511_17092.JBB_TechnicalSpec_2.pdf
PDF 3 MB Posted
- Solicitation number
- RFQ 171 230000000067 4
- Issued by
- Clinton County, Galien Village, Michigan
About this file
This technical specifications document is issued by the DTMB (Department of Technology, Management and Budget) and DMVA (Michigan Department of Military and Veterans Affairs) for the Gladstone Armory Renovate Armory Phase IV project (DTMB File #511/17092.JBB, DMVA Project #26A9520005). The specifications cover comprehensive construction work including selective demolition, concrete forming and reinforcing, masonry, structural steel, roofing, interior finishes, plumbing, HVAC, electrical, and communications systems. The document serves as the technical standards guide for all construction materials and installation methods required for the armory renovation, detailing specifications across 33 divisions of work with multiple subsections addressing specific construction components such as concrete formwork, cast-in-place concrete, unit masonry, steel joist framing, EPDM roofing, hollow metal doors and frames, gypsum board, ceramic tiling, plumbing piping, and electrical systems. The specifications reference industry standards including ASTM, ACI, ASME, AWS, and NSF requirements, establishing the baseline performance and quality criteria that all contractors must meet throughout the project execution.
The document establishes detailed performance requirements, material specifications, and execution standards across all construction disciplines. Pricing and financial terms are not addressed in this technical specifications document, as it functions exclusively as a standards and procedures guide rather than a bidding or contract award document. The specifications emphasize compliance with applicable codes, standards, and regulations from authorities having jurisdiction, require pre-installation meetings and quality assurance testing, and mandate coordination between trades. Key contract administration elements include requirements for mock-ups, shop drawings, product data submittals, field quality control testing, and commissioning activities such as system flushing, disinfection, and balance verification. The document does not contain information regarding set-asides, incumbent contractors, funding sources, or contract award dates, as these elements are typically found in separate bid documents or award notifications rather than technical specifications.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TEC
H
N
IC
A
L SPEC
IFIC
A
TIO
N
S
Table of Contents Generated by SpecBuilder: 11/18/2022
Division
Section Title
Pages
DIVISION 02
EXISTING CONDITIONS
02 41 19
SELECTIVE DEMOLITION
DIVISION 03
CONCRETE
03 10 00
CONCRETE FORMING AND ACCESSORIES
03 20 00
CONCRETE REINFORCING
03 30 00
CAST-IN-PLACE CONCRETE
DIVISION 04
MASONRY
04 20 00
UNIT MASONRY
DIVISION 05
METALS
05 21 00
STEEL JOIST FRAMING
05 31 00
STEEL DECKING
05 50 00
METAL FABRICATIONS
DIVISION 06
WOOD, PLASTICS, AND COMPOSITES
06 10 53
MISCELLANEOUS ROUGH CARPENTRY
DIVISION 07
THERMAL AND MOISTURE PROTECTION
07 11 13
BITUMINOUS DAMPPROOFING
07 21 00
THERMAL INSULATION
07 53 23
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
07 71 00
ROOF SPECIALTIES
07 84 00
FIRESTOPPING
07 92 00
JOINT SEALANTS
07 95 13.16
EXTERIOR EXPANSION JOINT COVER ASSEMBLIES
DIVISION 08
OPENINGS
08 11 13
HOLLOW METAL DOORS AND FRAMES
08 31 13
ACCESS DOORS AND FRAMES
08 33 23
OVERHEAD COILING DOORS
08 34 59
VAULT DOORS
08 51 13
ALUMINUM WINDOWS
08 71 00
DOOR HARDWARE
08 80 00
GLAZING
DIVISION 09
FINISHES
09 22 16
NON-STRUCTURAL METAL FRAMING
09 29 00
GYPSUM BOARD
09 30 13
CERAMIC TILING
09 51 23
ACOUSTICAL TILE CEILINGS
09 65 13
RESILIENT BASE AND ACCESSORIES
09 65 19
RESILIENT TILE FLOORING
09 65 66
