511_17092.JBB_TechnicalSpec_1.pdf
PDF 3 MB Posted
- Solicitation number
- RFQ 171 230000000067 4
- Issued by
- Clinton County, Galien Village, Michigan
About this file
Gladstone Armory Renovate Armory Phase IV - Project Manual and Bidding Documents
This is a Project Manual and bidding document package for a state construction project issued by the State of Michigan Department of Technology, Management and Budget (DTMB) and the Department of Military and Veterans Affairs (DMVA). The project involves complete renovation of the Gladstone Armory located at 604 S. 18th Street, Gladstone, Michigan 49837, including construction of two building additions: one 3,500 square foot addition with a concrete vault, physical fitness area, and supply storage, and one 1,500 square foot addition for office space. Interior renovation work includes restroom reconfiguration and fixture replacement, interior finishes, removal of mezzanine/storage space for classroom conversion, installation of new electrical service, and associated site work. A mandatory pre-bid meeting and site walk-through were scheduled for December 6, 2022, at 9:00 a.m. Electronic bids were due by 2:00 p.m. on January 11, 2023, through the SIGMA VSS system. The contract period extends from a Notice to Proceed through Substantial Completion by February 17, 2024, and final completion by March 17, 2024. The work is awarded under a single prime contract with all trades performing under one contract structure.
The bid includes a $40,000 project scope allowance and $6,000 utility allowance within the base bid. Five percent (5%) bid security is required in the form of a certified check, money order, or Bid Bond. Liquidated damages are assessed at $500 per calendar day for failure to achieve Substantial Completion by February 17, 2024, and $500 per day for failure to achieve final completion by March 17, 2024. The contract requires a Performance Bond and Payment Bond for all bids exceeding $50,000, along with comprehensive builders risk insurance. The Professional Services Contractor is OHM Advisors (contact: Tracie Williams, PE, 906-482-0535). The project is subject to prevailing wage requirements, Michigan residency requirements for employees (50% of workforce), nondiscrimination covenants, and soil erosion and sedimentation control compliance under Michigan law. The bidding documents include extensive specifications for quality requirements, submittal procedures, execution standards, and closeout documentation. All work must comply with the Michigan State Construction Code and applicable federal and state regulations.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
GLADSTONE ARMORY
RENOVATE ARMORY
(PHASE IV)
DEPARTMENT OF TECHNOLOGY,
MANAGEMENT AND BUDGET
DTMB FILE NO. 511/17092.JBB
DMVA FILE NO.: 26A9520005
PROJECT NO. 7136-21-0080
DATE: November 18, 2022
DTMB-0415 (R 08/22)
PROJECT ADVERTISEMENT
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
This form is required for the advertisement of all construction projects. (1984 PA 431)
TO:
DESIGN AND CONSTRUCTION DIVISION
DATE
November 18, 2022
FROM:
DTMB/DMVA
PROJECT MANAGER
Jeff Barsch
DTMB FILE NUMBER
511/17092.JBB
ADVERTISEMENT DATE
November 18, 2022
ELECTRONIC BID DUE DATE
Wednesday, January 11, 2023 at 2:00 p.m.
PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)
Gladstone Armory Renovate Armory (Phase IV) 604 S. 18th Street Gladstone, MI 49837
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION
A mandatory prebid meeting will be held at the project site on Tuesday, December 6, 2022, at 9:00 a.m.
Mandatory Yes No
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
COVID 19 Precautions:
1. Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed
DESCRIPTION OF WORK:
Complete construction of 2 building additions consisting of masonry loadbearing walls and steel joists with metal deck. One 3500 sq foot addition includes a concrete vault, physical fitness and supply storage; one 1500 sq ft addition includes additional office space. Interior renovation includes restroom reconfiguration and fixture replacement, interior finishes and removal of mezzanine/storage space for conversion of room into classroom space. Installation of a new electrical service and site work associated with the new additions. One single contract for all trades.
Please NOTE:
• Bid responses and bid attachments MUST be uploaded to SIGMA VSS.
•• Please remember that individual attachments can be no larger than 6mb.
•• Please do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response. SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the bid response has been uploaded.
•• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Bid Responses should not be emailed to the Project Director.
5% Bid Security:
Required
Not Required
NIGP CODES: 90922, 90924, 90976,91013,91447,91438,91430,91427, 91450, 91455, 91468,91473, 91479, 92615, 92645
ACCEPTING QUESTIONS UNTIL: Wednesday, January 4, 2023, at 12:00 p.m.
Documents may be obtained from:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfServi ce
PSC/Agency: OHM Advisors
Address: 424 Hancock Street, Hancock, MI 49930
Phone: (906) 482-0535
Email: deana.wuori@ohm-advisors.com
Fax:
Approved by:
mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:deana.wuori@ohm-advisors.com
STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS
MICHSPEC DTMB 00010 − 1 (Rev. 02/22)
This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0
Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition. Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0 Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR
STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
MICHSPEC No. 97.0820 − 00020 THROUGH 97.0820 − 00440
RELEASED ON NOVEMBER 1, 1997.
Developed from
Contract Forms and Conditions of the Contract
FORMSPEC Michigan Model and suggested for use with
Bidding Requirements
File No. 511/17092.JBB DMVA File No. 26A9520005
DTMB/DMVA
GLADSTONE ARMORY
Gladstone Armory Gladstone, MI
November 18, 2022
MICHSPEC DTMB 00010 − 2 (Rev. 02/22)
1997 Edition/R 03/22 Version
SECTION 00010 TABLE OF CONTENTS
SECTION/PAGE NO.
SUBJECT INDEX
SECTION 00020 GLOSSARY ............................................................................................................................................. 00020 - 1
SECTION 00030 ADVERTISEMENT .................................................................................................................................. 00030 - 1
SECTION 00100 INSTRUCTIONS TO BIDDERS ............................................................................................................... 00100 - 1
ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS .................................................................................................. 00100 - 1
ARTICLE 2 QUALIFICATIONS OF BIDDERS ..................................................................................................................... 00100 - 1
ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS ....................................... 00100 - 2
ARTICLE 4 INTERPRETATIONS; ADDENDA .................................................................................................................... 00100 - 3
ARTICLE 5 BID SECURITY ................................................................................................................................................ 00100 - 3
ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES .................................................................................................. 00100 - 4
ARTICLE 7 MATERIALS AND EQUIPMENT ...................................................................................................................... 00100 - 4
ARTICLE 8 SUBCONTRACTORS ...................................................................................................................................... 00100 - 5
ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS ................................................................................................. 00100 - 5
ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS.................................................................................................. 00100 - 6
ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ........................................................................................................ 00100 - 6
ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ................................................................................................ 00100 - 7
ARTICLE 13 BIDS TO REMAIN OPEN .................................................................................................................................. 00100 - 7
ARTICLE 14 AWARD OF THE CONTRACT .......................................................................................................................... 00100 - 7
ARTICLE 15 EXECUTION OF THE AGREEMENT ................................................................................................................ 00100 - 9
ARTICLE 16 MOBILIZATION PAY ITEM ............................................................................................................................. 00100 -10 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .................................. 00100 -10 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST........................................................................................ 00110 - 1
SECTION 00120 SUPPLEMENTARY INSTRUCTIONS ..................................................................................................... 00120 - 1
SECTION 00210 INFORMATION FOR BIDDERS .............................................................................................................. 00210 - 1
SECTION 00300 BID SUMMARY ...................................................................................................................... 00300 - SUMMARY
SECTION 00300 BID FORM ............................................................................................................................................... 00300 - 1
ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER"). ................................................. 00300 - 1
ARTICLE 2 THE BIDDER'S REPRESENTATIONS ............................................................................................................... 00300 - 1
ARTICLE 3 TIME OF COMPLETION ..................................................................................................................................... 00300 - 2
ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID .................................................................................................... 00300 - 2
ARTICLE 5 DEFINED TERMS ............................................................................................................................................... 00300 - 2
ARTICLE 6 BID SCHEDULE .................................................................................................................................................. 00300 - 3
ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES ...................................................................................................... 00300 - 5
ARTICLE 8 BID SUBMITTED ON ......................................................................................................................................... 00300 - 6
SECTION 00310 BID BOND ............................................................................................................................................... 00310 - 1
