36C25622R0030 EXHIBIT A-Performance Relevancy Survey .docx

DOCX document 41 KB Posted

Attached to
Z2FB--Biloxi MATOC-Seed Project Project #520-22-122 FCA Corrections BLDG 17 - 36C25622R0030
Solicitation number
520-22-122
Issued by

About this file

This document contains a performance relevancy survey for a federal construction contract opportunity with the Department of Veterans Affairs. Offerors are required to provide details of up to five past performance references involving construction projects of similar scope and complexity, including contract details, descriptions of work performed, and points of contact. Additional questions seek information on liquidated damages assessments, corrective actions taken, industry awards, unique skills, and descriptions of work to be performed and subcontractor involvement. The related federal contract opportunity is for a seed project for the MATOC program at the Biloxi VA Medical Center, with responses to the attached RFP due by the closing date.

View the file

Other files

File Type Posted
36C25622R0030 055000 Metal Fabrication.docx DOCX document
36C25622R0030 0006.docx DOCX document
36C25622R0030 262921 Enclosed Switches and Circuit Breakers.docx DOCX document
36C25622R0030 0005.docx DOCX document
36C25622R0030 Spec 013323 v2.doc DOC document
36C25622R0030 099100 PAINTING.doc DOC document
36C25622R0030 133419 Pre-Engineered Metal Bldg Systems.doc DOC document
36C25622R0030 262416 Electrical Panelboards.docx DOCX document
36C25622R0030 Main Elec Panel Schedule.pdf PDF
36C25622R0030 RFI Register 10182022.docx DOCX document
36C25622R0030 263213 Engine Generators v2.docx DOCX document
36C25622R0030 Site Utility Map.pdf PDF
36C25622R0030 211313 Wet Pipe Sprinkler System.docx DOCX document
36C25622R0030 0004.docx DOCX document
36C25622R0030 081113 Hollow Metal Doors and Frames.doc DOC document
36C25622R0030 087100 DOOR HARDWARE.doc DOC document
36C25622R0030 SD320523 04 Concrete Post Bollards.pdf PDF
36C25622R0030 34751313 Vehicle Barrier.docx DOCX document
36C25622R0030 SD320523 05 Removable Bollard 1 (Alternate Option for Generator).pdf PDF
36C25622R0030 Bldg 17 Details Section.pdf PDF
36C25622R0030 B17 Floor Plan.pdf PDF
36C25622R0030 SD320523 06 Removable Bollard 2 (Strap Detail).pdf PDF
36C25622R0030 0003.docx DOCX document
36C25622R0030 0002.docx DOCX document
36C25622R0030 FCA Corrections Bldg 17 - Full Set v2.pdf PDF
S04 Site Visit Attendance Sheet (08.30.2022).pdf PDF
36C25622R0030 0001.docx DOCX document
36C25622R0030 EXHIBIT I-Financial Disclosure.docx DOCX document
36C25622R0030 SOW FCA Corrections Bldg 17 (Revised v2).pdf PDF
36C25622R0030 Spec 013323.doc DOC document
36C25622R0030 Drawings-FCA Corrections BLDG 17 .pdf PDF
36C25622R0030 Spec 220511 .doc DOC document
36C25622R0030 EXHIBIT F-RFI Form .docx DOCX document
36C25622R0030 Spec 260511 .doc DOC document
36C25622R0030 EXHIBIT H-Contractor Information.docx DOCX document
36C25622R0030 Spec 062000 .doc DOC document
36C25622R0030 WD MS20220060 Mod 1 02252022 (Harrision Heavy) .docx DOCX document
36C25622R0030 Spec 024100 .doc DOC document
36C25622R0030 Spec 017419 .doc DOC document
36C25622R0030 EXHIBIT E-Surety Form .docx DOCX document
36C25622R0030 EXHIBIT D-Contractor Evaluation Form Construction Safety .docx DOCX document
36C25622R0030 VHA Supplemental Contract Requirements for Combatting COVID-19.docx DOCX document
36C25622R0030 WD MS20220050 Mod 2 02252022 (Harrision Building) .docx DOCX document
36C25622R0030 EXHIBIT C-Subcontractor Information and Consent Form .docx DOCX document
36C25622R0030 Spec 078400 .doc DOC document
36C25622R0030 EXHIBIT B-Past and Present Performance Questionnaire.docx DOCX document
36C25622R0030 WD MS20220133 Mod 1 02252022 (Harrision Highway) .docx DOCX document
36C25622R0030 Spec 013526 v2 (updated 071322).docx DOCX document
36C25622R0030 Spec 262726 v2 (updated (071322).doc DOC document
36C25622R0030 Seed ICRA .pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 Project No. 520-22-122 FCA Corrections BLDG 17-MATOC Seed Project 36C25622R0030

EXHIBIT A

PERFORMANCE RELEVANCY SURVEY

Offeror Name/Company

PART 1. CONTRACT REFERENCES: Provide the following information requested in this format for each of the projects/contracts you intend to have considered for evaluation. Projects shall have been completed no more than 5 years prior to the solicitation issue date. Provide all information requested regarding YOUR PERFORMANCE on the contracts you elect to reference.

Project Submittal #___________________ (NOTE: Offerors allowed NO MORE than 5 projects- offerors to make appropriate copies) Project/Contract Title: ________________________________ Contract Number/Task Order Number:_______________________ Location of Project:__________________________________ Description of Effort as Prime ( ) or Subcontractor ( ) Original Contract Value: $________________________ Current/completed Contract Value: $_________________________ Was project completed on time: Yes ( ) No ( ) Start date: ___________________ End date:_________________ Reason for delay if applicable:__________________________________________________ Any liquidated damages: Yes ( ) No ( ) CPARS available: Yes ( ) No ( ) (NOTE: Offeror can provide CPARS with proposal; however, the questionnaire has more detailed questions.)

Provide detailed description of the work performed under the contract and describe why you believe the work is VERY REVELANT, RELEVANT, or SEMI-RELEVANT. (Circle one)

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Relevance detailed description of project to include work by subcontractors:

Point of Contact of Reference on project (who you are sending questionnaire/survey to):

Name: ________________________ Title: ________________________ Agency: ________________________ Email: ________________________ Phone: ________________________ POTENTIAL OFFERORS: IT IS YOUR RESPONSIBILITY TO FOLLOW-UP WITH YOUR REFERENCES IN SUBMITTING QUESTIONNAIRES PRIOR TO THE CLOSE OF THE SOLICITATION.

PART 2. NOT RELATED TO PART 1: Additional offeror information required, but not project specific. THIS INFORMATION NEED ONLY BE PROVIDED ONCE IN YOUR SUBMISSION PACKAGE.

Offeror representative providing the below information:_______________________

1. Provide information regarding the assessment of liquidated damages on any contracts within the last five years. (Frequency, circumstances, severity of problem, etc.)

2. Offerors are strongly encouraged to include with their proposals information on problems encountered on any relevant projects and the specific corrective actions taken to remedy the problems. Furthermore, please provide explanation of any marginal ratings in CPARS if applicable:

3. Other Past Performance Considerations. Information provided shall be limited to the period starting five years prior to the solicitation release date and may include the following:

a. Professional/Industry awards (Identify award type, date of award and copy of certificate if applicable), Letters of appreciation, recognition or commendations

b. Discuss unique skills and accomplishments (Explain unique skills and/or accomplishments and provide supporting information for verification).

4. Address any technical areas about this project you consider uniquely relevant to this solicitation.

· Descriptions must address the following:

· Describe the specific elements of the work performed by your firm.

· Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on this project.

File details come from the government source that posted it. Updated .