Coordinate the location of the temporary construction partition and public access with the COR before construction.
2.35 Existing mop sink to remain. Protect in place.
2.37 Remove existing window and window sill. Prepare for drywall infill.
2.40 Existing window type "A" with a R.O. width approx. 3'-6 1/4"
2.41 Existing window type "B" with a R.O. width approx. 4'-2 3/4"
2.42 Existing window type "C" with a R.O. width approx. 2'-10"
2.43 Existing window type "D" with a R.O. width approx. 3'-6 1/4"
2.56 Remove existing handrails. Patch and repair wall finish to match existing.
2.57 Remove existing countertop/casework. Prepare the area for new work.
2.60 Prepare the existing tile floor for a resinous flooring system according to the manufacturer's instructions.
2.61 Remove existing plumbing fixture. See Plumbing Drawing.
2.65 Remove a portion of the existing handrail that interferes with the full swing of the door. Patch and repair finish to match existing.
2.67 Remove the existing aluminum storefront window and prepare the opening for new work.
2.68 Remove existing window sill and portion of wall as shown. Refer to detail 1/AE110. Protect existing windows in place.
2.69 Remove the windowsill and part of the wall as detailed in 3/AE110. Protect existing window.
2.72 Remove floor finish.
2.73 Remove existing recessed shower track in patient toilets.
2.74 Remove existing VCT flooring.
2.75 Remove existing window and prepare for new construction.
2.81 Remove existing wood windows and prepare the opening for new work.
2.84 Remove existing half-height wall and window frame/glazing.
Prepare area for new construction.
2.85 Remove existing hose bracket and wall protection. Salvage the hose bracket for future use and prepare the wall area for new construction.
2.87 Remove and salvage existing toilet for new construction.
Prepare area for new work.
2.89 Remove the existing shower grab bars. The contractor is
responsible for repairing and patching the existing solid surface shower enclosure to like-new condition if its surface is damaged during demolition or new installation.
22.01 Plumbing fixture. See Plumbing Drawings.
PLAN NOTES
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Unused hardware shall be turned over to C.O.R. Box hardware before giving to C.O.R.
C. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
D. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
E. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.
F. Prepare walls and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
G. Remove existing corner guards in areas to be remodeled.
GENERAL DEMOLITION NOTES
2.53
2.19
2.52
2.66
2.10
2.11
2.11
2.63
2.632.63
2.63
2.63
2.63
2.53
2.53
2.53
2.10
2.19
147A
106 176
C106
175A
120A 119
137136
138A
110A 110
147A
148A
C108
144A
110B
128 127 128A
126A C105A
125A
127A
124A
122A
121A
118117
C103
120B
129 131
133A
C107
150A
151A
153A
152A
158B
157A
158A
160 163
164A
165167167A
168A
168169169A
170A
113 112
111A
109A
109 108 108A
107A
C111
100A
C102
114A
154A
156A
C105
S2-1 130A 136A
C109
C112C101
2.63
2.63
2.53
2.19
2.19
2.19
2.53 2.19
2.19
2.19 2.19
2.19
2.19
2.19
2.19
2.19
2.19
2.19
2.19
2.192.192.192.19 2.192.192.192.19
2.19
2.19
2.19 2.19
2.19
2.73
Typ.
2.73
Typ.
2.73
Typ.
2.73 Typ.
2.73
Typ.
2.73
Typ.
2.73
Typ.
2.73 Typ.
2.73 Typ.
2.63
2.11
2.11
2.19
2.63
2.63
2.19
2.19
2.19
2.19
2.80
2.53
1.02
2.11
2.11
AE111
Sim
2.53
2.11
2.30
2.30
2.63
2.11
2.63
2.11
2.11
2.112.11
2.63
2.63
2.19
2.11
2.78
2.11
2.11
1.03
2.86 2.11
26.01
2.30
2.63
2.78
2.78
2.78
2.78
2.78
2.78
2.78
2.78
2.88
DEMOLITION LEGEND
Wall to be Demolished
Existing Wall to Remain
Door and Frame to be Demolished
Existing to Remain
ACT/Light Fixture to be Demolished
Area of Floor Prep for New Flooring
P: 937-224-0861 www.heapy.com J A S O N
H
R O S S
IO
H O
F O
E T A T
S
R EG
IS
E T
R E D
R A
C H
TI
E
CT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT
NO.
