A05 47PL0020R0001 AE SATOC IDIQ Min Submission Checklist.pdf

PDF 112 KB Posted

Attached to
R10 PBS, Request for A-E Qualifications (A/E SATOC IDIQs)
Solicitation number
47PL0120R0036
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Public Buildings Service Northwest/Arctic Region (R10) Acquisition Division 10PQC 400 15th

St SW

Auburn, WA 98001-6599

MINIMUM SUBMISSION REQUIREMENTS CHECKLIST

FIRM NAME:

PROPOSED FIRM/JOINT VENTURE AND/OR SUB CONSULTANT(S):

PROPOSED

Primary ZONE (circle one)

Zone A (Alaska), (professionals must be registered in AK)

Note: Please submit one Minimum Submission Requirements Checklist per each geographic area for which your firm submits a proposal.

1. COMPLETED CURRENT SF330

YES NO Comments

Completed SF330 for firm

Completed SF330 for Joint Venture / Sub- Consultants

2. MINIMUM STAFFING OF FIRM/ JOINT VENTURE ONLY

Name State(s) Registered Comments

Registered Architect or Engineer in the State proposed

Registered Architect or Engineer in the State proposed

CAD/BIM Technician N/A

CAD/BIM Technician N/A

Note: Minimum Staffing of the Firm/Joint Venture shall consist of a minimum of 3 people Note: The staffing listed in this section can be listed in #3 of this checklist, if they meet the registration requirements for #3.

registered in WA & OR) (professionals must be Oregon) Washington, Western Zone B C (Western

ID)

registered in WA, OR & (professionals must be Oregon & IDAHO) Washington, Eastern Zone C B (Eastern

A05 07/22/2020

GSA Public Buildings Service Northwest/Arctic Region (R10) Acquisition Division 10PQC 400 15th

St SW

Auburn, WA 98001-6599

3. REGISTRATION REQUIREMENTS FOR INDIVIDUALS OF FIRM, JOINT VENTURE, AND

SUB-CONSULTANTS

(place X in appropriate box) List 1 Person from the SF330 fulfilling each discipline

WA OR ID AK Name Firm

Architect

Structural Engineer

Mechanical Engineer

Civil Engineer

Electrical Engineer

Fire Protection Engineer

Other Professional

Other Professional

Note: These registration requirements of the firm/joint venture, including any sub-consultants that have been submitted with your proposal.

4. CURRENT AUTOCAD / REVIT SOFTWARE CAPABILITIES

YES NO Comments

AutoCAD (2019) and Revit (2019)

5. PROOF OF CURRENT CERTIFICATE OF ERRORS AND OMISSIONS INSURANCE

Proof of Current Insurance

6. Design Submission (Oral Presentation/Interview Phase only)

Design documentation provided

FIRM NAMEPROPOSED FIRMJOINT VENTURE ANDOR SUB CONSULTANTS:
1 COMPLETED CURRENT SF330:
YES:
YES1:
NO:
Comments:
Completed SF330 forJoint Venture SubConsultants:
FIRM JOI:
Completed SF330 forJoint Venture SubConsultants1:
Name:
Name1:
States Registered:
Comments1:
Registered Architect orEngineer in the Stateproposed:
Registered Architect orEngineer in the Stateproposed1:
fill_0:
CADBIM Technician:
NA:
CADBIM Technician1:
NA1:
place X in appropriate box:
WA:
AK:
Architect:
WA1:
OR:
ID:
AK1:
fill_1:
Name2:
Firm:
Structural Engineer:
fill_2:
fill_3:
fill_4:
fill_5:
fill_6:
fill_7:
fill_8:
fill_9:
fill_10:
fill_11:
fill_12:
fill_13:
fill_14:
fill_15:
fill_16:
fill_17:
fill_18:
fill_19:
fill_20:
fill_21:
Electrical Engineer:
fill_22:
fill_23:
fill_24:
fill_25:
fill_26:
fill_27:
fill_28:
fill_29:
fill_30:
fill_31:
fill_32:
fill_33:
fill_34:
fill_35:
fill_36:
fill_37:
fill_38:
fill_39:
fill_40:
fill_41:
ion requitted wit:
iremenh your:
ts of th:
e firmjoial:
nt ven:
ure including any s:
ubconsultants:
YES2:
YES3:
NO1:
Comments2:
YES4:
YES5:
NO2:
Comments3:
YES6:
YES7:
NO3:
Comments4:

File details come from the government source that posted it. Updated .