SECTION 00320 NONCOLLUSION AFFIDAVIT ................................................................................................................ 00320 - 1
SECTION 00410 BID BREAKDOWN ................................................................................................................................. 00410 - 1
SECTION 00420 QUESTIONNAIRE ................................................................................................................................... 00420 - 1
ARTICLE 1 ORGANIZATION ............................................................................................................................................... 00420 - 1
ARTICLE 2 SPECIALTY CONTRACTOR LICENSES .......................................................................................................... 00420 - 1
ARTICLE 3 EXPERIENCE ................................................................................................................................................... 00420 - 1
ARTICLE 4 ADDITIONAL QUALIFICATIONS ...................................................................................................................... 00420 - 2
ARTICLE 5 REFERENCES .................................................................................................................................................. 00420 - 2 REFERENCES ATTACHMENT ......................................................................................................................... 00420 - 3
SECTION 00430 LIST OF SUBCONTRACTORS ............................................................................................................... 00430 - 1
SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT .................................................................................. 00440 - 1
ARTICLE 1 BID MATERIALS AND EQUIPMENT −LISTED (NAMED OR SPECIFIED) ITEMS ........................................... 00440 - 1
ARTICLE 2 BID MATERIALS AND EQUIPMENT − OPEN SPECIFICATIONS .................................................................... 00440 - 3
SECTION 00500 AGREEMENT .......................................................................................................................................... 00500 - 1
ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK .............................................................................................. 00500 - 1
ARTICLE 2 CONTRACT DOCUMENTS .............................................................................................................................. 00500 - 1
ARTICLE 3 CONTRACT PRICE ........................................................................................................................................... 00500 - 2
MICHSPEC DTMB 00010 − 3 (Rev. 02/22)
ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES ................................................................................................... 00500 - 2
ARTICLE 5 PAYMENTS TO CONTRACTOR ...................................................................................................................... 00500 - 3
ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR ......................................................................................... 00500 - 3
ARTICLE 7 CONTRACTOR'S REPRESENTATIONS .......................................................................................................... 00500 - 3
ARTICLE 8 MISCELLANEOUS ............................................................................................................................................ 00500 - 3
ARTICLE 9 NOTICE AND SERVICE .................................................................................................................................... 00500 - 4
SECTION 00520 ATTACHMENT “A” TO AGREEMENT ................................................................................................... 00520 - 1
SECTION 00610 PERFORMANCE BOND ........................................................................................................................ 00610 - 1
SECTION 00620 PAYMENT BOND ................................................................................................................................... 00620 - 1
SECTION 00700 GENERAL CONDITIONS ........................................................................................................................ 00700 - 1
ARTICLE 1 INTERPRETATIONS ........................................................................................................................................... 00700 - 1
1.1 Section 00020 Glossary:............................................................................................................................................... 00700 - 1
1.2 Intent of the Contract Documents: ................................................................................................................................ 00700 - 1
1.3 Priority of the Contract Documents: .............................................................................................................................. 00700 - 2
1.4 Interpretation of Indemnification Provisions: ................................................................................................................. 00700 - 2
1.5 Additional Interpretations: ............................................................................................................................................. 00700 - 2
1.6 Ownership and Use of the Contract Documents: ......................................................................................................... 00700 - 3.
1.7 Copies of the Contract Documents: ............................................................................................................................... 00700 - 3
ARTICLE 2 THE OWNER−GENERAL PROVISIONS .......................................................................................................... 00700 - 3
2.1 Availability of Lands, Areas, Properties and Facilities: ................................................................................................. 00700 - 3
2.2 Reference Points; Base Lines and Benchmarks: .......................................................................................................... 00700 - 3
2.3 Stop Work Order: ......................................................................................................................................................... 00700 - 3.
2.4 Limitations on the Owner’s Responsibilities: ................................................................................................................ 00700 - 4
2.5 Additional General Provisions: ...................................................................................................................................... 00700 - 4
2.6 Partnering Charter: ...................................................................................................................................................... 00700 - 4.