/2
/2
:1
:0
A
M
RENOVATE B26 MENTAL
HEALTH
6/13/2025
DEMOLITION PLAN - FIRST FLOOR
RCP
AD121
VRSO
538-23-102
CHILLICOTHE, OHIO
STATION
RYAN JETER
CONSTRUCTION
DOCUMENTS
23067.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
N Scale: 1/8" = 1'-0"
Reflected Ceiling Demolition Plan
1.02 No ceiling work in this area.
1.03 DEDUCT ALTERNATE 01: West Sally Port
2.10 Existing gypsum board bulkhead to remain, protect in place.
2.11 Existing gypsum board ceiling/bulkhead to remain, protect in place.
2.19 Existing ceiling to remain. Modify as required for new
construction.
2.30 Coordinate the location of the temporary construction partition and public access with the COR before construction.
2.52 Remove portion of existing gypsum board soffit, as needed.
2.53 Remove existing acoustical tile and grid ceiling.
2.63 Remove the gypsum board ceiling/bulkhead and prepare the area for new work.
2.66 Remove portion of existing gypsum board ceiling, as required.
2.73 Remove existing recessed shower track in patient toilets.
2.78 Remove a portion of the existing ceiling as required to access existing plumbing lines. Refer to the Plumbing Drawings.
2.80 Remove portion of existing acoustical tile and grid ceiling.
Prepare area for new construction.
2.86 Remove a portion of the gypsum board ceiling and prepare the area for new work.
2.88 Remove and salvage existing bulkhead for future construction.
Prepare area for new work.
26.01 Light fixture. See Electrical Drawings.
PLAN NOTES
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Unused hardware shall be turned over to C.O.R. Box hardware before giving to C.O.R.
C. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
D. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
E. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.
F. Prepare walls and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
G. Remove existing corner guards in areas to be remodeled.
GENERAL DEMOLITION NOTES
UP
3.02
2.28
1.04
P: 937-224-0861 www.heapy.com J A S O N
H
R O S S
IO
H O
F O
E T A T
S
R EG
IS
E T
R E D
R A
C H
TI
E
CT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT
NO.
/2
/2
:1
:1
A
M
RENOVATE B26 MENTAL
HEALTH
6/13/2025
BASEMENT PLAN - NEW WORK
AE100
SOJR
538-23-102
CHILLICOTHE, OHIO
STATION
RYAN JETER
CONSTRUCTION
DOCUMENTS
23067.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
N Scale: 1/8" = 1'-0"
Basement Floor Plan
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
GENERAL NOTES
1.04 DEDUCT ALTERNATE 03: Basement slab & ventilation
adjustments.
2.28 Existing Mechanical Equipment and concrete pad to remain.
See Mechanical Drawings.
3.02 Concrete slab on grade over vapor barrier over 6" compacted aggregate base. See Structural Drawings.
PLAN NOTES
NURSE
STATION
STAFF TOILET
SHARED
WORKSPACE
VEST.
120B
PRIVATE
PATIENT
ROOM
CORRIDOR
C103
CORRIDOR
C105
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
126A
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
128A PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
127A
PATIENT
BATHROOM
125A
PRIVATE
PATIENT
ROOM
MED ROOM
CORRIDOR
C102
PRIVATE
PATIENT
ROOM
EXISTING
STAIR
S1-1 PATIENT
BATHROOM
114A
CORRIDOR
C104
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
124A
PATIENT
BATHROOM
122A
PATIENT
BATHROOM
121A
PATIENT
BATHROOM
111A
PATIENT
BATHROOM
109A
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
CONSULT
ROOM
TUB ROOM
MD/DO/APP
105A
COURTYARD
LINEN CHUTE
130A
LINEN
VESTIBULE
HAC
EXAM ROOM
STORAGE
SALLYPORT
C112
VEST.
