About this file

This is an amendment to a solicitation for multiple-award indefinite delivery indefinite quantity contracts for general construction and design-build capabilities to support the installation of electric vehicle supply equipment at federal agency locations. The amendment provides clarification on several aspects of the solicitation, including replacing language related to pricing sheets, experience requirements, and past performance submissions. It also extends the question deadline to April 12th and the proposal due date to April 27th. Offerors are requested to submit details of up to four relevant construction projects for each geographic zone being proposed, with a maximum of two pages per project. The contracts will have a one-year base period and four one-year options, be set aside for small businesses, and have a maximum ordering limit of $500 million per zone. Four geographic zones are defined covering the United States and associated territories.

View the file

Other files

File Type Posted
Amendment 0004 Questions and Answers.pdf PDF
AMENDMENT 0004 ATTACHMENT A.pdf PDF
Revised Supplemental SF 1442 Pricing Sheet R1.xlsx XLSX spreadsheet
Amendment 0004 SF30.pdf PDF
Revised The Solicitation DB201.pdf PDF
The Agreement DB101 April 14 2022.pdf PDF
Statement of Work April 14 2022.pdf PDF
Revised ATTACHMENT B PRIOR EXPERIENCE WORKSHEET.docx DOCX document
Pre Proposal Conference Registration List 04072022.xlsx XLSX spreadsheet
Amendment 0003 SF30.pdf PDF
Pre Proposal Conference slides 04072022.pdf PDF
Amendment 0002 Questions and Answers.pdf PDF
Revised Supplemental SF 1442 Pricing Sheet.xlsx XLSX spreadsheet
Amendment 0002 SF30.pdf PDF
Amendment 0001 Questions and Answers.pdf PDF
AMENDMENT 0001 ATTACHMENT A.pdf PDF
Amendment 0001 SF30.pdf PDF
GSA Form 527 Contractor Qualification and Financial Information.pdf PDF
1442 47PL0122R0022.pdf PDF
The Solicitation DB201.pdf PDF
ATTACHMENT B Prior Experience Worksheet.docx DOCX document
ATTACHMENT A Past Performance Questionnaire.docx DOCX document
The Agreement DB101.pdf PDF
Statement of Work March 17 2022.pdf PDF
ATTACHMENT C Small Business Socioeconomic Category Designation Form.docx DOCX document
Supplemental SF 1442 Pricing Sheet.xlsx XLSX spreadsheet
PBS EV - Vendor SCRM Plan Template.xlsx XLSX spreadsheet
C301 Representations and Certifications.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 47PL0122R0022 Amendment #0002 Attachment A Date: April 6, 2022

Project Title: GSA PBS Governmentwide Multiple-Award IDiQ Contract(s) for General Construction with Design/Build Capabilities to Support the Installation of Electric Vehicle Supply Equipment (EVSE)

AMENDMENT 0002 ATTACHMENT A

1. See attachment titled “Amendment 0002 Questions and Answers” which is hereby incorporated into the solicitation.

2. Attachment titled, “Statement of Work March 17 2022”, section (8) is hereby deleted and replaced with the following:

“ (8) Inclusion of EVSE and Ancillary Services Within Task Order Requirements

GSA Class Deviation CD-2022-04 allows Contracting Officers to authorize contractors under these IDIQ contracts to use the Federal Supply Schedule (FSS) “Electric Vehicle Supply Equipment (EVSE) and Ancillary Services” Blanket Purchase Agreements (BPAs) for supplies and ancillary services required to support electrification of the Federal fleet, to include infrastructure.

Use of the FSS EVSE and Ancillary Services BPAs for supplies or ancillary services specified in the Task Order requirements is mandatory, unless the required supplies or ancillary services are not available on the BPAs. This includes, but is not limited to all types of electric vehicle charging terminals. In the event that a contractor determines that required supplies or ancillary services under a Task Order are not available through the FSS EVSE and Ancillary Services BPAs, contractors must notify the Task Order Contracting Officer as soon as practicable to request an exception from this requirement.

IDIQ contractors placing orders under the FSS EVSE and Ancillary Services BPAs must follow any applicable GSA ordering procedures in addition to the ordering procedures in FAR Subpart 8.4 and FAR Part 51.

Additional requirements (e.g., cybersecurity and supply chain risk management (SCRM) requirements) may be specified at the Task Order level.”

3. Attachment titled “Revised Supplemental SF1442 Pricing Sheet” hereby supersedes and replaces in its entirety (including all references to) attachment titled “Supplemental SF1442 Pricing Sheet”. The following has been updated in the attachment “Revised Supplemental SF1442 Pricing Sheet”: 1. unlocked data fields to be completed, 2. removed the rows for: Testing and Commissioning, Overhead, Profit, 3. removed instructions on overhead and profit.