ARTICLE 3 THE PROFESSIONAL − GENERAL PROVISIONS .......................................................................................... 00700 - 4
3.1 Owner’s Representative: ............................................................................................................................................. 00700 - 4
3.2 Clarifications and Interpretations: ................................................................................................................................. 00700 - 4
3.3 Minor Variations and No-Cost Changes; Minor Delays:................................................................................................ 00700 - 5
3.4 Determinations by the Professional: ........................................................................................................................... 00700 - 5
3.5 Limitations on the Professional’s Responsibilities: ....................................................................................................... 00700 - 5
ARTICLE 4 CONTROL OF WORK − GENERAL PROVISIONS ........................................................................................... 00700 - 5
4.1 Review of the Contract Documents: ............................................................................................................................. 00700 - 5
4.2 Management, Supervision, and Personnel: .................................................................................................................. 00700 - 5
4.3 Materials and Equipment: ............................................................................................................................................. 00700 - 6
4.4 Concerning Control of Work: ....................................................................................................................................... 00700 - 6.
4.5 Patent Fees and Royalties: ........................................................................................................................................... 00700 - 7
4.6 Use of Premises: .......................................................................................................................................................... 00700 - 7
4.7 Record Documents: ...................................................................................................................................................... 00700 - 7
4.8 Emergencies: ................................................................................................................................................................ 00700 - 8
4.9 Indemnification: ............................................................................................................................................................ 00700 - 8
ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS .......................................................................................................... 00700 - 8
5.1 Employment of Subcontractors: .................................................................................................................................... 00700 - 8
5.2 "Or Equal" and Substitute Materials and Equipment:.................................................................................................... 00700 - 9
5.3 The Contractor’s Continuing Responsibilities: ............................................................................................................ 00700 - 9
ARTICLE 6 SUBMITTALS .................................................................................................................................................... 00700 - 9
6.1 Shop Drawing, Sample and Other Technical Submittals: ............................................................................................. 00700 - 9
6.2 Review and Return of Technical Submittals: ............................................................................................................. 00700 - 10.
6.3 Progress Schedule Submittals: ................................................................................................................................... 00700 - 10
6.4 Review and Return of Progress Schedule Submittals: .............................................................................................. 00700 - 10.
6.5 Additional Provisions Concerning Submittals: ........................................................................................................... 00700 - 10.
ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ........................................................................................................ 00700 - 11
7.1 Laws; Permits (Which Include Approvals and Licenses): .......................................................................................... 00700 - 11.
7.2 Sales and Use Tax and Other Similar Taxes: ............................................................................................................ 00700 - 12.
7.3 Safety and Protection: ................................................................................................................................................ 00700 - 12
7.4 Bonds and Insurance - General Requirements: .......................................................................................................... 00700 - 12
7.5 The Contractor’s Liability Insurance:......................................................................................................................... 00700 - 12
7.6 Pollution Liability Insurance: ....................................................................................................................................... 00700 - 13
7.7 Property Insurance (Builder's All Risk Insurance): ...................................................................................................... 00700 - 13
MICHSPEC DTMB 00010 − 4 (Rev. 02/22)
7.8 Waiver of Rights: ........................................................................................................................................................ 00700 - 13
7.9 Receipt and Application of Proceeds: ......................................................................................................................... 00700 - 13
7.10 Unfair Labor Practice: ................................................................................................................................................. 00700 - 13
7.11 Michigan Right-To-Know Law: ................................................................................................................................... 00700 - 13.
7.12 Nondiscrimination: ...................................................................................................................................................... 00700 - 14
7.13 Michigan Residency for Employees: ........................................................................................................................... 00700 - 14
ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION ........................................................................................... 00700 - 15
8.1 Starting the Work: ...................................................................................................................................................... 00700 - 15.