C104A
PRIVATE
PATIENT
ROOM
STAFF /
VISITOR
TOILET
PATIENT
BATHROOM
164A
MED ROOM
100A
ELEC.
ELEC.
CORRIDOR
C107
RECREATION
CONFERENCE
ROOM
DAY ROOM
175B
CORRIDOR
C111
PRIVATE
PATIENT
ROOM
164QUIET ROOM
PATIENT
BATHROOM
167A
PATIENT
BATHROOM
168A
PATIENT
BATHROOM
169A
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
170A
EXISTING
STAIR
S5-1
IT / DATA
ROOM
COURTYARDDINING
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
SERVERY &
NUTRITION
175A
NURSE
STATION
NUTRITION
166 EXISTING
STAIR
S4-1
STAFF TOILET
CLEAN
UTILITY/MED
SUPPLY
SOILED
UTILITY
SHARED
WORK ROOM
STAFF
LOCKER
144A
SHARED
WORKSPACE
STORAGE
NURSE
MANAGER
SALLY PORT
C108
SHARED
WORKSPACE
WARD CLERK
NURSE
STATION
PATIENT
BATHROOM
107A
PATIENT
BATHROOM
108A
PRIVATE
PATIENT
ROOM
SALLY PORT
C101
BARIATRIC
PRIVATE
PATIENT
ROOM
BARIATRIC
PATIENT
BATHROOM
148A
EXISTING
STAIR
S3-1
HAC
BARIATRIC
PRIVATE
PATIENT
ROOM
BARIATRIC
PATIENT
BATHROOM
147A
EXISTING
STAIR
S2-1
ELEC.
CORRIDOR
C102
VISITOR
ROOM
DAY ROOM
GROUP ROOM
CORRIDOR
C108
CORRIDOR
C110
CORRIDOR
C110A
STORAGE
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
151A
PATIENT
BATHROOM
153A
PRIVATE
PATIENT
ROOM
153 CORRIDOR
C109
PATIENT
BATHROOM
150A
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
152A
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
154A
PRIVATE
PATIENT
ROOM
PATIENT
BATHROOM
157A
MEDROOM
VEST
158A
PATIENT
BATHROOM
156A
STORAGE
CONSULT
ROOM
CLOSET
102A
C108BC108A
CORRIDOR
C100
STORAGE
120A
C112BC112A
CORRIDOR
C106
CLOSET
C110A
147 148
LAUNDRY
AE112
B
AE112
A
AE113
B
AE113
A
AF101-F
A
AE112
C
F.V.
11' - 9 7/8"
F .V
/2
STAFF
LOUNGE
WAITING
STORAGE
133A
STORAGE
136A
STAFF TOILET
2.15
2.15
2.152.15
9.17
2.16
.5
9.17
S1.0-S
9.17
9.17
9.17
9.17
2.16 2.16
9.19 9.19 9.199.19 9.19 9.19 9.19 9.19
9.17
Passage
166A
175B
112 111 109 108 107 170 169 168 167
S2.0
AE110
AE110
S2.3
AE113
A Sim
F .V
AE110
A L
IG
N
A L
IG
N
8.07
8.07 8.07
8.07
8.07
AE112
c
SOILED
UTILITY
CORRIDOR
C112
8.07
AE112
AF101-F
B
100A
100B100
TYP. A
TYP. B
9.17
S2.0
A L
IG
N
ALIGN
C100
105A
S4-1
C109A
8.07 8.07
8.07
AE113
C
8.072.15
8.07
A E
18'-5 3/4" F.V.
9.17
9.17
A L
IG
N
8.07
S2.0
E1
13'-1" 13'-1" 30'-5" F.V.
