(27) Limitations on Subcontracting.xls
XLS spreadsheet 41 KB Posted
- Solicitation number
- N4008522R2589
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| POST-AWARD CONTRACTOR'S LIMITATIONS | |||||||||
| ON SUBCONTRACTING CERTIFICATION | |||||||||
| From: | Contractor | ||||||||
| To: | Mike Giangregorio | ||||||||
| PWD New London | |||||||||
| Naval Facilities Engineering Command, Mid-Atlantic | |||||||||
| Subj: | Contract No. | ||||||||
| 1. Prime contractor is to complete and submit the following for each reporting period (6 months) for each performance period (Base Year and Options). | |||||||||
| Block 1 | Block 2 | Block 3 | Block 4 | Block 5 | Block 6 | Block 7 | |||
| Period of Performance | FFP & | ||||||||
| Task Order # (list TO#) | Prime | ||||||||
| Labor Cost | Sub | ||||||||
| Labor Cost | Total FFP or Task Order Labor Cost | % Cost Performed by Prime | % Cost Performed by Sub | ||||||
| FFP | $0.00 | $0.00 | $0.00 | 0% | 0% | ||||
| CLIN 0001 | $0.00 | $0.00 | 0% | 0% | |||||
| CLIN 0002 | $0.00 | 0% | 0% | ||||||
| CLIN0003 | $0.00 | 0% | 0% | ||||||
| TOTAL FOR CURRENT REPORTING PERIOD | $0.00 | $0.00 | $0.00 | 0% | 0% | ||||
| TO XXXX | $0.00 | 0% | 0% | ||||||
| TO XXXX | $0.00 | 0% | 0% | ||||||
| Etc. | $0.00 | 0% | 0% | ||||||
| ** add rows here | $0.00 | 0% | 0% | ||||||
| TOTAL FOR PREVIOUS REPORTING PERIOD | $0.00 | $0.00 | $0.00 | 0% | 0% | ||||
| Total | $0.00 | 0% | 0% | ||||||
| Total | $0.00 | 0% | 0% | ||||||
| Total | $0.00 | 0% | 0% | ||||||
| Total | $0.00 | 0% | 0% | ||||||
| Total | $0.00 | 0% | 0% | ||||||
| CONTRACT TOTAL | $0.00 | $0.00 | $0.00 | 0% | 0% | ||||
| 2. Furthermore, in accordance with the provisions of FAR 52.219-14, Limitations on Subcontracting (Nov 2011), 13 CFR 124.510 and 13 CFR 125.6, in the performance of this contract, | |||||||||
| In the case of a contract for services (except construction), Contractor has expended at least 50 percent of the cost of the contract performance incurred for personnel with its own (prime contractor) employees. | |||||||||
| In the case of a contract for supplies or products (other than procurement from a non-manufacturer in such supplies or products Contractor has performed at least 50 percent of the cost of manufacturing the supplies or products (not including the costs of materials). | |||||||||
| In the case of a contract for general construction, Cambridge Marine Construction has performed at least 15 percent of the cost of the contract with its own employees (not including the costs of materials). | |||||||||
| In the case of a contract for construction by special trade contractors, contractor has performed at least 25 percent of the cost of the contract with its own employees (not including the cost of materials). | |||||||||
| I certify that to the best of its knowledge and belief, the information provided in this report is accurate, complete, and current as of the date of report. | |||||||||
| CONTRACTOR: | |||||||||
| SIGNATURE | DATE | ||||||||
| NAME AND TITLE |
&CPage &P of &N
Sheet2
Sheet3
File details come from the government source that posted it. Updated .