47QFHA24R0001_T10_08_PRISM MATOC RFP 2nd Set of Responses to Questions._ Final.pdf

PDF 558 KB Posted

Attached to
OUSD PRISM MATOC SOLICITATION
Solicitation number
47QFHA24R0001
Issued by

View the file

Other files

File Type Posted
47QFHA24R0001_T10_08_PRISM MATOC Solicitation Amendment 5.pdf PDF
47QFHA24R0001_T10_09_DEAMS Seed Attachment 1_ PWS_Amendment 5.docx DOCX document
47QFHA24R0001_T10_08_PRISM MATOC RFP 3rd Set of Responses to Questions.v2.pdf PDF
47QFHA24R0001_T10_09_DEAMS Seed Attachment 4_Price Template Amendment 4.xlsx XLSX spreadsheet
47QFHA24R0004_T10_09_DRRS Seed Exhibit 2_Staff Matrix Amendment 4.xlsx XLSX spreadsheet
47QFHA24R0001_T10_09_DEAMS Seed Attachment 1_ PWS Amendment 4.docx DOCX document
47QFHA24R0001_T10_08_PRISM MATOC Solicitation Amendment 4.pdf PDF
47QFHA24R0001_T10_08_PRISM MATOC Attachment 7_MATOC Labor Rates Ranges.Amendment 4.pdf PDF
47QFHA24R0001_T10_08_PRISM MATOC RFP 3rd Set of Responses to Questions.pdf PDF
47QFHA24R0001_T10_08_DEAMS OCI Related Information.pdf PDF
47QFHA24R0004_T10_09_DRRS Seed Attachment 1_PWS_Amendment 3...docx DOCX document
47QFHA24R0001_T10_08_DEAMS RFP Remainder of 2nd Set of Responses to Questions.pdf PDF
47QFHA24R0001_T10_09_OXD Seed Attachment 1_PWS_Amendment 3.docx DOCX document
47QFHA24R0001_T10_08_PRISM MATOC Exhibit 5_AFARS Example SB Participation Plan.pdf PDF
47QFHA24R0004_T10_09_DRRS Seed Attachment 3__Price Template_Amendment 3.xlsx XLSX spreadsheet
47QFHA24R0001_T10_09_OXD Seed Attachment 3_Price Template_Amendment 3.xlsx XLSX spreadsheet
47QFHA24R0004_T10_09_DRRS Seed Exhibit 2_Staff Matrix Amendment 3.xlsx XLSX spreadsheet
47QFHA24R0001_T10_08_PRISM MATOC Attachment 7_MATOC Labor Rates Ranges.Amendment 3.pdf PDF
47QFHA24R0001_T10_08_PRISM MATOC Attachment 3_Price Labor Rates Template Amendment 3..xlsx XLSX spreadsheet
47QFHA24R0001_T10_08_PRISM MATOC Exhibit 4_Sample SB Participation-Plan-Template.xlsx XLSX spreadsheet
47QFHA24R0001_T10_09_DEAMS Seed Attachment 1_ PWS_Amendment 3.docx DOCX document
47QFHA24R0001_T10_08_PRISM MATOC Solicitation Amendment 3.pdf PDF
47QFHA24R0001_T10_09_OXD Seed Exhibit 2_Staff Matrix_Amendment 3..xlsx XLSX spreadsheet
47QFHA24R0001 NOTICE ---- PRISM REOPENED QUESTION PERIOD.pdf PDF
47QFHA24R0001_T10_09_DEAMS Seed Exhibit 4_Interface Map Amendment 2.pdf PDF
47QFHA24R0001_T10_08_PRISM MATOC Solicitation Amendment 2.pdf PDF
47QFHA24R0001_T10_08_PRISM MATOC Attachment 8_PRISM Non-Key Personnel Certification.docx DOCX document
47QFHA24R0001_T10_09_DEAMS Seed Attachment 7_QASP.pdf PDF
47QFHA24R0001_T10_08_OXD RFP 2nd Set of Responses to Questions._ Final.pdf PDF
47QFHA24R0001_T10_08_PRISM MATOC Attachment 1_PWS_Amendment 2.docx DOCX document
47QFHA24R0001_T10_08_PRISM MATOC Attachment 7_MATOC Labor Rates Ranges.Amendment 2.pdf PDF
47QFHA24R0001_T10_09_DEAMS Seed Attachment 1_ PWS Amendment 2.docx DOCX document
47QFHA24R0001_T10_09_DEAMS Seed Attachment 4_Price Template Amendment 2.xlsx XLSX spreadsheet
47QFHA24R0001_T10_09_OXD Seed Attachment 1_PWS_Amendment 2.docx DOCX document
47QFHA24R0004_T10_09_DRRS RFP 2nd Set of Responses to Questions._ Final.pdf PDF
47QFHA24R0001_T10_08_PRISM MATOC Solicitation Amendment 2.pdf PDF
47QFHA24R0001_T10_08_PRISM MATOC Attachment 3_Price Labor Rates Template Amendment 2..xlsx XLSX spreadsheet
47QFHA24R0001_T10_08_DEAMS RFP 2nd Set of Responses to Questions._ Final.pdf PDF
47QFHA24R0001_T10_09_OXD Seed Attachment 3_Price Template Amendment 2.xlsx XLSX spreadsheet
47QFHA24R0004_T10_09_DRRS Seed Attachment 3__Price Template Amendment 2.xlsx XLSX spreadsheet
47QFHA24R0001_T10_08_PRISM MATOC Attachment 3_Price Labor Rates Template Amendment 1..xlsx XLSX spreadsheet
47QFHA24R0001_T10_08_PRISM MATOC Solicitation Amendment 1.pdf PDF
47QFHA24R0001_T10_08_PRISM MATOC Exhibit 2_Labor Categories and Definitions Amendment 1.pdf PDF
47QFHA24R0004_T10_09_DRRS Seed Attachment 3__Price Template Amendment 1.xlsx XLSX spreadsheet
47QFHA24R0001_T10_09_OXD Seed Exhibit 3_Labor Hour Ranges Amendment 1.pdf PDF
47QFHA24R0001_T10_09_OXD Seed Attachment 3_Price Template Amendment 1.xlsx XLSX spreadsheet
47QFHA24R0001_T10_08_PRISM MATOC Exhibit 1_MATOC RFP 1st Set of Responses to Questions Posted.pdf PDF
47QFHA24R0004_T10_09_DRRS Seed Exhibit 3_Labor Hour Ranges Amendment 1.pdf PDF
47QFHA24R0001_T10_09_DEAMS Seed Attachment 4_Price Template Amendment 1.xlsx XLSX spreadsheet
J12. 47QFHA24R0004_T10_09_DRRS Seed Attachment 2_PRS.docx DOCX document
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Number

Solicitation Section

Page Language Reference Question Text Question Nature

Response Government

Action Status

L.4

All documents provided by the offeror shall be labeled as CUI//SP- SSEL//FEDCON in the top of the document and CUI in the file name. For more information pertaining to CUI please visit https://www.archives.gov/cui.