AE111
A L
IG
N
9.47
A L
IG
N
9.47
9.48
1.03 12.32
12.32
9.17
2.16 2.16 2.16
S1.0-S 166A
AE111
AE111
Sim
AE111
ALIGN
9.17 9.17 9.17
9.17
9.17
22.1022.10 8.07
22.11
22.11
22.11
22.11
22.11
22.11
22.1122.1122.11
22.1122.1122.1122.1122.11
22.11
8.25
8.25
8.25
8.25
8.25
8.25
8.25
8.24
8.24
8.24
8.24
8.24
8.24
22.11
2.16
8.29
AE113
D 10.05
10.05 10.0510.05
10.0510.05
10.05
10.05
10.05
10.05
10.05
10.05
10.05
10.05 10.05
10.05
8.25
158A
C106
S2.0
C111A
8.15
8.15
8.15
8.15
8.15
8.15
P: 937-224-0861 www.heapy.com J A S O N
H
R O S S
IO
H O
F O
E T A T
S
R EG
IS
E T
R E D
R A
C H
TI
E
CT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT
NO.
/2
/2
:1
:1
A
M
RENOVATE B26 MENTAL
HEALTH
6/13/2025
FIRST FLOOR PLAN - NEW WORK
AE101
SOJR
538-23-102
CHILLICOTHE, OHIO
STATION
RYAN JETER
CONSTRUCTION
DOCUMENTS
23067.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
N Scale: 1/8" = 1'-0"
First Floor Plan
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
1.03 DEDUCT ALTERNATE 01: West Sally Port
2.15 Existing fire extinguisher to remain. Protect in place.
2.16 Existing window sill to remain. Protect in place.
8.07 Card reader.
8.15 Prepare and apply security film to both sides of the existing window.
8.24 Install 12" x 12" behavioral health steel access door with a tamper-proof cam latch. Center access door on casework apron. Refer to detail B8/AE511 and Plumbing Drawings.
8.25 Install 12" x 12" behavioral health steel access door with a tamper-proof cam latch. Center access door on the backside of shower control valves. Refer to the Plumbing Drawings.
8.29 Install frosted privacy window film on the existing window glazing.
9.17 New solid surface window sill and wall partition infill. Refer to detail 4/AE110 and the Finish Schedule.
9.19 New solid surface window sill, refer to detail 2/AE110 and the Finish Schedule.
9.47 Infill wall cavity with new gypsum board wall partition.
9.48 Patch, repair, and extend existing column gypsum enclosure partitions to floor. Paint to match existing conditions.
10.05 Install new grab bars in shower. See Sheet AE113 Elevations 16 & 17.
12.32 Wire management grommet. Coordinate the exact location and quantity with COR.
22.10 Wall access panel, by Div. 22 Contractor. See Plumbing
Drawings.
22.11 Reinstall the salvaged toilet to its original location, once resinous flooring has been installed.
PLAN NOTES
GENERAL NOTES
9.80
STRUCTURE ABOVE
FIN. CEILING
FLOOR SLAB
S1.0
9.02
9.219.21
7.82
7.82
4 7/8"
1 1/2"
S3.0
9.05
9.21
7.82
9.80
S2.0
7.82
7.82
9.02
9.21
4 1/4"
9.80
S2.3
3 1/8"
9.01
9.21
7.82
7.82
7/8"
5 3/8" F.V.
1/2"
F .V
/8
2.13
6.28
6.08
7.85
7.85
45.0°
2.03
9.21
6.08
2.59
2.03
2.70
2.13
1" F.V.
2.59
2.71
2.70
2.01
2.79
2.23
2.01
2.13
2.16
AE110
Sim
2.16
2.31
45.0°
/4
5/8"
1 3/4" 4" 3" F.V.
2.13
7.85
6.28
6.18
6.08
7.85
2.01
9.21
9.44
2.23
7.14
2.16
2.31
AE111
Sim
F .V
. 175B
S e e D o o r
S c h e d u le
LG
H4H3
J1
S1
11' - 11 5/8" F.V.
2" EQ. 2" EQ. 2" EQ. 2"
SCHED
SEE DOOR 2"
M2
8.26
S1.0-S
1-HR RATED
SMOKE BARRIER
U.L. #U419
9.80
9.02
9.219.21
7.82
7.82
4 7/8"
1' - 7 1/4" F.V.