RESILIENT ATHLETIC FLOORING
09 91 00
PAINTING
DIVISION 10
SPECIALTIES
10 14 23.13
ROOM-IDENTIFICATION SIGNAGE
10 21 13.19
PLASTIC TOILET COMPARTMENTS
10 22 13
WIRE MESH PARTITIONS
10 28 00
ACCESSORIES
10 44 00
FIRE PROTECTION SPECIALTIES
10 51 26
PLASTIC LOCKERS
DIVISION 12
FURNISHINGS
12 21 13
HORIZONTAL LOUVER BLINDS
12 32 00
MANUFACTURED WOOD CASEWORK
DIVISION 22
PLUMBING
22 05 17
SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
22 05 18
ESCUTCHEONS FOR PLUMBING PIPING
22 05 23.12
BALL VALVES FOR PLUMBING PIPING
22 05 29
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND
EQUIPMENT
22 05 53
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 19 PLUMBING PIPING INSULATION 7
22 11 16
DOMESTIC WATER PIPING
22 11 19
DOMESTIC WATER PIPING SPECIALTIES
22 13 16
SANITARY WASTE AND VENT PIPING
22 13 19
SANITARY WASTE PIPING SPECIALTIES
22 42 13.13
COMMERCIAL WATER CLOSETS
22 42 13.16
COMMERCIAL URINALS
22 42 16.13
COMMERCIAL LAVATORIES
22 42 16.16
COMMERCIAL SINKS
22 42 23
COMMERCIAL SHOWERS
DIVISION 23
HEATING VENTILATING AND AIR CONDITIONING (HVAC)
23 05 23.12
BALL VALVES FOR HVAC PIPING
23 05 29
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 53
IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 05 93
TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 13
DUCT INSULATION
23 07 19
HVAC PIPING INSULATION
23 11 23
FACILITY NATURAL-GAS PIPING
23 21 13
HYDRONIC PIPING
23 31 13
METAL DUCTS
23 33 00
AIR DUCT ACCESSORIES
23 37 13.13
AIR DIFFUSERS
23 37 13.23
REGISTERS AND GRILLES
23 72 23.29
PACKAGED, OUTDOOR, FIXED PLATE ENERGY RECOVERY UNITS
23 74 16.11
PACKAGED, SMALL-CAPACITY, ROOFTOP AIR-CONDITIONING
UNITS
23 81 26
SPLIT-SYSTEM AIR-CONDITIONERS
23 82 16.11
HYDRONIC AIR COILS
DIVISION 26
ELECTRICAL
26 05 19
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 23
CONTROL-VOLTAGE ELECTRICAL POWER CABLES
26 05 26
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 43
UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL
SYSTEMS
26 05 44
SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND
CABLING
26 05 53
IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 09 23
LIGHTING CONTROL DEVICES
26 24 16
PANELBOARDS
26 27 26
WIRING DEVICES
26 28 13
FUSES
26 28 16
ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 29 23
VARIABLE-FREQUENCY MOTOR CONTROLLERS
26 43 13
SURGE PROTECTIVE DEVICES FOR LOW-VOLTAGE ELECTRICAL
POWER CIRCUITS
26 51 19
LED INTERIOR LIGHTING
26 52 13
EMERGENCY AND EXIT LIGHTING
26 56 19
LED EXTERIOR LIGHTING
DIVISION 27
COMMUNICATIONS
27 05 28
PATHWAYS FOR COMMUNICATIONS SYSTEMS
27 05 29
HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS
27 05 44
SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS
AND CABLING
27 05 53
IDENTIFICATION FOR COMMUNICATIONS SYSTEMS
27 15 13
COMMUNICATIONS COPPER HORIZONTAL CABLING
DIVISION 31
EARTHWORK
31 10 00
SITE CLEARING
31 20 00
EARTH MOVING
DIVISION 32
EXTERIOR IMPROVEMENTS
32 92 00
TURF AND GRASSES
DIVISION 33
UTILITIES
33 42 00
STORMWATER CONVEYANCE
END OF TABLE OF CONTENTS
DTMB/DMVA
Gladstone Armory Renovate Armory Phase IV DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
SELECTIVE DEMOLITION
02 41 19 - Page 1 of 6
11/18/2022
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
SECTION 02 41 19 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
B. Related Requirements:
1. Section 01 10 00 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.
2. Section 01 73 00 "Execution" for cutting and patching procedures.
3. Section 31 10 00 "Site Clearing" for site clearing and removal of above- and below-grade improvements not part of selective demolition.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and store.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.4 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site .
