47QFSA26R0004_SolicitationQuestionsAnswers_2026-05-04.pdf

PDF 167 KB Posted

Attached to
USMC 2D MAW MV-22 Maintenance Support
Solicitation number
47QFSA26R0004
Issued by

About this file

This is a Solicitation Question and Answer (Q&A) document for federal contract opportunity 47QFSA26R0004, titled "2nd MAW MV-22 Maintenance Support," issued by the General Services Administration (GSA) on behalf of the Marine Corps.

The solicitation seeks a contractor to provide Organizational and Intermediate Level (O/I-Level) scheduled and unscheduled maintenance support for MV-22 Osprey tiltrotor aircraft at Marine Corps Air Station (MCAS) New River. Key service requirements include maintenance of complex systems including avionics, powerplants, hydraulics, airframes, landing systems, rotor/dynamic components, flight controls, structural and composite repair, and general support equipment (GSE). The contractor must comply with Naval Aviation Maintenance Program (NAMP) standards, applicable MV-22 maintenance instruction manuals, Marine Corps Order (MCO) 8023.3B Technical Directives, and squadron Standard Operating Procedures. Required qualifications include Power Plants Mechanics and Airframes Mechanics certified for MV-22 operations, with additional staffing for Maintenance Control personnel, ground support equipment mechanics, and related aviation maintenance positions. Corporate experience evaluation requires demonstrated capability managing at least 100 aircraft and maintaining complex tiltrotor, drivetrain, and propulsion systems. Contractor Ground Operating Procedures (GOPs) and a Workforce Contingency Plan must be submitted as deliverables. The Q&A clarifies that this is an open market, standalone contract (not an IDIQ or task order vehicle), does not require OASIS or GSA schedule status, and that rescue operations are limited to a 50-mile radius of MCAS New River with no travel ODC funding provided.

View the file

Other files

File Type Posted
47QFSA26R0004_SolicitationQuestionsAnswers_2026-05-22.pdf PDF
47QFSA26R0004_AMD05.pdf PDF
47QFSA26R0004_AMD04.pdf PDF
47QFSA26R0004_AMD03.pdf PDF
47QFSA26R0004_SF33.pdf PDF
47QFSA26R0004_AMD02.pdf PDF
47QFRSA26R0004AttNWD20154389AMD02.pdf PDF
47QFSA26R0004_SolicitationQuestionsAnswers_2026-05-13.pdf PDF
47QFSA26R0004_PreProposalConferenceAttendenceList.pdf PDF
47QFSA26R0004_AttIPriceExcelWorkbookAMD01.xlsx XLSX spreadsheet
47QFSA26R0004_AMD01.pdf PDF
47QFSA26R0004_AttLCorporateExperienceTemplate.docx DOCX document
47QFSA26R0004_AttKLetterofCommitmentTemplate.docx DOCX document
47QFSA26R0004_AttBAcronymList.pdf PDF
47QFSA26R0004_AttCDeliverableAcceptanceRejectionReportTemplate.docx DOCX document
47QFSA26R0004_AttGOrganizationalConflictofInterestStatement.docx DOCX document
47QFSA26R0004_AttNServiceContractActWD20154389.pdf PDF
47QFSA26R0004_AttEDepartmentofDefenseForm254.pdf PDF
47QFSA26R0004_SolicitationCoverLetter.pdf PDF
47QFSA26R0004_AttIPriceExcelWorkbook.xlsx XLSX spreadsheet
47QFSA26R0004_AttMOfferorQuestionandAnswerTemplate.xlsx XLSX spreadsheet
47QFSA26R0004_AttDProblemNotificationReportTemplate.docx DOCX document
47QFSA26R0004_AttJProjectStaffingPlanTemplate.xlsx XLSX spreadsheet
47QFSA26R0004_RequestforProposal.pdf PDF
47QFSA26R0004_AttFCorporateNonDisclosureAgreement.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART # PARAGRAPH # PARAGRAPH TITLE QUESTION GOVERNMENT RESPONSE

IV M.6.3 Factor 3: Corporate Experience

Paragraph two of Section M.6.3 states that "Similar Size is defined as at least 100 aircraft." with respect to relevance of Corporate Experience. The exact number of MV- 22Bs within MAG-29 at MCAS New River should be around sixty (60) spread across six (6) TACAIR squadrons, given the current Primary Aircraft Authorization (PAA) at 10 aircraft per squadron as of 2025.

Question 1: Respectfully request clarification on the accuracy of the 100 aircraft threshold and recommend reduction of the threshold to reflect the realistic and current MV-22 aircraft count within MAG-29.

Question 2: Respectfully request clarification on whether the intent of the 100 aircraft threshold is to assess an offeror’s capacity to manage operational complexity at scale, rather than requiring that such experience be derived from a single contract vehicle. If so, would the Government consider allowing offerors to substantiate this capability through aggregated past performance examples that, in total, meet or exceed the threshold?