/8
/8
F .V
S3.0 S2.0 S1.0
2.03
2.02
2.03
S3.0
S2.0S1.0
/8
/8
F .V
2.02
2.03
2'-9 5/8" F.V.
2.15
114.5° S1.0
2.03
6.08
3' - 1" F.V.
LG
2" 2"
J1
H1
S2
J1
8.26
2' - 8" F.V.
LG
2" 2"
" H1
S2
J1J1
8.26
7' - 7" F.V.
LG
2" 2"
H1
S2
J1J1
8.26
9.21
9.80
H1
5.09
See Plan
7.83
8.26
8.14
9.21
9.80
J1
See Plan
7.89
8.26
8.14
S1
7.81
8.26
6.42
8.14
9.02
M1M2
8.26
8.14
8.26
8.14
9.21
9.80
See Plan
S2
7.89
8.26
8.14
8.14
8.14
9.21
9.80
5.09
See Plan
7.83
8.26
H2
8.19
6.08
6.08
H3
7.83
8.26
8.14
9.21
9.80
See Plan
S3
7.89
8.26
8.14
9.46
H4
7.83
8.26
8.19
Width Varies
Existing Soffit
2.01
Width Varies
Existing Soffit
2.01
J3
4 1/2"
/2
8.26
8.14
8.14
9.21
9.80
See Plan
7.83
8.26
J2
8.19
2.79
2.01
2.01
2.01
2.24
See sheet AD101
Existing Window R.O. Width (Varies)
2.59
9' - 2" F.V.
2"EQ.2"EQ.2"EQ.2"
" LG
J1
H3
J1
S3
M2
4' - 2" F.V.
2" 2"
H3
J1
S3
J1
LG
PASS-THRU
EQ 1'-0" EQ
2' - 2" F.V.
2" 2"
LG
H3
S3
J1J1
3' - 4" F.V.
2" 2"
LG
H3
S3
J1 J1
1'-10" F.V.
2" 2"
" H3
S3
J1J1
LG
J3
13' - 3" F.V.
2" EQ. 2" EQ. 2" EQ. 2" EQ. 4 1/2"
LG
F
.V
J1
H3
S1
M2
8.26
J3
1' - 9" F.V.
4 1/2" 2"
J1
S1
H3
8.26
LG
14' - 9" F.V.
F
.V
E1
2.13
WF
8.15
9.80
9.52
9.02
9.21
4 1/4"
T1.0
S1.0
S2.0
S1.0-F
S3.0
2' - 3 7/8" 4 7/8" 2' - 6 1/8"
2.02
S1.0-FS1.0-F
2-HR RATED
FIRE BARRIER
U.L. #U906
4.12
M1.0
5 5/8"
P: 937-224-0861 www.heapy.com J A S O N
H
R O S S
IO
H O
F O
E T A T
S
R EG
IS
E T
R E D
R A
C H
TI
E
CT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT
NO.
/2
/2
:1
:2
A
M
RENOVATE B26 MENTAL
HEALTH
6/13/2025
WALL TYPES, PLAN DETAILS, &
SECTIONS
AE110
VRSO
538-23-102
CHILLICOTHE, OHIO
STATION
RYAN JETER
CONSTRUCTION
DOCUMENTS
23067.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
Scale: 1" = 1'-0"
Wall Types
2.01 Existing construction to remain.
2.02 Existing structure to remain.
2.03 The existing wall partition to remain. Protect in place.
2.13 Existing window to remain. Protect in place.
2.15 Existing fire extinguisher to remain. Protect in place.
2.16 Existing window sill to remain. Protect in place.
2.23 Existing wall beyond, protect in place.
2.24 Line of the existing window sill above.
2.31 Existing coved base to remain. Protect in place.
2.59 Remove portion of existing wall partition, blocking, etc., as needed for the installation of new construction.
2.70 Remove existing solid surface window sill. Prepare the area for new work.
2.71 Cut and remove existing caststone sill from face of jamb at window opening. Avoid damaging existing brick wall; protect in place.