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
SELECTIVE DEMOLITION
02 41 19 - Page 2 of 6
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
5. Review areas where existing construction is to remain and requires protection.
1.5 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property , for environmental protection , for dust control and , for noise control. Indicate proposed locations and construction of barriers.
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's building manager's and other tenants' on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Use of elevator and stairs.
5. Coordination of Owner's continuing occupancy of portions of existing building and of
Owner's partial occupancy of completed Work.
C. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by salvage and demolition operations. Comply with Section 01 32 33 "Photographic Documentation." Submit before Work begins.
1.6 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.7 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. Hazardous materials will be removed by Owner before start of the Work.
2. If suspected hazardous materials are encountered, do not disturb; immediately notify
Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
1.8 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
SELECTIVE DEMOLITION
02 41 19 - Page 3 of 6
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Steel Tendons: Locate tensioned steel tendons and include recommendations for de-tensioning.
D. Verify that hazardous materials have been remediated before proceeding with building demolition operations.
E. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video .
1. Inventory and record the condition of items to be removed and salvaged.
2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.
3.2 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Owner will arrange to shut off indicated services/systems when requested by Contractor.
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
SELECTIVE DEMOLITION
02 41 19 - Page 4 of 6
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
c. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
3.4 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 01 50 00 "Temporary Facilities and Controls."
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
C. Remove temporary barricades and protections where hazards no longer exist.
3.5 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping.
Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 1 hour after flame-cutting operations.
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
10. Dispose of demolished items and materials promptly.
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
SELECTIVE DEMOLITION
02 41 19 - Page 5 of 6
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Work in Historic Areas: Selective demolition may be performed only in areas of Project that are not designated as historic. In historic spaces, areas, and rooms, or on historic surfaces, the terms "demolish" or "remove" shall mean historic "removal" or "dismantling" as specified in Section 02 42 96 "Historic Removal and Dismantling."
D. Removed and Salvaged Items:
1. Clean salvaged items.
E. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete.
Neatly trim openings to dimensions indicated.
B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.
C. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.
D. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Comply with requirements specified in Section 01 74 19 "Construction Waste Management and Disposal."
B. Burning: Do not burn demolished materials.
3.8 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
SELECTIVE DEMOLITION
02 41 19 - Page 6 of 6
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
END OF SECTION 02 41 19
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CONCRETE FORMING AND ACCESSORIES
03 10 00 - Page 1 of 4
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
SECTION 03 10 00 - CONCRETE FORMING AND ACCESSORIES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Form-facing material for cast-in-place concrete.
2. Shoring, bracing, and anchoring.
B. Related Requirements:
1. Section 03 30 00 "Cast-In-Place Concrete" for requirements related to cast-in-place concrete.
1.3 DEFINITIONS
A. Form-Facing Material: Temporary structure or mold for the support of concrete while the concrete is setting and gaining sufficient strength to be self-supporting.
B. Formwork: The total system of support of freshly placed concrete, including the mold or sheathing that contacts the concrete, as well as supporting members, hardware, and necessary bracing.
1.4 ACTION SUBMITTALS
A. Product Data: For each of the following:
1. Exposed surface form-facing material.
2. Form-release agent.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For testing and inspection agency.
1.6 QUALITY ASSURANCE
A. Testing and Inspection Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Concrete Formwork: Design, engineer, erect, shore, brace, and maintain formwork, shores, and reshores in accordance with ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.
1. Design wood panel forms in accordance with APA's "Concrete Forming
Design/Construction Guide."
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CONCRETE FORMING AND ACCESSORIES
03 10 00 - Page 2 of 4
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
2. Design formwork to limit deflection of form-facing material to 1/360 of center-to-center spacing of supports.
2.2 FORM-FACING MATERIALS
A. As-Cast Surface Form-Facing Material:
1. Provide continuous, true, and smooth concrete surfaces.
2. Furnish in largest practicable sizes to minimize number of joints.
3. Acceptable Materials: As required to comply with Surface Finish designations specified in
Section 03 30 00 "Cast-In-Place Concrete, and as follows:
a. Plywood, metal, or other approved panel materials.
b. Exterior-grade plywood panels, suitable for concrete forms, complying with
DOC PS 1, and as follows:
1) APA HDO (high-density overlay).
