This document is a Travel Management Company (TMC) Passenger Name Record (PNR) Validation Configuration Worksheet template used as a mandatory submission requirement for TMC firms bidding on the USFK TMC Services contract (47QMCB26R0006). The worksheet establishes the technical validation process that confirms a TMC's Department of Defense Online Booking Tool (DoD OBT) connectivity and data exchange capabilities before contract award eligibility. All TMCs, including joint ventures and subcontractors with different Pseudo City Codes (PCCs), Site Identification Codes (SIDs), or other technical configurations, must submit a completed and validated worksheet by the Contracting Officer-specified deadline. The validation process requires TMCs to identify their Global Distribution System (GDS) platform (Sabre or Worldspan), provide all relevant PCCs/SIDs, Airline Reporting Corporation (ARC) and International Air Transport Association (IATA) numbers, establish five distinct queue assignments (Ticketing, Cancellation, Inbound, Polling/Outbound, and Urgent), and configure Company Profiles/Worldfiles for each supported location.

The submission process requires TMCs to complete three tables detailing company information, queue configurations, and company profile/worldfile specifications, then execute technical GDS procedures to open branch/bridge access, receive a DoD OBT test PNR, place it on the specified outbound queue, and submit validation confirmation to the Contracting Officer. PCCs/SIDs submitted in the worksheet cannot be changed between submission and service start date without Contracting Officer approval. The worksheet also mandates specific required GDS settings including automatic hotel description settings, 12-hour clock activation, and removal of quality control applications that require mandatory fields. This template serves as a prerequisite administrative and technical document; it does not specify pricing, performance metrics, or detailed service requirements, which are contained in the associated Performance Work Statement and other solicitation attachments.

View the file

Other files

File Type Posted
Attachment 1 - USFK PNR Validation Worksheet (REV)_Tracked_2026-08-05.docx DOCX document
47QMCB26R0006_0005_SF30_2026-08-05.pdf PDF
0005_47QMCB26R0006_Korea_TMC_Services_RFP_Tracked_2026-08-05.pdf PDF
USFK Regulation 700-19 dated 08-28-12.pdf PDF
0005_47QMCB26R0006_Korea_TMC_Services_RFP_Clean_2026-08-05.pdf PDF
47QMCB26R0006_0004_SF30_2026-07-15.pdf PDF
47QMCB26R0006_Amendment0004_Questions_Received_2026-07-15.xlsx XLSX spreadsheet
47QMCB26R0006_0003_SF30_2026-07-14.pdf PDF
47QMCB26R0006_0002_SF30_2026-07-10.pdf PDF
Attachment 7 - USFK USAF Part 1 USAF CBA Reconciliation Process.docx DOCX document
Attachment 3 - USFK_TMC_Data_Requirement Guide_v2.pdf PDF
47QMCB26R0006_Amendment0002_Questions_Received_2026-07-10.xlsx XLSX spreadsheet
Attachment 7 - USFK Army Part 2 CBARS Reconciliation Process System.docx DOCX document
Attachment 8 - USFK_Historical Workload Data_v2.xlsx XLSX spreadsheet
47QMCB26R0006_Korea_TMC_Services_RFP_Final_2026-07-10_Clean.pdf PDF
47QMCB26R0006_Korea_TMC_Services_RFP_Final_2026-07-10_Tracked.pdf PDF
47QMCB26R0006_Amendment0001_Questions_Received_2026-07-08.xlsx XLSX spreadsheet
47QMCB26R0006_0001_SF30_2026-07-08.pdf PDF
47QMCB26R0006_Korea_TMC_Services_RFP_Final_2026-07-08_Clean.pdf PDF
47QMCB26R0006_Korea_TMC_Services_RFP_Final_2026-07-08_Tracked.pdf PDF
Attachment 14 - USFK_Incentive_Disincentive_Language_Examples.docx DOCX document
Attachment 8 - USFK_Historical Workload Data.xlsx XLSX spreadsheet
Attachment 4 - USFK_PastPerformanceQuestionnaire.docx DOCX document
Attachment 5 - USFK QASP.docx DOCX document
Attachment 2 - USFK TMC Orientation and User Guide.pdf PDF
Attachment 9 - USFK GATES Instructions.docx DOCX document
Attachment 10 - USFK Pricing Model.xlsx XLSX spreadsheet
47QMCB26R0006_Korea_TMC_Services_RFP_Final_2026-07-01.pdf PDF
Attachment 1 - USFK PNR Validation Worksheet.docx DOCX document
Attachment 3 - USFK_TMC_Data_Requirement Guide.pdf PDF
Attachment 13 - USFK GTR-LOPA Instructions.docx DOCX document
Attachment 6 - USFK Site Data Location.xlsx XLSX spreadsheet
47QMCB26R0006_SF_1449_2026-07-01.pdf PDF
Attachment 12 - USFK_PersonnelWorkforcePlanTemplate.docx DOCX document
Attachment 11 - USFK Workload Data Report Example.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

