RFIs_and_Answers.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Design Build Chiller Plant, Monroe Federal Courthouse
Solicitation number
47PH1119R0002
Issued by

About this file

RFIs and Answers

View the file

Other files

File Type Posted
Amendment_007_Form.pdf PDF
MON-16-Chiller-02FEB19_HVAC-Spec_update.pdf PDF
Equipment_Must_Have_Requirements_update.pdf PDF
Amendment_006_SF_30.pdf PDF
Amendment_005_SF_30.pdf PDF
Amendment_004_Form.pdf PDF
Proposal_Price_Breakout.docx DOCX document
Amendment_003_Form.pdf PDF
Sign_in_sheet_1.pdf PDF
Sign_in_Sheet_2.pdf PDF
Amendment_002.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M1-M5.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M11-M14.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M6-M10.pdf PDF
MON-16-Chiller-02FEB19-HVAC-Spec.pdf PDF
47PH1119R0002__Form.pdf PDF
MON-18-Phasing-01JAN14-Drawings.pdf PDF
MON-16-Chiller-02FEB19-TableContents.pdf PDF
Construction_IEQ_Management_Plan.pdf PDF
Equipment_Must_Have_Requirements.pdf PDF
Div_23_GSA__Object_Point_Naming_and_Tagging_Standard.pdf PDF
Exhibit_A_-_GSA_R7_N4_Mechanical_Project_DDC_Controls_Requirements_vers_Monroe20181031.pdf PDF
DB_Agreement.pdf PDF
Wage_Rate_LA42_4_Solicitation_attachment_Jan_19.pdf PDF
Flow_Diagram_and_Schedule_from_MON-18-100_Drawings-01JAN17.pdf PDF
Exhibit_B_-_Building_point_Histories_to_be_mapped_into_and_configured_for_Region_7_AMS.pdf PDF
Scope_of_Work_Design_Build__Monroe_Chiller_12-11-18.docx DOCX document
MON-16-Chiller-02FEB19-Elec-Spec.pdf PDF
MON-16-Chiller-02FEB19-Div-1.pdf PDF
MON-16-Chiller-02FEB19-Electrical.pdf PDF
47PH1119R0002_solicitation.pdf PDF
Exhibit_C_-_Graphic_Format_Bid_Document_20180125.pdf PDF
MON-16-Chiller-02FEB19-CoverSheet.pdf PDF
Exhibit_D-_Visio-RiserDiagramSample_31512.pdf PDF
Reps_and_Certs.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Monroe HVAC Design/Build RFI List

RFI's Deadline: March 5th Proposal Deadline: March 12th
No.CommentResponse Accepted or Further Clarification needed
1The provided chiller schedule shows a maximum size requirement of 4’6’’ x 12’6’’. Is this still requiredChiller schedule was part of an earlier design. This was provided as a courtesy, for use as a reference and no requirements are tied to them.
2Are they any equipment capacity redundancy or oversizing requirements for the chiller and cooling tower?Correct
3Are all of the exhaust fans, ductless minis splits, terminal boxes, and electric heaters shown on the schedule a part of the project scope?The project described in this document involves complete renovation and replacement of the chiller plant at the Monroe Federal Building and Courthouse in Monroe, Louisiana, including chillers, pumps, VFDs, Air Handlers, cooling tower and coils.
4Is there a specific format for the price breakout required in the Solicitation?There is no specific format for price breakout. Proposals prices should be broken out in a way that the proposer can show an understanding of the key individual costs of this project.
5Is the GSA providing a commissioning agent/company or is the contractor to provide? Credentials for this person were not requested in the Key Team Member InfoGSA will award a contract to a independent Cx contractor for this project.
6The Design Development Submissions at 35%, 75%, and 100% - will these meeting be performed via conference calls with emailed drawings and or video conference? Or will we be congregating at one meeting place?Conference calls or in person meetings are acceptable. However, GSA would suspect that all pertinent parties be present for the initial kick-off meeting for introductions.
7Has anyone requested a second site visit or is there currently a second site visit scheduled?A second visit date will be added to the solicitation as an amendment.
8Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate?Sales tax is exempt, but it is the responsibility of the contractor to accomplish the state required administration. The GSA will not provide a tax exemption certificate.
9Will the Government provide comprehensive written badging requirements for the project if badging is required?Yes
10Where will the designated parking area be for workers accessing the construction site?GSA doesn't guarantee parking for all contract employees, however, property management will allow 1 or 2 service type vehicles to park in TBD locations for tools and supplies.
11Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project? The software is compatible with the VA’s networks and is currently in use at many VA locations.All new software would have to be approved by GSA IT. This could cause delays. the prefered method would be to submit electronic files. If the files are extremely large, delivering the files on a thumb-drive would be acceptable.
12During construction in an area where the ceilings or fire suppression system will be disrupted, will NFPA 241 apply? Will the government require additional security measures beyond NFPA code such as fire watch, temporary fire alarms, adjustments to sprinkler heads, etc.Correct, the contractor shall submit a GSA form for burn permits that outline the fire watch plan.
13Does the Government have a fire alarm servicer that they currently work with? What is the name and contact information of the person or persons that will need to be coordinated with for security and fire alarm and suppression systems work and/or disruptions?This information can be provided by the facilities contractor.
14Has the work area been checked for asbestos?Asbestos is checked every 7 years, however, another check will be conducted by GSA once the work areas are clearly indentified in the desighn.
15What is the Governments’ policy if asbestos products are encountered during construction?Asbestos abatement is the responsibility of the governement.
16Does the Government currently have a 3rd party testing service for those items requiring testing or is the contractor free to locate and hire applicable testing firms?GSA will award a contract to a independent Cx contractor for this project.
17Who is responsible for the utility locations?Winning contractor is responsible for locating underground utilities.
18Due to current potentially significant tariffs being placed on the importation of building materials such as wood or steel by the current Presidential Executive Branch, if a tariff is placed after bid time and before award will the government consider a price escalation on a contract value for products such as steel or wood should the executive branch levee tariffs effecting such materials? Most of these materials would still have been Buy American compliant as the tariffs would increase pricing on all steel or wood materials, regardless of origin.Post award price adjustments may be considered if a new tariff enacted after award of the contract directly affects the cost of supplies.
19Are there any floor plans of the building showing the existing equipment, piping and ductwork?Drawings are limited, however, send a request to the CO to receive the few drawings that are available.
20What Air Handling Units are being replaced and where are they located?6&7
21Please provide the existing structural drawings for this building.No structual drawings are available.
22The existing roof is in bad shape, since there will be quite a bit of work on the roof, will the roof be replaced as a part of this project?No
23What are the means of ingress and egress for the equipment?To be determined by winning contractor
24Is this project all Phase 1 work, including the structural modifications or is this just the mechanical and electrical portion of the work?To be determined by winning contractor
25Who is the manufacturer for the light fixtures to be replaced in the basement?Unknown
26In looking thru the equipment schedule and flow diagram that was previously provided by Leidos Engineering in 2016 but we are to use as a guide; it provides information for exhaust fans, air terminal devices, VAV’s, etc. that are not shown to be “Future Project” items which leads me to believe they are to be included in the first phase. Can you confirm that anything (all equipment) not identified as “Future Projects” on the “Flow Diagram and Schedule” attachment are to be included in the first phase?The Leidos Engineering drawings are supplied by GSA as a courtesy. The design of the project is the sole responcibility of the winning contractor.
27Regarding pricing breakout, currently there are three sub-divisions, A. Replace cooling tower, B. Replace chiller(s) and air handling units (conversion of two existing split systems into two new hydronic air handling units) and C. the total project price. For pricing A and B as listed per the DB agreement, are these prices to be for only these major system components as listed and not to include other project installation items such as lighting, structure, pumps, downstream piping system modifications, interior patching, hydronic accessories? Are the other remaining items only to be captured in the total project price?When providing prices for the SF 1442 include all costs associated with each line item to include ancillary costs. Line items 1 and 2 should contain all costs that when added equal the total proposed price for the entire project.
28Should contractors price temporary cooling be factored into their estimates for the occupied facility and if so, what CLIN would be most appropriate for this cost.This is to be determined by the winning contractor. The building must have chilled water available during all normal hours of business during the cooling season for this geographical area.
29Will new LED lighting within the basement be limited to only the basement room in which the chillers and pumps are housed or also include the adjacent remainder of the mechanical basement?All areas of the chiller/bolier plant shall have new LED fixtures. Closets and offices are omitted.
30What is the exact amount of project liquidated damages as one point in the documents lists $1,770.00 and another indicates $2,370.42?Liquidated Damages for this project will be $1,770.00 a day.
31Per # 4 “Purpose”, page 1 of the Scope of Work, …replacement of chiller plant…, including … ,air handlers,…; Are all existing air handling units within the building be replaced with new hydronic air handling units or are only the two existing split system air handling units being replaced with two new hydronic air handling units?Existing AHU's 6&7 only. Design per winning firm, but the plan is to to remove Dx and add new AHU to CHWS.
32Is the intent for all piping (CS,CR,CWS,CWR & Makeup) to be replaced from basement to cooling tower?Winning firm to design per their recommendations.
33What are the badging requirements for the facility? What are the badging requirements to allow the contractor to escort subcontractors in the courthouse. Will other federal/military badges expedite the badging process?All contractors and their sub-contractors will have to apply for security clearance that includes badging. Only GSA Region 7 secuirty clearance is acceptable.
34What is the availability of performing work after regular business hours/over weekends? If this work is allowed, is a GSA escort required?After hours work is acceptable, however it will need to be coordinated with GSA. All after hour access will require adjudicated security cleared employees.

Sheet2

Sheet3