2) APA MDO (medium-density overlay); mill-release agent treated and edge sealed.
3) APA Structural 1 Plyform, B-B or better; mill oiled and edge sealed.
4) APA Plyform Class I, B-B or better; mill oiled and edge sealed.
B. Concealed Surface Form-Facing Material: Lumber, plywood, metal, plastic, or another approved material.
1. Provide lumber dressed on at least two edges and one side for tight fit.
2.3 RELATED MATERIALS
A. Dovetail Anchor Slots: Hot-dip galvanized-steel sheet, not less than 0.034 inch thick, with bent tab anchors. Temporarily fill or cover face opening of slots to prevent intrusion of concrete or debris.
B. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.
C. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.
1. Formulate form-release agent with rust inhibitor for steel form-facing materials.
2. Form release agent for form liners shall be acceptable to form liner manufacturer.
D. Form Ties: Factory-fabricated, removable or snap-off, glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
1. Furnish units that leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface.
2. Furnish ties that, when removed, leave holes no larger than 1 inch in diameter in concrete surface.
3. Furnish ties with integral water-barrier plates to walls indicated to receive dampproofing or waterproofing.
PART 3 - EXECUTION
3.1 INSTALLATION OF FORMWORK
A. Comply with ACI 301.
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CONCRETE FORMING AND ACCESSORIES
03 10 00 - Page 3 of 4
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
B. Construct formwork, so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117 and to comply with the Surface Finish designations specified in Section 03 30 00 "Cast-In-Place Concrete" for as-cast finishes .
C. Limit concrete surface irregularities as follows:
1. Surface Finish-2.0: ACI 117 Class B, 1/4 inch.
D. Construct forms tight enough to prevent loss of concrete mortar.
1. Minimize joints.
2. Exposed Concrete: Symmetrically align joints in forms.
E. Construct removable forms for easy removal without hammering or prying against concrete surfaces.
1. Provide crush or wrecking plates where stripping may damage cast-concrete surfaces.
2. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.
3. Install keyways, reglets, recesses, and other accessories, for easy removal.
F. Do not use rust-stained, steel, form-facing material.
G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces.
1. Provide and secure units to support screed strips
2. Use strike-off templates or compacting-type screeds.
H. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible.
1. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar.
2. Locate temporary openings in forms at inconspicuous locations.
I. Chamfer exterior corners and edges of permanently exposed concrete.
J. At construction joints, overlap forms onto previously placed concrete not less than 12 inches.
K. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work.
1. Determine sizes and locations from trades providing such items.
2. Obtain written approval of Architect prior to forming openings not indicated on Drawings.
L. Construction and Movement Joints:
1. Construct joints true to line with faces perpendicular to surface plane of concrete.
2. Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.
3. Place joints perpendicular to main reinforcement.
4. Locate joints for beams, slabs, joists, and girders in the middle third of spans.
a. Offset joints in girders a minimum distance of twice the beam width from a beam-girder intersection.
5. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.
6. Space vertical joints in walls at max 20ft o.c. .
a. Locate joints beside piers integral with walls, near corners, and in concealed locations where possible.
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CONCRETE FORMING AND ACCESSORIES
03 10 00 - Page 4 of 4
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
M. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.
N. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.
O. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.
3.2 INSTALLATION OF EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete.
1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC 303.
3. Clean embedded items immediately prior to concrete placement.
3.3 REMOVING AND REUSING FORMS
A. Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F for 24 hours after placing concrete. Concrete has to be hard enough to not be damaged by form-removal operations, and curing and protection operations need to be maintained.
1. Leave formwork for beam soffits, joists, slabs, and other structural elements that support weight of concrete in place until concrete has achieved at least 70 percent of its 28-day design compressive strength.
2. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores.
B. Clean and repair surfaces of forms to be reused in the Work.
1. Split, frayed, delaminated, or otherwise damaged form-facing material are unacceptable for exposed surfaces.
2. Apply new form-release agent.
C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints.
1. Align and secure joints to avoid offsets.
2. Do not use patched forms for exposed concrete surfaces unless approved by Architect.
3.4 SHORING AND RESHORING INSTALLATION
A. Comply with ACI 318 and ACI 301 for design, installation, and removal of shoring and reshoring.
1. Do not remove shoring or reshoring until measurement of slab tolerances is complete.
B. In multistory construction, extend shoring or reshoring over a sufficient number of stories to distribute loads in such a manner that no floor or member will be excessively loaded or will induce tensile stress in concrete members without sufficient steel reinforcement.
