10 H 20 Rev1 _ Bid Spreadsheet for HUD Elevator Modernization 2024 05 08 _ Bid Sheet.pdf

PDF 107 KB Posted

Attached to
National Elevator Modernization & Construction IDIQ AND AMENDMENT 001 & 002
Solicitation number
47PM1124R0011
Issued by

About this file

This document is a bid spreadsheet for the HUD Elevator Modernization project. It contains detailed pricing information for various contract line items (CLINs), including the base contract design and construction services for elevators 1-8, as well as several optional services such as modernization of elevators 9-17 and 19-22, removal and replacement of elevator doors, design and installation of elevator sump pit plumbing and electrical work, and salvage of equipment.

The bid spreadsheet is associated with Solicitation No. 47PM1124R0011 for the National Elevator Modernization Indefinite Delivery/Indefinite Quantity (IDIQ) contract issued by the General Services Administration (GSA). This unrestricted solicitation seeks to award up to six IDIQ contracts with a maximum aggregate value of $650 million over the life of the contracts. The task orders will be awarded using FAR Part 16.5 procedures. Key dates include the virtual pre-proposal conference on April 30, 2024, site visits on May 7-8, 2024, and proposal due date of May 28, 2024.

View the file

Other files

File Type Posted
47PM1124R0011_AMEND 0002.pdf PDF
Questions and Answers as of 2024 05 16.pdf PDF
10 H 02 rev2 _ HUD Elevator Modernization DB Statement of Work_SOW_ 2024 05 08.pdf PDF
10 H 01 Rev1 _ SF18 Request for Quotation.pdf PDF
L 02 SOW Attachment 15 Spec 284620 Multiplex Fire Alarm.pdf PDF
10_NEW National Elevator IDIQ RFP and Agreement 2024 05 16.pdf PDF
10 H 02 rev 1 HUD Elevator Modernization DB SOW 2024 05 02.pdf PDF
GSA Affiliated Customer Account GACA.pdf PDF
0 SF-18 Lafayette Elevator.pdf PDF
24 Lafayette Additional Task Order Provisions and Clauses 2024 05 02.pdf PDF
3 SOW - Modernize Lafayette Elevators Task Order SOW Rev 5-6-2024.pdf PDF
HUD Loading Doc sign.jpg JPG image
10 H 24 RFI Response to Travel Path.pdf PDF
Solicitation Amendment 47PM1124R0011_0001.pdf PDF
Questions and Answers as of 2024 05 08.pdf PDF
10 H 01A rev1 Additional Task Order Provisions and Clauses.pdf PDF
25 Lafayette Additional Task Order Provisions and Clauses 2024 05 02.pdf PDF
10 H 01A rev1 - Additional Task Order Provisions and Clauses 2024 05 02.pdf PDF
Questions and Answers 2024 05 02.pdf PDF
10 H 02 rev 1 HUD Elevator Modernization DB SOW 2024 05 02.pdf PDF
09 PreProposal Conference 2024 04 30.pdf PDF
10 13 Past Performance_Customer Surveys.pdf PDF
10 11 IDIQ attachment GSA 527 Contractors Qualifications and Financial Information.pdf PDF
10 03 IDIQ attachment Section 02085 Roofing.pdf PDF
10 04 IDIQ attachment Section 02087 Removal of Bird and Bat Droppings.pdf PDF
10 02 IDIQ attachment Section 02085 Asbestos Abatement Procedures.pdf PDF
10 10 IDIQ attachment Reps and Certifications.pdf PDF
10 14 IDIQ attachment Bonding Insurance Geography Qualification Sheet_NEW.xlsx XLSX spreadsheet
Solicitation National Elevator IDIQ and agreement.pdf PDF
10 07 IDIQ attachment ADM 7002.1 GSA Smart Buildings.pdf PDF
10 12 IDIQ attachment Past Performance_NEW.xlsx XLSX spreadsheet
10 15A IDIQ attachment IDIQ Pricing Sheet_NEW.xlsx XLSX spreadsheet
10 08 IDIQ attachment CIO 2180.2 GSA Rules of Behavior for Handling Personally Identifiable Information PII.pdf PDF
10 06 IDIQ attachment PIB 18 02 Attachment 6 File Naming.pdf PDF
10 00 IDIQ attachment NDA_Document_Security.pdf PDF
10 01 IDIQ attachment Section 01546 Safety and Health Specification.pdf PDF
10 05 IDIQ attachment Section 02090 Control of Lead Based Paint Specification.pdf PDF
Solicitation Cover Letter.pdf PDF
10 15B Pricing Sheet Attachment Wage Determination.pdf PDF
10 09 ADM 2181 1 Homeland Security Presidential Directive 12 Personal Identity Verification for Contractor Employees.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Spreadsheet for HUD Elevator Modernization Color Key