Attachment 1 - PNR Validation Worksheet V2.7 August 2026 Attachment 1 – United States Forces Korea (USFK) Travel Management Company Passenger Name Record Validation Configuration Worksheet August 2026 – V2.7 Background:

The Passenger Name Record (PNR) Validation Configuration is a process that confirms the Department of Defense Online Booking Tool (DoD OBT) has the ability to exchange a PNR with the Travel Management Company (TMC) and provides the TMC with an example of an actual PNR that is delivered from the DoD OBT. Additionally, the process assures that the DoD OBT can send a PNR to the TMC on a specified queue and can sweep the PNR from the TMC outbound queue back into the DoD OBT.

This process validates the technical aspects of TMC connectivity and provides the TMC the experience of exchanging data with the DoD OBT. The current DoD OBT only supports Sabre and Worldspan Global Distribution System (GDS).

Requirements:

A TMC submitting a proposal for an acquisition must submit a completed TMC PNR Validation Configuration Worksheet. The TMC must “PASS” the PNR Validation to be eligible to bid on the contract and be eligible for contract award. The PNR Validation Configuration Worksheet must contain the GDS, all Pseudo City Codes (PCCs)/Site Identification Codes (SIDs), the Airline Reporting Corporation (ARC)/International Air Transport Association (IATA) Numbers, Queue Assignments, Company Profiles/Worldfiles and contact information on or before: hh:mm am/pm Month, Day, Year (to be added by the Contracting Officer specific to each solicitation) Under a joint venture or subcontractor, if parties have different PCCs/SIDs, ARC/IATA Numbers, Queue Assignments, Company Profiles/Worldfiles and contact information, each TMC must submit a separate TMC PNR Validation Configuration Worksheet.

The TMC is required to submit a PNR Validation Configuration Worksheet, as a notification of intent to the Government. The TMC shall submit the PNR Validation Configuration Worksheet, irrespective of whether the TMC intends to use the same PCC/SID/Queue Assignments/Company Profiles/Worldfiles already connected to the DoD OBT.

For GDS submissions, all travel fulfillment operations, ticketing, and Pseudo City Codes (PCCs) must reside exclusively on the standard Global Host (Example: Sabre GDS Code 1S, Worldspan 1P).Configuration changes (e.g., Company Profiles/Worldfiles, Queue Assignments) to the current connection of a PCC/SID, shall be identified in Table 2. The PCC/SID submitted herein, whether for a prime or sub-contractor, shall remain the same and cannot be revised between the PNR Validation Configuration Worksheet submission date and the service start date of the contract. Any request for changes must be submitted to the Contracting Officer (CO) for approval.

In the event there are multiple PCCs/SIDs submitted, the Government reserves the right to conduct a random sampling during the PNR Validation testing process.

The TMC shall be deemed to have satisfied this requirement when the TMC submits a copy of the validated DoD OBT test PNR to the Contracting Officer, (CO) in accordance with the validation procedures.

TMC PNR Validation Procedures:

Fill out and complete Table 1.

Fill out and complete Table 2 and Table 3 of the TMC PNR Validation Configuration Worksheet, making sure to specify the GDS, PCCs/SIDs, five (5) different Queue Assignments and the Company Profiles/Worldfiles.

Sign and date the PNR Validation Configuration Worksheet.

Submit the completed TMC PNR Validation Configuration Worksheet by:

(CO to add hh:mm am/pm Month, Day, Year) to (CO to add their email address).

Open Branch/Bridge access within the GDS (Sabre or Worldspan).

Receive a DoD OBT test PNR in the queues identified in Table 2.

Place the DoD OBT test PNR on the specified outbound queue for the DoD OBT to sweep.

Receive verification the test PNR was received in the DoD OBT.

Submit a copy of the validated DoD OBT test PNR to the Contracting Officer, (CO) at:

(CO to add their email address).

Table 1.

TMC Name
The primary name of the Travel Management Company.
Joint Venture / Subcontractor TMC Name
Name of the joint/subcontractor company, if applicable.
Address 1
The physical address of the TMC.
Address 2
The physical address of the TMC.
City / State / Zip Code
Location of the TMC.
ARC/IATA Number
The TMC's ARC/IATA assigned number(s).
Solicitation Number
The contract solicitation number.
TMC will support location(s)/site(s)
The location(s) or site(s) the TMC will service.
TMC POC
The primary point of contact at the TMC.
Telephone Number
The phone number for the primary POC.
Email
The email address for the primary POC.
Alternate TMC POC
The secondary point of contact at the TMC.
Telephone Number
The phone number for the alternate POC.
Email
The email address for the alternate POC.