8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ................................................................................................... 00700 - 15
8.3 Compliance with Contract Time Requirements: .......................................................................................................... 00700 - 15
8.4 Substantial Completion: .............................................................................................................................................. 00700 - 15
8.5 Partial Use: ................................................................................................................................................................. 00700 - 16
8.6 Division of Responsibilities: ........................................................................................................................................ 00700 - 16
8.7 Suspension of Work: .................................................................................................................................................. 00700 - 16
8.8 Sharing of Total Float on Non-Critical Paths: .............................................................................................................. 00700 - 16
ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND
APPROVALS; CORRECTION OF WORK ....................................................................................................... 00700 - 17
9.1 Warranty: ................................................................................................................................................................... 00700 - 17
9.2 Tests, Inspections and Approvals: ............................................................................................................................. 00700 - 17
9.3 Uncovering Work: ...................................................................................................................................................... 00700 - 17
9.4 Correction of Work: .................................................................................................................................................... 00700 - 17
9.5 Special Correction Period Requirements: .................................................................................................................. 00700 - 18
9.6 Special Maintenance Requirements: ......................................................................................................................... 00700 - 18
ARTICLE 10 CHANGES ..................................................................................................................................................... 00700 - 19
10.1 Changes in the Work: ................................................................................................................................................ 00700 - 19
10.2 Differing Subsurface or Physical Site Conditions: ..................................................................................................... 00700 - 19.
10.3 Responsibilities for Underground Utilities: ................................................................................................................. 00700 - 20
10.4 Hazardous Material Conditions: ................................................................................................................................. 00700 - 20
10.5 Incidents with Archaeological Features: .................................................................................................................... 00700 - 20
10.6 Unit Price Work: ......................................................................................................................................................... 00700 - 21
10.7 Cash Allowances; Provisionary Allowances: ............................................................................................................. 00700 - 21
10.8 Change Orders; Change Authorizations: ................................................................................................................... 00700 - 21
ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN
CONTRACT TIME ......................................................................................................................................... 00700 - 22
11.1 General Provisions: ................................................................................................................................................... 00700 - 22
11.2 Changes in Contract Time: ........................................................................................................................................ 00700 - 22
11.3 Methods for Making Adjustments in Contract Price: ................................................................................................. 00700 - 22.
11.4 Labor, Subcontract and Material/Equipment Costs: .................................................................................................. 00700 - 23
11.5 Construction Equipment Costs: ................................................................................................................................. 00700 - 23
11.6 Rented or Leased Construction Equipment: .............................................................................................................. 00700 - 23
11.7 Owned Construction Equipment: ............................................................................................................................... 00700 - 24
11.8 General Conditions Costs: ......................................................................................................................................... 00700 - 24
11.9 Limitations on Allowable Costs: ................................................................................................................................. 00700 - 24
11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ....................... 00700 - 24.
11.11 Limits on the Fee for the Work Involved: ................................................................................................................... 00700 - 25.
11.12 Fee for Unabsorbed Home Office Overhead: ............................................................................................................. 00700 - 25
11.13 Changes in Contract Time for Early Completion: ........................................................................................................ 00700 - 25
11.14 Access to Records: ..................................................................................................................................................... 00700 - 26
11.15 Price Reduction for Defective Cost and Pricing Data: ................................................................................................ 00700 - 26
ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ............................................................................................... 00700 - 26
12.1. Schedule of Values: ................................................................................................................................................... 00700 - 26
12.2 Requests for Payment: .............................................................................................................................................. 00700 - 27
12.3 Review of Request for Payment; Intent of Review: .................................................................................................... 00700 - 27
12.4 Refusal to Make or to Recommend Payment: .......................................................................................................... 00700 - 27.
12.5 Final Request for Payment: ....................................................................................................................................... 00700 - 27
12.6 Final Payment and Acceptance: ................................................................................................................................ 00700 - 28
12.7 Contractor’s Continuing Obligation: ......................................................................................................................... 00700 - 28
12.8 Waiver of Claims: ...................................................................................................................................................... 00700 - 28
ARTICLE 13 OTHER WORK .............................................................................................................................................. 00700 - 28
13.1 Related Work at Site: ................................................................................................................................................. 00700 - 28
13.2 Coordination Requirements: ...................................................................................................................................... 00700 - 29
MICHSPEC DTMB 00010 − 5 (Rev. 02/22)
13.3 Claims Between the Contractor and Other Parties: ................................................................................................. 00700 - 29
ARTICLE 14 TERMINATION .............................................................................................................................................. 00700 - 29
14.1 Notice Requiring Assurance of Due Performance: ................................................................................................... 00700 - 29.
