47QFSA26R0004_SolicitationQuestionsAnswers_2026-05-13.pdf
PDF 168 KB Posted
- Attached to
- USMC 2D MAW MV-22 Maintenance Support
- Solicitation number
- 47QFSA26R0004
About this file
This is a Solicitation Question and Answer (Q&A) document for the 2nd Marine Air Wing (MAW) MV-22 Maintenance Support contract, Solicitation Number 47QFSA26R0004. The document addresses clarifications requested by potential offerors regarding the RFP requirements, PWS specifications, and evaluation criteria.
The solicitation seeks a contractor to provide Organizational and Intermediate Level (O/I-Level) scheduled and unscheduled maintenance support for MV-22 aircraft at MCAS New River. Key requirements include performing maintenance in accordance with Commander Naval Air Forces Instruction (COMNAVAIRFORINST) 4790, Naval Aviation Maintenance Program (NAMP), applicable MV-22 maintenance manuals, and Marine Corps Orders. The contractor must maintain qualified personnel including Powerplants Mechanics, Airframes Mechanics, Maintenance Control personnel, and Ground Support Equipment Mechanics, with Maintenance Control staff required to obtain Collateral Duty Qualification within six months of contract initiation. Major systems maintenance encompasses avionics, powerplants, hydraulics, airframes, landing systems, rotor/dynamic components, flight controls, structural and composite repair, and general support equipment. The contractor is required to submit a Contractor Ground Operating Procedures (GOPs) deliverable, participate in periodic quality assurance audits and inspections (AMMT, ALMAT, MPA visits), and provide monthly status reports. Corporate Experience evaluation requires demonstration of experience maintaining similar-complexity tiltrotor, drivetrain, and propulsion systems, with "similar size" defined as at least 100 aircraft. Pre-award certifications require CMMC Level 1 compliance per DFARS 252.204-7021. This is an open market RFP for a standalone contract; neither OASIS nor GSA Schedule status is required. Submissions must be made via email only, and proposals must include separate Written Price Proposals and Written Technical Proposals with specified page limitations covering staffing plans, technical approach, corporate experience, and PWS responses.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART # PARAGRAPH # PARAGRAPH TITLE QUESTION GOVERNMENT RESPONSE
IV M.6.3 Factor 3: Corporate Experience
Paragraph two of Section M.6.3 states that "Similar Size is defined as at least 100 aircraft." with respect to relevance of Corporate Experience. The exact number of MV- 22Bs within MAG-29 at MCAS New River should be around sixty (60) spread across six (6) TACAIR squadrons, given the current Primary Aircraft Authorization (PAA) at 10 aircraft per squadron as of 2025.
Question 1: Respectfully request clarification on the accuracy of the 100 aircraft threshold and recommend reduction of the threshold to reflect the realistic and current MV-22 aircraft count within MAG-29.
Question 2: Respectfully request clarification on whether the intent of the 100 aircraft threshold is to assess an offeror’s capacity to manage operational complexity at scale, rather than requiring that such experience be derived from a single contract vehicle. If so, would the Government consider allowing offerors to substantiate this capability through aggregated past performance examples that, in total, meet or exceed the threshold?
The 100 aircraft is due to the Marine Corps operational shifts. Aircraft is moved in and out of the operational location often and at times there are 100 different aircraft at MCAS New River. For the second question, the requirements accurately reflect the Marine Corps needs. Please review Section M.6.3. for the ratings.
IV M.2 Pass/Fail Elements
Paragraph 2, Item d within Section M.2 states that "The offeror shall provide evidence that it possesses the required certifications in compliance with DFARS 252.204-7021 (Section K) including Capability Maturity Model Integration (CMMI) Maturity Level 1). This DFARS reference is specific to Cybersecurity Maturity Model Certification (CMMC), versus CMMI. Can the government confirm that the requirement is for CMMC Level 1?
See Amendment 01.
IV M.6.3 Factor 3: Corporate Experience
Paragraph four within Section M.6.3 states that "Similar complexity is defined as maintenance in complex tiltrotor, drivetrain, and propulsion systems." Given that the model for all CMS contracts is retention of incumbent staff and backfilling as required with qualified and certified staff with relevant MV-22 experience to account for needs associated with attrition, we respectfully request that the government consider revision of the requirement to be ""Similar complexity is defined as maintenance in complex tiltrotor, fixed wing and/or rotary wing, drivetrain, and propulsion systems." The revision of this requirement will increase competition for this requirement.
The Government has considered the request and declines the request to revise the existing characterization of "similar complexity" in the RFP; the RFP accurately reflects and corresponds to the Government's needs there.