The 100 aircraft is due to the Marine Corps operational shifts. Aircraft is moved in and out of the operational location often and at times there are 100 different aircraft at MCAS New River. For the second question, the requirements accurately reflect the Marine Corps needs. Please review Section M.6.3. for the ratings.

IV M.2 Pass/Fail Elements

Paragraph 2, Item d within Section M.2 states that "The offeror shall provide evidence that it possesses the required certifications in compliance with DFARS 252.204-7021 (Section K) including Capability Maturity Model Integration (CMMI) Maturity Level 1). This DFARS reference is specific to Cybersecurity Maturity Model Certification (CMMC), versus CMMI. Can the government confirm that the requirement is for CMMC Level 1?

See Amendment 01.

IV M.6.3 Factor 3: Corporate Experience

Paragraph four within Section M.6.3 states that "Similar complexity is defined as maintenance in complex tiltrotor, drivetrain, and propulsion systems." Given that the model for all CMS contracts is retention of incumbent staff and backfilling as required with qualified and certified staff with relevant MV-22 experience to account for needs associated with attrition, we respectfully request that the government consider revision of the requirement to be ""Similar complexity is defined as maintenance in complex tiltrotor, fixed wing and/or rotary wing, drivetrain, and propulsion systems." The revision of this requirement will increase competition for this requirement.

The Government has considered the request and declines the request to revise the existing characterization of "similar complexity" in the RFP; the RFP accurately reflects and corresponds to the Government's needs there.

PWS C.2 & C.7 SCOPE & WORKLOAD DATA

Paragraph states "Contractor will perform Organizational and Intermediate Level (O/I- Level) scheduled and unscheduled maintenance. QUESTION: Will the USG clarify specifically what I-Level maintennace functions the Powerr Plants Mechnaics and Airframes Mechanics are expected to perform?

The Government will be unable to provide specifics on the requirements but it would be the major systems such as would avionics, powerplants, hydraulics, airframes, landing systems, rotor/dynamic components, flight controls, structural and composite repair,general support equipment(GSE), aviation life supports ALSs etc.

PWS C.2 SCOPE

Marine Corps Order (MCO) 8023.3B is cited as a referenced instruction/order the Contractor is expected to ues/follow. QUESTION: Will the USG clarify if there are ordnance handling aspects of this effort as there are no ordnance related tasks addressed in the PWS?

No ordnance is not including in this requirement.

PWS C.2 SCOPE

Subparagraph a. states "The contractor will perform all work in accordance with the most current version of Commander Naval Air Forces Instruction (COMNAVAIRFORINST) 4790, also referred to as the Naval Aviation Maintenance Program (NAMP), applicable MV-22 maintenance instruction manuals, Marine Corps Order (MCO) 8023.3B Technical Directives (TDs), Squadron Standard Operating Procedures (SOPs), and such other instructions as may be applicable in the support of these tasks." There is no specific mention of NAVAIRINST 3710.1 (Contractor’s Flight and Ground Operations). QUESTION: Since the NAMP, Chapter 11 references NAVAIRINST 3710.1 along with 252.228-7001 Ground and Flight Risk, which is cited in the PWS, will the USG require Contractor Ground Operating Procedures (GOPs) as a Deliverable?

While the NAMP, Chapter 11 references NAVAIRINST 3710.1 along with Ground and Flight Risk, which is cited in the PWS, the USG will still require Contractor Ground Operating Procedures (GOPs) as a Deliverable.

Solicitation Number: 47QFSA26R0004

ATTACHMENT M

SOLICITATION QUESTION AND ANSWER (Q&A)

Solicitation Name: 2nd MAW MV22 Maintenance Support

Template Version 09-26-24 Page 1 of

PWS C.2 SCOPE

The Contractor will participate in periodic quality assurance (QA) audits and periodic monitoring. Additionally, the Contractor shall participate in periodic: Aviation Maintenance Management Team (AMMT) inspections, Aviation Logistics Management Assist Team (ALMAT) inspections, Maintenance Program Assist (MPA) visits, etc.

QUESTION: Are there any NAMPSOP programs the Contractor will be directly responsible for managing? If so, please specify.

No, contractors will not be responsible for managing. However, they are expected to be compliant and be part of periodic audits.

PWS C.6 LIST OF REQUIRED QUALIFICATIONS /

CERTIFICATIONS

Referenced Table does not address Plane Captian qualification or Safe For Flight for Maintenance Control. QUESTION: Will the USG clarify if these qualifications are required as well?

See Amendment 01. Mech 3 and Plane Captain Mech 2 or 1.

