This document contains a technical specification section for firestopping and a related federal contract opportunity notice. The technical specification outlines requirements for firestopping products and installation for penetrations in fire rated walls, floors, and decks. Acceptable firestopping systems must be tested and rated by FM, UL, or WH in accordance with ASTM E814 and seal openings to maintain the fire barrier rating. Smoke stopping seals are also required in smoke partitions. The related federal contract opportunity is a request for proposal for project number 520-22-122 regarding corrections building 17 at the Biloxi VA medical center. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 16.

View the file

Other files

File Type Posted
36C25622R0030 055000 Metal Fabrication.docx DOCX document
36C25622R0030 0006.docx DOCX document
36C25622R0030 262921 Enclosed Switches and Circuit Breakers.docx DOCX document
36C25622R0030 0005.docx DOCX document
36C25622R0030 Spec 013323 v2.doc DOC document
36C25622R0030 099100 PAINTING.doc DOC document
36C25622R0030 133419 Pre-Engineered Metal Bldg Systems.doc DOC document
36C25622R0030 262416 Electrical Panelboards.docx DOCX document
36C25622R0030 Main Elec Panel Schedule.pdf PDF
36C25622R0030 RFI Register 10182022.docx DOCX document
36C25622R0030 263213 Engine Generators v2.docx DOCX document
36C25622R0030 Site Utility Map.pdf PDF
36C25622R0030 211313 Wet Pipe Sprinkler System.docx DOCX document
36C25622R0030 0004.docx DOCX document
36C25622R0030 081113 Hollow Metal Doors and Frames.doc DOC document
36C25622R0030 087100 DOOR HARDWARE.doc DOC document
36C25622R0030 SD320523 04 Concrete Post Bollards.pdf PDF
36C25622R0030 34751313 Vehicle Barrier.docx DOCX document
36C25622R0030 SD320523 05 Removable Bollard 1 (Alternate Option for Generator).pdf PDF
36C25622R0030 Bldg 17 Details Section.pdf PDF
36C25622R0030 B17 Floor Plan.pdf PDF
36C25622R0030 SD320523 06 Removable Bollard 2 (Strap Detail).pdf PDF
36C25622R0030 0003.docx DOCX document
36C25622R0030 0002.docx DOCX document
36C25622R0030 FCA Corrections Bldg 17 - Full Set v2.pdf PDF
S04 Site Visit Attendance Sheet (08.30.2022).pdf PDF
36C25622R0030 0001.docx DOCX document
36C25622R0030 EXHIBIT I-Financial Disclosure.docx DOCX document
36C25622R0030 SOW FCA Corrections Bldg 17 (Revised v2).pdf PDF
36C25622R0030 Spec 013323.doc DOC document
36C25622R0030 Drawings-FCA Corrections BLDG 17 .pdf PDF
36C25622R0030 Spec 220511 .doc DOC document
36C25622R0030 EXHIBIT F-RFI Form .docx DOCX document
36C25622R0030 Spec 260511 .doc DOC document
36C25622R0030 EXHIBIT H-Contractor Information.docx DOCX document
36C25622R0030 Spec 062000 .doc DOC document
36C25622R0030 WD MS20220060 Mod 1 02252022 (Harrision Heavy) .docx DOCX document
36C25622R0030 Spec 024100 .doc DOC document
36C25622R0030 Spec 017419 .doc DOC document
36C25622R0030 EXHIBIT E-Surety Form .docx DOCX document
36C25622R0030 EXHIBIT A-Performance Relevancy Survey .docx DOCX document
36C25622R0030 EXHIBIT D-Contractor Evaluation Form Construction Safety .docx DOCX document
36C25622R0030 VHA Supplemental Contract Requirements for Combatting COVID-19.docx DOCX document
36C25622R0030 WD MS20220050 Mod 2 02252022 (Harrision Building) .docx DOCX document
36C25622R0030 EXHIBIT C-Subcontractor Information and Consent Form .docx DOCX document
36C25622R0030 EXHIBIT B-Past and Present Performance Questionnaire.docx DOCX document
36C25622R0030 WD MS20220133 Mod 1 02252022 (Harrision Highway) .docx DOCX document
36C25622R0030 Spec 013526 v2 (updated 071322).docx DOCX document
36C25622R0030 Spec 262726 v2 (updated (071322).doc DOC document
36C25622R0030 Seed ICRA .pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 07 84 00

FIRESTOPPING

PART 1 GENERAL

1.1 DESCRIPTION

A.

Closures of openings in walls, floors, and roof decks against penetration of flame, heat, and smoke or gases in fire resistant rated construction.

B.

Closure of openings in walls against penetration of gases or smoke in smoke partitions.

1.2 RELATED WORK(NOT APPLICABLE)

1.3 SUBMITTALS

A.

Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B.

Manufacturers literature, data, and installation instructions for types of firestopping and smoke stopping used.

C.

List of FM, UL, or WH classification number of systems installed.

D.

Certified laboratory test reports for ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use.

1.4 DELIVERY AND STORAGE

A.

Deliver materials in their original unopened containers with manufacturer’s name and product identification.

B.

Store in a location providing protection from damage and exposure to the elements.

1.5 warranty

Firestopping work subject to the terms of the Article “Warranty of Construction”, FAR clause 52.246-21, except extend the warranty period to five years.

1.6 QUALITY ASSURANCE

FM, UL, or WH or other approved laboratory tested products will be acceptable.

1.7 APPLICABLE PUBLICATIONS

A.

Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.

B.

American Society for Testing and Materials (ASTM):

E84-10 Surface Burning Characteristics of Building Materials

E814-11 Fire Tests of Through-Penetration Fire Stops

C.

Factory Mutual Engineering and Research Corporation (FM):

Annual Issue Approval Guide Building Materials

D.

Underwriters Laboratories, Inc. (UL):

Annual Issue Building Materials Directory

Annual Issue Fire Resistance Directory

1479-10 Fire Tests of Through-Penetration Firestops

E.

Warnock Hersey (WH):

Annual Issue Certification Listings

PART 2 - PRODUCTS

2.1 FIRESTOP SYSTEMS

A.

Use either factory built (Firestop Devices) or field erected (through-Penetration Firestop Systems) to form a specific building system maintaining required integrity of the fire barrier and stop the passage of gases or smoke. No mixing of more than one fire stop product is allowed for use in any one penetration.

B.

Through-penetration firestop systems and firestop devices tested in accordance with ASTM E814 or UL 1479 using the "F" or "T" rating to maintain the same rating and integrity as the fire barrier being sealed. "T" ratings are not required for penetrations smaller than or equal to 100 mm (4 in) nominal pipe or 0.01 m2 (16 sq. in.) in overall cross sectional area.

C.

Products requiring heat activation to seal an opening by its intumescence shall exhibit a demonstrated ability to function as designed to maintain the fire barrier.

D.

Firestop sealants used for firestopping or smoke sealing shall have following properties:

1.

Contain no flammable or toxic solvents.

2.

Have no dangerous or flammable out gassing during the drying or curing of products.

3.

Water-resistant after drying or curing and unaffected by high humidity, condensation or transient water exposure.

4.

When used in exposed areas, shall be capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.

E.

Firestopping system or devices used for penetrations by glass pipe, plastic pipe or conduits, unenclosed cables, or other non-metallic materials shall have following properties:

1.

Classified for use with the particular type of penetrating material used.

2.

Penetrations containing loose electrical cables, computer data cables, and communications cables protected using firestopping systems that allow unrestricted cable changes without damage to the seal.

3.

Intumescent products which would expand to seal the opening and act as fire, smoke, toxic fumes, and, water sealant.

F.

Maximum flame spread of 25 and smoke development of 50 when tested in accordance with ASTM E84.

G.

FM, UL, or WH rated or tested by an approved laboratory in accordance with ASTM E814.

H.

Materials to be asbestos free.

2.2 SMOKE STOPPING IN SMOKE PARTITIONS

A.

Use silicone sealant in smoke partitions as specified in Section 07 92 00, JOINT SEALANTS.

B.

Use mineral fiber filler and bond breaker behind sealant.

C.

Sealants shall have a maximum flame spread of 25 and smoke developed of 50 when tested in accordance with E84.

D.

When used in exposed areas capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.

PART 3 - EXECUTION

3.1 EXAMINATION

Submit product data and installation instructions, as required by article, submittals, after an on site examination of areas to receive firestopping.

3.2 PREPARATION

A.

Remove dirt, grease, oil, loose materials, or other substances that prevent adherence and bonding or application of the firestopping or smoke stopping materials.

B.

Remove insulation on insulated pipe for a distance of 150 mm (six inches) on either side of the fire rated assembly prior to applying the firestopping materials unless the firestopping materials are tested and approved for use on insulated pipes.

3.3 INSTALLATION

A.

Do not begin work until the specified material data and installation instructions of the proposed firestopping systems have been submitted and approved.

B.

Install firestopping systems with smoke stopping in accordance with FM, UL, WH, or other approved system details and installation instructions.

C.

Install smoke stopping seals in smoke partitions.

3.4 CLEAN-UP AND ACCEPTANCE OF WORK

A.

As work on each floor is completed, remove materials, litter, and debris.

B.

Do not move materials and equipment to the next-scheduled work area until completed work is inspected and accepted by the Resident Engineer.

C.

Clean up spills of liquid type materials.

- - - E N D - - -