14.2 Contractor Default and Termination for Cause: ........................................................................................................ 00700 - 30
14.3 Surety Default: ........................................................................................................................................................... 00700 - 31
14.4 Termination for Convenience of the Owner: .............................................................................................................. 00700 - 31
14.5 The Contractor May Suspend Work: ...................................................................................................................... 00700 – 31.
ARTICLE 15 DISPUTES .................................................................................................................................................... 00700 - 31
15.1 Claims Under This Article: ......................................................................................................................................... 00700 - 31
15.2 Requirement for Certification of Contractor Claims: ................................................................................................. 00700 - 32
15.3 Recommendations or Decisions from the Professional:........................................................................................... 00700 - 32
15.4 Determinations by the Director-DCD: ....................................................................................................................... 00700 - 32
15.5 Supplements to AAA Arbitration: ............................................................................................................................... 00700 - 33
15.6 Interest on a Judgment; Payment of Judgment: ........................................................................................................ 00700 - 33
15.7 Venue; Flow-Through Provision: ............................................................................................................................... 00700 - 33
SECTION 00800 SUPPLEMENTARY CONDITIONS ....................................................................................................... 00800 - 1
DIVISION 010000 GENERAL REQUIREMENTS PROVIDED BY PSC
SUMMARY 011000
SUBSTITUTION PROCEDURES 012500
PROJECT MANAGEMENT AND COORDINATION 013100
SUBMITTAL PROCEDURES 013300
QUALITY REQUIREMENTS 014000
TEMPORARY FACILITIES AND CONTROLS 015000
PRODUCT REQUIREMENTS 016000
EXECUTION 017300
OPERATION AND MAINTENANCE DATA 017839
PROJECT RECORD DOCUMENTS 017839
DEMONSTRATION AND TRAINING 017900
SECTION 01310 PROGRESS SCHEDULE ...................................................................................................................... 01310 - 1
APPENDIX I SPECIAL PROJECT PROCEDURES
APPENDIX II STATE OF MICHIGAN FEDERAL PROVISIONS ADDENDUM & WAGE RATE SCHEDULES
CLOSEOUT DOCUMENTS
Contractor Closeout Checklist
Project Final Completion Checklist
Guarantee and Indebtedness Statement
Certificate of Substantial Completion
DRAWINGS - BOUND SEPARATELY
TITLE SHEETS THRU
COVERSHEET & PROJECT INFORMATION G-001
CODE COMPLIANCE SUMMARY AND PLAN G-101
CODE COMPLIANCE PLAN G-102
NOTES C-001
LEGEND & DETAILS C-002
REMOVAL PLAN C-120
SITE PLAN C-130
LAYOUT PLAN C-131
GRADING PLAN C-170
GENERAL STRUCTURAL INFORMATION S-001
GENERAL STRUCTURAL INFORMATION S-002
FOUNDATION PLANS S-101
MICHSPEC DTMB 00010 − 6 (Rev. 02/22)
ROOF FRAMING PLANS S-102
ROOF FRAMING PLANS S-103
SECTIONS S-301
SECTIONS S-302
STRUCTURAL DETAILS S-500
STRUCTURAL DETAILS S-501
STRUCTURAL DETAILS S-502
STRUCTURAL DETAILS S-503
ARCHITECTURAL SYMBOLS & LEGENDS A-001
ASSEMBLY TYPES AND DETAILS A-011
DEMOLITION PLAN AD101
MAIN FLOOR PLAN A-101
MAIN FLOOR PLAN ENLARGED PLAN – AREA A A-102
MAIN FLOOR PLAN ENLARGED PLAN – AREA B A-103
