| File | Type | Posted |
|---|---|---|
| A07 AE RFI and Responses as of 07282020.pdf | ||
| A07 47PL0020R0001 AE IDIQ SOW 07282020.pdf | ||
| A07 AE IDIQ AMENDMENT 07282020.pdf | ||
| A07 R10 AE IDIQ RequestforQualifications_07072020.pdf | ||
| A06 47PL0020R0001 AE SATOC IDIQ SOW 07242020.pdf | ||
| 47PL0020R0001 AE SATOC IDIQ AMENDMENT A06.pdf | ||
| A05 47PL0020R0001 AE SATOC IDIQ Min Submission Checklist.pdf | ||
| 47PL0020R0001 AE SATOC IDIQ Slide Deck.pdf | ||
| 47PL0020R0001 AE SATOC IDIQ AMENDMENT A04.pdf | ||
| 47PL0020R0001 AE SATOC IDIQ Preproposal Firm Registration Log.pdf | ||
| A03 R10 AE IDIQ Request for Qualifications 07072020.pdf | ||
| AE Request for Qualifications PBS REGION 10.pdf | ||
| Checklist 20200626.docx | DOCX document | |
| 47PL0120R0036 A-E Synopsis 20200629.pdf | ||
| GSA_PBS_R10 SAES_20200624.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: 47PL0020R0001 Project: A/E SATOC IDIQ Amendment: A05 Date: 07/23/2020
Amendment A05 makes the following changes to the solicitation:
1. Offerors are instructed to remove and replace Document 2 “Minimum Submission
Requirements List” with revised document of same name dated 07/22/2020.
2. Request for Information (RFI) received through July 21, 2020 are posted with responses. GSA requests that all other RFI(s) be submitted as soon as possible and no later than close of business Monday July 27, 2020.
3. The solicitation schedule remains as posted:
Solicitation Schedule - Critical Dates
Milestone Name Date
Request for Information (RFI) Due Date 7/23/2020
Statement of Qualifications Due Date 7/30/2020
4. The “Solicitation Posting Schedule” provided in A04 is amended to read as:
Solicitation Posting Table
Posting
Number
Post Title
Post Date
1 Special Notice 05/20/20
2 Special Notice, update 1 05/28/20
3 Special Notice, update 2 6/3/2020
4 Synopsis/Solicitation, Amendment A01 6/29/2020
5 Synopsis/Solicitation, Amendment A02 7/2/2020
6 Synopsis/Solicitation, Amendment A03 7/7/2020
7 Synopsis/Solicitation, Amendment A04 7/14/2020
8 Synopsis/Solicitation, Amendment A05 7/23/2020
5. Link to public posting:
https://beta.sam.gov/opp/67e0b8ba8fe94bc29900c1be8117ce87/view#history
6. Link to Request for Information (RFI) form:
https://docs.google.com/forms/d/1bLxU4QiHL-5t7LqCCTQYFGZnt3yCAabUfel1lATrS-U/edit
47PL0020R0001
A/E SATOC IDIQ
Request for Information and Responses GSA, PBS, Northwest Arctic Region
ID Q3. Document: Request for Qualifications 3. GSA RESPONSES (RFQ)
Is there a page limitation? Under SF330, Part I, Section F - Projects, it states to list only 2 to five projects? Typically, for the SF330 projects, we list 10 projects. Also, on many occasions, I have listed a project under the required 10 projects, and it has several task orders or projects under that specific GSA contract. Area we allowed to list multiple projects under the main contract for GSA?
Offerors are instructed to review the Request for
Qualifications for page limitations. Only five projects are required.
If we do not have an office in any of the zones, can we still submit our qualifications packages? Yes
Under SF330, Part H, Is this where you want our technical expertise and Design
Philosophy an methods? Is Section H only 5 pages?
Qualifications for Technical Expertise and Design Philosophy submittal requirements. See RFQ for page limitations.
4 Do we have to use the Arial font, or can we use a similar font to Arial?
Refer to Request for Qualifications for font requirements.