Solicitation requires CUI, however, per Q&A released with Final, encryption is not required. Will the Government consider removing CUI language from section L.4?

Contracting No, CUI labeling is required. No Action Complete

G.3.2

The PCCM will serve as a primary contact and who will be authorized access to the evaluation for review and comment for PRISM and task orders awarded under PRISM. The PCPM shall respond promptly to past performance evaluations as documented by the PRISM CO. In addition, the PCCM will be required to identify an alternate contact that will be responsible for notifying the PRISM CO in the event the primary contact is unavailable to process evaluations within the required 30-day time frame.

The text refers to PCCM. Can the Government clarify this is the PCPM?

Contracting Corrected Document edited Complete

H.9, L.5, M.5 37, 88, 116

The PRISM CO must tailor security requirements (both facility and employee), clauses, provisions, and other applicable terms and conditions specific to each task order solicitation and award.

What are Offerors required to submit within MATOC VOLUME 5 – SYSTEMS, CERTIFICATIONS, AND CLEARANCES - Tab F: Security Clearances at the MATOC Level?

Contracting For key personnel Document edited Complete

252.215-7016 Notification to Offerors – Post Award Debriefings

(DEC 2022)

83 Post Award debriefing.

Will the government allow all awarded TO to be protestable or only protestable above a certain threshold (e.g. $20M)?

Contracting Protests will be allowed in accordance with Federal Regulations and GSA Policies

No Action Complete

Streamlined Task Order Ordering Procedures

(STOOP)

A request to provide a Price or Cost Proposal within 15 Days for the work included in the STOOP Notice or a Voluntary Removal of Fair Opportunity Response (VRFOR) regarding the STOOP Notice.

Will the government require any sort of tech approach response or orals based on the nature of the requirements of the TO? Recommend requirement be left to End User/Owner of the Task Order be able to determine what type of technical approach/response, if any, should be required specific to STOOP procedure.

Technical Included Document edited Complete

M.3.6.a

Subject Matter Experts (Minimum of 6, Maximum of 10 – KP: 3-5 Each Pool)

The Subject Matter Expertise KP requires Ten (10) or more years of experience in three or more of the P&R Pool and/or MDoDS Pool functional areas listed in Factor 3 Corporate Experience, as a SME on Professional Services contracts at the task order level. Recommend removing "as a SME on Professional Services contracts at the task order level" as SME personnel may have experience outside of service contracts within P&R or MDoDS functional areas.

Technical No No Action Complete

Streamlined Task Order Ordering Procedures (STOOP) is

Task order competition is critical to the success of this MATOC;

thus, awardees will only be allowed two (2) VRFORs per calendar year.

Do the three seed task orders in the MATOC Solicitation count against an Offeror's two (2) VRFOR per calendar year? Contracting Yes, unless a waiver is received. No Action Complete

Streamlined Task Order Ordering Procedures (STOOP) is

Task order competition is critical to the success of this MATOC;

thus, awardees will only be allowed two (2) VRFORs per calendar year.

Will the Government issue a waiver for an Offeror to no bid a Task Order that they may be precluded from supporting due to an existing OCI as to not count against the two (2) VRFOR per calendar year?

Contracting Yes. No Action Complete

G.2.4

The Contractor’s PCPM shall attend and actively participate in all meetings, including all PMR Meetings.

Will the Government please define "all meetings" as it relates to the duties of the PCPM? Technical As required Document edited Complete

G.2.3.4.

Minimum Requirements for Non-Key Personnel

Minimum requirements speak to a Mid Level LCAT. Does Mid Level equate to the Journeyman Level found in Attachment

Technical Yes, Updated Document edited Complete

G.2.3.4.

Minimum Requirements for Non-Key Personnel

Minimum Requirements for non-key personnel will be verified at the task order level.

Is it the Government's intention to only allocate the Key Personnel in M.3.6 to fill potential Senior level LCAT Positions on the Task Orders? Technical

KP is used ot qualify for base contracts and will be used at the TO level as applicable.

No Action Complete

M.3.5.

TECHNICAL

APPROACH

Factor 1: Technical Approach (Tab A) – The Technical Approach evaluation provides an assessment of the offeror’s technical capabilities to satisfy the Government’s requirements. The proposal will be evaluated based on the proposed approach to perform the work. The evaluation criteria for the Subfactors are provided below.

Will the Government consider adding Technical Approach Evaluation Criteria for the MATOC PWS Task Area responses? Recommend adding a Subfactor 0 PWS Technical Response (Tab A0) under Factor 1 Technical Approach Tab A.

Contracting No No Action Complete

M.3.5.

TECHNICAL

APPROACH

Factor 1: Technical Approach (Tab A) – The Technical Approach evaluation provides an assessment of the offeror’s technical capabilities to satisfy the Government’s requirements. The proposal will be evaluated based on the proposed approach to perform the work. The evaluation criteria for the Subfactors are provided below.

Is Factor 1 Technical Approach intended to be strictly a Management Approach summary of Subfactor 1, 2 or 3, and 4? Contracting

Responses are required for the subfactors.

No Action Complete

P&R POOL

KEY

PERSONNEL

and MDoDS

POOL KEY

PERSONNEL

106 - 108 For those Key Personnel that are pluralized, (ex. a. Sr. Systems Analysts, e.

Technical Advisors), is the Government expecting multiple KPs? If multiple, what is the minimum and maximum?

Technical See 1st Set of Responses and Amendment

Document edited Complete

M.3.4.

SECTION M

DEFINITIONS

STOOP 6. a) Task order competition is critical to the success of this MATOC; thus, awardees will only be allowed two (2) VRFORs per calendar year. Awardees must provide a written justification and seek approval from a PRISM CO if seeking 3 or more VRFORs within a calendar year. Awardees with 3 or more VRFORs within a calendar year may be placed in Dormancy status and/or receive a negative CPARS rating, without written prior approval from a PRISM CO to exceed 3 VRFORs.