MAIN FLOOR PLAN ENLARGED PLAN – AREA C A-104
ROOF PLAN A-111
EXTERIOR ELEVATIONS A-201
EXTERIOR ELEVATIONS A-202
BUILDING SECTIONS A-301
BUILDING SECTIONS A-302
WALL SECTIONS A-311
WALL SECTIONS A-312
WALL SECTIONS A-313
WALL SECTIONS A-314
INTERIOR ELEVATIONS A-451
PLAN DETAILS A-511
SECTION DETAILS A-531
INTERIOR DETAILS A-541
OPENING SCHEDULES & DETAILS A-601
FINISH SCHEDULE & DETAILS A-602
MAIN FLOOR REFLECTED CEILING PLAN A-701
GENERAL MECHANICAL INFORMATION M-001
MECHANICAL DEMOLITION MD101
MECHANICAL MAIN FLOOR PLAN M-101
MECHANICAL PLAN – AREA A M-102
MECHANICAL PLAN – AREA B M-103
MECHANICAL PLAN – AREA C M-104
MECHANICAL ROOF PLAN M-111
MECHANICAL DETAILS AND SCHEDULES M-601
GENERAL ELECTRICAL INFORMATION E-001
ELECTRICAL SITE DEMOLITION PLAN ED100
MAIN FLOOR ELECTRICAL DEMOLITION PLAN ED101
ELECTRICAL DETAILS DEMOLITION ED601
ELECTRICAL SITE PLAN E-100
ELECTRICAL FLOOR POWER PLAN E-101
ELECTRICAL FLOOR LIGHTING PLAN E-102
MAIN FLOOR LOW VOLTAGE PLAN E-103
ELECTRICAL SCHEDULES E-601
ELECTRICAL SCHEDULES E-602
GENERAL PLUMBING INFORMATION P-001
PLUMBING DEMOLITION PLAN PD101
PLUMBING MAIN FLOOR PLAN P-101
PLUMBING PLAN – AREA C P-102
TECHNICAL SPECIFICATIONS
SELECTIVE DEMOLITION 024119
CONCRETE FORMING AND ACCESSORIES 031000
CONCRETE REINFORCING 032000
CAST-IN-PLACE CONCRETE 033000
UNIT MASONRY 042000
CONCRETE UNIT MASONRY 042200
STEEL JOIST FRAMING 052100
STEEL DECKING 053100
METAL FABRICATIONS 055000
MISCELLANEOUS ROUGH CARPENTRY 061053
MICHSPEC DTMB 00010 − 7 (Rev. 02/22)
BITUMINOUS DAMPPROOFING 071113
THERMAL INSULATION 072100
EPDM ROOFING 075323
ROOF SPECIALTIES 077100
FIRESTOPPING 078400
JOINT SEALANTS 079200
EXTERIOR EXPANSION JOINT COVER ASSEMBLIES 079513.16
HOLLOW METAL DOORS AND FRAMES 081113
ACCESS DOORS AND FRAMES 083113
OVERHEAD DOORS AND FRAMES 083323
VAULT DOORS 083459
ALUMINUM WINDOWS 085113
DOOR HARDWARE 087100
GLAZING 088000
NON-STRUCTURAL METAL FRAMING 092216
GYPSUM BOARD 092900
CERAMIC TILING 093013
ACOUSTICAL TILE CEILINGS 095123
RESILIENT BASE AND ACCESSORIES 096513
RESILIENT TILE FLOORING 096519
RESILIENT ATHLETIC FLOORING 096566
PAINTING 099100
ROOM-IDENTIFICATION SIGNAGE 101423.13
PLASTIC TOILET COMPARTMENTS 102113.19
WIRE MESH PARTITIONS 102213
ACCESSORIES 102800
FIRE PROTECTION SPECIALTIES 104400
PLASTIC LOCKERS 105126
HORIZONTAL LOUVER BLINDS 122113
MANUFACTURED WOOD CASEWORK 123200
SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220517
ESCUTCHEONS FOR PLUMBING PIPING 220518
BALL VALVES FOR PLUMBING PIPING 220523.12
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 220553
PLUMBING PIPING INSULATION 220719
DOMESTIC WATER PIPING 221116
DOMESTIC WATER PIPING SPECIALTIES 221319
SANITARY WASTE AND VENT PIPING 221316
SANITARY WASTE PIPING SPECIALTIES 221319
COMMERCIAL WATER CLOSETS 224213.13
COMMERCIAL URINALS 224213.16
COMMERCIAL LAVATORIES 224216.13
COMMERCIAL SINKS 224216.16
COMMERCIAL SHOWERS 224223
BALL VALVES FOR HVAC PIPING 230523.12
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529
IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 230553
TESTING, ADJUSTING, AND BALANCING FOR HVAC 230593
DUCT INSULATION 230713
HVAC PIPING INSULATION 230719
FACILITY NATURAL-GAS PIPING 231123
HYDRONIC PIPING 232113
HYDRONIC PIPING SPECIALTIES 232116
METAL DUCTS 233113
AIR DUCT ACCESSORIES 233300
AIR DIFFUSERS 233713.13
REGISTERS AND GRILLES 233713.23
PACKAGED, OUTDOOR, FIXED PLATE ENERGY RECOVERY UNITS 237223.29
PACKAGED, SMALL-CAPACITY, ROOFTOP AIR-CONDITIONING UNITS 237416.11
SPLIT-SYSTEM AIR-CONDITIONERS 238126
HYDRONIC AIR COILS 238216.11
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519
CONTROL-VOLTAGE ELECTRICAL POWER CABLES 260523
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529
MICHSPEC DTMB 00010 − 8 (Rev. 02/22)
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 260533
UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 260443
SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING 260544
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553
LIGHTING CONTROL DEVICES 260923
PANELBOARDS 262416
WIRING DEVICES 262726
FUSES 262813
ENCLOSED SWITCHES AND CIRCUIT BREAKERS 262816
VARIABLE-FREQUENCY MOTOR CONTROLLERS 262923
SURGE PROTECTIVE DEVICES FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS 264313
LED INTERIOR LIGHTING 265119
EMERGENCY AND EXIT LIGHTING 265213
LED EXTERIOR LIGHTING 265619
PATHWAYS FOR COMMUNICATIONS SYSTEMS 270528
HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS 270529
SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS AND CABLING 270544
IDENTIFICATION FOR COMMUNICATIONS SYSTEMS 270553
COMMUNICATIONS COPPER HORIZONTAL CABLING 271513
SITE CLEARING 311000
EARTH MOVING 312000
TURF AND GRASSES 329200
STORMWATER CONVEYANCE 334200
APPENDICES
Asbestos & Lead Report Existing Roof Warranty Soil Borings
STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY
MICHSPEC DTMB 00020 - 1 (R 03/22)
SECTION 00020 GLOSSARY
1.1 Defined Terms:
1.1.1. The following terms or relative pronouns used in
Division 0 of the Specifications have these intent and meanings:
Activity− An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.
Addenda− Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.
Agreement− The written agreement between the Owner and Contractor covering the Work to be furnished and performed.
Alternate− Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.
Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s preference is the lowest Bidder is considered the Apparent Low Bidder.
Archaeological Feature− Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.
As-Planned Schedule− The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.
Authorized Technical Data− Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph 3.0 of Section 00210 Information for Bidders.
Bar Chart Schedule− Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.
STATE OF MICHIGAN MODEL
Developed from FORMSPEC Michigan Model.
Bid− Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates. The term Bid includes a Rebid.
Bidder− The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.
Bidding Documents− The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.
Bid Price− The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.
Bid Security− A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.
Bidding Requirements− The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.
*AD Board− The Administrative Board of the State of Michigan.
Bonds− Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.
Business Day− Any Day except Saturdays, Sundays and holidays observed by the Owner.
Bulletin− A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.
Calendar Day− Every day shown on the calendar, Saturdays, Sundays, and holidays included.
Cash Allowance− An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents. Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently
MICHSPEC DTMB 00020 - 2 (R 03/22)
detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.
Change Authorization− A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.
Change Order− A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.
Contact Person− Individual in the employ of the Professional or the Owner who is designated as the sole point of contact for prospective Bidders for requests or inquiries concerning the Work and/or the Bidding Documents.
Contract− Refer to the definition in paragraph 1.1 of Section 00500 Agreement. The term “Contract” encompasses the legal obligations of the Owner and Contractor, as defined by the Contract Documents.
Con…
This is the start of the file's text. The full file is on GovTribe.