5 Is there a limit on the number of resumes that we should show?
Refer to Request for Qualifications for number of resumes.
Past Performance & Technical Expertise // We are responding to this RFQ with teaming members. Are SF330’s required for the teaming members as well? Are similar projects required to be submitted for teaming members as part of the technical qualifications (5 each), or just the prime small business A/E partner (5 total)?
Refer to Request for Qualifications for required submittals. Offerors are instructed to refer to amendment A05 for remaining questions.
Response Requirements // SF330 versus written qualifications package // GSA is asking for the SF 330.
GSA requires the SF330 for Statement of Qualifications submittals.
Are you asking for the complete and extended document with resumes, and projects? or just part II? Refer to the Request for Qualifications for requirements
If we are submitting an SF330 and the Written Qualifications narrative, how detailed does the 330 need to be? Most of the info we include in Section H will now be in the Written Qualifications. Refer to the Request for Qualifications for requirements
Written Qualifications Example Projects – Are these to be the same as the projects in Section F of the 330? See Amendment A05
11 Just verifying that resumes are to be included in BOTH portions of the package. See Amendment A05
Written Qualifications Package / Technical Qualifications Package // 1) In the
"Written Qualifications Package" section of the RFQ, there is a request for 5 Similar Projects completed within the past six years. Our understanding is that this is in addition to the projects included in Section F. Confirmed.
Are the 10 projects included in Section F of the SF330 also subject to the restriction of being completed within the last 6 years, or can these projects be completed at any time, allowing to show a greater breadth of experience in the SF330.
Refer to Request for Qualifications for submittal requirements. 7/23/202016
Request for Information and Responses GSA, PBS, Northwest Arctic Region
ID Q3. Document: Request for Qualifications 3. GSA RESPONSES (RFQ)
As a related question, can the 5 projects listed in the "Written Qualifications
Package" also be included as part of the 10 projects in the SF330, as long as these projects do meet the 6 year restriction? Confirmed.
It is noted that the "Technical Qualifications Package" is to include a "Minimum
Submission Requirements Checklist."). Is this a document that will be provided in an amendment? Answered by posting of amendment A03
16 It is the first paragraph in the solicitation section listed above // Advertisement Not a question
17 This occurs in the 3rd paragraph following Factor 6: Description, Page 2 of 17 Not a question
Paragraph titled "Similar Projects:" "Requirements Under Contract:" It is the first paragraph in the solicitation section listed above Not a question
Provide project specific information for each CA key personnel proposed on this project Not a question
20 Is July 30th still the submittal date? Confirmed
If we submit for multiple zones, do we have to submit separate submittals for each zone or can we just mention in our cover letter which zones we are interested in?
Offerors are instructed to review amendment A05 for instructions for submitting for multiple zones.
It states to Ensure to include the resumes of Key Personnel for each proposed team member who will serve as Project Manager or, Designer(s) of Record/ Engineer(s) of Record (DOR and EOR), identified by individual discipline, architectural, electrical, mechanical, civil/structural, fire life safety, as well as the primary cost estimator. Can we list additional resumes and/or disciplines, such as hazardous materials, building envelope, etc.? Yes
During the presentation today, you stated that the solicitation number is now:, dated
July 7th, states 47PL0020R0002 as the solicitation number. See amendment A04
I am also confused about the original public notice date that is required on SF330, Part I. The publish date is June 29, 2020.
You mentioned today during the presentation that the size of the project is between
$250,000 and $500,000. Is that total construction costs or A/E fees?
Estimated average Estimated Cost of Constructed range is $250,000 to $500,000.
Does it matter if we don't have any offices yet in any of those locations but have the capability to work at another firm's offices that are on our team?
Contractor Teaming Arrangements are encouraged.
Refer to the Request for Qualifications
7/23/202016
Request for Information and Responses GSA, PBS, Northwest Arctic Region
ID Q3. Document: Request for Qualifications 3. GSA RESPONSES (RFQ)
Will we gain any points for having an existing A/E IDIQ with GSA or several of them in the past in other regions?