Will the Government provide a waiver from this requirement should awardees choose not to prime and instead subcontract with another prime bidder, per the teaming requirements stipulated in H.12 Prime to Prime Partnering?

Contracting Yes No Action Complete

Subfactor 4:

Small Business Participation (Tab A4):

104/105

Subfactor 4: Small Business Participation (Tab A4) (h.) Additional Important Note for Other Than U.S. Small Businesses ONLY. A Small Business Subcontracting Plan is Required (FAR 52.219-9) Separate from Small Business Participation Plan for OTSB. Other than U.S. Small Business offerors must submit a subcontracting plan meeting the requirements of FAR 52.219-9 and DFARS 252.219- 7003 (or DFARS 252.219-7004 if the offeror has a comprehensive subcontracting plan). Other than U.S. Small Businesses must submit an acceptable subcontracting plan to be eligible for award.

Subcontracting Plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan.

Will the Government confirm, for other than small business (OTSB) offerors, having to submit a Small Business Subcontracting Plan meeting the requirements of FAR 52.219-9, the SB Subcontracting Plan shall be submitted within Volume 2 Responsibility as Tab E? The current structure as is, disadvantages Large Businesses by reducing page count dedicated to their Technical Approach. Alternatively, recommend removing Small Business Subcontracting Plan from the Factor 1 Technical Approach page count.

Contracting No page limit for Subcontracting Plans Document edited Complete

Subfactor 4:

Small Business Participation (Tab A4):

104/105

Subfactor 4: Small Business Participation (Tab A4): All offerors (both large and small businesses) are required to submit a Small Business Participation Plan for evaluation of the level of proposed participation of U.S. small businesses in the performance of this acquisition (as small business prime offerors or small business subcontractors) relative to the objectives and goals established herein. The Small Business Participation subfactor will be evaluated using the Small Business Rating table which will be incorporated into the overall Technical Approach rating. Evaluation Criteria Include: a.

List all proposed Subcontractors, with UEI number and CAGE code if applicable. b. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals (OTSBs are Encouraged to subcontract with SBs within the MATOC Pools). c.

The extent of commitment to use such firms. d. Identification of the complexity and variety of the work small firms are to perform. e. The extent of participation of small business prime offerors and small business subcontractors in terms of the percentage of the value of the total acquisition, or alternatively the percentage of ‘planned subcontracting’ dollars. f. The extent to which the offeror meets or exceeds the goals: DOD Small Business Program Goals (% of total contract value): Small Business: 30%, SDB 5%, HUBZONE: 3%, SDVOSB: 5%, and WOSB: 5%.

With the evaluation criteria information required within Subfactor 4: Small Business Participation, evaluation criteria (a) through (g), will the Government consider excluding the Small Business Participation (Tab A4) from the page count within Factor 1 Technical Approach?

Contracting 5 pages Document edited to Technical Approach.

Document edited Complete

Subfactor 4:

Small Business Participation (Tab A4). B.1.6.

Minimum Guarantee, Maximum Task Order Amount and Maximum MATOC Ceiling

105/5

The extent of participation of small business prime offerors and small business subcontractors in terms of the percentage of the value of the total acquisition, or alternatively the percentage of ‘planned subcontracting’ dollars. f. The extent to which the offeror meets or exceeds the goals: DOD Small Business Program Goals (% of total contract value): Small Business: 30%, SDB 5%, HUBZONE: 3%, SDVOSB: 5%, and WOSB: 5%.

Will the government please confirm for the PRISM MATOC Individual Pools (Personnel and Readiness (P&R) Pool, and the Major Department of Defense Systems (MDoDS) Pool) offerors should use the maximum dollar ceiling for the PRISM MATOC, including the option periods, if exercised, of $1,800,000,000 (B.1.6, page 6) for the development of SB Subcontracting Plan participation goals.

Contracting Percentages will be calculated based on the maximum task order amont of $400M.

Document edited Complete

G.2.3.4

Minimum Requirements for Non-Key Personnel (Minimum requirements for non-key personnel will be verified at the task order level).

Section G.2.3.4 Minimum Requirements for Non-Key Personnel includes labor categories that are not included in the Attachment 3 Price Labor Rates Template, or Exhibit 2 Labor Categories and Definitions.

Examples: a. Information Assurance (Jr., or Mid.); b. Information Technology (Jr., or Mid.); c. Management Analyst (Jr., or Mid.); e. Regulatory Compliance (Jr., or Mid.)

Please clarify the intent and meaning of RFP Section G.2.3.4 since it conflicts with Exhibit 2 Labor Categories and Definitions, Labor Rates Template.

Contracting Corrected Document edited Complete

L.1

Section L.1 incorporates FAR 52.222-46 Evaluation of Compensation for Professional Employees. Paragraph (a) of this FAR clause requires offerors to submit a total compensation plan as a part of their proposals.

Neither Section L.5 Proposal Format nor the following sections describing the specific requirements of each Proposal Volume include a requirement to submit a Compensation Plan in accordance with FAR 52.222-46.

Given that the Government has provided the Direct Labor Rate ranges that are governing offeror's proposed rates, would the Government please confirm that despite the incorporation of FAR 52.222-46, Offerors shall not submit a Compensation Plan with their proposal responses?

If not confirmed, please amend the Proposal Format and Submission Instructions to include a requirement for a Compensation Plan, specify the Volume and Tab that the Compensation Plan shall be submitted with, and amend the Evaluation criteria to explain how the Compensation Plan will be evaluated.

Contracting See 1st set of responses and amendment Document edited Complete

F.4.1

F.4.1. Deliverable and Reporting Requirements

The Deliverables and Reports required for PRISM includes Meaningful Relationship and Teaming Commitment Letters (MRCL) (TCL). The Proposal Volume requirements of Section L only reference the Teaming Commitment Letters (TCLs). Please confirm that Volume 5, Tab E shall also include Meaningful Relationship Commitment Letters (MRCLs) if applicable.

Contracting Removed MRCL Document edited Complete

22 L.10 94

If an Offeror’s Accounting System has been audited by the Defense Contract Audit Agency (DCAA), CPA/Consultant, or other Cognizant Federal Agency other than DCAA, the Offeror must attach their most current audit report of their Accounting System to the Modified Pre-Award Survey (SF 1408) template.

The RFP requests the most current audit report to be attached to the SF1408.

Audit Reports themselves do not provide evidence of an Approved Accounting System or a determination of Accounting System Adequacy. The Audit Reports are provided to DCMA, who is the agency typically cognizant over business system administration. Per DFARS 252.7502, the cognizant contracting officer (typically from DCMA) reviews the audit report and consults with the auditor;

the Cognizant contracting officer then makes the official determination of the acceptability of a contractor's accounting system, approves or disapproves the system, and/or pursues correction of any deficiencies. DCMA issues approvals and evidence of such approvals through a letter to the Contractor with their determination.

To demonstrate evidence of an approved accounting system, we believe that the Government should be requesting evidence from the offeror's Cognizant Oversight Agency stating that the Offeror's Accounting System has been found adequate and is approved in the form of a letter on official letterhead, signed and dated, rather than the audit report itself. We recommend the Government amend the RFP to change the requirement for the most current audit report to “current evidence from the Offeror’s Cognizant Oversight Agency / Cognizant Contracting Officer that their accounting system has been audited and approved.”

Hybrid Changed Document edited Complete

23 L.5 88

MATOC Volume 6 – Cost/Price o Tab A: MATOC Pricing/SF 33 o Tab B: P&R OXD Seed Pricing o Tab C: MDoDS DRRS Seed Pricing o Tab D: P&R DEAMS Seed Pricing

Would the Government consider moving the SF33 to the Volume I - General response as a separate Tab? Contracting

No. SF33 will remain with the Vol. 6, Tab A.

No page count for Volume 6

No Action Complete

24 L.5 88

MATOC Volume 6 – Cost/Price o Tab A: MATOC Pricing/SF 33 o Tab B: P&R OXD Seed Pricing o Tab C: MDoDS DRRS Seed Pricing o Tab D: P&R DEAMS Seed Pricing

Please confirm that two files may be provided to address Tab A of Volume 6;

one file with the SF33 in .pdf format, and one file with the MATOC Pricing in the template provided as RFP Attachment 3.

If not confirmed, please clarify that the SF33 shall be included as an additional tab within the MATOC Pricing Template provided as RFP Attachment 3.

Contracting No actual pricing is required on the SF33 and Volume 6 has no page count

No Action Complete

25 M.6.1 117

3. Binding Ceiling Rates: For each labor category the offeror shall provide cost element breakdown of Direct Labor, Fringe Benefits, Overhead, and General and Administrative (G&A) for the ceiling rate for that labor category. Ceiling rates will apply to all PRISM task orders, as applicable. All percentages and rates shall be rounded to two decimal places. *Note: Profit and/or fee shall NOT be included in the binding ceiling rates.

Profit and/or fee will be negotiated at the task order level.

Is it the Government's intention that the binding ceiling rates are to be used for Cost Plus Task Orders? If so, we believe that establishing fully loaded labor rate ceilings for CPFF task orders will ultimately disadvantage the Government during contract performance. By requiring offerors to commit to CPFF labor rate ceilings at the time of proposal, prior to the identification of specific tasking requirements and the associated personnel requirements, means that offerors may set ceiling rates that will not accommodate all personnel ultimately needed under future tasking, when specific needs and requirements are known. This will harm the Government's mission and goals as much as it could harm the contractor financially, as the contractor will not be willing to lose money on a CPFF task order and will only provide the resources afforded by the CPFF ceiling rate. As a result, the Government may not be able to access the types of personnel and skill sets needed on future CPFF tasking. For the Government's benefit, we recommend removing the CPFF ceiling rates, and instead relying on FFP tasking when the Government seeks to contain their costs for task orders.

Contracting Binding ceiling rates will remain. No Action Complete

L.11

For the MATOC Pricing, offerors must complete and include the MATOC Cost/Price Template listed in Section J.

Offerors shall only provide the ceiling rates for Year 1 of the contract with a Start Date of 1 July 2024.

RFP Section L.11 states that offerors shall use a Start Date of 1 July 2024 for the Year 1 rates.

RFP Attachment 3 Price Labor Rates Template lists April 2024 as the start date for Year 1.

Respectfully request that Attachment 3 be updated to align to the 1 July 2024 Start Date to be consistent with the RFP text.

Contracting Amended Document edited Complete

L.11

Completion of the Base Year and Option (OY) tabs will populate in the summary tab. Labor rates must be consistent with the binding labor rates submitted for the MATOC Base Contract Awards for the Prime contractor and the subcontractors. If a non-teaming subcontractor is being utilized for a task order requirement, the subcontractor labor rates cannot exceed those of the Prime contractor, unless approved by the PRISM CO.

The pricing instructions for the MATOC state "Labor rates must be consistent with the binding labor rates submitted for the MATOC Base Contract Awards for the Prime contractor and the subcontractors."

Please confirm that this statement applies to the Task Order pricing, and should be read as "Task Order Labor Rates must be consistent with the binding labor rates submitted for the MATOC Base Contract Awards..."

Contracting Correct Document edited Complete

28 L.11 94 For the MATOC Pricing, offerors must complete and include the MATOC Cost/Price Template listed in Section J.

Please confirm that the MATOC labor rates and supporting documentation is requested of the Prime offeror only.

If not confirmed, please clarify the exact subcontractor pricing requirements (to include which volumes and Tabs are required); and further confirm that subcontractor proposals that include proprietary cost data (direct and indirect rates) may be submitted in sealed packages.

Contracting Also applies to Teaming Subcontractors. No Action Complete

29 L.11 94 For the MATOC Pricing, offerors must complete and include the MATOC Cost/Price Template listed in Section J.

Please confirm that the Prime offeror's MATOC labor rates are considered "team-wide" ceiling rates and apply to both the prime and all subcontractors.

If not confirmed, please clarify the exact subcontractor pricing requirements (to include which volumes and Tabs are required; and further confirm that subcontractor proposals that include proprietary cost (direct and indirect rate data) may be submitted in sealed packages.

Contracting

Teaming Subcontractors must also complete the Direct Labor Rates spreadsheet. Non-teaming subcontractors can't exceed Prime ceiling rates.

No Action Complete

30 L.11.2 96

Caution: Offerors are strongly advised to provide clear and convincing rationale to support indirect rates not generated from their acceptable accounting system, otherwise the proposed indirect rate may not be considered fair and reasonable, and the Offeror may not be eligible for award regardless of the technical score.

The RFP states that Offerors are strongly advised to provide clear and convincing rationale to support indirect rates not generated from their acceptable accounting system.

Volume 6 does not appear to allow for a written price narrative. Please clarify how and where an offeror's rationale should be submitted within the Proposal volumes / Tabs and/or price templates.

Contracting Price Narrative allowed for areas requested

31 M.6.2 119

6. Pursuant FAR 15.404-1(a)(3) & (4) Cost analysis will be used to evaluate the reasonableness of individual cost elements for cost type contracts, certified cost or pricing data or other than certified cost or pricing data.

7. Pursuant FAR 15.404-1(d)(1) Cost Realism will be used to independently review and evaluate specific elements of each offeror’s proposed cost estimate to determine whether the estimated proposed cost elements are, realistic for the work to be performed; reflect a clear understanding of the requirements; and are consistent with the unique methods of performance and materials described in the offeror’s technical proposal.

The Seed task order pricing templates do not request, nor provision space for, offerors to provide the cost elements for CPFF CLINs. Please clarify the format that offerors are to use to prepare CPFF CLIN pricing - shall offerors only provide discounts to the MATOC rates as the current templates request, or shall offerors provide a cost element breakdown typical of CPFF pricing?

If a cost element breakdown is requested, please provide a format and location for where this information shall be submitted.

Contracting No additional cost elements are needed. No Action Complete

32 L.11.1 95

Offerors are prohibited from including Profit and/or Fee in the Direct Labor Rates. Profit and/or Fee will be negotiated and determined at the task order level.

The RFP states that Offerors shall not include profit / fee in the MATOC rates, and that Profit / Fee will be negotiated and determined at the task order level.

The Seed task order pricing templates do not provide any space for offerors to propose Profit or Fee as a part of their proposed price.

Please provide revised Seed task order templates that include the ability to propose Profit / Fee at the task order level.

Contracting Profit or Fee section will be added Document edited Complete

33 M.6.1 117

"The Prime is responsible for ensuring that the subcontractor provides a full and complete labor rate build that provides complete transparency for the direct labor rate component and each indirect rate applied to it."

Prior to this statement, there are no references in Section L Instructions regarding subcontractor price proposals.

Please clarify the subcontractor proposal requirements for the MATOC and (separately) the Seed Task Orders.

For example, in support of any subcontractor MATOC pricing, are subcontractors also required to submit a Volume 5 in order to provide evidence of their accounting system and proposed indirect rates?

Contracting Teaming subcontractors are also required to provide the MATOC Labor Rates attachment.

No Action Complete

34 L.11 94-95

For the MATOC Pricing, offerors must complete and include the MATOC Cost/Price Template listed in Section J.

Offerors shall only provide the ceiling rates for Year 1 of the contract with a Start Date of 1 July 2024. Ceiling rates for Years 2 through 5 will automatically be calculated for each labor category by an escalation factor embedded in the Template. Offerors shall not change the escalation factor in the Template. This escalation factor is determined by the Bureau of Labor Statistics (BLS) Economic Cost Index (ECI) and is based on the average annual BLS ECI for the previous three years from the date the PRISM solicitation is issued.

The current BLS ECI 10-year average is 3.2%.

Completion of the Base Year and Option (OY) tabs will populate in the summary tab. Labor rates must be consistent with the binding labor rates submitted for the MATOC Base Contract Awards for the Prime contractor and the subcontractors. If a non-teaming subcontractor is being utilized for a task order requirement, the subcontractor labor rates cannot exceed those of the Prime contractor, unless approved by the PRISM CO.

Please clarify whether subcontractor pricing at the MATOC level is required, or whether subcontractors will be subject to the ceiling rates established by the Prime offeror.

Contracting

Teaming subcontractors are also required to provide the MATOC Labor Rates attachment. Subcontractors that are only being used for isolated task orders will not be able to propose ceiling rates above the Prime ceiling rates.

No Action Complete

35 M.6.1 117

All direct labor rates proposed for each LCAT shall be within the Government established labor rate range (Direct Labor Rate Range) as reflected in the PRISM Direct Labor Rate Range attachment.

Please confirm that if an offeror's proposed MATOC direct labor rates are within the ranges provided, no further supporting information is required to demonstrate fair and reasonable pricing.

Contracting Supporting information may be required consistent with other requirements in the Solicitation.

No Action Complete

36 M.6.1 117

Pursuant to FAR 15.404-1(c)(2)(iii) a comparison will be done of costs proposed by the offeror for individual cost elements with (C) Other cost estimates received in response to the Government’s request, and (D) with the Independent Government cost estimates by technical personnel.

Please confirm that M.6.1, paragraph 5 is an evaluation technique that will be applied to the Seed Task Order pricing only, given that the offeror's forward pricing / approved billing rate documentation will support the fair and reasonable pricing of indirect rates and the Direct Labor rate ranges will determine the fairness and reasonableness of the direct labor rates.

Contracting Paragraph 5 will be removed. Document edited Complete

J3.

47QFHA24R000

1_T10_08_PRIS

M MATOC

Attachment 3_Price Labor Rates Template V1.

Con. Site rows 149-153

Will the Government update the Subject Matter Expert labor categories to include the Subject Matter Expert III?

Contracting Corrected Document edited Complete

J3.

47QFHA24R000

1_T10_08_PRIS

M MATOC

Attachment 3_Price Labor Rates Template V1.

Con. Site rows 149-153

Will the Government update the SOC ID # for the Subject Matter Expert II labor category?

Contracting SOC ID numbers can be found in the labor category definitions

No Action Complete

J30.

47QFHA24R000

1_T10_09_DEA

MS Seed Attachment 4_Price Template..

all tabs Will the Government update the price template to remove the OASIS references in Columns M & N?

Contracting Yes Document edited Complete

Attachment 7 MATOC Labor Rate Ranges

The Direct Labor Rate range of the Subject Matter Expert IV is significantly lower than the direct labor rate ranges of the Senior and SME Oracle consultants. We would expect that the SME categories should have the highest direct labor rate ranges to accommodate the potential wide range of expertise, undefined at the IDIQ level, that may be requested at the task order level. We respectfully request that the Government increase the DL ranges of the SME categories and to accommodate a wider variety of Subject Matter Expertise.

Contracting Increased

Document edited

Complete

M.3.6. KEY

PERSONNEL

(KP) P&R

POOL KEY

PERSONNEL

The majority of P&R pool KP have a stipulation around having Air Force experience coupled with financial management/systems experience related to DEAMS. Since this is pool-level KP for P&R, recommend removing as it a) dilutes P&R-specific functional areas experience and b) unfairly considers AF experience above other P&R strategic partners.

Technical See 1st Set of Responses and Amendment No Action

Complete

M.3.5.

TECHNICAL

APPROACH

Subfactor 2:

Management Approach to Critical Functional Areas of the P&R Pool (Tab A2):

The evaluation criteria for P&R Tab A2 are based heavily on Federal Finance or Accounting Systems, seemingly aligning with the requirements of DEAMS rather than the broader P&R Pool requirements. Will the Government consider updating evaluation criteria to more closely align with PWS requirements and/or the P&R Functional Areas cited under Factor 3 Corporate Experience?

Technical

See 1st Set of Responses and Amendment No Action

Complete

43 L.11 95

Labor rates must be consistent with the binding labor rates submitted for the MATOC Base Contract Awards for the Prime contractor and the subcontractors. If a non-teaming subcontractor is being utilized for a task order requirement, the subcontractor labor rates cannot exceed those of the Prime contractor, unless approved by the PRISM

CO.

Please define a "non-teaming subcontractor." Contracting Subcontractors not teaming with the Prime Contractor on the MATOC Proposal.

No Action Complete

RFP Solicitation Document, Section M3.5.

104 Subfactor 4 Is Tab A4 (Subfactor 4: Small Business Participation Plan) of the Technical Approach included in the 40 page limit?

Contracting See 1st set of responses and amendment Document edited Complete

RFP Solicitation Document, Section L11

94 Tab A MATOC Pricing

The solicitation states that "The current BLS ECI 10-year average is 3.2%," however the formulas for escalation in Attachment J3 are 3.02%. Can the government please issue an updated J3 attachment reflecting the 3.2% escalation rates?

Contracting Will correct Document edited Complete

RFP Solicitation Document, Section M3.6

106 Factor 2: Key Personnel Can the Government please confirm that offerors should provide only 3-5 Subject Matter Expert Key Personnel if the Offeror is only bidding on the P&R Pool?

Contracting That is correct. Document edited Complete

RFP Solicitation Document, Section M3.6

106 c. Project Managers Can the Government please confirm that offerors should provide only 1-2 Project Managers if the Offeror is only bidding on the P&R Pool?

Contracting Correct

Document edited Complete

RFP Solicitation Document, Section M3.6

106 P&R Pool Key Personnel Can the Government please confirm that an individual designated as a Key Personnel "Subject Matter Expert" may also be designated as "P&R Pool" Key Personnel?

Contracting Correct No Action Complete

RFP Solicitation Document, Section M3.6

106 Factor 2: Key Personnel Can the Government please confirm offerors should submit a maximum of 8 resumes for Key Personnel to include: Program Manager (1), Project Manager (1-2), and Subject Matter Experts (3-5)?

Contracting Bid it how you see it. No Action Complete

RFP Solicitation Document, Section M.6.1

117 MATOC Price Proposal

Numbered bullet #3 titled Binding Ceiling Rates on page 117 of the RFP states that "ceiling rates will apply to all PRISM task orders, as applicable," however, the task order pricing templates do not include any entries for profit or fee. How will the government allow profit/fee on task orders?

Contracting See response to question 32 No Action Complete

RFP Solicitation Document, Section M.6.1

116 Factor 5, MATOC Price Proposal

The PRISM PWS covers a wide range of clearance levels. To maintain market rates, many firms typically include clearance premiums for staff (direct labor rates), especially for Tier 5 Security Investigations and above. Can bidders include premiums for highly cleared staff in task order responses?

Hybrid Yes No Action Complete

52 L.6.1. 89 L.6.1. Technical and Price Proposal Submissions, P&R Submission

The solicitation current structure unduly restricts competition, in that offerors who have information technology (IT) consulting experience and capabilities relating to financial systems typically would not have experience and capabilities for the other personnel and readiness (P&R) functions, which are largely advisory and assistance services as defined in the Federal Acquisition Regulation (FAR). See FAR Subpart 37.200; Defense Federal Acquisition Regulation Supplement (DFARS) 237.201; EDP Enters., Inc., B-284533.6, 2003 CPD ¶ 93 (finding agency violated the Competition in Contracting Act by improperly consolidating food services with other logistics support functions, such as base, vehicle, and aircraft maintenance services, where there was no reasonable justification for restricting competition by consolidating these varied services).

Questions:

1. Will the Government explain the rational basis for putting the Defense Enterprise Accounting and Management System (DEAMS) Seed Task Order in the P&R Pool?

2. What is the link between P&R and financial systems?

3. Will the Government explain the consideration, if any, for not placing DEAMS in a separate pool that is focused on support for Federal financial management systems?

4. Will the Government explain if, and how, it determined that including the DEAMS Seed Task Order in the P&R Pool is necessary to satisfy the Government’s legitimate needs?

Hybrid

The Air Force is a Strategic Partner of OUSD. This requirement does not procure IT Services, it procures non-commercial Professional Services. EDP Enters., Inc., B-284533.6 involves an A- 76 procurement, competing private sector against the Government's "Most Efficient Organization" (MEO) and a "Bundled" requirement. Our Office of General Counsel and the agency HCA have all agreed that this requirement does not involve Consolidation or Bundling.

No Action Complete

53 L.6.1. 89 L.6.1. Technical and Price Proposal Submissions, P&R Submission

General Services Administration (GSA) Personnel and Readiness Infrastructure Support Management (PRISM) Multiple Award Task Order Contract (MATOC) pools involve contract consolidation, as addressed in FAR 7.107-2.

Questions:

1. Has the Senior Procurement Executive (SPE) or Chief Acquisition Officer (CAO) made a written determination that the consolidation is necessary, as prescribed in FAR 7.107-2? Per FAR 7.107-2(d)(3), “[r]eduction of administrative or personnel costs alone is not sufficient justification for consolidation unless the cost savings are expected to be at least 10 percent of the estimated contract or order value (including options) of the consolidated requirements, as determined by the SPE or CAO.” Please also note that administrative convenience is not a legal basis to justify consolidating requirements where the consolidation restricts competition (EDP Enters., B- 284533.6, supra).

2. What market research has the Government conducted that informed its decision to consolidate these requirements (FAR 7.107-2(a)(1))?

3. Did the Government identify alternative contracting approaches that would involve a lesser degree of consolidation, as required by FAR 7.107-2(a)(2)? If so, what approaches did the Government consider?

Contracting See response to question 52. No Action Complete

54 H.4., M.3.

32-33 and 99-

H.4.4. PRISM DORMANT STATUS, M.3.4. SECTION M

DEFINITIONS, STOOP

Per M.3.4, Streamlined Task Order Ordering Procedures (STOOP), paragraph 6.a:

“Task order competition is critical to the success of this MATOC; thus, awardees will only be allowed two (2) VRFORs per calendar year. Awardees must provide a written justification and seek approval from a PRISM CO if seeking 3 or more VRFORs within a calendar year. Awardees with 3 or more VRFORs within a calendar year may be placed in Dormancy status and/or receive a negative CPARS rating, without written prior approval from a PRISM CO to exceed 3 VRFORs.”

Questions:

1.Will the Government provide a list of planned task orders to allow vendors to estimate the Dormancy risk associated with bidding on PRISM, given the above restriction?

2.Will the Government confirm that no bid decisions pursuant to the following involuntary conditions are exempt from the Voluntary Removal of Fair Opportunity Response (VRFOR) process?

2 a.Organizational conflicts of interest per FAR Subpart 9.5 or General Services Acquisition Manual (GSAM) Subpart 509.5

2 b.Independence conflicts per Government Accountability Office (GAO), Government Auditing Standards 2024 Revision (also known as the Yellow Book), Chapter 3, paragraphs 3.17 through 3.108

2 c.Teaming as a subcontractor to another prime in accordance with solicitation Section H.12, Prime to Prime Partnering.

Contracting

1). A list of planned task orders can not be provided at this point. 2). No bid decisions in response to the use STOOP will represent a Voluntary Removal of Fair Opportunity Response (VRFOR) process. 3) OCI situations will not represent a VRFOR process. 4). Any decision not to bid due to Conflicts of Interest will not represent a VRFOR process. 5). If a Prime decides to act as a Subcontractor with another Prime, it will not represent a VRFOR process.

No Action Complete

55 M.3.6., M.3.7. 105-108, 111

M.3.6. MATOC KEY PERSONNEL (APPLICABLE TO BOTH

POOLS), para. a through c and

P&R POOL KEY PERSONNEL, paragraphs a.-l.

and

M.3.7, para. 7. P&R Functional Financial Management Support

(FFMS)

This solicitation is disproportionately weighted towards P&R, such that the solicitation is unduly restrictive of competition for the DEAMS Seed Task Order.

The requirements pertaining to key personnel and corporate experience are unduly restrictive of competition because six (6) of the seven (7) functional areas described in the P&R Pool are P&R-specific task areas. Only one (1) functional area is related to financial management systems.

For example, the only pool-level key personnel required to have experience supporting “two or more of the P&R functional areas listed in Factor 3 Corporate Experience leading teams” are those related to financial system experience, while the remainder of pool-level key personnel only require one.

Further, the MATOC Key Personnel Program Manager (PCPM) and the Subject Matter Experts are required to have “three or more of the P&R Pool and/or MDoDS Pool functional areas listed in Factor 3 Corporate Experience,” while the Project Managers require “two or more of the P&R Pool and/or MDoDS Pool functional areas listed in Factor 3 Corporate Experience.”

Program/Project Managers and Subject Matter Experts supporting financial management systems such as DEAMS would not reasonably be expected to have experience in any of the other six (6) P&R functional areas.

Questions:

1.Will the Government provide the rationale for requiring financial management experts to possess traditional P&R experience? Financial management or professional services vendors do not typically provide all services described across the MATOC/pool level.

2.What is the logic behind linking financial management and P&R (Front Office Support, Resiliency, etc.) expertise for purposes of the key personnel and corporate experience evaluation criteria? These key personnel requirements are unduly restrictive to vendors who are not focused on P&R and reduce the bidder pool to a limited class of very large businesses who meet all requirements.

Contracting

This is a MATOC with a broad set a requirements; thus, the government is seeking vendors capable of performing various types of professional services.

All of the evaluation criteria includes "or similar" types of language and is not restricted to OUSD P&R experience.

Some of the KPs will be reduced to "one or more P&R Functional Areas". The government will not establish a 3rd Pool.

56 M.6.2. 118 M.6.2 Seed Task Orders Utilizing STOOP

Subfactor 2 is a generic discussion of P&R Pool-level requirements and does not allow for the DEAMS Seed Task Order Performance Work Statement (PWS) to be part of the evaluation.

Questions:

1.How does the Government intend to evaluate the technical capability of the offeror specific to the DEAMS Seed Task Order PWS and their ability to provide a low-risk solution to the Government, given the generic P&R Pool-level evaluation criteria provided in Subfactor 2?

2.The DEAMS Seed Task Order was specifically exempt from STOOP in the previous draft Request for Quotation (RFQ), given the complexity of the services. What has changed in the last 90 days that has reduced the complexity of DEAMS, resulting in the use of STOOP for the seed task order?

Contracting

1). Factor 1, Subfactor 2 includes evaluation criteria essential to the type of work performed on DEAMS and similar Functional Financial Management Requirements. Nonetheless, a Task Order Specific Technical Approach will be Document edited to the evaluation criteria. 2) The government has determined that it is the most efficient use of government resources to also evaluate DEAMS through the STOOP procedures.

Document edited Complete

57 PRISM PWS, 2. 1 2. Description of Services/Introduction

The DEAMS Industry Day emphasized the Government’s need to acquire AF financial systems and AF functional accounting knowledge and expertise as it relates to the DEAMS Seed Task Order.

The PRISM PWS does not detail or define services for FFMS or AF financial systems.

Question: Because the PRISM PWS is the only PWS evaluated, will the Government clarify where the AF financial system requirement is defined in the

PRISM PWS

Technical The scope of work for DEAMS fits under tasks 2, 4 & 5 the PRISM PWS.

No Action Complete

58 M.3.7. 111 M.3.7., para. 7. P&R Functional Financial Management Support

(FFMS)

Per review of the solicitation, the Government is requesting corporate experience related to P&R FFMS.

Question: Will the Government clarify which portions of the PRISM PWS support FFMS delivery?

Hybrid See response to question 57. No Action Complete

59 M.3.6. 105-106

M.3.6. MATOC KEY PERSONNEL (APPLICABLE TO BOTH

POOLS), para. a through c

The requirement for a minimum of five (5) MATOC key personnel to bid on one (1) pool or nine (9) key personnel to bid on both pools is unduly restrictive, does not promote competition, and unfairly limits the bidder pool to those vendors who focus on P&R. This requirement provides an unfair competitive advantage to P&R vendors only and is not fair to vendors across both pools, which unreasonably restricts a vendor’s ability to fairly compete for this work.

Questions:

1.Please explain the Government’s rationale for requiring five (5) MATOC key personnel per pool?

2.Please explain how five (5) MATOC key personnel are necessary to meet the Government’s minimum needs upon initial award, given that the “government is willing to fund a PCPM for a total of 480 hours per year, but only with one or more active task orders?”

Hybrid

This is a MATOC with a broad set a requirements; thus, the government is seeking vendors capable of performing various types of professional services.

KP experience and qualifications are essential to ensuring a vendor pool capable of meeting the government's requirements.

PCPMs will be the primary POC for all active task orders being performed by a vendor.

No Action Complete

60 M.3.7., M.6.

108-114, 118-

M.3.7, para. 7. P&R Functional Financial Management Support

(FFMS)

and

M.6.2 Seed Task Orders Utilizing STOOP

FFMS, and specifically DEAMS, are not consistent with the requirements described through the remainder of the P&R Pool, nor the Major Department of Defense Systems (MDoDS) Pool. Competing FFMS/DEAMS in this manner introduces unfair risk to the Government and will result in failure to meet the Government’s needs.

Questions:

1.Will the Government explain the purpose of procuring FFMS support through a P&R vehicle?

2.Why is FFMS, and specifically DEAMS, being procured as part of a P&R pool vs. being made a third pool?

Hybrid See response to question 57. No Action Complete

61 H.5.1 33-34 H.5.1, PRISM NAICS Codes, para. 1-2

Per North American Industry Classification System (NAICS) Code description, 541330 Engineering Services is composed of:

“establishments primarily engaged in applying physical laws and principles of engineering in the design, development, and utilization of machines, materials, instruments, structures, processes, and systems. The assignments undertaken by these establishments may involve any of the following activities: provision of advice, preparation of feasibility studies, preparation of preliminary and final plans and designs, provision of technical services during the construction or installation phase, inspection and evaluation of engineering projects, and related services.”

Question: Will the Government explain how NAICS 541330 is relevant to this procurement?

Contracting This NAICS represents work that will be procured under PRISM.

No Action Complete

62 H.8.1 35 H.8.1, Acceptable Accounting System

Question: Will the Government confirm that a MATOC awardee that has an accounting system deemed to be acceptable by the Defense Contract Audit Agency (DCAA) is eligible to receive a seed task order award that contains Cost Plus Fixed Fee (CPFF) Contract Line Item Numbers (CLIN)?

Hybrid Yes No Action Complete

M.3.6 Key Personnel

105-107

Factor 2: Key Personnel

P&R POOL KEY PERSONNEL

8 of the 12 P&R Pool Key Personnel require experience in two or more of the P&R functional areas "and" expertise in Air Force or similar federal agency financial management policices, processes, and procedures specifcially in using the DEAMS or similar application.

These qualifications may not be related, and could significantly reduce the Key Personnel needed to support other areas of P&R required.

Can the Government change the requirement to state P&R functional areas "of" expertise in Air Force or similar federal agency? (vice "and")

Technical Language broadened Document edited Complete

M.3.6 Key Personnel

105-107

Factor 2: Key Personnel P&R Pool

P&R KP positions - In the final RFP the eight positions specifically targeted to DEAMs work require experience in two or more functional areas whereas all other technical key personnel for P&R and MDoDs pools only require experience in one or more functional areas.

Can the Government change the "two or more" to "one or more"? Technical Yes - see answer #6 Document edited Complete

M.3.6 Key Personnel

105-106 *Note: Additional credit will be given for key personnel with experience in proposed roles dealing with TDLs, Multi-Tenant and/or Cost type contracting.

Does this note apply to all Key Personnel Positions or just the MATOC Key Personnel (PCPM, PM, SME)?

Technical All KP positions No Action Complete

M.3.6 Key Personnel &

J9. Exhibit 2

MATOC LCATS

and Definitions

105-108

J9. Pg. 1

J9. Exhibit 2 MATOC LCATS and Definitions SENIOR: A Senior labor category has over 10 years of experience and a MAIMS degree. A Senior labor category typically works on high-visibility or mission critical aspects of a given program and performs all functional duties independently. A Senior labor category may oversee the efforts of less senior staff and/or be responsible for the efforts of all staff assigned to a specific job.

P&R POOL KEY PERSONNEL

a. Sr. Systems Analysts: Eight (8) or more years of experience in the proposed role in one or more of the P&R functional areas listed in Factor 3 Corporate Experience. Experience working on projects listed in Factor 3 Corporate Experience in the role proposed. Minimum bachelor’s degree in a relevant field of study (Engineering, Computer Science, etc.) and professional license (as applicable for the relevant field of study) preferred.

There is a disconnect between years of experience and education requirements stated in the Key Personnel Section and in Attachment J9. Exhibit 2 MATOC LCATS and Definitions. For instance, to be qualified as a Senior level of a labor category, Exhibit 2 states there is a requirement of 10 years of experience and a masters degree. This is in conflict with many of the Key Personnel positions in Section M.3.6.

We recognize the the note in Exhibit 2 says we can make exceptions during a task order proposal, but if we were to make an exception for key personnel requested in M.3.6, that would have to be done at the MATOC level.

Can the Government confirm, is this exception acceptable to be used for these MATOC level KP or are the KP requirements going to be adjusted to be in alignment with Exhibit 2?

Hybrid Will correct Document edited Complete

L.8 MATOC

VOLUME 3-

Technical Proposals o Tab B: Key Personnel (KP) (1 Page Limit per KP Resume) Can the Government consider increasing this 1 page limit to 2 pages to ensure sufficient detail for evaluation?

Contracting See 1st set of responses and amendment Document edited Complete

M3.7. FACTOR

3 CORPORATE

EXPERIENCE

Major Department of Defense Systems (MDoDS) Pool

3. MDoDS Life Cycle Support

113-114

Major Department of Defense Systems (MDoDS) Pool

3. MDoDS Life Cycle Support Life Cycle Support Evaluation Criteria Includes:

a. Experience providing program life cycle support, systems engineering and analysis, integration, network engineering, systems maintenance, testing, training, implementation, hardware/software installation, life cycle management, and documentation to support systems in a reporting enterprise.

i. Experience providing software engineering, software development, systems engineering and analysis, integration, network engineering, systems maintenance, testing, training, implementation, hardware/software installation, life cycle management.

The criteria in MDoDS Life Cycle Support for "a." and "i." in the MDoDS Pool Corporate Experience evaluation criteria are very similar.

Can the Government clarify the intended difference and understanding to be gained from the experience cited against these two evaluation factor bullets?

Contracting Deleted "I" Document edited Complete

M3.7. FACTOR

3 CORPORATE

EXPERIENCE