36C25622R0030 0005.docx

DOCX document 26 KB Posted

Attached to
Z2FB--Biloxi MATOC-Seed Project Project #520-22-122 FCA Corrections BLDG 17 - 36C25622R0030
Solicitation number
520-22-122
Issued by

About this file

This amendment to solicitation 36C25622R0030 extends the proposal due date to November 3, 2022 at 2:00 PM Central Time. It provides supplemental specifications and drawings to complement answers in an attached RFI register. Offerors must now submit quality control, safety, and infection control plans with initial proposals. The amendment replaces specification 0133223 in its entirety. The solicitation is for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 for the Biloxi MATOC-Seed Project #520-22-122 FCA Corrections BLDG 17 and includes requirements for painting, pre-engineered metal buildings, wet pipe sprinkler systems, electrical panelboards, enclosed switches and circuit breakers, and engine generators.

View the file

Other files

File Type Posted
36C25622R0030 055000 Metal Fabrication.docx DOCX document
36C25622R0030 0006.docx DOCX document
36C25622R0030 262921 Enclosed Switches and Circuit Breakers.docx DOCX document
36C25622R0030 Spec 013323 v2.doc DOC document
36C25622R0030 099100 PAINTING.doc DOC document
36C25622R0030 133419 Pre-Engineered Metal Bldg Systems.doc DOC document
36C25622R0030 262416 Electrical Panelboards.docx DOCX document
36C25622R0030 Main Elec Panel Schedule.pdf PDF
36C25622R0030 RFI Register 10182022.docx DOCX document
36C25622R0030 263213 Engine Generators v2.docx DOCX document
36C25622R0030 Site Utility Map.pdf PDF
36C25622R0030 211313 Wet Pipe Sprinkler System.docx DOCX document
36C25622R0030 0004.docx DOCX document
36C25622R0030 081113 Hollow Metal Doors and Frames.doc DOC document
36C25622R0030 087100 DOOR HARDWARE.doc DOC document
36C25622R0030 SD320523 04 Concrete Post Bollards.pdf PDF
36C25622R0030 34751313 Vehicle Barrier.docx DOCX document
36C25622R0030 SD320523 05 Removable Bollard 1 (Alternate Option for Generator).pdf PDF
36C25622R0030 Bldg 17 Details Section.pdf PDF
36C25622R0030 B17 Floor Plan.pdf PDF
36C25622R0030 SD320523 06 Removable Bollard 2 (Strap Detail).pdf PDF
36C25622R0030 0003.docx DOCX document
36C25622R0030 0002.docx DOCX document
36C25622R0030 FCA Corrections Bldg 17 - Full Set v2.pdf PDF
S04 Site Visit Attendance Sheet (08.30.2022).pdf PDF
36C25622R0030 0001.docx DOCX document
36C25622R0030 EXHIBIT I-Financial Disclosure.docx DOCX document
36C25622R0030 SOW FCA Corrections Bldg 17 (Revised v2).pdf PDF
36C25622R0030 Spec 013323.doc DOC document
36C25622R0030 Drawings-FCA Corrections BLDG 17 .pdf PDF
36C25622R0030 Spec 220511 .doc DOC document
36C25622R0030 EXHIBIT F-RFI Form .docx DOCX document
36C25622R0030 Spec 260511 .doc DOC document
36C25622R0030 EXHIBIT H-Contractor Information.docx DOCX document
36C25622R0030 Spec 062000 .doc DOC document
36C25622R0030 WD MS20220060 Mod 1 02252022 (Harrision Heavy) .docx DOCX document
36C25622R0030 Spec 024100 .doc DOC document
36C25622R0030 Spec 017419 .doc DOC document
36C25622R0030 EXHIBIT E-Surety Form .docx DOCX document
36C25622R0030 EXHIBIT A-Performance Relevancy Survey .docx DOCX document
36C25622R0030 EXHIBIT D-Contractor Evaluation Form Construction Safety .docx DOCX document
36C25622R0030 VHA Supplemental Contract Requirements for Combatting COVID-19.docx DOCX document
36C25622R0030 WD MS20220050 Mod 2 02252022 (Harrision Building) .docx DOCX document
36C25622R0030 EXHIBIT C-Subcontractor Information and Consent Form .docx DOCX document
36C25622R0030 Spec 078400 .doc DOC document
36C25622R0030 EXHIBIT B-Past and Present Performance Questionnaire.docx DOCX document
36C25622R0030 WD MS20220133 Mod 1 02252022 (Harrision Highway) .docx DOCX document
36C25622R0030 Spec 013526 v2 (updated 071322).docx DOCX document
36C25622R0030 Spec 262726 v2 (updated (071322).doc DOC document
36C25622R0030 Seed ICRA .pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25622R0030

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 10/19/2022 520-23-2-7042-0001 520-22-122 00502

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 16

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HIGHWAY, 71N

PINEVILLE LA 71360-4004

00502

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 16

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HIGHWAY, 71N

PINEVILLE LA 71360-4004

To all Offerors/Bidders

36C25622R0030 08-12-2022

X X X

11/03/2022 @ 1400 HRS CT.

NA

X The purpose of this amendment is to extend the date for receipt of proposals, provide supplemental Specifications & Drawings, to provide the RFI Register, to change language located in the terms and conditions of the solicitation, and to replace Spec 0133223 in its entirety.

(1) The solicitation is extended and closes on 11/03/2022 @ 1400 hrs CT. (2) See attached supplemen tal specifications and drawings. The attached supplemental information is intended to compliment the answers located in the attached RFI Register. (3) See attached RFI Register. (4) The Quality Control Plan, Safety Plan, and Infection Control Plan ar e required to be submitted with initial proposals. Change RFP Section A.4; Paragraphs 14.1, 15.1, and 16.1 from “at the time of award of the base contract” to read “at the time/date of receipt of proposals.” (5) Replace Spec 0133223 with Spec 0133 223 v2 in its entirety.

All other terms and conditions remain unchanged.

William A. Geary Contracting Officer List of Attachments

See attached document: 36C25622R0030 099100 PAINTING.

See attached document: 36C25622R0030 133419 Pre-Engineered Metal Bldg Systems.

See attached document: 36C25622R0030 211313 Wet Pipe Sprinkler System.

See attached document: 36C25622R0030 262416 Electrical Panelboards.

See attached document: 36C25622R0030 262921 Enclosed Switches and Circuit Breakers.

See attached document: 36C25622R0030 263213 Engine Generators v2.

See attached document: 36C25622R0030 Main Elec Panel Schedule.

See attached document: 36C25622R0030 RFI Register 10182022.

See attached document: 36C25622R0030 Site Utility Map.

See attached document: 36C25622R0030 Spec 013323 v2.

File details come from the government source that posted it. Updated .