PWS C.2 & C.7 SCOPE & WORKLOAD DATA
Paragraph states "Contractor will perform Organizational and Intermediate Level (O/I- Level) scheduled and unscheduled maintenance. QUESTION: Will the USG clarify specifically what I-Level maintennace functions the Powerr Plants Mechnaics and Airframes Mechanics are expected to perform?
The Government will be unable to provide specifics on the requirements but it would be the major systems such as would avionics, powerplants, hydraulics, airframes, landing systems, rotor/dynamic components, flight controls, structural and composite repair,general support equipment(GSE), aviation life supports ALSs etc.
PWS C.2 SCOPE
Marine Corps Order (MCO) 8023.3B is cited as a referenced instruction/order the Contractor is expected to ues/follow. QUESTION: Will the USG clarify if there are ordnance handling aspects of this effort as there are no ordnance related tasks addressed in the PWS?
No ordnance is not including in this requirement.
PWS C.2 SCOPE
Subparagraph a. states "The contractor will perform all work in accordance with the most current version of Commander Naval Air Forces Instruction (COMNAVAIRFORINST) 4790, also referred to as the Naval Aviation Maintenance Program (NAMP), applicable MV-22 maintenance instruction manuals, Marine Corps Order (MCO) 8023.3B Technical Directives (TDs), Squadron Standard Operating Procedures (SOPs), and such other instructions as may be applicable in the support of these tasks." There is no specific mention of NAVAIRINST 3710.1 (Contractor’s Flight and Ground Operations). QUESTION: Since the NAMP, Chapter 11 references NAVAIRINST 3710.1 along with 252.228-7001 Ground and Flight Risk, which is cited in the PWS, will the USG require Contractor Ground Operating Procedures (GOPs) as a Deliverable?
While the NAMP, Chapter 11 references NAVAIRINST 3710.1 along with Ground and Flight Risk, which is cited in the PWS, the USG will still require Contractor Ground Operating Procedures (GOPs) as a Deliverable.
Solicitation Number: 47QFSA26R0004
ATTACHMENT M
SOLICITATION QUESTION AND ANSWER (Q&A)
Solicitation Name: 2nd MAW MV22 Maintenance Support
Template Version 09-26-24 Page 1 of
PWS C.2 SCOPE
The Contractor will participate in periodic quality assurance (QA) audits and periodic monitoring. Additionally, the Contractor shall participate in periodic: Aviation Maintenance Management Team (AMMT) inspections, Aviation Logistics Management Assist Team (ALMAT) inspections, Maintenance Program Assist (MPA) visits, etc.
QUESTION: Are there any NAMPSOP programs the Contractor will be directly responsible for managing? If so, please specify.
No, contractors will not be responsible for managing. However, they are expected to be compliant and be part of periodic audits.
PWS C.6 LIST OF REQUIRED QUALIFICATIONS /
CERTIFICATIONS
Referenced Table does not address Plane Captian qualification or Safe For Flight for Maintenance Control. QUESTION: Will the USG clarify if these qualifications are required as well?
Plane Captains are not a requirement and as of now there are no qualified Plane Captains. The SFF is the Safe For Flight. The onsight Commanding Officer's make the determination to deligate someone a PC or SFF. Contractors may be required but those needs are based on the local Commanding Officer. Contractors may need to complete a syllabus to obtain the delegation.
PWS C.6 LIST OF REQUIRED QUALIFICATIONS /
CERTIFICATIONS
MV-22 Maintenance Control has (Note 3), which includes the following statement "All CMS will attain Collateral Duty Qualification within 6 months from contract initiation."
QUESTION: Will the USG clarify if the Maintenance Control personnel are expected to obtain CDI qualifications and if that is in copmpliance with the NAMP?
Yes.
PWS C.6 LIST OF REQUIRED QUALIFICATIONS /
CERTIFICATIONS
Ground Support Equipment Mechanic (NOTE 4) states "(5) qualified contractors to support the maintenance operations for ground support equipment (GSE). The scope of work includes both scheduled and unscheduled maintenance services to ensure continued operational readiness and compliance with all applicable technical standards and safety regulations." QUESTION: Will the USG clarify if SE Mechanics are expected to perform bot O & I-Level maintenance on SE checked out from MALS-26 or is just "servicing" required/authorized?
Yes, for maintenance and servicing.
PWS F.2 & F.7 PLACE OF PERFORMANCE & HOURS
OF OPERATION
In an HOURS OF OPERATION section, a subparagraph addresses "Rescue of stranded aircraft", which would constute emergent work with Travel highly likely.
QUESTION: Since paragraph F.2 specifically states "Long-distance travel is not anticipated to be required in support of this effort" and since there are no Travel ODC funds allocated, will the USG clarify how the Contractor would support an emergent aircraft rescue outside of 50 mile of MCAS New River?