C. Plan sequence of removal of shores and reshore to avoid damage to concrete. Locate and provide adequate reshoring to support construction without excessive stress or deflection.
END OF SECTION 03 10 00
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CONCRETE REINFORCING
03 20 00 - Page 1 of 3
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
SECTION 03 20 00 - CONCRETE REINFORCING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Steel reinforcement bars.
2. Welded-wire reinforcement.
1.2 ACTION SUBMITTALS
A. Shop Drawings: Comply with ACI SP-066:
1. Include placing drawings that detail fabrication, bending, and placement.
2. Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement.
B. Construction Joint Layout: Indicate proposed construction joints required to build the structure.
1. Location of construction joints is subject to approval of Architect and Engineer.
PART 2 - PRODUCTS
2.1 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A615/A615M, Grade 60 , deformed.
B. Epoxy-Coated Reinforcing Bars:
1. Steel Bars: ASTM A615/A615M, Grade 60 , deformed bars.
2. Epoxy Coating: ASTM A775/A775M with less than 2 percent damaged coating in each 12-inch bar length.
C. Plain-Steel Welded-Wire Reinforcement: ASTM A1064/A1064M, plain, fabricated from as-drawn steel wire into flat sheets.
2.2 REINFORCEMENT ACCESSORIES
A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place.
1. Manufacture bar supports from steel wire, plastic, or precast concrete in accordance with
CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:
a. For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire, all-plastic bar supports, or CRSI Class 2 stainless steel bar supports.
B. Steel Tie Wire: ASTM A1064/A1064M, annealed steel, not less than 0.0508 inch in diameter.
2.3 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CONCRETE REINFORCING
03 20 00 - Page 2 of 3
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
PART 3 - EXECUTION
3.1 PREPARATION
A. Protection of In-Place Conditions:
1. Do not cut or puncture vapor retarder.
2. Repair damage and reseal vapor retarder before placing concrete.
B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.
3.2 INSTALLATION OF STEEL REINFORCEMENT
A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.
B. Accurately position, support, and secure reinforcement against displacement.
1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.
2. Do not tack weld crossing reinforcing bars.
C. Preserve clearance between bars of not less than 1 inch, not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.
D. Provide concrete coverage in accordance with ACI 318.
E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
F. Splices: Lap splices as indicated on Drawings.
1. Bars indicated to be continuous, and all vertical bars to be lapped not less than 36 bar diameters at splices, or 24 inches, whichever is greater.
2. Stagger splices in accordance with ACI 318.
3. Mechanical Splice Couplers: Install in accordance with manufacturer's instructions.
4. Weld reinforcing bars in accordance with AWS D1.4/D 1.4M, where indicated on Drawings.
G. Install welded-wire reinforcement in longest practicable lengths.
1. Support welded-wire reinforcement in accordance with CRSI "Manual of Standard
Practice."
a. For reinforcement less than W4.0 or D4.0, continuous support spacing to not exceed
12 inches.
2. Lap edges and ends of adjoining sheets at least one wire spacing plus 2 inches for plain wire and 8 inches for deformed wire.
3. Offset laps of adjoining sheet widths to prevent continuous laps in either direction.
4. Lace overlaps with wire.
3.3 JOINTS
A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect and Engineer.
1. Place joints perpendicular to main reinforcement.
2. Continue reinforcement across construction joints unless otherwise indicated.
3. Do not continue reinforcement through sides of strip placements of floors and slabs.
3.4 INSTALLATION TOLERANCES
A. Comply with ACI 117.
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CONCRETE REINFORCING
03 20 00 - Page 3 of 3
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
END OF SECTION 03 20 00
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CAST-IN-PLACE CONCRETE
03 30 00 - Page 1 of 15
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
SECTION 03 30 00 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cast-in-place concrete, including concrete materials, mixture design, placement procedures, and finishes.
B. Related Requirements:
1. Section 03 10 00 "Concrete Forming and Accessories" for form-facing materials, form liners, insulating concrete forms, and waterstops.