4. Attachment titled “The Solicitation DB201”, Section II.B., 3.a, is hereby deleted and replaced with the following: "The technical proposal shall be limited to the following components and their respective page limitations:

Cover Page – indicating which Geographic Zone(s) the offeror is requesting to be considered for (i.e., Zone A, B, C, D), not to exceed one (1) page.

Table of Contents - Optional, not to exceed one (1) page, if provided Project Bonding Capacity – no page limitation Factor 1 – Prior Experience on Relevant Projects - for each project submitted, the completed Attachment B shall not exceed two (2) pages. If more than two

(2) pages are submitted, only the first two (2) pages will be evaluated.

Factor 2 - Past Performance on Relevant Projects - PPQs have no page limitation. A list of any other forms of performance recognition shall not exceed two (2) pages. If more than two (2) pages are submitted, only the first two (2) pages will be evaluated.

Factor 3 - Management Plan – the entire Management Plan, including resumes, shall not exceed ten (10) pages. If more than ten (10) pages are submitted, only the first ten (10) pages will be evaluated.

Factor 4 - Small Business Socioeconomic Category Designation - The Attachment C, Small Business/Socioeconomic Category Designation Form, is excluded from the page limitation.

All pages in the technical proposal must be 8.5 inches by 11 inches and use twelve (12) point font. Pages that differ from these page dimensions will not be evaluated."

5. Attachment titled “The Solicitation DB201”, section II, the requirement to submit a GSA Form 527, Contractor’s Qualifications and Financial Information, is hereby deleted in its entirety and is no longer required.

6. Attachment titled “The Solicitation DB201”, Section II.B.3.b, language is hereby changed from "SAM Unique Entity ID # and/or DUNS# for offeror" to "SAM Unique Entity ID # for the offeror”.

7. Attachment titled “The Solicitation DB201”, section II.B.4, Electronic Submission, hereby adds the following, “You may zip files if needed, to meet the email size limit of 25 MB.”

8. The following language in “The Solicitation DB201”, section II.D, Technical Proposal, Factor 1 – Prior Experience on Relevant Projects, is hereby changed From: “Using the Attachment B template, the offeror is requested to submit a detailed descriptive listing of a maximum of four (4) projects either completed or substantially completed within six (6) years of the proposal due date that are similar in nature to the anticipated type of work to be performed under these IDIQ contracts, as described in this solicitation. If more than four (4) projects are submitted, only the first four (4) will be evaluated.”

To: “Using the Attachment B template, for each Geographic Zone(s) the offeror is requesting to be considered for, the offeror is requested to submit a detailed descriptive listing of a maximum of four (4) projects either completed or substantially completed within six (6) years of the proposal due date that are similar in nature to the anticipated type of work to be performed under these IDIQ contracts, as described in this solicitation. If more than four (4) projects are submitted for each Geographic Zone(s) the offeror is requesting to be considered for, only the first four (4) will be evaluated. Projects submitted must be located within the Geographic Zone that the offeror is requesting to be considered for. For each project submitted, offerors must indicate on the Attachment B template which Geographic Zone the project is being submitted for. For each project submitted, the Attachment B template shall not exceed two

(2) pages. If more than two (2) pages are submitted, only the first two (2) pages will be evaluated.”

9. Attachment titled “The Solicitation DB201”, section II.d., Factor 2, d., sentence changes from "Also include performance recognition documents" to "Also list performance recognition documents".

10. The following language from the Attachment titled “The Solicitation DB201”, section II.F, is hereby deleted: “(4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.”

11. As a reminder, the Pre-Proposal Conference is being held on April 7, 2022 at 2:30 pm Eastern Time.

To register in advance for this meeting:

https://gsa.zoomgov.com/meeting/register/vJIsfuCvqTstHaiu5axSXFZiez6rFQUq gm0

After registering, you will receive a confirmation email containing information about joining the meeting.

12. Due date and time for questions is April 12, 2022 5:00 PM Eastern Time. Send all questions via email to: pbs-ev-idiq@gsa.gov

13. The offer due date is extended by 7 days from April 20,2022 to April 27, 2022 at 2:00 pm Eastern Time.

14. This Amendment must be acknowledged as part of your submitted proposal.

15. All other terms and conditions remain unchanged.

—--END—--

https://gsa.zoomgov.com/meeting/register/vJIsfuCvqTstHaiu5axSXFZiez6rFQUqgm0 https://gsa.zoomgov.com/meeting/register/vJIsfuCvqTstHaiu5axSXFZiez6rFQUqgm0 mailto:pbs-ev-idiq@gsa.gov

File details come from the government source that posted it. Updated .