2.79 Abate and remove sheet metal lining over asbestos insulation on metal lath. Existing cement finish to remain.
4.12 6" concrete masonry unit. See Structural Drawings.
5.09 Cold-formed framing box header.
6.08 2" x ___" fire-retardant treated wood blocking.
6.18 3/4" plywood.
6.28 Solid surface window sill. Refer to the Finish Schedule.
6.42 Shim.
7.14 Batt thermal wall insulation. R-19 min.
7.81 Continuous bead of pick-proof sealant over backer rod.
7.82 Continuous acoustic sealant @ non-rated walls / fire-rated sealant @ rated walls each side.
7.83 Continuous sealant on each side.
7.85 Provide a continuous bead of pick-proof sealant along the sill and adjacent material.
7.89 Continuous bead of pick-proof sealant on each side.
8.14 Glazing to be 7/16" laminated glass, unless noted otherwise.
8.15 Prepare and apply security film to both sides of the existing window.
8.19 Door Panel. Refer to the Door Schedule for the type.
8.26 4-1/2" Aluminum storefront window system.
9.01 2 1/2" non-structural metal framing @ 16" O.C.
9.02 3 5/8" non-structural metal framing @ 16" O.C.
9.05 7/8" [Z or hat] furring channel @ 16" O.C.
9.21 5/8" Type X abuse-resistant gypsum board.
9.44 Wall base, refer to Finish Schedule.
9.46 Solid surface countertop, refer to casework section detail 3/AE511.
9.52 Flame-retardant plastic sheeting sealed to create negative air pressure inside the work zone.
9.80 Acoustic insulation
DETAIL NOTES
Scale: 1 1/2" = 1'-0"2 Sill Detail - New Work
Scale: 1 1/2" = 1'-0"1 Sill Detail - Demo.
Scale: 1 1/2" = 1'-0"3 Exist. Rad. Recess - Demo.
Scale: 1 1/2" = 1'-0"4 Exist. Rad. Recess - New Work
Scale: 1/4" = 1'-0"
Interior Storefront Types
Scale: 1 1/2" = 1'-0"5 Plan Detail
Scale: 1 1/2" = 1'-0"6 Plan Detail
Scale: 1 1/2" = 1'-0"8 Plan Detail
N.T.S.Scale:
Storefront Frame Dtl.
Scale: 1 1/2" = 1'-0"9 Plan Detail - Radiator Recess Demo.
Scale: 1 1/2" = 1'-0"7 Plan Detail
2.71
2.59
2.79
2.70
2.01
2.01
2.82
2.83
First Floor
2.54
2.34
2.01
2.01
2.02
Existing Bulkhead
2.02
2.86
2.70
F
.V
/8
F .V
2.02
2.03
2.03
8.07 10.43
M
IN
2'-8 5/8" F.V.
S1.0
S2.0
S2.3 S2.0
2.22 2.03
S3.0
S1.0-S
2.018.01
Align to existing
Align to existing
2.01
2.13
2.01
2.01
2.01
2.24
Align to existing
9.21
7.14
See sheet AD101
Existing Window R.O. Width (Varies)
2'-1" F.V.
/2
F .V
S2.3S2.0
S2.0
2.02
2.03
P: 937-224-0861 www.heapy.com J A S O N
H
R O S S
IO
H O
F O
E T A T
S
R EG
IS
E T
R E D
R A
C H
TI
E
CT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT
NO.