Offerors are instructed to review the Request for
Qualifications for the criteria.
For SF330 Part Ii, it states the maximum page for subconsultants is six? What if we have eight subconsultants, do we not show all Part II's? Refer to amendment A05
Then it states that we need to include a narrative for Labor capacity, operational control and workload, which is two pages and ability and capacity to perform with is three pages. Does this response go into SF330, Section H, additional information as well?
Offerors are instructed to review instructions in the
Request for Qualifications.
1) On page 12 of the RFQ, under section VIII, it states: A/E Firms submitting qualification packages under this notice must be a small business firm with a main office and/or branch office in each of the geographic zone(s) they are interested in being considered for. Failure to address all evaluation criteria and provide required data may result in rejection of the statement of qualifications. - Does this mean, for example, that if we wanted to submit for Zone B (Eastern Washington, Eastern Oregon, and the state of Idaho) we would need to have an office in Washington, Oregon and Idaho? Likewise, if we wanted to submit for Zone C (Western Washington and remaining area of the state of Oregon) would we need to have a main office or branch office in Washington and Oregon? Or, is it acceptable to have just 1 office in Oregon should we submit for Zone B or Zone C?
Offerors will need to meet minimum requirements for licensing, otherwise refer to Scope of Work amended by A05.
Can the applying firm apply for more than one zone? If so, will the applying firm need to submit 2 separate qualification packages? Yes
Do our subconsultants have to have an active registration in the System for Award Management (SAM) (www.sam.gov) at the time of offer submission? For the SF330, Part II, are subconsultants allowed to have more than one Part II? It states the maximum page for the subconsultants is six, but if we have 8 subconsultants, can we submit a Part II for each subconsultant?
Yes, subconsultants should register in the System for
Award Management
Under 2, Minimum staffing, you are only looking for three total from the prime? And you only want us to list our registrations for the Zones in A, B or C? Can we list other States that we are registered in? Is the minimum staffing just for the prime or can this be subconsultants too? For 3, Registration requirements, can we just check off which states your team members are registered in or does each one have to be registered in all of those states?
1. Refer to Request for Quals, section XX.
Registrations for each working state. Refer to 330 for list of registrations (Part II). Offerors may use 330 Form G (additional listings).
7/23/202016
ID 4. Document: A/E Statement of Services 4. GSA RESPONSES (A/E SOW)
In Section F of SF330 you ask for 2-5 projects when Section F consists of 10 projects.
Are you asking that we don't include a total of 10 projects and just the 5 projects you specify?
Confirmed GSA is requesting a minimum of five (5) projects instead of ten (10).
Are you asking that these same 2-5 projects are also included in a separate section not within the SF330 Form? and what should the title of this section be called? See above
Are you asking that our team ONLY include Architect, Mechanical, Electrical, Fire Life Safety, Civil, Structural, and Cost Estimator, and you are not asking for any specialty service sub-consultants be a part of our submittal?
Offerors are instructed to review A/E IDIQ Scope of Work posted by amendment A05. GSA is requesting core disciplines only.
In the RFQ it states that Zone C is Western Washington and remaining area of the state of Oregon, but the Checklist says Zone C is Eastern Washington/Eastern Oregon.
Which one is correct as it will alter our preference if submitted as stated in the RFQ if the Checklist is correct?
Offerors are instructed to use corrected Document 2 Minimum Submission Requirements amended by A05
On page 12 of the RFQ, under section VIII, it states: A/E Firms submitting qualification packages under this notice must be a small business firm with a main office and/or branch office in each of the geographic zone(s) they are interested in being considered for. Failure to address all evaluation criteria and provide required data may result in rejection of the statement of qualifications. - Does this mean, for example, that if we wanted to submit for Zone B (Eastern Washington, Eastern Oregon, and the state of Idaho) we would need to have an office in Washington, Oregon and Idaho? Likewise, if we wanted to submit for Zone C (Western Washington and remaining area of the state of Oregon) would we need to have a main office or branch office in Washington and Oregon? Or, is it acceptable to have just 1 office in Oregon should we submit for Zone B or Zone C?