No Yes

10. If submitting under a Joint Venture or Subcontractor (select yes or no)?Sabre Worldspan

GDS used to support this contract (check all that apply):

Pseudo City Codes (PCC) / Site Identification Codes (SID) and GDS Queue Assignments:

Include a minimum of one (1) PCC/SID for the GDS identified above.

Identify the five (5) different Queue Assignments for each PCC/SID in Table 2.

Identify the Queue Assignment Numbers associated with each PCC/SID in Table 2.

(No categories for Worldspan or prefatory codes for Sabre shall be listed, list only the queue numbers).

Table 2.

PCC/SID*
Connected to OBT
Ticketing Queue
Cancellation Queue
Inbound Queue
Polling Outbound Queue
Urgent Queue

Sabre: ABC1 Worldspan: 1AB (Example)

Yes or No
506

*Modify Table 2 with additional rows as needed to satisfy the requirement.

Explanation of Queues Used in DoD OBT:

Ticketing Queue – Approved DoD OBT PNRs will be placed on this queue three (3) business days prior to travel.

Cancellation Queue – Authorizations cancelled in DoD OBT PNRs will be placed on this queue.

Inbound Queue – Any new/changed DoD OBT PNRs will be placed on this queue.

Polling/Outbound Queue – Outbound queue for TMC’s to return PNRs to the DoD OBT.

Urgent Queue – Any new/changed DoD OBT PNRs within three (3) business days prior to travel or if earlier ticketing is required will be placed on this queue.

Company Profiles / Worldfiles set up to support DoD OBT:

Each PCC/SID listed in Table 3 must be associated with a Company Profile/Worldfile, as identified in the examples below:

(Sabre – Profile; Worldspan – 2nd level Worldfile) A Company Profile/Worldfile MUST be provided for each site/location associated with the PCC.

Examples:

Sabre:
-ABC1-HAPPYTOWN (ABC1 is the PCC and HAPPYTOWN is the profile name)

Dashes must be included in Sabre profiles

Worldspan:
HAPPYTOWN (Just the Worldfile name. HAPPYTOWN is the Worldfile)

No spaces or dashes in Worldspan Worldfiles

Identify characters that can be misinterpreted (i.e., number 0 for letter O, number 1 for letter l etc.). If the PCC/SID or Company Profile/Worldfile Name used by the TMC contains an ambiguous character, specify this in the comments column below.

Table 3.

PCC/SID*
Sabre Company Profile Name /

Worldspan Worldfile Name Comments

Sabre: ABC1 Worldspan: 1AB

-ABC1-HAPPYTOWN

HAPPYTOWN

ABC1 (number 1) 1AB (number 1)

*Modify Table 3 with additional rows as needed to satisfy the requirement.

Quality Control Applications:

NO quality control applications are to be attached to a DoD OBT profile or PCC/SID that requires a mandatory field prior to ending a PNR.

Examples to check if you have mandatory edits turned on Sabre – Flex edits (W/K*TJRALL) Worldspan – Worldfile edits Required PCC/SID Settings for DoD OBT:

Sabre:
Automatic hotel descriptionOff (HIP¤AUTOHOD)
12‐Hour ClockOn
Worldspan:
Worldspan (AIR Table)
12‐Hour ClockOn (DEF/A) Hotel Property Code turned On (H/L)
PowerShopperOn

Note: PNR will require the PI stored Remark Qualifiers:

Table 4. identifies the “alpha qualifiers” to be used to identify traveler record information for air, car, hotel, personal, change and any additional information.

The “DoD OBT‐to‐TMC Qualifiers” are pre-set by the DoD OBT and cannot be changed.

Table 4.

Remark Subject
DoD OBT to TMC Qualifier

(pre‐set) TMC to DoD OBT Qualifier

Air
W
E
Car
X
D
Hotel
Y
G
Personal
P
P
Change
A

GDS Open Branch/Bridge Access Procedures:

Sabre:

SI9

W/TAATMCPCC#AOBTPCC

W/TAATMCPCC#BOBTPCC

Worldspan:

KYApseudo Template appears, tab and change N to Y in the following fields:

Access PNRs Access Queues Allow

QEP/QEM

Access Profiles Emulation Enter Display Branches KY* Emulation format:

4@Epseudo End Emulation:

4@EOFF

Delete Branch/Bridge Access Procedures:

Sabre:
SI*9

W/TADour pcc#B pcc to be deleted W/TADour pcc#A pcc to be deleted

Worldspan:

KY* ‐ lists all branched PCCs KYDpseudo being deleted

Authorized Name and Title (Printed)

Signature

Date

Defense Travel Management Office
1
travel.dod.mil

Department of Defense | Defense Human Resources Activity

Defense Travel Management Office
6
travel.dod.mil

image1.png image2.png

File details come from the government source that posted it. Updated .