/2
/2
:1
:2
A
M
RENOVATE B26 MENTAL
HEALTH
6/13/2025
PLAN DETAILS & SECTIONS
AE111
VRSO
538-23-102
CHILLICOTHE, OHIO
STATION
RYAN JETER
CONSTRUCTION
DOCUMENTS
23067.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
Scale: 1 1/2" = 1'-0"1 Demolition - Door Opening
2.01 Existing construction to remain.
2.02 Existing structure to remain.
2.03 The existing wall partition to remain. Protect in place.
2.13 Existing window to remain. Protect in place.
2.22 Reinstall casework & related accessories.
2.24 Line of the existing window sill above.
2.34 Remove the section of masonry wall construction from the concrete slab to the existing structure/brick angle above.
2.54 Remove the existing aluminum window completely. Prepare the area for new construction.
2.59 Remove portion of existing wall partition, blocking, etc., as needed for the installation of new construction.
2.70 Remove existing solid surface window sill. Prepare the area for new work.
2.71 Cut and remove existing caststone sill from face of jamb at window opening. Avoid damaging existing brick wall; protect in place.
2.79 Abate and remove sheet metal lining over asbestos insulation on metal lath. Existing cement finish to remain.
2.82 Remove and level a portion of the raised topping curb at the base of the existing masonry wall construction. Prepare area for new construction.
2.83 Cut and remove a portion of the existing structure at the window opening.
2.86 Remove a portion of the gypsum board ceiling and prepare the area for new work.
7.14 Batt thermal wall insulation. R-19 min.
8.01 Hollow metal door.
8.07 Card reader.
9.21 5/8" Type X abuse-resistant gypsum board.
10.43 Install salvaged fire extinguisher cabinet to new location.
DETAIL NOTES
Scale: 1 1/2" = 1'-0"4 Plan Detail
(DEDUCT ALTERNATE 02)Scale: 1 1/2" = 1'-0"3 Plan Detail @ Door Opening
Scale: 1 1/2" = 1'-0"2 Plan Detail - Radiator Recess Infill
Scale: 1 1/2" = 1'-0"5 Plan Detail
AE112
A E
AE112
A E
TUB ROOM
1/8" Slope
1/8" Slope
/8
S lo p e
/8
S lo p e
1/8" Slope
/8
S lo p e
/8
S lo p e1
/8
S lo p e
1/8" Slope
/8
S lo p e
FD
FD
FD
RES-1
RES-2
RES-1
RES-2
2.29
2.08
AL
RES-2
RES-1
2.08
RES-1
RES-2
A E
A E
AE112
AE112
A E
NURSE
STATION
VEST
158A
MEDROOM
AE511
H E
AE511
3.1
AE112
AE511
Sim
4.1
AE112
12.32
12.32
12.32
AE110
2' - 8 1/2" 2' - 11" 5' - 2 7/8" F.V. 10' - 1 1/2" F.V.
S2.0
158A
8.07
A L
IG
N
RB-1
P-3
P-3
RB-1
C1
SS-2
+/- 7' - 2 7/8"
+/- 1' - 5 3/8"
+/- 4' - 2 1/8"
C1
1'-0"
PASS THRU
2'-9" 2'-6" 2'-6" 2'-3" Filler Panel
B1 B1 B1
S lo p e
D T o p
P-2
PL-1
SS-2
PL-1
2'-9" 2'-6" 2'-6"
W3 W3 W3
W3
2'-3" Filler Panel 6.31
6.31 H
E
B2
A E
LAUNDRY
AE112
A L
IG
N
2.07
9.13
P-2
9.39
RB-1
9.13
CG-1PL-1PASS-THRU CG-1
" 158A
PL-2
09 10
1'-0"
P-2
RB-1
9.13
9.39
A E
AE112
2.09
STAFF
LOCKER
144A
4'-0" 4 1/8" F.V.
F
.V
10.03
S lo p e d T o p 10.53
10.52 PL-3 RB-1
S lo p e d T o p
10.53
10.52
OPEN
PL-3
10.03
RB-1
RB-1
SS-2
7'-1 23/32"
C1
7'-7 1/4"
C2
OPEN
SS-2
RB-1
3'-1 1/4"2'-8 1/8" 1'-8 1/2"
0302 SS-2SS-2
RB-1
C2 C2
OPENOPEN
RB-1
P: 937-224-0861 www.heapy.com J A S O N
H
R O S S
IO
H O
F O
E T A T
S
R EG
IS
E T
R E D
R A
C H
TI
E
CT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT
NO.
