5-Consent of Surety-Change Order.pdf.pdf
PDF 648 KB Posted
- Solicitation number
- IFB-26-00362
- Issued by
- Hillsborough County, Florida
About this file
This is a Consent of Surety - Change Order document related to Hillsborough County Engineering and Operations' Roadway Resurfacing Repair and Preservation project for Districts 1 and 2. The document pertains to the contractor's surety bond requirements and any modifications to the original contract terms. The roadway resurfacing project encompasses milling and resurfacing of roadways throughout Hillsborough County utilizing Superpave Asphaltic Concrete structural courses, friction courses, preservation treatments, and/or Full Depth Reclamation (FDR) methods. The project has an estimated cost of $16,000,000.00 and requires a qualified contractor to execute the work across the designated districts.
The contract includes a Small Business Enterprise (SBE) goal of 5% participation as subcontractors. The Consent of Surety - Change Order document specifically addresses the surety's acknowledgment and approval of any contract modifications, ensuring that the bonding company authorizes changes to the original contract terms and conditions. This document is essential for validating that the contractor's surety maintains financial responsibility and accepts the obligations associated with any amendments to the original contract scope or pricing.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSENT OF SURETY TO CHANGE ORDER
CONTRACT TITLE:
CONTRACTOR (PRINCIPAL):
SURETY:
AGENT:
The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount
(increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .
This Consent is dated this day of , 20 .
SURETY:
BY: (SEAL)
Authorized Signature
-OR-
BY: (SEAL)
As Attorney in Fact (Attach Power of Attorney)
Printed Name
STATE OF FLORIDA
COUNTY OF HILLSBOROUGH
The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person)
________________________ for _________________________________________________.
(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)
(Signature of Notary Public)
(Print, Type, or Stamp Name of Notary Public)
Personally Know OR Produced Identification
Type of Identification Produced __________________
Revised 03.09.2020
File details come from the government source that posted it. Updated .