Data Input

Options Calculated Amount

GSA Fixed Amount

CLIN 1 Base Contract Design & Construction Services for Elevator 1-8 Modernization 1a Cost of the Design Work for Entire Project (except as discussed in Options 5,7,8,9) ($ - ) 1b Cost of Elevator 1-8 Modernization Work ($ - ) 1c Cost of Electrical Work (ELN Switchboards) in Car 1-8 Machine Room ($ - ) 1d Cost of Hazmat (Asbestos) Sampling and Abatement (PE 1-8, FE 18) ($ - ) 1e General Conditions ($ - ) 1f Insurance & Bonds ($ - ) 1g Overhead ($ - ) 1h Profit ($ - )

Base Bid (Lump Sum, Firm Fixed Price) ($ - ) CLIN 2 Option 1 Construction Services for Elevator 9-17 Modernization

2a Cost of Elevator 9-16 Modernization Work ($ - ) 2b Cost of Electrical Work (ELS Switchboards) in Car 9-16 Machine Room ($ - ) 2c Cost of Hazmat (Asbestos) Sampling and Abatement (PE 9-16, FE 17) ($ - ) 2d General Conditions ($ - ) 2e Insurance & Bonds ($ - ) 2f Overhead ($ - ) 2g Profit ($ - )

Option 1 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 3 Option 2 Construction Services for Elevator 19,20, 21, and 22 Modernization

3a Cost of Elevator 19,20, 21, and 22 Modernization Work ($ - ) 3b Cost of Electrical - Emergency Switchgear and Associated Work ($ - ) 3c General Conditions ($ - ) 3d Insurance & Bonds ($ - ) 3e Overhead ($ - ) 3f Profit ($ - )

Option 2 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 4 Option 3 Additional Construction Services for Elevator 1-8 Modernization

4a Cost of Removal and Replacement of Elevator 1-8 Doors ($ - ) 4b General Conditions ($ - ) 4c Insurance & Bonds ($ - ) 4d Overhead ($ - ) 4e Profit ($ - )

Option 3 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 5 Option 4 Additional Construction Services for Elevator 1-8 Modernization

5a Salvage North Machine Room Equipment for Parts ($ - ) 5b General Conditions ($ - ) 5c Insurance & Bonds ($ - ) 5d Overhead ($ - ) 5e Profit ($ - )

Option 4 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 6 Option 5 Additional Design & Construction Services for Elevator 1-8 Modernization

6a Cost of Design of Elevator Sump Pit Plumbing and Electrical (PE 1-8, FE 18) ($ - ) 6b Cost of Installation of Elevator Sump Pit Plumbing and Electrical (PE 1-8, FE 18) ($ - ) 6c General Conditions ($ - ) 6d Insurance & Bonds ($ - ) 6e Overhead ($ - ) 6f Profit ($ - )

Option 5 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 7 Option 6 Additional Design & Construction Services for Elevator 9-16 Modernization

7a Removal and Replacement of Elevator 9-16 Doors ($ - ) 7b General Conditions ($ - ) 7c Insurance & Bonds ($ - ) 7d Overhead ($ - ) 7e Profit ($ - )

Option 6 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 8 Option 7 Additional Design & Construction Services for Elevator 9-17 Modernization

8a Cost of Design of Elevator Sump Pit Plumbing and Electrical (PE 9-16, FE 17) ($ - ) 8b Cost of Installation of Elevator Sump Pit Plumbing and Electrical (PE 9-16, FE 17) ($ - ) 8c General Conditions ($ - ) 8d Insurance & Bonds ($ - ) 8e Overhead ($ - ) 8f Profit ($ - )

Option 7 (Lump Sum, Firm Fixed Price) ($ - ) CLIN 9 Option 8 Additional Design & Construction Services for Elevator 19,20, & 21 Modernization

9a Cost of Design of Elevator Sump Pit Plumbing and Electrical (FE 19, HSE 20-21) ($ - ) 9b Cost of Installation of Elevator Sump Pit Plumbing and Electrical (FE 19, HSE 20-21) ($ - ) 9c General Conditions ($ - ) 9d Insurance & Bonds ($ - ) 9e Overhead ($ - ) 9f Profit ($ - )

Option 8 (Lump Sum, Firm Fixed Price) ($ - ) Total Evaluated Overall Price with Options ($ - )

Overhead Pricing Overhead % (Home Office) 0% Extended General Conditions Per Calendar Day (Field Office). This should be an all in loaded rate to include all costs

Notes See Statement of Work for descriptions of Options.

File details come from the government source that posted it. Updated .