2. Section 03 20 00 "Concrete Reinforcing" for steel reinforcing bars and welded-wire reinforcement.
3. Section 31 20 00 "Earth Moving" for bases under slabs-on-ground.
4. Section 09 91 00 "Painting" for sealer applied to concrete floors.
1.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash, slag cement, other pozzolans, and silica fume;
materials subject to compliance with requirements.
B. Water/Cement Ratio (w/cm): The ratio by weight of water to cementitious materials.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site .
1. Require representatives of each entity directly concerned with cast-in-place concrete to attend in person or virtually, including the following:
a. Contractor's superintendent.
b. Independent testing agency responsible for concrete design mixtures.
c. Ready-mix concrete manufacturer.
d. Concrete Subcontractor.
e. Engineer/Architect.
2. Review the following:
a. Special inspection and testing and inspecting agency procedures for field quality control.
b. Construction joints, control joints, isolation joints, and joint-filler strips.
c. Semirigid joint fillers.
d. Vapor-retarder installation.
e. Anchor rod and anchorage device installation tolerances.
f. Cold and hot weather concreting procedures.
g. Concrete finishes and finishing.
h. Curing procedures.
i. Forms and form-removal limitations.
j. Methods for achieving specified floor and slab flatness and levelness.
k. Floor and slab flatness and levelness measurements.
l. Concrete repair procedures.
m. Concrete protection.
n. Initial curing of field test cylinders (ASTM C31/C31M.)
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CAST-IN-PLACE CONCRETE
03 30 00 - Page 2 of 15
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
1.4 ACTION SUBMITTALS
A. Product Data: For each of the following.
1. Portland cement.
2. Fly ash.
3. Slag cement.
4. Aggregates.
5. Admixtures:
a. Include limitations of use, including restrictions on cementitious materials, supplementary cementitious materials, air entrainment, aggregates, temperature at time of concrete placement, relative humidity at time of concrete placement, curing conditions, and use of other admixtures.
6. Vapor retarders.
7. Curing materials.
8. Joint fillers.
9. Repair materials.
B. Design Mixtures: For each concrete mixture, include the following:
1. Mixture identification.
2. Minimum 28-day compressive strength.
3. Durability exposure class.
4. Maximum w/cm.
5. Slump limit.
6. Air content.
7. Nominal maximum aggregate size.
8. Include manufacturer's certification that permeability-reducing admixture is compatible with mix design.
9. Include certification that dosage rate for permeability-reducing admixture matches dosage rate used in performance compliance test.
10. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.
C. Shop Drawings:
1. Construction Joint Layout: Indicate proposed construction joints required to construct the structure.
a. Location of construction joints is subject to approval of the Architect.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For the following:
1. Testing agency: Include copies of applicable ACI certificates.
B. Material Test Reports: For the following, from a qualified testing agency:
1. Portland cement.
2. Fly ash.
3. Slag cement.
4. Aggregates.
5. Admixtures:
a. Permeability-Reducing Admixture: Include independent test reports, indicating compliance with specified requirements, including dosage rate used in test.
C. Field quality-control reports.
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CAST-IN-PLACE CONCRETE
03 30 00 - Page 3 of 15
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
1.6 QUALITY ASSURANCE
A. Ready-Mixed Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C94/C94M requirements for production facilities and equipment.
1. Manufacturer certified in accordance with NRMCA's "Certification of Ready Mixed
Concrete Production Facilities."
B. Laboratory Testing Agency Qualifications: A testing agency qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated and employing an ACI-certified Concrete Quality Control Technical Manager.
1. Personnel performing laboratory tests to be an ACI-certified Concrete Strength Testing
Technician and Concrete Laboratory Testing Technician, Grade I. Testing agency laboratory supervisor to be an ACI-certified Concrete Laboratory Testing Technician, Grade II.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Comply with ASTM C94/C94M and ACI 301.
1.8 FIELD CONDITIONS
A. Cold-Weather Placement: Comply with ACI 301 and ACI 306.1 and as follows.
1. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
2. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.
3. Do not use frozen materials or materials containing ice or snow.
4. Do not place concrete in contact with surfaces less than 35 deg F, other than reinforcing steel.
5. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.