Offerors are required to at a minimum have an office within the primary zone.
If we have applied for licenses in Zone C, but are waiting for them, can we still submit for Zone C?
Licenses are required to be active at time of award, if selected
If our company doesn't have licensed staff in the Northwest/Arctic region yet, would this disqualify us from submitting on this contract? Architectural licenses can be obtained quite quickly. Yes, licenses are required.
If our firm and our team are not interested in Zone A, is it ok if we show our team without licenses in Alaska? In the Checklist, under 2, minimum Staffing of the Prime firm, it states that a minimum of 3 people need to be listed. Do all of those people have to be registered in all zones? Can one of these listed be a subconsultant from another firm?
License has to be in place in 1 state of each zone. A license is required for stamped drawings in the state where the project is located. Yes the consultant can be the licensed personnel.
ID 5. RFI - Minimum Submission Requirements
5. GSA RESPONSES, Minimum Submission
Requirements (refers to checklist format posted in
Word doc, need to convert to excel)
In Section F of SF330 you ask for 2-5 projects when Section F consists of 10 projects. Are you asking that we don't include a total of 10 projects and just the 5 projects you specify? See SOW RFI (tab)
Are you asking that these same 2-5 projects are also included in a separate section not within the SF330 Form? and what should the title of this section be called?
See previous responses regarding number of projects to be submitted.
Do you consider the "Written Qualifications Package" all contents of our submittal
(SF330 plus other submission requirements)? Yes
Under Criterion 2, item 2 under Submission Requirements - You list three narrative items related to Specialized Experience and Technical Competence be included in Section H of the SF330, are these the only three items you want to see in Section H, or can we include additional information here?
The narrative items are amplifications to the base requirements of the SF330. Offerors are instructed to use complete the form in accordance with the instructions. The amplifications are in addition to the form.
For Criterion D - Past Performance, is the only items you want to see in this section are the past performance evaluations/reports from clients? You do not want the 2-5 projects shown again with each of these reports?
Offerors are instructed to review the requirements for the
Request for Qualifications.
Where do we insert the Minimum Submission Requirements Checklist within our final package? Cover page
7 Will we be able to ask questions at today's pre-proposal conference? No
Do we need an Alaska license for all disciplines, if we have zone B and C as primary and secondary?
Selected firms must be able to seal and sign in all zones.
Firms must have evidence of licensed professionals for the primary zone
RESPONSE REQUIREMENTS, Paragraph 4, Technical Qualifications Package shall consist of..., 1st bullet // What exactly is the Minimum Submission Requirements Checklist and where do I find this this checklist? See Document 2 updated for A05
ID 5. RFI - Minimum Submission Requirements
5. GSA RESPONSES, Minimum Submission
Requirements (refers to checklist format posted in
Word doc, need to convert to excel)
Special Notice 47PL0120R0036 - Response Requirements section // Will the following forms be issued during or after the June 3rd Virtual Meeting?
1) Minimum submission requirements (include one completed Minimum Submission Requirements Checklist)
2) Completed SF 330 OBE, posted see beta.sam
Response Requirements // In the request for qualifications, there is a requirement to submit a Minimum Submission Requirements Checklist. Is this something that the A/E is to develop and provide, or is this a form that GSA will be providing for submission?
Return completed Document 2 with Statement of
Qualifications as cover page.
12 Written qualifications and checklist // SF330 versus written qualifications package Not a question. Resubmit as RFI.
Submission instructions // Where can I find the Minimum Submission
Requirements Checklist to download? See previous response
Where it states: Discuss in the narrative how surge workload (i.e. emergencies, partial or complete redesign, secondary zone work, etc.), would be managed.
Page limit of two single sided pages for list of current projects, are you looking for a listing of the Prime's company-wide current projects or just the personnel listed in this qualifications package for the prime?
