This is a technical attachment containing the wiring diagram and operational procedures for a Manual Maintenance Bypass (MBP) system designed for Uninterruptible Power System (UPS) installations. The document provides detailed configuration specifications for wall-mounted or free-standing cabinet implementations of the Manual Maintenance Bypass Switch (MMBPS), which enables technicians to safely transition UPS loads during maintenance operations.
The MBP sequence of operation follows a make-before-break protocol that requires placing the UPS unit in Static Bypass mode and using Kirk Keys to systematically control three switches in sequence: Switch No. 1 (closure), Switch No. 2 (opening), and Switch No. 3 (optional load bank testing). The wiring diagram illustrates the interconnections between the UPS three-phase output, essential panel input, maintenance bypass breaker, static bypass breaker, rectifier input breaker, and connections to critical load panels and load banks. The system includes an interlock mechanism with a solenoid-controlled Kirk Key release that coordinates UPS output voltage phasing with the essential panel. Normally Open (N.O.) and Normally Closed (N.C.) switch configurations are specified, along with optional Kirk Key solenoid power connections to ensure safe operational sequencing during maintenance activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5.0_Section J Attachment J.01_ DRAFT Equipment Specification_C.docx | DOCX document | |
| 4_Draft UPS SOW_10.20.25_C.pdf | ||
| 5.1B Section J Attachment J.01B_DRAFT SCADA Specification_C.docx | DOCX document | |
| 3_Appendix B UPS III Draft Section B_10.22.2025.xlsx | XLSX spreadsheet | |
| 1_UPS Market Survey_10.10.2025_C.pdf | ||
| 5.1A Section J Attachment J.01A_DRAFT Sync System_C.docx | DOCX document | |
| 2_ Appendix A UPS III Capability Form_10.10.2025_C.docx | DOCX document | |
| 6_Section J Attachment J.05 Cybersecurity SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J, ATTACHMENT J.01C
MANUAL MAINTENANCE BYPASS CONFIGURATION
MANUAL MAINTENANCE BYPASS CONFIGURATION
MANUAL MAINTENANCE BYPASS SWITCH (MMBPS)
WIRING DIAGRAM FOR WALL MOUNT OR FREE STANDING CABINET
MANUAL MAINTENANCE BYPASS (MBP) WALL MOUNT PANEL OR FREE STANDING CABINET
MBP Sequence of Operation for Make-before-break.
Place UPS unit in Static Bypass mode of operation. UPS output voltage is now in phase with essential panel. UPS interlock with MBP panel signals Kirk Key solenoid release.
Remove Kirk Key from solenoid, then insert in SW No. 1 Kirk Key and close switch No. 1.
Then insert Kirk Key in SW No. 2 and open switch No. 2.
If needed, close switch No. 3 for UPS load bank testing.
SW-3
SW-2
SW-1
UPS
Three Phase
N.C.
OUTPUT TO LOAD BANK
AC OUTPUT TO CRITICAL LOAD PANEL
N.O.
ESSENTIAL PANEL
MAINTENANCE BYPASS BREAKER BREAKERSWITCHBREAKER
UPS STATIC BYPASS BREAKER
UPS RECTIFIER INPUT BEAKER
SW 2
N.C.
SW 3
SW 1
N.O
Optional Kirk Key Solenoid Power
Output from UPS
Output to Critical Panel
Output to
Load Bank
Optional Kirk Keys on Switches SW-1, 2 and 3. Interconnection between UPS and Interlock solenoid for Kirk Key.
N.O = Normally Open
N.C.= Normally Closed
Essential Panel input to MMBPS