PWS C.6 LIST OF REQUIRED QUALIFICATIONS /

CERTIFICATIONS

MV-22 Maintenance Control has (Note 3), which includes the following statement "All CMS will attain Collateral Duty Qualification within 6 months from contract initiation."

QUESTION: Will the USG clarify if the Maintenance Control personnel are expected to obtain CDI qualifications and if that is in copmpliance with the NAMP?

Yes.

PWS C.6 LIST OF REQUIRED QUALIFICATIONS /

CERTIFICATIONS

Ground Support Equipment Mechanic (NOTE 4) states "(5) qualified contractors to support the maintenance operations for ground support equipment (GSE). The scope of work includes both scheduled and unscheduled maintenance services to ensure continued operational readiness and compliance with all applicable technical standards and safety regulations." QUESTION: Will the USG clarify if SE Mechanics are expected to perform bot O & I-Level maintenance on SE checked out from MALS-26 or is just "servicing" required/authorized?

Yes, for maintenance and servicing.

PWS F.2 & F.7 PLACE OF PERFORMANCE & HOURS

OF OPERATION

In an HOURS OF OPERATION section, a subparagraph addresses "Rescue of stranded aircraft", which would constute emergent work with Travel highly likely.

QUESTION: Since paragraph F.2 specifically states "Long-distance travel is not anticipated to be required in support of this effort" and since there are no Travel ODC funds allocated, will the USG clarify how the Contractor would support an emergent aircraft rescue outside of 50 mile of MCAS New River?

Rescue of stranded aircraft outside of 50 miles would not be part of the contractor's effort.

RFP H.11 SECTION 508 COMPLIANCE

REQUIREMENTS

In section H.11 (c) the USG identifies a requirement for Seciton 508 Compliance.

QUESTION: Since the awarded Contractor will use USG provided IT equipment (e.g., NALCOMIS OOMA, IETMS, etc.) in the performance of this effort, will the USG clarify how "The contractor shall identify all ICT products, platforms, and services to be used and the degree of compliance with the applicable standards" which is further stated in the RFP and since the ICT does NOT belong to the Contractor?

If the equipment is government provided, it will be Section 508 compliant. All electronic submissions by the contractor to the government are required to be Section 508 compliant.

RFP L.5.2.9, M.2 PASS/FAIL ELEMENTS (TAB I)

Section L and M reference FAR 252.204-7021 and “Capability Maturity Model Integration (CMMI) Maturity Level 1.” QUESTION: Because DFARS 252.204-7021 is associated with Cybersecurity Maturity Model Certification (CMMC) requirements rather than CMMI, can the Government clarify whether offerors are required to demonstrate CMMC Level 1 or CMMI Level 1?

See Amendment 01.

47QFSA26R0004_AttIPriceExcel Workbook and RFP Price Summary Tab Column I, Cells 18-21

Section B.4 displays the Base and all Option Periods. B.4.5 is the Fourth and final Option Period for all listed CLINs; however, the USG provided Price Workbook has an Option Period 5 that is mapped to the Base Period Tab. QUESTION: Will the USG update the attachment or should offerors overide Cells I19 and I20 with $0 values?

See Amendment 01.

RFP Section B B.4.5 Section B.4.5 lists Overtime CLIN as 0002 instead of 4002. QUESTION: Please confirm the correct CLIN structure for the Fourth Option Period and provide a revised pricing table.

See Amendment 01.

RFP Sections C & F C.4.1.3 and F.3

Section C states that the Monthly Status Report (MSR) is due "NLT 3rd duty day of each month"; however Section F states the MSR is due "monthhly, 10th calendar day of the next month." QUESTION: Please clarify the required submission timeline for the Monthly Status Report, as Section C.4.1.3 and Section F.3 specify conflicting due dates.

See Amendment 01.

RFP C.4.2 TASK 2-WORKFORCE CONTINGENCY

PLAN

PWS requires a workforce contingency plan, but it is not included in section F.3 as a deliverable. QUESTION: Will the Governemnt clarify the requirement for Worforce Contingency Plan as a Deliverable?

See Amendment 01.

Will this opportunity be released as a separate contract or as a Task Order under an existing IDIQ Contract Vehicle? This is an open market RFP. It will be a stand alone contract.

If an existing Contract Vehicle - which one? No.

Is the offerer required to have an OASIS or GSA schedule to respond to the RFP? No.

Template Version 09-26-24 Page 2 of

RFP - Section L L.6 - L.7 Written Technical Proposal

Reference #1: L.6, which states, “Part II is the Written Technical Proposal and shall contain the following (page limitations, if applicable, are indicated in the parentheses following each item):

a. Project Staffing Plan

b. Project Staffing Rationale (limited to 2 pages)

c. KPQM (limited to 2 pages for the Key Person)

d. Draft Transition-In Plan (limited to 2 pages)

e. Technical Assumptions (if any, limited to 1 page)

f. QMP (limited to 2 pages)

g. Corporate Experience (limited to 4 pages)

h. Written Response to PWS (limited to 8 pages)” Reference #2: L.7, which states, “The Written Technical Proposal shall include the following topics and be organized in the following order:

a. Topic 1: Key Personnel and Project Staffing

b. Topic 2: Technical Approach” Question: Do Topics 1 and 2 have a page limit, separate from items a-h in the list above?

