(5) 1503020 M PEST CONTROL.pdf
PDF 90 KB Posted
- Solicitation number
- N4008522R2589
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1503020 – Pest Control
SECTION M: EVALUATION FACTORS FOR AWARD - NEGOTIATED
Spec Item
Questions for Pest Control, Specification 1503020
2.3 From the Contractor Work Plan (CWP), describe the tools to be used for pest surveillance (such as sticky traps, flashlights, flushing agents, light traps, etc.) and the techniques to be used for pest identification.
2.3 From the Contractor Work Plan (CWP), describe the proposed pest control procedures that follow the principles of Integrated Pest Management (IPM) and reflect current industry practices.
2.3 From the Contractor Work Plan (CWP), describe pest control records that will be kept electronically for reporting requirements.
2.3 From the Contractor Work Plan (CWP), describe how quality control oversight will be conducted for recurring work.
Questions for Pest Control, Specification 1503020
File details come from the government source that posted it. Updated .