Proposed key personnel is preferred. Jessica to check back to Request for Quals and Checklist for consistency
ID 6. RFI - General Question 6. GSA RESPONSES - RFI General Questions
RFQ part IX. Section B states that sections are supposed to be clearly labeled.
1. Since it is an electronic submission do you want separate title pages to define these sections or would headers and bookmarked .pdf documents suffice?
Offerors may use title pages.
This section lists “Proof of Insurability” but is not defined as to what GSA expects within the RFQ response
Offerors to provide evidence of insurance (commitment letter)
Jessica check Request for Quals doc & amend
3 Should the labels also include Criterion 5: Geographical Consideration Yes
Will there be a list of the firms who participated/attended the online pre-proposal conference?
Yes, posted see A04
5 Will the list of interested firms become available?
Interested firms are available on beta.sam.gov
Will you please provide information regarding what exclusions apply to an Architect's gross revenue (for instance, can we exclude payments to sub-consultants, etc.)? Also, is this requirement for the last year's revenue, or for an average from the past 3 years?
Interested parties are advised to review the small business size standards in FAR 19 and requirements established by the Small Business Administration
Would GSA consider proposals from Engineering firms (NAICS 541330) meeting that small business threshold ($16.5M) that includes architectural services from a subconsultant.
Interested parties are advised to review the size standards for the
NAICS codes. The size standard for the selected NAICS code is $8.0M
"Procurement Description" - Paragraph 3 (Definition of Small Business) // Will you please provide information regarding what exclusions apply to an Architect's gross revenue (for instance, can we exclude payments to sub-consultants, etc.)? Also, is this requirement for the last year's revenue, or for an average from the past 3 years?
See response above
If we want to go for more than one zone, do we submit separate packages for each or can we indicate on the cover letter we’d like to be considered for more than one zone?
Offerors may submit Statement of Qualifications for more than one primary zone. (must meet minimum requirements by zone)
10 Was the prebid call held today (6/3) at 4pm? Will a transcript be available? OBE
You stated in the 06/04/3030: "There are changes in the actual request for
Architect/Engineer Qualifications that is expected to be issued on approximately June 4, 2020 and June 9, 2020." Will the June 9 change be coming soon?
OBE by A04, and now A05
ID 6. RFI - General Question 6. GSA RESPONSES - RFI General Questions
The solicitation states "The Written Phase (Factors 1 through 3 combined) and the Oral
Presentation/Interviews Phase (Factor 6) are weighted approximately the same (50% and 50%)" . Since this adds up to 100%......this leaves out written factors 4 & 5 for any weighting. Please review
See amendment A04 and A05.
ID
Document:
Request for
RESPONSE
S (RFQ)
Project References paragraph // DELETE paragraph below the section DELETE
Methods and Philosophy"
DUPLICATE
DELETE
n Administrati on (CA) DELETE
*Project Completion:
Projects Confirmed
Update 06/04/3030 of the DELETE
Is there a page limitation?
Duplicate to above
Under SF330, Part H, Is this
Duplicate to above
Do we have to use the Arial font, or
Duplicate to above
Is there a limit on the number of
Duplicate to above
ID
4.
Document:
A/E
4. GSA
RESPONSE
S (A/E applying firm apply for more than one zone? If so, will the applying firm need to submit 2 separate qualification packages?
one qual, more than one zone is okay, selection is based on qualification s submitted
ID
5. RFI -
Minimum
Submissio n
5. GSA
RESPONSE
S, Minimum
Submissio
Are you asking that our team
ONLY
include duplicate
For Criterion 3-5, other than the SF330 Part II, these
Jessica to look up form
Do we need to include evidence of our
Yes (Jessica double check)
Under the Checklist, # 3, do you only want
Jessica to
CHANGE
LIST to core disciplines
ID
6. RFI -
General
Question
6. GSA
RESPONSE
S - RFI
The solicitation requires the designers for the team be registered in copy answer from min req list RFI and SOW rfi
File details come from the government source that posted it. Updated .