B. Hot-Weather Placement: Comply with ACI 301 and ACI 305.1, and as follows:
1. Maintain concrete temperature at time of discharge to not exceed 95 deg F.
2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.
PART 2 - PRODUCTS
2.1 CONCRETE, GENERAL
A. ACI Publications: Comply with ACI 301 unless modified by requirements in the Contract Documents.
2.2 CONCRETE MATERIALS
A. Cementitious Materials:
1. Portland Cement: ASTM C150/C150M, Type I , gray .
2. Fly Ash: ASTM C618, Class C.
3. Slag Cement: ASTM C989/C989M, Grade 100 or 120.
4. Performance-Based Hydraulic Cement: ASTM C1157/C1157M: Type GU, general use .
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CAST-IN-PLACE CONCRETE
03 30 00 - Page 4 of 15
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
B. Normal-Weight Aggregates: ASTM C33/C33M, Class 4M for exterior concrete or Class 1N for interior concrete, coarse aggregate or better, graded. Provide aggregates from a single source.
1. Alkali-Silica Reaction: Comply with one of the following:
a. Expansion Result of Aggregate: Not more than 0.04 percent at one-year when tested in accordance with ASTM C1293.
b. Expansion Results of Aggregate and Cementitious Materials in Combination: Not more than 0.10 percent at an age of 16 days when tested in accordance with ASTM C1567.
c. Alkali Content in Concrete: Not more than 4 lb./cu. yd. for moderately reactive aggregate or 3 lb./cu. yd. for highly reactive aggregate, when tested in accordance with ASTM C1293 and categorized in accordance with ASTM C1778, based on alkali content being calculated in accordance with ACI 301.
2. Maximum Coarse-Aggregate Size: 3/4 inch nominal.
3. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
C. Air-Entraining Admixture: ASTM C260/C260M.
D. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride in steel-reinforced concrete.
1. Water-Reducing Admixture: ASTM C494/C494M, Type A.
2. Retarding Admixture: ASTM C494/C494M, Type B.
3. Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type D.
E. Water and Water Used to Make Ice: ASTM C94/C94M, potable.
2.3 VAPOR RETARDERS
A. Sheet Vapor Retarder, Class C: ASTM E1745, Class C ; not less than 10 mils thick. Include manufacturer's recommended adhesive or pressure-sensitive joint tape.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. ISI Building Products.
b. Stego Industries, LLC.
c. Tex-Trude.
d. or equal equivalent as approved by Engineer
2.4 CURING MATERIALS
A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. ChemMasters, Inc.
b. Euclid Chemical Company (The); an RPM company.
c. Sika Corporation.
d. or equal as approved by the Engineer
B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.
C. Moisture-Retaining Cover: ASTM C171, polyethylene film burlap-polyethylene sheet.
1. Color:
http://www.specagent.com/LookUp/?ulid=11018&mf=04&src=wd http://www.specagent.com/LookUp/?ulid=11025&mf=04&src=wd
DTMB File #511/17092.JBB DMVA Project #26A9520005
OHM PROJECT #7136-21-0080
CAST-IN-PLACE CONCRETE
03 30 00 - Page 5 of 15
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "OHM Advisors" for "Gladstone Armory Renovate Armory Phase IV". A valid, current MasterSpec license is required for editing and use of this document for any other project.(16861)
a. Ambient Temperature Below 50 deg F: Black.
b. Ambient Temperature between 50 deg F and 85 deg F: Any color.
c. Ambient Temperature Above 85 deg F: White.
D. Water: Potable or complying with ASTM C1602/C1602M.
2.5 RELATED MATERIALS
A. Expansion- and Isolation-Joint-Filler Strips: ASTM D1751, asphalt-saturated cellulosic fiber or ASTM D1752, cork or self-expanding cork.
B. Bonding Agent: ASTM C1059/C1059M, Type II, nonredispersible, acrylic emulsion or styrene butadiene.
C. Epoxy Bonding Adhesive: ASTM C881, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class suitable for application temperature and of grade and class to suit requirements, and as follows:
1. Types IV and V, load bearing, for bonding hardened or freshly mixed concrete to hardened concrete.
2.6 REPAIR MATERIALS
A. Repair Underlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at edges to match adjacent floor elevations.
1. Cement Binder: ASTM C150/C150M portland…
This is the start of the file's text. The full file is on GovTribe.