This is a Scope of Work document issued by the Directorate of Public Works at Camp Blanding Joint Training Center under the Florida Army National Guard for paving projects identified as PN 220017 (4800 Block Paving) and PN 220016 (4800 Area Paving Streets and Avenues). The work consists of repaving multiple streets (Pensacola, Westerly, Rutland, and Eustis Streets) and avenues (Plant City, Melbourne, and Quincy Avenues) at the Camp Blanding facility in Starke, Florida. Prior to paving, contractors must remove all grass from roadway edges and driveways, mill existing asphalt to remove deficient areas, and apply an FDOT-approved tack product using a heated distributor truck at a rate of 0.10 gallons per square yard. The project requires a two-lift paving approach consisting of a leveling course (1.25 inches of SP-12.5 hot mix asphalt with maximum 30% RAP) followed by a final paving lift (1.5 inches of 12.5 mix per FDOT Standards). A mandatory pre-bid site visit is required for all bidders, as noted in the memorandum dated 29 April 2026. The roadway must maintain a 2% fall from centerline to edges, and any new paving that crosses a culvert requires the culvert to be replaced in-kind with concrete mitered ends added.

All inspections and testing are the contractor's responsibility and must be included in the bid. All new culverts shall be concrete, matching the original shape and size while maintaining proper inverts and positive flow between culverts. Roadside ditches along newly paved roads must be cleaned and maintained for natural flow, with contractors responsible for repairing any damaged concrete lining caused by their equipment. Avenues with existing utility cuts require testing for base and sub-base compaction densities, with all areas requiring 98% compaction or higher prior to paving. Any grass-stripped or damaged areas require new sod installation with no seeding permitted; contractors must water until sod is established. All millings, dirt, and other recyclable materials shall remain on Camp Blanding property for reuse.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIRECTORATE OF PUBLIC WORKS

CAMP BLANDING JOINT TRAINING CENTER

FLORIDA ARMY NATIONAL GUARD

5629 STATE ROAD 16 WEST, BUILDING 2300

STARKE, FLORIDA 32091-9703

29 April 2026

CBJTC-DPW

MEMORANDUM FOR: Bidders Pre-Bid SITE VISIT IS MANDATORY.

SUBJECT: CBJTC 4800 Block_Paving PN 220017 CBJTC 4800 Area Paving STREETS (Pensacola, Westerly, Rutland and Eustis Streets) PN 220016 CBJTC 4800 Area Paving AVENUES (Plant City, Melbourne and Quincy Avenues)

Scope of Work:

Repave the streets identified in the attached map, at the Camp Blanding Joint Training Center.

Prior to paving, remove all grass from roadway edges and driveways.

All Streets will be milled of existing asphalt to remove all deficient areas.

All inspections and testing are the responsibility of the contractor and cost must be included in your bid.

Following clean-up an FDOT approved tack product will be applied by use of a heated distributor truck at a rate of 0.10 gallons per square yard.

Following the application of the FDOT approved tack product, a leveling course (1st lift, approximately 1 ½ inches) of SP-12.5 hot mix asphalt (maximum 30% RAP) will be placed by spreader and compacted prior to further work. 2nd lift, final paving to consist of 1 1/2" of 12.5 mix per FDOT Standards. There shall be a 2% fall from the centerline of the road to each edge of road.

Anywhere the new paving crosses a culvert, the culvert is to be replaced (with like for like), and concrete mitered ends added. (See Project Notes (2.) below)

Project Notes:

Steets Avenues All new culverts shall be concrete. The shape and size must remain as original. All culverts must be replaced to their original inverts and maintain a positive flow from culvert to culvert.

All roadside ditches along newly paved roads must be cleaned from culvert to culvert and maintain a natural flow from culvert to culvert. Some ditches are concrete lined. The contractor shall repair any of the concrete lining which is damaged by their equipment.

All Avenues that have existing utility cuts will require testing for densities of base and sub-base compaction. All testing must reach 98% compaction or higher prior to paving.

Any areas that have grass stripped or damaged will require new sod. No seeding allowed. Contractor must water until sod is established.

ALL millings, dirt or other recyclable materials shall remain on Camp Blanding and will be r

1456071518.NFG

Highlight

220024 - 3600 Paving _ Ludlow, Bristol, Greenwich, Winter Haven Streets_7JUL26_Procurement Request.pdf
220024 - 3600 Paving - Ludlow, Bristol, Greenwich, Winterhaven Streets_SOW and Bidding Sheet.pdf
12220024_420 3600 Paved Streets.pdf

File details come from the government source that posted it. Updated .