A05 47PL0020R0001 AE SATOC IDIQ Min Submission Checklist.pdf
PDF 112 KB Posted
- Solicitation number
- 47PL0120R0036
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA Public Buildings Service Northwest/Arctic Region (R10) Acquisition Division 10PQC 400 15th
St SW
Auburn, WA 98001-6599
MINIMUM SUBMISSION REQUIREMENTS CHECKLIST
FIRM NAME:
PROPOSED FIRM/JOINT VENTURE AND/OR SUB CONSULTANT(S):
PROPOSED
Primary ZONE (circle one)
Zone A (Alaska), (professionals must be registered in AK)
Note: Please submit one Minimum Submission Requirements Checklist per each geographic area for which your firm submits a proposal.
1. COMPLETED CURRENT SF330
YES NO Comments
Completed SF330 for firm
Completed SF330 for Joint Venture / Sub- Consultants
2. MINIMUM STAFFING OF FIRM/ JOINT VENTURE ONLY
Name State(s) Registered Comments
Registered Architect or Engineer in the State proposed
Registered Architect or Engineer in the State proposed
CAD/BIM Technician N/A
CAD/BIM Technician N/A
Note: Minimum Staffing of the Firm/Joint Venture shall consist of a minimum of 3 people Note: The staffing listed in this section can be listed in #3 of this checklist, if they meet the registration requirements for #3.
registered in WA & OR) (professionals must be Oregon) Washington, Western Zone B C (Western
ID)
registered in WA, OR & (professionals must be Oregon & IDAHO) Washington, Eastern Zone C B (Eastern
A05 07/22/2020
GSA Public Buildings Service Northwest/Arctic Region (R10) Acquisition Division 10PQC 400 15th
St SW
Auburn, WA 98001-6599
3. REGISTRATION REQUIREMENTS FOR INDIVIDUALS OF FIRM, JOINT VENTURE, AND
SUB-CONSULTANTS
(place X in appropriate box) List 1 Person from the SF330 fulfilling each discipline
WA OR ID AK Name Firm
Architect
Structural Engineer
Mechanical Engineer
Civil Engineer
Electrical Engineer
Fire Protection Engineer
Other Professional
Other Professional
Note: These registration requirements of the firm/joint venture, including any sub-consultants that have been submitted with your proposal.
4. CURRENT AUTOCAD / REVIT SOFTWARE CAPABILITIES
YES NO Comments
AutoCAD (2019) and Revit (2019)
5. PROOF OF CURRENT CERTIFICATE OF ERRORS AND OMISSIONS INSURANCE
Proof of Current Insurance
6. Design Submission (Oral Presentation/Interview Phase only)
Design documentation provided
| FIRM NAMEPROPOSED FIRMJOINT VENTURE ANDOR SUB CONSULTANTS: |
| 1 COMPLETED CURRENT SF330: |
| YES: |
| YES1: |
| NO: |
| Comments: |
| Completed SF330 forJoint Venture SubConsultants: |
| FIRM JOI: |
| Completed SF330 forJoint Venture SubConsultants1: |
| Name: |
| Name1: |
| States Registered: |
| Comments1: |
| Registered Architect orEngineer in the Stateproposed: |
| Registered Architect orEngineer in the Stateproposed1: |
| fill_0: |
| CADBIM Technician: |
| NA: |
| CADBIM Technician1: |
| NA1: |
| place X in appropriate box: |
| WA: |
| AK: |
| Architect: |
| WA1: |
| OR: |
| ID: |
| AK1: |
| fill_1: |
| Name2: |
| Firm: |
| Structural Engineer: |
| fill_2: |
| fill_3: |
| fill_4: |
| fill_5: |
| fill_6: |
| fill_7: |
| fill_8: |
| fill_9: |
| fill_10: |
| fill_11: |
| fill_12: |
| fill_13: |
| fill_14: |
| fill_15: |
| fill_16: |
| fill_17: |
| fill_18: |
| fill_19: |
| fill_20: |
| fill_21: |
| Electrical Engineer: |
| fill_22: |
| fill_23: |
| fill_24: |
| fill_25: |
| fill_26: |
| fill_27: |
| fill_28: |
| fill_29: |
| fill_30: |
| fill_31: |
| fill_32: |
| fill_33: |
| fill_34: |
| fill_35: |
| fill_36: |
| fill_37: |
| fill_38: |
| fill_39: |
| fill_40: |
| fill_41: |
| ion requitted wit: |
| iremenh your: |
| ts of th: |
| e firmjoial: |
| nt ven: |
| ure including any s: |
| ubconsultants: |
| YES2: |
| YES3: |
| NO1: |
| Comments2: |
| YES4: |
| YES5: |
| NO2: |
| Comments3: |
| YES6: |
| YES7: |
| NO3: |
| Comments4: |
File details come from the government source that posted it. Updated .