/2
/2
:1
:3
A
M
RENOVATE B26 MENTAL
HEALTH
6/13/2025
ENLARGED PLANS & ELEVATIONS
AE112
VRSO
538-23-102
CHILLICOTHE, OHIO
STATION
RYAN JETER
CONSTRUCTION
DOCUMENTS
23067.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
B
Scale: 1/4" = 1'-0"
TUB ROOM
A
Scale: 1/4" = 1'-0"
NURSE STATION & MEDROOM
C
Scale: 1/4" = 1'-0"
LAUNDRY
2.07 Salvage existing sink, casework, and related accessories for new construction. See Plumbing Drawings.
2.08 Salvage existing toilet & related accessories for new construction.
2.09 Existing finishes to remain.
2.29 Existing sink/countertop to remain. Protect in place.
6.31 Casework filler. Finish to match adjacent cabinet.
8.07 Card reader.
9.13 New wall finish and base to match existing.
9.39 Verify the paint color prior to painting.
10.03 Locker's filler by manufacturer to match locker's finish.
10.52 Contractor to provide a platform/base for lockers.
10.53 Sloped top to match the locker by locker manufacturer.
12.32 Wire management grommet. Coordinate the exact location and quantity with COR.
DETAIL NOTES
13 12
Scale: 1/4" = 1'-0"
STAFF LOCKER
c
3.1
A. Contractor to field measure all casework dimensions before production.
GENERAL INT. ELEVATION NOTES
Scale: 1/4" = 1'-0"
WARD CLERK
4.1
A E
AE113
HAC
F
A L
IG
N
22.09
M1.0
S3.0
INFILL OPN.
3'-11" F.V.
2.35
AE113
A E
AE113
A E
AE113
AE113
AE113
A E
A E
D
B
A
A
B
C
K
BARIATRIC
PRIVATE
PATIENT
ROOM
BARIATRIC
PATIENT
BATHROOM
147A
J
I
1'
.0
G
/8
F .V
/8
/4
3' - 7 7/8"
6' - 4 7/8" 7' - 7 3/4" F.V.
2' - 9 7/8"
3' - 7"
F.V.
4' - 10 1/2"
S2.0
S2.0
S2.0
S2.3
S2.0
S3.0
S2.0
P-2
WSF-2
P-3
WSF-2
CG-1
RES-2
RB-1
OPEN OPEN
WSF-2
P-2
ALCOVE
WSF-2
P-2
RES-1
RES-2
B
A
D
A
K
RES-1
RES-2
B
RES-1
RES-2
I
OPEN
2'-9"
B8
SS-2
PL-1
" RES-1
RES-2
SS-2 C
RES-2
G
WP-1
WSF-1
F
2.35
WP-1
WSF-1
2.35
22.09
8"
1' - 0"
Note: Flush valve located on accessible side
6"
1' - 6"
B
A
K
C
Note:
Beginning of reflective surface
MIN.
7"
G
T o D is p e n s e r
O p e n in g
T o
O p e ra b le
M e c h a n is m
E I H
K
Finish Floor
D
J
" 5
F
T o
O p e ra b le
M e c h a n is m
T o D is p e n s e r
O p e n in g
SHARED
WORK ROOM
A E
AE113
A E
AE113
12.32
12.32
12.32
12.32
12.32
RB-1
SS-2
9' - 0 1/2"
C1
3' - 11 3/8"
1' - 9 7/8" F.V.
4' - 6"
SS-2
RB-1
CG-1
C1C1
4'-3"
SS-2
RB-1
C1
CG-1CG-1
6'-7"
C1
SS-2
RB-1CG-1
AE113
A E
L
D A
CONTROL PANEL
A
L
10.04
2.36
D
2.36
10.04
P: 937-224-0861 www.heapy.com J A S O N
H
R O S S
IO
H O
F O
E T A T
S
R EG
IS
E T
R E D
R A
C H
TI
E
CT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .