10 H 20 Rev1 _ Bid Spreadsheet for HUD Elevator Modernization 2024 05 08 _ Bid Sheet.pdf
PDF 107 KB Posted
- Solicitation number
- 47PM1124R0011
About this file
This document is a bid spreadsheet for the HUD Elevator Modernization project. It contains detailed pricing information for various contract line items (CLINs), including the base contract design and construction services for elevators 1-8, as well as several optional services such as modernization of elevators 9-17 and 19-22, removal and replacement of elevator doors, design and installation of elevator sump pit plumbing and electrical work, and salvage of equipment.
The bid spreadsheet is associated with Solicitation No. 47PM1124R0011 for the National Elevator Modernization Indefinite Delivery/Indefinite Quantity (IDIQ) contract issued by the General Services Administration (GSA). This unrestricted solicitation seeks to award up to six IDIQ contracts with a maximum aggregate value of $650 million over the life of the contracts. The task orders will be awarded using FAR Part 16.5 procedures. Key dates include the virtual pre-proposal conference on April 30, 2024, site visits on May 7-8, 2024, and proposal due date of May 28, 2024.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Spreadsheet for HUD Elevator Modernization Color Key
Data Input
Options Calculated Amount
GSA Fixed Amount
CLIN 1 Base Contract Design & Construction Services for Elevator 1-8 Modernization 1a Cost of the Design Work for Entire Project (except as discussed in Options 5,7,8,9) ($ - ) 1b Cost of Elevator 1-8 Modernization Work ($ - ) 1c Cost of Electrical Work (ELN Switchboards) in Car 1-8 Machine Room ($ - ) 1d Cost of Hazmat (Asbestos) Sampling and Abatement (PE 1-8, FE 18) ($ - ) 1e General Conditions ($ - ) 1f Insurance & Bonds ($ - ) 1g Overhead ($ - ) 1h Profit ($ - )
Base Bid (Lump Sum, Firm Fixed Price) ($ - ) CLIN 2 Option 1 Construction Services for Elevator 9-17 Modernization
2a Cost of Elevator 9-16 Modernization Work ($ - ) 2b Cost of Electrical Work (ELS Switchboards) in Car 9-16 Machine Room ($ - ) 2c Cost of Hazmat (Asbestos) Sampling and Abatement (PE 9-16, FE 17) ($ - ) 2d General Conditions ($ - ) 2e Insurance & Bonds ($ - ) 2f Overhead ($ - ) 2g Profit ($ - )
Option 1 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 3 Option 2 Construction Services for Elevator 19,20, 21, and 22 Modernization
3a Cost of Elevator 19,20, 21, and 22 Modernization Work ($ - ) 3b Cost of Electrical - Emergency Switchgear and Associated Work ($ - ) 3c General Conditions ($ - ) 3d Insurance & Bonds ($ - ) 3e Overhead ($ - ) 3f Profit ($ - )
Option 2 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 4 Option 3 Additional Construction Services for Elevator 1-8 Modernization
4a Cost of Removal and Replacement of Elevator 1-8 Doors ($ - ) 4b General Conditions ($ - ) 4c Insurance & Bonds ($ - ) 4d Overhead ($ - ) 4e Profit ($ - )
Option 3 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 5 Option 4 Additional Construction Services for Elevator 1-8 Modernization
5a Salvage North Machine Room Equipment for Parts ($ - ) 5b General Conditions ($ - ) 5c Insurance & Bonds ($ - ) 5d Overhead ($ - ) 5e Profit ($ - )
Option 4 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 6 Option 5 Additional Design & Construction Services for Elevator 1-8 Modernization
6a Cost of Design of Elevator Sump Pit Plumbing and Electrical (PE 1-8, FE 18) ($ - ) 6b Cost of Installation of Elevator Sump Pit Plumbing and Electrical (PE 1-8, FE 18) ($ - ) 6c General Conditions ($ - ) 6d Insurance & Bonds ($ - ) 6e Overhead ($ - ) 6f Profit ($ - )
Option 5 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 7 Option 6 Additional Design & Construction Services for Elevator 9-16 Modernization
7a Removal and Replacement of Elevator 9-16 Doors ($ - ) 7b General Conditions ($ - ) 7c Insurance & Bonds ($ - ) 7d Overhead ($ - ) 7e Profit ($ - )
Option 6 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 8 Option 7 Additional Design & Construction Services for Elevator 9-17 Modernization
8a Cost of Design of Elevator Sump Pit Plumbing and Electrical (PE 9-16, FE 17) ($ - ) 8b Cost of Installation of Elevator Sump Pit Plumbing and Electrical (PE 9-16, FE 17) ($ - ) 8c General Conditions ($ - ) 8d Insurance & Bonds ($ - ) 8e Overhead ($ - ) 8f Profit ($ - )
Option 7 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 9 Option 8 Additional Design & Construction Services for Elevator 19,20, & 21 Modernization
9a Cost of Design of Elevator Sump Pit Plumbing and Electrical (FE 19, HSE 20-21) ($ - ) 9b Cost of Installation of Elevator Sump Pit Plumbing and Electrical (FE 19, HSE 20-21) ($ - ) 9c General Conditions ($ - ) 9d Insurance & Bonds ($ - ) 9e Overhead ($ - ) 9f Profit ($ - )
Option 8 (Lump Sum, Firm Fixed Price) ($ - ) Total Evaluated Overall Price with Options ($ - )
Overhead Pricing Overhead % (Home Office) 0% Extended General Conditions Per Calendar Day (Field Office). This should be an all in loaded rate to include all costs
Notes See Statement of Work for descriptions of Options.