Rescue of stranded aircraft outside of 50 miles would not be part of the contractor's effort.
RFP H.11 SECTION 508 COMPLIANCE
REQUIREMENTS
In section H.11 (c) the USG identifies a requirement for Seciton 508 Compliance.
QUESTION: Since the awarded Contractor will use USG provided IT equipment (e.g., NALCOMIS OOMA, IETMS, etc.) in the performance of this effort, will the USG clarify how "The contractor shall identify all ICT products, platforms, and services to be used and the degree of compliance with the applicable standards" which is further stated in the RFP and since the ICT does NOT belong to the Contractor?
If the equipment is government provided, it will be Section 508 compliant. All electronic submissions by the contractor to the government are required to be Section 508 compliant.
RFP L.5.2.9, M.2 PASS/FAIL ELEMENTS (TAB I)
Section L and M reference FAR 252.204-7021 and “Capability Maturity Model Integration (CMMI) Maturity Level 1.” QUESTION: Because DFARS 252.204-7021 is associated with Cybersecurity Maturity Model Certification (CMMC) requirements rather than CMMI, can the Government clarify whether offerors are required to demonstrate CMMC Level 1 or CMMI Level 1?
See Amendment 01 and 02.
47QFSA26R0004_AttIPriceExcel Workbook and RFP Price Summary Tab Column I, Cells 18-21
Section B.4 displays the Base and all Option Periods. B.4.5 is the Fourth and final Option Period for all listed CLINs; however, the USG provided Price Workbook has an Option Period 5 that is mapped to the Base Period Tab. QUESTION: Will the USG update the attachment or should offerors overide Cells I19 and I20 with $0 values?
See Amendment 01.
RFP Section B B.4.5 Section B.4.5 lists Overtime CLIN as 0002 instead of 4002. QUESTION: Please confirm the correct CLIN structure for the Fourth Option Period and provide a revised pricing table.
See Amendment 01.
RFP Sections C & F C.4.1.3 and F.3
Section C states that the Monthly Status Report (MSR) is due "NLT 3rd duty day of each month"; however Section F states the MSR is due "monthhly, 10th calendar day of the next month." QUESTION: Please clarify the required submission timeline for the Monthly Status Report, as Section C.4.1.3 and Section F.3 specify conflicting due dates.
See Amendment 01.
RFP C.4.2 TASK 2-WORKFORCE CONTINGENCY
PLAN
PWS requires a workforce contingency plan, but it is not included in section F.3 as a deliverable. QUESTION: Will the Governemnt clarify the requirement for Worforce Contingency Plan as a Deliverable?
See Amendment 01.
Will this opportunity be released as a separate contract or as a Task Order under an existing IDIQ Contract Vehicle? This is an open market RFP. It will be a stand alone contract.
If an existing Contract Vehicle - which one? No.
Is the offerer required to have an OASIS or GSA schedule to respond to the RFP? No.
Template Version 09-26-24 Page 2 of
RFP - Section L L.6 - L.7 Written Technical Proposal
Reference #1: L.6, which states, “Part II is the Written Technical Proposal and shall contain the following (page limitations, if applicable, are indicated in the parentheses following each item):
a. Project Staffing Plan
b. Project Staffing Rationale (limited to 2 pages)
c. KPQM (limited to 2 pages for the Key Person)
d. Draft Transition-In Plan (limited to 2 pages)
e. Technical Assumptions (if any, limited to 1 page)
f. QMP (limited to 2 pages)
g. Corporate Experience (limited to 4 pages)
h. Written Response to PWS (limited to 8 pages)” Reference #2: L.7, which states, “The Written Technical Proposal shall include the following topics and be organized in the following order:
a. Topic 1: Key Personnel and Project Staffing
b. Topic 2: Technical Approach” Question: Do Topics 1 and 2 have a page limit, separate from items a-h in the list above?
No, those are the page limitations and are part of their respective Topics.
RFP - Section L L.5.1 Written Technical Proposal
Reference: L.5.1 designates (Tab A - Tab I) in parentheses after items a. - i. (L.5.1.1 - 5.2.9).
Question: Will GSA please clarify if the "tab" letters are intended to correspond to a particular proposal attachment?
The Governemnt doesn't quite understand the question but if the intent is to inquire if those tab letters are connected to another part of the technical proposal,
no. Those tabs are for the price proposal and other administrative matters.
RFP Section L L.5.1.8 - L.5.2.9 Price Assumptions (Tab H) / Pass/Fail Elements (Tab I)
Reference: The section numbering is out of sequence, jumping from L.5.1.8 to L.5.2.9, then to L.6.
Question: If this numbering sequence is unintended, will GSA please update accordingly?
See Amendment 01.