No, those are the page limitations and are part of their respective Topics.

RFP - Section L L.5.1 Written Technical Proposal

Reference: L.5.1 designates (Tab A - Tab I) in parentheses after items a. - i. (L.5.1.1 - 5.2.9).

Question: Will GSA please clarify if the "tab" letters are intended to correspond to a particular proposal attachment?

The Governemnt doesn't quite understand the question but if the intent is to inquire if those tab letters are connected to another part of the technical proposal,

no. Those tabs are for the price proposal and other administrative matters.

RFP Section L L.5.1.8 - L.5.2.9 Price Assumptions (Tab H) / Pass/Fail Elements (Tab I)

Reference: The section numbering is out of sequence, jumping from L.5.1.8 to L.5.2.9, then to L.6.

Question: If this numbering sequence is unintended, will GSA please update accordingly?

See Amendment 01.

RFP Section L L6.6 Corporate Experience / Written Response to PWS

Reference: L.6.6 is used to number both Corporate Experience and Written Response to

PWS.

Question: If this numbering sequence is unintended, will GSA please update accordingly?

See Amendment 01.

RFP - Section L F.3; H.8, L.5.2.9€ Mission Essential Contractor Services Plan

Reference: F.3 and H.8 state that a Mission-Essential Contractor Services Plan is due after award, at the Project Kick-Off Meeting. However, L.5.2.9(e) lists this as an item in the "Pass/Fail Elements (Tab I)" as part of the Written Price Proposal.

Question: Will GSA please clarify if the Mission-Essential Contractor Services Plan CDRL is due with proposal submission? If so, will GSA align the RFP accordingly?

See Amendment 01.

RFP - Section L L.5.2.9 Pass/Fail Elements (Tab I)

Reference: L.5.2.9 states "A failure on any single Pass/Fail criteria will make the proposal ineligible for award, with no further evaluation of the Written Price Proposal (Part I) and Written Technical Proposal (Part II) accomplished by the Government. At the time of proposal Part I submission, the offeror shall provide:.." L.5.2.9 is listed in the area for instructions on Part II, but states to include these items in Part I.

Question: Due to page count limitations, will GSA please clarify which Pass/Fail criteria are to be included in Part I and Part II, respectively?

The Written Price Proposal is to be separate from the Written Technical Proposal.

The information required in the Written Price Proposal is not affected by the page counts.

RFP - Section L L.5.2.9; H.9 Pass/Fail Elements (Tab I)

Reference: L.5.2.9 (d) states "d. Required Certifications: The offeror shall provide evidence that it possesses the required certifications in compliance with Section H.9 including Capability Maturity Model Integration (CMMI) Maturity Level." -- and Section H.9 points to requirements re: Training and Permits.

Question: Will the GSA please specify the types of certifications it requires to be compliant with Section H.9 and update Section L accordingly? (see related next question below)

See Amendment 01.

RFP - Section M M.2(d) Pass/Fail Elements / Required Certifications

Reference: M.2(d) states "Required Certifications: The offeror shall provide evidence that it possesses the required certifications in compliance with DFARS 252.204-7021 (Section K) including Capability Maturity Model Integration (CMMI) Maturity Level 1."

Question: DFARS 252.204-7021 is related to Contractor Compliance With the Cybersecurity Maturity Model Certification (CMMC) Level Requirements. Will GSA clarify if the required certifications are for CMMI or CMMC levels, and update Section M accordingly?

See Amendment 01.

RFP - Section M M.6 Technical Evaluation Factors

Reference: M.6, which states, “The Government will combine the results of the written and oral submissions including the Q&A responses, to arrive at a rating for the technical evaluation factors as a whole.”

Question: Will GSA please clarify what the “oral submissions” and the “Q&A responses” are?

See Amendment 01.

Solicitation Cover Letter Page 1 Submission Deadlines and Instructions

For your reference as a follow-up to the question during the Pre-Proposal Conference:

Enterprise Portal (https://acqbot.us/portal/overview) is the sam.gov "submission portal" that we have used in the past. Example: AFRL MAC:

https://sam.gov/workspace/contract/opp/8ff5733877344abc953498aa99137477/view

The Government is unsure of this issue. It is being looked at this time. A future amendment may remove the SAM.gov submission.

Template Version 09-26-24 Page 3 of

Q&A

File details come from the government source that posted it. Updated .