RFP Section L L6.6 Corporate Experience / Written Response to PWS
Reference: L.6.6 is used to number both Corporate Experience and Written Response to
PWS.
Question: If this numbering sequence is unintended, will GSA please update accordingly?
See Amendment 01.
RFP - Section L F.3; H.8, L.5.2.9€ Mission Essential Contractor Services Plan
Reference: F.3 and H.8 state that a Mission-Essential Contractor Services Plan is due after award, at the Project Kick-Off Meeting. However, L.5.2.9(e) lists this as an item in the "Pass/Fail Elements (Tab I)" as part of the Written Price Proposal.
Question: Will GSA please clarify if the Mission-Essential Contractor Services Plan CDRL is due with proposal submission? If so, will GSA align the RFP accordingly?
See Amendment 02. This is removed from the Pass/Fail Requirements. It is only required post-award.
RFP - Section L L.5.2.9 Pass/Fail Elements (Tab I)
Reference: L.5.2.9 states "A failure on any single Pass/Fail criteria will make the proposal ineligible for award, with no further evaluation of the Written Price Proposal (Part I) and Written Technical Proposal (Part II) accomplished by the Government. At the time of proposal Part I submission, the offeror shall provide:.." L.5.2.9 is listed in the area for instructions on Part II, but states to include these items in Part I.
Question: Due to page count limitations, will GSA please clarify which Pass/Fail criteria are to be included in Part I and Part II, respectively?
The Written Price Proposal is to be separate from the Written Technical Proposal.
The information required in the Written Price Proposal is not affected by the page counts.
RFP - Section L L.5.2.9; H.9 Pass/Fail Elements (Tab I)
Reference: L.5.2.9 (d) states "d. Required Certifications: The offeror shall provide evidence that it possesses the required certifications in compliance with Section H.9 including Capability Maturity Model Integration (CMMI) Maturity Level." -- and Section H.9 points to requirements re: Training and Permits.
Question: Will the GSA please specify the types of certifications it requires to be compliant with Section H.9 and update Section L accordingly? (see related next question below)
The only required certification pre-award is the CMMC Level 1. GSA will not require specific Training certifications pre-award.
RFP - Section M M.2(d) Pass/Fail Elements / Required Certifications
Reference: M.2(d) states "Required Certifications: The offeror shall provide evidence that it possesses the required certifications in compliance with DFARS 252.204-7021 (Section K) including Capability Maturity Model Integration (CMMI) Maturity Level 1."
Question: DFARS 252.204-7021 is related to Contractor Compliance With the Cybersecurity Maturity Model Certification (CMMC) Level Requirements. Will GSA clarify if the required certifications are for CMMI or CMMC levels, and update Section M accordingly?
See Amendment 01 and 02.
RFP - Section M M.6 Technical Evaluation Factors
Reference: M.6, which states, “The Government will combine the results of the written and oral submissions including the Q&A responses, to arrive at a rating for the technical evaluation factors as a whole.”
Question: Will GSA please clarify what the “oral submissions” and the “Q&A responses” are?
See Amendment 01.
Solicitation Cover Letter Page 1 Submission Deadlines and Instructions
For your reference as a follow-up to the question during the Pre-Proposal Conference:
Enterprise Portal (https://acqbot.us/portal/overview) is the sam.gov "submission portal" that we have used in the past. Example: AFRL MAC:
https://sam.gov/workspace/contract/opp/8ff5733877344abc953498aa99137477/view
See Amendment 02 removing the Sam.gov submission. Only email submissions will be accepted.
Template Version 09-26-24 Page 3 of
RFP C.2 SCOPE
Subparagraph states "Additional guidance and minimum qualifications are provided in Section C.6. These Contractor personnel shall augment government maintenance personnel at the O/I/D-Level.
QUESTION: Will the USG clarify where and how CMS personnel will augment D-level maintenance?
As of now, there is not requirement for D-Level Maintenance; however, they will supplement PMI (Periodic Maintenance Interval) inspections which is a D-level requirement. They only supplement by providing O/I level maintenance that is outside of the PMI scope of work.
RFP M.6.3 FACTOR 3: CORPORATE EXPERIENCE
The following definitions will be used to determine the relevance of the offeror’s Corporate Experience submissions. Similar Size is defined as at least 100 aircraft. The USG used 100 aircraft as a Corporate Experience discriminator on in section M, when the maximum number of MAG-26 MV-22 aircraft on the flightline at MCAS New River is 60, and that is with no aircraft deployed is 72, excluding VMMT-204's aircraft.
QUESTION: Since it is unrealistic for any CMS team to maintain 100 MV-22 aircraft for MAG-26, would the USG consider reducing the "similar size" requirement number of aircraft to 60 vice 100 so other 8(a) companies can compete favorably with the incumbent?
See the answer to the first question received.